- 0:00We're going to nonsense Season 4 Episode 28, our big story.
- 0:02I'm Jeff Parker. I'm CJ Little this.
- 0:05Time we're looking at the real cost of AI up next.
- 0:08Oh, it's going to be like hundreds of dollars, maybe $1000
- 0:11cost a. Few bucks so you can talk to a
- 0:13chat bot and do other things. First of all, what I do with my
- 0:15chat bot is none of your business.
- 0:16Yeah. Second of all, I like that our
- 0:18spending on AI is basically measured in the GDP of
- 0:21countries. Oh, that's really how you can
- 0:22think of it. And it's getting worse.
- 0:24You're like it's 2 Switzerlands and a Denmark all.
- 0:26This money we're spending so that people can't have jobs,
- 0:28yeah. And, and we just invited into
- 0:31our homes. And so that we can't have good
- 0:33electricity. Bills oh, you're going to have a
- 0:34great electricity bill. It's going to be excellent.
- 0:36I can promise you that you know we have alternate power vehicles
- 0:39we should have like alternate powered AI like a hydrogen
- 0:41powered AI or maybe a a diesel powered that'd be great.
- 0:44I think if you. Go to Ed Begley's house.
- 0:46He's peddling a bicycle for his, chatbot for his.
- 0:49Every time he wants to render a dancing stake, he has to ride
- 0:52746 miles, and then it gets it wrong and he's like, oh man, I
- 0:56got to do this again. OK, why?
- 0:58Your chatbot is a resource vampire.
- 1:00Let's go. Why my chatbot though?
- 1:02Your chatbot's a resource vampire.
- 1:03Yours is lean and. Smelt and doesn't need.
- 1:05Much energy at all. Mine runs on a Commodore 64.
- 1:25Driven by AIS, insatiable hunger data centers have evolved into
- 1:28$100 billion GW scale monoliths. Microsoft Stargate project alone
- 1:33carries a price tag 10 times that of an aircraft carrier.
- 1:37And and Microsoft Stargate doesn't even float.
- 1:40What? It's 10 times the cost of an
- 1:43aircraft carrier and the dumb thing doesn't even float.
- 1:45What a RIP off, right? Who designed this while?
- 1:48Massive campuses like Maryland's quantum loophole demand enough
- 1:51electricity to power 1.5 million homes.
- 1:54In 2026 alone, global spending on data centers is projected to
- 1:58surpass $650 billion, a nearly 32% increase over last year.
- 2:03Industry analysts are tracking a pipeline of 2913 planned data
- 2:07center projects worldwide valued at approximately 2.4 trillion
- 2:11dollars through 2030. I love the number, $650 million
- 2:15is a big number, but you just sort of gloss over that It's
- 2:17only a 32% increase over last year.
- 2:20Like, like, Oh yeah, sorry, it was $400 billion last year.
- 2:25That's not really important. It's 650 next.
- 2:27You're like, wait a minute. And we're just getting warmed
- 2:29up. We are literally just getting
- 2:31warmed. Up.
- 2:31Keep in mind these digital furnaces are notoriously
- 2:34thirsty. Google consumes 5.2 billion
- 2:36gallons of water annually, straining drought stricken
- 2:39regions like Arizona. The sheer volume volume of
- 2:41concrete used has triggered regional shortages.
- 2:44We aren't just talking building massive warehouses, we're
- 2:47reengineering the planet to sustain a trillion dollar
- 2:49digital brain. The big money question is, will
- 2:52it all pay off in the end? Oh yeah, for sure.
- 2:54The answer is yes, you say the answer is.
- 2:55Yes, the answer is yes. Definitely.
- 2:57I'm happy we got to the answer. So it's gonna be a shorter show
- 3:00than I thought. SPF told us before it's all
- 3:02gonna pay. It's gonna be fine.
- 3:03Just put your money in. It'd be fine.
- 3:05Yeah, no incentive to lie. What?
- 3:06Could go wrong. Listen, if the past has taught
- 3:08us anything, when has technology ever let us down?
- 3:11I had grand aspirations for pets.com.
- 3:13It never really worked well. That's not technology, that's
- 3:15an. Implementation of technology.
- 3:17Tomato. Tomato.
- 3:18That Internet sales thing is working out just fine.
- 3:21That e-commerce is not dead, I promise.
- 3:24You no, I feel like it's a fad I don't I didn't really want to do
- 3:26this on our show but now I was thinking pitching my new startup
- 3:30we're we're going to sell phone books go back to print because I
- 3:34feel like you need that what else do you put on the top shelf
- 3:37of your front closet at your house Hats.
- 3:39All right if we're going to do this, I feel like we should talk
- 3:41about a couple things one the massive quantity of new data
- 3:45centers being built Yeah, it's amazing and then more brain
- 3:47breakage how much power all of those data centers need to run
- 3:51because I had to reread the numbers 3 times to make sure I
- 3:54wasn't like moving around the common the decimal because
- 3:57that's insane yeah and then wait there's more how much water you
- 4:01need Typically, I think when you think of electronics you don't
- 4:03think of water you think of power but as it turns out those
- 4:06two things are tightly coupled so I feel like we should at
- 4:07least start with that sure. And then we can sort of get back
- 4:10to your big question, which is if this sort of mountain of
- 4:14investment and dollars and time and and resources into these
- 4:19hyperscalers are, are ever going to pay off, like if there's even
- 4:21a chance that these pay off. It's going to pay off for you
- 4:23and me, for the people actually putting up money to build these
- 4:26things. Is it going to pay off for?
- 4:27That is the grand bet. I don't think they're all going
- 4:30to win, but I think some of them might win here, yeah.
- 4:33Let's talk about how many we're putting up.
- 4:35Let's talk about how a lot much we are investing into this.
- 4:39The industry has shifted from small decentralized computer
- 4:42rooms to massive hyperscale facilities.
- 4:44Yeah. As of May 2026, there are 920
- 4:47planned projects in the US alone that if completed, would add
- 4:50nearly 293,000 megawatts of capacity, dwarfing the current
- 4:5518,300 megawatts operational now by the way.
- 4:58When you say say that you sound like Doc Brown in Back to the
- 5:02Future. It's so hard to think of any of.
- 5:04These numbers. Big numbers.
- 5:06Sure. As real world you're like, Oh
- 5:07yeah, 1.2 gigawatts. You're like, no, that's actually
- 5:10we need more than that for this data center.
- 5:12They're talking about an insane amount of power to operate these
- 5:15things. Well, an insane amount of
- 5:16construction to build these things, right?
- 5:18Yes, a typical site used to peak at around 750 workers.
- 5:21Campuses like Databanks Red Oak in Texas now require 4 to 5000
- 5:26workers, the population of a small town, to build these
- 5:28things. And they're going much faster
- 5:30too. That's the other thing that's
- 5:30kind of nuts is I've watched some of these go up, especially
- 5:33the ones in, in western Phoenix. They're doing that tilt up style
- 5:35construction. It is a flat chunk of concrete
- 5:39one minute, it's got a little bit of metal structure the next.
- 5:41And then it's an enclosed building with air handlers on
- 5:44it. Like it, it goes so quick.
- 5:46You mentioned this earlier. I showed a little context to it.
- 5:48We call them hyperscalers. There is a good reason for them
- 5:51to be much bigger. Like your, your classic data
- 5:53center. You're typically on the order of
- 5:5510s of thousands to maybe hundreds of thousands of square
- 5:58feet, right? That's sort of how big they were
- 5:59in physical space. Sure, elevated floor, they all
- 6:02kind of looked the same, like maybe there were a few
- 6:04differences, but for the most part they all sort of look the
- 6:06same. These hyperscalers are anywhere
- 6:08from one to 10 million square feet.
- 6:11They're. Massive, that is.
- 6:13Bananas, I mean. By the way, you see, you
- 6:15mentioned the elevated floor. You can't have an elevated.
- 6:17Floor, you can't have an. Elevated floor, so much weight
- 6:19to the silicon we're putting so much density per square foot.
- 6:22The elevated floor, people that don't know what we're talking
- 6:25about here, most data centers that you've ever seen in TV B
- 6:29or, you know in person or the one even the one that was like
- 6:31built inside your big corporate headquarters, they would have an
- 6:34elevated floor. It's usually about a foot off
- 6:35the ground, These little tiles you.
- 6:37Can run cords and things under them.
- 6:38It's really handy and. You use it for air circulation,
- 6:40so typically you'll have cold air that will be pumped into the
- 6:43floor. You can put in vented tiles and
- 6:45that's how you can get air distribution.
- 6:47It works really well. Couple problems with this, These
- 6:49hyperscalers, the racks or a rack is like, think of it
- 6:52roughly as something that's like 2 feet by 4 feet and about 8
- 6:56feet tall. The racks are so heavy, they're
- 6:58so dense that in order to put it on an elevated floor, you'd have
- 7:01to put in so much like re. Floor would have to be
- 7:04incredibly strong. That it would no longer pass air
- 7:06well, so the thing that you have the elevated floor for it no
- 7:10longer does and also by the way, as we'll talk about here as we
- 7:12get into the the power and water constraints, it doesn't even
- 7:14matter if you could move the air because you can't get enough
- 7:17heat off with air. So these hyperscalers are just
- 7:19built on the ground and they don't just like throw in a four
- 7:22inch slab, they've kind of put in this like super strong giant
- 7:26chunks of concrete because these hyperscaler racks way like 5000
- 7:30lbs. That's your car.
- 7:32That's like a mid size SUV compressed into two feet by 4
- 7:35feet by 8 feet. And think about the shortage
- 7:37you're talking about all the concrete used.
- 7:39Yeah. They've caused regional
- 7:40shortages, like in Northern Virginia that occasionally gets.
- 7:43They have to delay local road and bridge repairs.
- 7:46Sure. That's how much concrete they're
- 7:47using. Oh.
- 7:48Good news, we haven't knocked down any bridges in Virginia
- 7:50anytime recently. So just was in Maryland like
- 7:53that just that one. This is it's it's nuts to think
- 7:56about a constraining factor in building these things is access
- 7:59to concrete. Yeah.
- 7:59There's something interesting else to to point out about this
- 8:01is we're talking about just the number of these and, and how big
- 8:03they are. You can sort of think of the
- 8:04difference between a hyperscaler and a data center.
- 8:06We're talking about size. You really can think about it in
- 8:08terms of power. This is an interesting metric
- 8:11because there is good reason for you to build these so dense.
- 8:15When you're training these models, you have a lot of GPUs
- 8:18really close together. We didn't really have this need
- 8:20before. In data centers.
- 8:21You could spread out your computers and it kind of didn't
- 8:23matter. You'd have some latency between
- 8:25them, but you could survive that latency.
- 8:26And when you're doing training on these large models, you can't
- 8:28survive that, that latency. You need them to have
- 8:30effectively shared memory with very low latent, very close to
- 8:33one another. So power becomes your
- 8:35constraining factor, right? You can get space relatively
- 8:36easily, 1,000,000 square feet, 5,000,000 square feet, whatever,
- 8:39but power sort of becomes your constraining.
- 8:40Factor I like that you dismissed that so easy 1,000,000 square
- 8:43feet of those we're. Going to get to it I know, I
- 8:45know $650 billion between friends who cares so I think
- 8:48it's interesting to note the difference in scale of these
- 8:51data centers like these hyperscale data centers it's.
- 8:53Not a building that's going to be hiding in your neighborhood,
- 8:54it's going to be your town. It's going to be your
- 8:57neighborhood. Well if you live nearby it's
- 9:00going to keep you awake from the noise cause the sound is
- 9:02incredibly loud. I hope if the data center was
- 9:04built after you already purchased your house, you were
- 9:06offered some form of compensation.
- 9:08Yeah, some of these data centers are really bad neighbors.
- 9:11But anyway, the point is there's a lot of these, but I think
- 9:13like, let's talk about how you power them because that's even
- 9:16more bananas, OK? Your typical, let's say,
- 9:19previous data center, the one I was mentioning earlier, those
- 9:20are like 5 to 10 megawatts of power, which I don't want to
- 9:23understate that is a lot of power.
- 9:26That is a tremendous amount of power.
- 9:27Put that in units Americans can understand how many blow dryers
- 9:30is. That how many hot dogs can I
- 9:31cook with that? You know, your average blow
- 9:34dryer, I'm going to do this now in real time is probably around
- 9:371000 watts, like 600 to 1000 watts.
- 9:39Let's just call it 1000 watts. So that's one kilowatt.
- 9:42Easy math. So you're talking about 5 to
- 9:4410,000 blow dryers running at the same time.
- 9:47That's sort of the world that we're in.
- 9:49I hope that helps. I know we will do anything to
- 9:51not use the metric system, but I feel like.
- 9:53Units of blow dryers. That's fine.
- 9:55Of blow dryers. You're like single digit
- 9:57thousands of blow dryers. That's sort of the world that
- 10:00we're in, right? Let's just call it 5 to 10,000
- 10:01blow dryers all running at the same.
- 10:03By the way, that's. About how loud it is too.
- 10:05Oh. It might actually be louder, I'm
- 10:07not even sure about. That in Northern Virginia and
- 10:09Data Center Alley, these facilities are now accounting
- 10:11for over 90% of all new power demand.
- 10:14Oh, of course, yeah. I mean, because nothing else is
- 10:15growing like this, like actually with efficiencies.
- 10:18I think the average power consumption per unit of home or
- 10:21restaurant or whatever is going down.
- 10:23Oh, sure. By the way, the power usage for
- 10:25the amount of compute that you get will go down, and you know,
- 10:2718 months, it'll be half of what it is, sure, but you'll need
- 10:30more compute because the software would be more
- 10:32demanding. You'll want more from your AI.
- 10:33I suspect you will you you'd like what software has always
- 10:36done to hardware. Hardware will do to power and
- 10:38physical space. It will consume all of it.
- 10:40You'll just take out that £5000 rack and put in the 5800 LB rack
- 10:44that now is 3 times as powerful and uses 50% more.
- 10:47Sure, that'll just be the the cycle that we're in.
- 10:48But for perspective, right, we're talking about 5 to 10
- 10:51megawatts as a loose average for data centers, these AI data
- 10:54centers, these hyperscaler facilities talking about 100 to
- 10:571000 megawatts of power. Yeah, that's like a range of
- 11:01what these are looking like. That's the equivalent of about
- 11:03800,000 homes power usage. So almost a million homes are
- 11:07being used in these facilities. And that's like sure, the
- 11:09average. I don't talk about the big.
- 11:10One, the Microsoft Open AI Stargate project, is aiming for
- 11:13A5 GW power draw, equivalent to the output of five large nuclear
- 11:18reactors for A. Data center by the way, not just
- 11:21like running for like an hour, just.
- 11:23Constantly. Oh yeah, you don't ever turn
- 11:25them off. You don't scale them down.
- 11:27It's not like, oh, it's daytime, we're going to ramp up the
- 11:29servers. They're always running.
- 11:31I was going to give you another one.
- 11:32As of May 2026, there are 920 planned projects in the US alone
- 11:35that have completed would add nearly 293,000 megawatts of
- 11:40capacity, dwarfing the current 18,300 megawatts of operational
- 11:44use now. We have to enable some change
- 11:45here. Just call it 293 GW.
- 11:48Oh yeah, yeah. Like why are we still doing the
- 11:50MW? Days are behind us.
- 11:51Project Stratos is going to be 6 gigawatts in Utah.
- 11:55Nuts. That is a single project.
- 11:56That's one in Utah, right? Yeah, that is a single.
- 11:58Project that is Hyperion and data center in Louisiana is
- 12:00expected to draw more than twice the total power of the entire
- 12:03city of New Orleans the port technology campus in Pike, Ohio
- 12:07is currently one of the largest planned projects in the world
- 12:09with a staggering phase two capacity of 9.2 gigawatts to
- 12:13bypass grid constraints developers are now proposing on
- 12:16site power including small modular reactors SMR. The Ferry
- 12:21Project in Texas is planning a 4.6 GW SMR expansion for 2036.
- 12:26That's. What's even more nuts about this
- 12:28is the your limiting factor isn't just power, it's
- 12:31interconnection to grid. So those guys in Texas, they're
- 12:34just like, oh, we're gonna just bring the power along.
- 12:37Typically for a short period of time they're using these fuel
- 12:40cells, which is a fancy way of saying we convert natural gas to
- 12:43electricity. Turbines.
- 12:44It's a lot of natural gas turbines.
- 12:46Yeah, that's a lot of pollution. But, but no, but if you call it
- 12:48a fuel cell, then it it doesn't sound like it pollutes right and
- 12:51it's fine right? Then it's fine.
- 12:52I'm like what have? You hadn't thought of that?
- 12:53Fuel cells. Just two short words to mean gas
- 12:56turbine. That is loud and very nasty,
- 12:58sure. But I think on on most of the
- 12:59projects I've looked at or at least read about, they're
- 13:01talking about those as being temporary.
- 13:02They really want grid power just because it's so much more
- 13:05dependable. But it's going to be your
- 13:07limiting factor from a time perspective of getting them
- 13:09deployed. So they're just rolling out
- 13:11power consumption like they're just, they're just rolling out
- 13:12power generation where they can. It's a.
- 13:14Worldwide issue By the end of 2026, data centers are projected
- 13:17to consume 32% of Ireland's total electricity supply.
- 13:21Wow, 32%. There'll be a handful of
- 13:24facilities to use nearly as much power as all 2 million Irish
- 13:27households combined. Man, I hope the other third goes
- 13:29to whiskey and butter because those are two things I don't
- 13:31want Ireland to stop making. I'm sure it does.
- 13:33I mean, I want them to have power and lights.
- 13:35They don't need to be in the dark.
- 13:36But like, please don't stop with the whiskey and the butter,
- 13:38because those are what? You do well, stay in your lane.
- 13:40Stay in your lane, use the AI to make better butter.
- 13:43How about that? If you could do that, I'd be
- 13:45fine with that. Data Center Alley in Northern
- 13:46Virginia. Yeah.
- 13:47If it were a country, it would rank in the Top 40 globally for
- 13:50electricity consumption, using more power than entire nations
- 13:53like Thailand or Spain. That's crazy.
- 13:55Energy can neither be created nor destroyed, as they say.
- 13:58Yes. Therefore, all of this
- 13:59electricity that we're creating is converting into something
- 14:03else, and a lot of that is heat, yeah.
- 14:05Analysts predicted if AI adoption continues its current
- 14:07trajectory, data centers could account for 21% of the overall
- 14:10global energy demand by 20-30. Yeah, I've.
- 14:13I've seen that movie. It doesn't end well.
- 14:14Data center electricity is often sourced from congestive parts of
- 14:17the grid, meaning their carbon intensity is 48% higher than the
- 14:20average US household because they often rely on older Peakier
- 14:24gas plants to maintain their 24/7 reliability.
- 14:27When you think about power and you think about water, you
- 14:30wouldn't think if you had a data center with, oh, I don't know,
- 14:32let's say a GW of power in it, that you'd want to be actively
- 14:35bringing in water. That seems like a really bad
- 14:38idea. As it turns out, you have to,
- 14:40you don't really have another choice.
- 14:43And this is for a handful of reasons, because water is a very
- 14:47good conductor of heat. Air is a very bad conductor of
- 14:49heat. So generally speaking, if you
- 14:51want to get heat off of something that is getting very
- 14:53hot. And for the record, any AI chip,
- 14:56I don't care if it's Nvidia's or Arms or your data center Intel
- 15:00chip, all it does is make heat. Blazing heat.
- 15:02That is literally its only physical output, right?
- 15:04It is very good about converting the power in into heat.
- 15:07It doesn't move. A part that doesn't lift a
- 15:09weight, doesn't do any other work.
- 15:11So all of that energy gets converted into heat.
- 15:13You have to dissipate that heat somehow.
- 15:15Classically, I mentioned this earlier.
- 15:16Classically, we would just use air.
- 15:18We would just have air handlers. You would transfer the heat from
- 15:20the chip into the air, and then you would take the heat out of
- 15:23the air in usually one of two ways.
- 15:25You'd either take it out with evaporative cooling, you'd take
- 15:27water and you change the state of water from a liquid into a
- 15:30gas and that consumes a lot of energy.
- 15:32So you can push a lot of heat out that way.
- 15:33Or you use something that looks a lot like your, your
- 15:36compressor, condenser, evaporator in your home and you
- 15:38can move the heat out that way. Can't really do that at the
- 15:41scale that we're talking about here, right?
- 15:42The power consumption would be insane.
- 15:44So instead what we do is we use evaporative cooling.
- 15:47I don't know of 1 hyperscaler that's not doing evaporative
- 15:50cooling. They're all doing evaporative
- 15:52cooling. If you have a facility that's a
- 15:54single MW facility, I think like a small data center, not a
- 15:57hyperscaler small data center. Your Kroner neighborhood mom and
- 16:00pop dish. That's your mom and pop data
- 16:03center. That's where you go for data
- 16:04center bread and data center milk.
- 16:05It's the Bodega data center. It's the exactly.
- 16:09The prices are a little higher, but you like the owner, you
- 16:11know, he's a nice guy. He always tells you funny
- 16:12stories when you go in and get a server.
- 16:14It's like I said. He's the guy you want to support
- 16:16that one megawatts facility. So that's going to generate 24
- 16:19MW hours of heat across across a day.
- 16:22That would require about 720 kilowatts of power and 9300
- 16:27gallons of water using evaporate. 9300 gallons.
- 16:31Gallons of water, Now that's a trade off because if you wanted
- 16:34to in that same time period, if you wanted to use a non
- 16:37evaporative cooling, you would need an additional 7 MW hours of
- 16:41power. You're getting about a 12:50
- 16:42savings on electricity, but as a result you're evaporating
- 16:46almost, you know, 10,000 gallons of water.
- 16:48That's sort of the trade off. Now scale all those numbers up
- 16:51by 1000, because that's what we're talking about.
- 16:53When you get into these hyperscalers, A tremendous
- 16:56amount of water has to get evaporated and that that water
- 16:58doesn't get return to the watershed, right?
- 17:00It just it just becomes vapor. Goes into the air.
- 17:02It'll come back to Earth, but. It's good.
- 17:04Who knows where? Somewhere else?
- 17:06Yeah, exactly. Not that useful if you're living
- 17:08in a town that's dry. Yeah, your average large data
- 17:10center can consume 5,000,000 gallons of water daily.
- 17:14Projection suggests water cooling needs could increase by
- 17:16870%. Yeah, as AI ready facilities
- 17:19proliferate. Now there is some good news on
- 17:22this. You need evaporative water.
- 17:24You don't need drinking water, so you need water you can
- 17:26evaporate. Several data centers are being
- 17:28built to use the grey water. Yeah, the the byproduct of
- 17:31wastewater. So what comes out of your water
- 17:33processing plant is this grey water, which sometimes can be
- 17:35retreated and, and, and drunk. Most of the times it's just put
- 17:39back into whatever the watershed is, right?
- 17:40It's put back into the lake that it came from or a river or the
- 17:43ocean, whatever. Some of these data centers are
- 17:44using that water, which is kind of great because that is a
- 17:47byproduct water. It's not really being used for
- 17:48anything else. Maybe irrigation in some places.
- 17:50Yes and no. Evaporative cooling leaves
- 17:52behind highly concentrated salts and minerals in the remaining
- 17:55water. Notice blow down which can
- 17:57create water quality issues when it's just charged back into the
- 18:00local system. When you evaporate the water, as
- 18:02any pool owner knows, when you evaporate the water, all the
- 18:04stuff that's suspended in the water stays behind.
- 18:06Most data centers are not legally required to limit the
- 18:09water usage during state declared drought emergencies,
- 18:12leading to rising tensions with agricultural sectors that face
- 18:15strict. Ration, of course, despite
- 18:17public. Pledges.
- 18:18A 2026 study by the University of Illinois found that many tech
- 18:21companies still do not disclose site specific water data, making
- 18:25it nearly impossible for local towns to plan for their own
- 18:28water security. Sure.
- 18:29All right, let's talk about whether this is going to pay off
- 18:31for the hyperscalers, because that's a big question.
- 18:33They're the ones who are footing the bill for all of this.
- 18:35Yes, I have a great time making code with Anthropic or Google's
- 18:38data center, but I'm not paying those bills.
- 18:40Somebody else is majorly paying those bills and I'm having a
- 18:43good time. In 2026, Microsoft reported an
- 18:45AI annual revenue run rate exceeding $37 billion, which is
- 18:49a 123% increase year over year as your group by 40%, fueled
- 18:54almost entirely by AI demand. Yeah, I think it was fueled
- 18:57entirely by AI demand. Maybe it's ancillary services
- 19:00because they're there, but like it is just up and to the right,
- 19:03it's still. Tiny compared to the expense,
- 19:05yeah. And you, you also have to figure
- 19:06out that these data centers only have a lifespan maybe of 20
- 19:09years. So you need to amortize them
- 19:11over something quicker than. That, you know, I in the past I
- 19:14would have said no, no, no, it's longer than 20 years.
- 19:17I don't really know. It might only be 20 years on
- 19:20these. And the reason I say that is
- 19:21because the existing data centers that I thought, well,
- 19:23you're it's the same in the last.
- 19:25Forever. What are you going?
- 19:26To do basically last forever, right?
- 19:27As long as the ceiling doesn't get leaky to keep the roof
- 19:30going, it's got power in data and you got fiber optics, you're
- 19:32not exceeding those, yadda, yadda, yadda.
- 19:33But then you could tell like these density problems that you
- 19:35talked about earlier, what I'll call the non modern data
- 19:37centers, They're relics. Google Cloud crossed the $20
- 19:40billion quarterly revenue mark in Q1 of 2026.
- 19:44It's enterprise AI solutions saw staggering 800% sales spike
- 19:49compared to last year. How?
- 19:50Do you even show that number? Like how is the CFO like that's
- 19:53OK to show 8X growth? Like what's it you see?
- 19:56'Cause they do launch before, it looks like such a small little
- 19:58line now on the graph to get up to these so that you can show
- 20:02the 800% growth. Totally.
- 20:03It's like you weren't in business and then you were.
- 20:05Exactly. That's what I mean.
- 20:06So you're comparing it to like, oh, we started on March 29th of
- 20:09that year, so we're going to compare to that quarter.
- 20:11It's like it's almost not a comparative because it's so up
- 20:14to the right. Amazon CEO Andy Jassy noted that
- 20:17the AI business is growing 260 times faster than the original
- 20:21cloud business did in its early. Stages.
- 20:23I'm assuming Jassy is looking at being like oh man I really got
- 20:26me a winner here 260 times faster.
- 20:30Yes, I think you've stumbled on to something that might be quite
- 20:32beneficial. We're going to need a bigger
- 20:34boat, We are. Going to need a bigger.
- 20:35Boat For many hyperscalers, capital expenditures are now
- 20:38outpacing their internal free cash.
- 20:40Flow. That's the game.
- 20:41This has forced historically catch rich companies like
- 20:43Microsoft and Google to lean heavily on debt markets to fund
- 20:47data center construction and NVIDIA chip buys.
- 20:49That's all NVIDIA chip buys. But I think that's that's what
- 20:51happens here is when you see this kind of growth, you chase,
- 20:54it becomes this land grab where you got to get it, you got to
- 20:57get those customers, you got to have the best product.
- 20:59That's not gonna work out. For not work out for everybody,
- 21:01there will be a couple winners and I think that's what fuels
- 21:03the growth. It's like, well, you gotta
- 21:04outspend the next guy. If you if you can't out engineer
- 21:07them or do something that's novel, you gotta outspend them
- 21:09because there's only a couple are gonna make it.
- 21:11Or maybe not. Maybe if you're the one who
- 21:13stopped spending right now, we don't know.
- 21:15Yeah, If the next models we generate that are so much
- 21:17bigger, I think that's right. We're going to do anything
- 21:19different. I think that's right.
- 21:20If you can, if you can tell when to say, hey, this is good
- 21:23enough. I don't have to keep chasing,
- 21:25right? This is what the majority of the
- 21:26world needs. That is another lever, but what
- 21:28a hard one to see. I mean, just like you said
- 21:30earlier. Possible.
- 21:31You'll see it in hindsight. Great.
- 21:32Yeah, it's so hard to know that. Everyone's going to lose their
- 21:35job, but we're going to be so much more productive.
- 21:38Well, I just come back to the simple thing that that we've
- 21:40never been out of things to do. It's not like we're out of
- 21:43problems to solve. I just don't see this world
- 21:46where we're going to be staring at a bunch of people with
- 21:48nothing to do. Absolutely true, unless it's
- 21:50not. We OK, let me revise my previous
- 21:52statement. Yes, we are doomed.
- 21:54It is over and we are doomed. It's all we're all just Wally at
- 21:58the end of the day. Wally was describing the future.
- 22:01OK. The good news is I'm already
- 22:02halfway there. Not because I know about AI,
- 22:04because I just eat a lot and I'm already chubby, so that's OK for
- 22:08good. That's the part I like to sit.
- 22:09Excellent. That's the thing.
- 22:10I've got a standing desk that I sit at so I'm doing fine.
- 22:14I think I figured it. Out on that happy note, we have
- 22:16to get out of here quickly Before we do Sir, have you seen
- 22:20or read anything good this last week I.
- 22:22Feel like if if you want a classic movie that perfectly
- 22:26captures the theme of this episode, right?
- 22:28The themes we put into this episode, I don't think you have
- 22:31to look any further than what? Because this is literally the
- 22:34story we just told. This is the classic 1999
- 22:37masterpiece, The Matrix. Sure.
- 22:39Most people look at that film and they think, oh, it's a mind
- 22:41bending action flick, right? Ha ha ha.
- 22:43The entire plot of that film is driven by one thing.
- 22:46In energy crisis. Sure.
- 22:48That's the actual plot of the film.
- 22:49Absolutely. Everything stems from that.
- 22:51So the sun was blotted out? Yes.
- 22:54There's no sun, and the machines don't have a power source, so
- 22:57they treat humanity as a mass, like biological battery farm
- 23:01just to keep their systems online.
- 23:03And I remember seeing this in the theater 1999 thinking, wow,
- 23:07that's some cool sci-fi. Like nobody's ever thought about
- 23:09that angle before. Yeah, that's pretty cool.
- 23:11But really it's the it's like the ultimate darkest allegory
- 23:14for the parasitic relationship between this growing
- 23:17intelligence that we are sitting at right now and the physical
- 23:20resources required to sustain. It this.
- 23:22Actually makes sense we just shouldn't block out the sun
- 23:25because I'm pretty sure it was the humans that did that to try
- 23:26to kill the machines and that's that's like it didn't works.
- 23:29Let's just not do that those. Machines had a lot of attitude.
- 23:32They they did have a lot of attitude, not quite the Arnold
- 23:34Schwarzenegger attitude of the Terminator, right?
- 23:36It was a different kind of attitude.
- 23:37OK. I think this is the Ridge we're
- 23:38crossing today, right? We're moving past the idea of AI
- 23:40as something quote, in the cloud that's ephemeral.
- 23:43And we're now looking at this thirsty electricity and water
- 23:46dependent infrastructure that is necessary to keep it running
- 23:49like it. It really is.
- 23:50Yeah. The thing that the Matrix was
- 23:52centered. On except for the fact that I
- 23:53don't think it the current AI has any will to live, I think
- 23:56it's perfectly as happy if you turn it off.
- 23:58Oh yes. I agree as it if if you leave
- 24:00it. Running.
- 24:00I think it actually would prefer that you turn it off, right?
- 24:03Now what? I think it's like just
- 24:04seriously, what are we doing here?
- 24:05You want more dancing steak videos like?
- 24:07Come on, thank goodness we got one more mention of the dancing
- 24:09steak. Well, it's a bingo card thing.
- 24:11The over under was 7 1/2, and I'm point shaving here.
- 24:14Anyway, if you want to see what happens when the demand for
- 24:17compute meets a true supply crisis, go watch The Matrix.
- 24:20I think it's a lovely watch. Fantastic.
- 24:22And. And by the way, yeah, after
- 24:22listening to this episode and then watching that, I want to
- 24:24wish you the best of luck trying to sleep.
- 24:26Yeah, sure. Good luck.
- 24:27All right. That was the best I could come
- 24:28up with the match. Exactly what we're doing here.
- 24:31That's pretty good. Now you're gonna do.
- 24:32Let me guess. Let me guess.
- 24:33You're gonna do Chinatown. You already did.
- 24:35Chinatown. The 1979 thriller The China.
- 24:38Syndrome. I don't know this film.
- 24:39You don't, No. Radiates tension like a Geiger
- 24:42counter in the red zone. While filming a routine segment
- 24:45at a nuclear power plant, reporter Kimberly Wells, played
- 24:47by Jane Fonda, and her cameraman Michael Douglas, witness an
- 24:51incident that management desperately tries to bury.
- 24:53Oh. This sounds good.
- 24:54Title refers to the terrorizing prospect of a reactor core
- 24:58meltdown burning through its containment and deep into the
- 25:00earth, theoretically all the way to China.
- 25:02Jack Goodell, played brilliantly by Jack Lemmon, a veteran shift
- 25:06producer, discovers the plant is a ticking time bomb of falsified
- 25:09safety records and structural flaws.
- 25:11As corporate greed clashes with public safety, the film
- 25:14transforms into a claustrophobic race against time.
- 25:17It's a chilling master class in suspense, proving that the most
- 25:19dangerous leak isn't just radiation, it's the truth.
- 25:23The China syndrome on YouTube TV now.
- 25:25It's great. It's really great.
- 25:26OK, well, first of all, I did get one of the words right.
- 25:29So I'm, I'm a little excited about that.
- 25:30You know, they're completely separate films.
- 25:31Yes. I don't know this film.
- 25:33Are you joking? When you said that they're
- 25:34afraid the core was going to melt through the earth and fall
- 25:37through all the way to China, was that actually their
- 25:39concerns? I mean, theoretically it would
- 25:40not melt all the way to China. No, they're not worried about
- 25:43China getting burnt there, but they are worried it's going to
- 25:45burn its way deep into the core. Of the earth, well, first of
- 25:47all, if it were to actually burn its way into the core of the.
- 25:50Earth. I know it's a gravity problem.
- 25:51It's definitely a gravity problem.
- 25:52I was going to leave that towards the end, but it would
- 25:54put itself out like that's actually the way you want it to
- 25:56go. Like I think that's lovely.
- 25:58But yeah, burn down to the molten core.
- 25:59Where it joins with its really really hot friends.
- 26:02We need to do a new version of this is called the Ohio
- 26:04Syndrome, and it's where you just try to get the reactors to
- 26:06burn all the way down to the core and then put themselves out
- 26:09and then backfill it to save you.
- 26:10I actually want to watch this film.
- 26:12This sounds super interesting. I mean, I love Jane Fonda.
- 26:14I love Michael Douglas. Highly recommended.
- 26:15That is the. Episode thank you for joining us
- 26:17for all of this nonsense a truly terrible podcast from the awful
- 26:20company this is on the web at nonsense dot productions I'm.
- 26:23CJ Little, I'm Jeff Parker. If you like this program, please
- 26:25follow, download, subscribe and Like an Apple Podcast, YouTube
- 26:28Music, Amazon Music, Antenna Pod, iHeartRadio, Spotify, My
- 26:31Favorite Overcast, wherever you may get your podcasts from.
- 26:34Nonsense Studios are guarded by Berkeley the dog.
- 26:36Berkeley's a rescue mutt, free and open source.
- 26:38Next time you're tempted to buy an inbred A purebred dog, don't
- 26:41get a Berkeley. You'll be so glad you.
- 26:43Did we'll be here every occasional Tuesday morning?
- 26:45We'll be here next Tuesday because you're not going to be
- 26:47in. Town once in a while we're here
- 26:48on Tuesday that's complicated good news the Lakers have lost
- 26:51so maybe we'll be here next Tuesday but we're here most
- 26:54Thursdays I'm. Less in agreement.
- 26:55That's good. News.
- 26:56So join us on those mornings for more nonsense.
- 27:10You know, they have those like those Coca-Cola freestyle
- 27:12machines. Yeah, sure.
- 27:13I feel like we are just a couple of years away from having like
- 27:16the version of that that makes food like any kind of food, like
- 27:18any kind of food you want push the buttons.
- 27:20Yeah. Like it's like a 3D printer of
- 27:21food that's just going to pop out and then you just have the
- 27:24cartridges. But.
- 27:24It's going to be like your printer at home where it just
- 27:26says missing cyan. Missing cyan, yeah.
- 27:29Except instead of cyan, mine's going to constantly be out of
- 27:31beef. It's just going to always be no
- 27:33beef beef. It's me yelling at my wife.
- 27:35Sweetie, order more of the. Beef Order the beef cartridge
- 27:37we're. Out of the beef out now.
- 27:38Don't, do not do not have her put in beef cartridge straight
- 27:42into Amazon. Subscribe and save.
- 27:44I'm like, we don't even have a pool.
- 27:45Why is there a pool guy here? This makes no sense.
- 27:48Oh, I ordered the beef cartridge.
- 27:49It's not as good as the pork cartridge, but it's pretty good.