Latest / Mechanical Engineering Made Simple / (#20) Lean Principles -Drag the Factory Floor to the Engineering Office
Transcript
- 0:00Welcome back, design junkies, to mechanical Engineering Made
- 0:03Simple. So today we're going to try
- 0:04something a little different. We're taking lean principles,
- 0:07you know, this stuff usually associated with the factory
- 0:09floor and dragging them kicking and screaming into the
- 0:12engineering office. We're diving into lean
- 0:15engineering. Basically, how do you apply that
- 0:18relentless focus on cutting waste and boosting value across
- 0:21the entire product development process?
- 0:23Exactly. It's about seeing the whole
- 0:25operation from that first glimmer of an idea all the way
- 0:28to shipping the product as well. A single complex system.
- 0:32Right, not just optimizing isolated parts.
- 0:35Because historically, yes, Lean was about streamlining the
- 0:38assembly line. But we've come to realize that
- 0:41the biggest cost commitments, the really impactful ones, they
- 0:44happen way before anyone picks up a wrench.
- 0:46So our core mission here is really about accelerating the
- 0:49whole cycle time, getting rid of waste, yes, but also setting up
- 0:53really efficient standard processes.
- 0:55And this is where you start hearing about things like
- 0:58integrated product and process development IPCD.
- 1:00IPPD sounds a bit like jargon, maybe.
- 1:04Let's make it real. We're talking about pulling
- 1:06everything together. Design specs, manufacturing
- 1:09needs, supply chain logistics right from the get go, aren't
- 1:13we? Pretty much integration from day
- 1:15one. OK, so let's start at the
- 1:17beginning. Product development or PD?
- 1:20What is it? Well, the way I see it, PD
- 1:22starts the moment you spot a gap in the market, some opportunity,
- 1:26and it doesn't really stop until that product is being made, sold
- 1:30and crucially, delivered successfully.
- 1:33It's the whole 9 yards. It is the whole marathon.
- 1:36And if PDO and marathon, the main thing you're actually
- 1:38creating along the way is, well, it's uncertainty reduction
- 1:41uncertainty. Reduction.
- 1:42OK, unpack that a bit. Think about it.
- 1:44Every activity in product development, every design
- 1:46choice, every simulation, every prototype test, it's
- 1:49fundamentally about gathering information to kill risk.
- 1:52Every dollar spent, every hour invested should be chipping away
- 1:55at what you don't know. So as time goes on, that risk
- 1:58level should be dropping sharply, while the value you're
- 2:00locking in should be climbing just as fast.
- 2:03That makes sense, but it raises the question of where this
- 2:05uncertainty actually comes from. Risk is about the unknowns.
- 2:08Right. And engineers, project managers,
- 2:11they're used to dealing with the known unknowns.
- 2:13You know, the tests they know they need to run, the data
- 2:15points they know they're missing.
- 2:17That's part of the plan. But the real curve balls, ah.
- 2:20Those are the unknown unknowns, the things you didn't even know
- 2:23you didn't know. Maybe an unexpected material
- 2:26interaction, a sudden shift in regulations, or a competitor
- 2:30coming out of left field. Lean PD tries to use really fast
- 2:34feedback and concurrent work to surface those nasty surprises as
- 2:39early as humanly possible. And timing is just, it's
- 2:43everything here, isn't it? Because design so
- 2:46interconnected, those early decisions have these huge ripple
- 2:49effects. I remember seeing this classic
- 2:50graph. Oh, that 3 curve graph.
- 2:52It's practically scripture in systems engineering.
- 2:54It shows ease of change plummeting almost immediately
- 2:57right there in the conceptual phase.
- 2:58So making changes is cheap early on.
- 3:00Dirt cheap you can pivot the whole design for almost nothing,
- 3:05but flipside cost incurred the money you're actually spending
- 3:08and more importantly, life cycle cost committed the LCC.
- 3:13They spike upwards incredibly steeply right then during
- 3:17preliminary design. An engineer choosing, say, a
- 3:20slightly cheaper component today might unknowingly commit the
- 3:23company to hundreds of thousands in extra maintenance or unique
- 3:26spare parts over the next decade.
- 3:28Wow. So waiting to resolve
- 3:30uncertainty doesn't just cost a bit more, it costs exponentially
- 3:33more later on. Exactly.
- 3:35The penalty multiplies, which means you absolutely need tools
- 3:38and methods that force collaborative, informed
- 3:40decisions early, locking in the right LCC profile.
- 3:43And that leads us naturally to things like integrated
- 3:46concurrent engineering, ICE and it's sort of evolution, real
- 3:50time concurrent engineering RTCE.
- 3:51Right. ICE, which got its start at
- 3:53places like JPL, isn't just about having more meetings.
- 3:56It's fundamentally about doing the actual design work together
- 3:59simultaneously, not just. Status updates.
- 4:01No, not at all. You've got stress analysis,
- 4:04thermal, electrical, manufacturing folks all working
- 4:07in parallel. The magic ingredient is usually
- 4:10a central server, a single source of truth.
- 4:12All the design data flows through it.
- 4:14So if you're the thermal engineer, you see the structural
- 4:17engineer's latest bracket update the instant they committed.
- 4:20No waiting for drawings, no outdated information.
- 4:23I can imagine that's maybe a bit unnerving for engineers used to
- 4:26working in silos, but the benefits must be significant,
- 4:29That instant visibility. It changes everything.
- 4:31First, it drastically cuts down information lag and the blame
- 4:35game that comes with it. 2nd, and this is crucial, it shifts
- 4:39decision making. It moves away from subjective
- 4:42cause and, you know, design by seniority, where the person with
- 4:46the fanciest title wins towards objective, data-driven choices.
- 4:50How so? Well, if the structural engineer
- 4:53uploads a design and the thermal simulation running automatically
- 4:56flags it as overheating within minutes, the data makes the
- 4:59decision. It's not about who argues best.
- 5:02And the speed improvements reported are, well, they're
- 5:04pretty staggering, some teams getting new designs done in
- 5:07hours instead of weeks. Yes, the metrics are often
- 5:10dramatic. We've seen lead times for
- 5:12standard design tasks cut by a third or more, and that ability
- 5:16to generate a viable new concept design in, say, 4 hours versus 4
- 5:20weeks. That's not just faster, it's
- 5:22strategically different. It means you could explore maybe
- 5:254 completely different architectures in a single day.
- 5:28Instead of spending a month just validating 1.
- 5:31You cover the design space much more effectively.
- 5:34Finding the global optimum, not just the first acceptable
- 5:37solution. Precisely.
- 5:39And this drive for efficiency also brings up another key lean
- 5:42idea, variability reduction through design for reuse.
- 5:45OK design for reuse, like using standard parts or making things
- 5:49symmetrical. Exactly that kind of thing.
- 5:51Multi use parts. For example designing A
- 5:53component so the same part works on both the left hand and right
- 5:55hand side of an assembly. Maybe just by flipping it over
- 5:58or making it a true mirror image?
- 6:00Seems basic maybe? It seems basic, but the
- 6:02downstream effects are enormous. Fewer unique part numbers to
- 6:06manage, which means lower inventory costs, less tooling
- 6:10complexity, reduced chance of assembly errors.
- 6:13Think about the person on the assembly line.
- 6:15If the parts are symmetrical, they can't install it backwards.
- 6:17Fewer mistakes, less rework, lower cost.
- 6:21It cascades. Right.
- 6:22And to do that effectively, you can't just think about your own
- 6:25design task. You need to consider
- 6:27manufacturing, assembly, even maintenance down the line.
- 6:31This forces a wider view. It absolutely does.
- 6:33It forces you to zoom out and think about the entire system,
- 6:37the extended enterprise. OK, the extended enterprise.
- 6:40Let's define that. A lean enterprise isn't just the
- 6:42company itself. It's this integrated entity that
- 6:45creates value for all its stakeholders, this whole
- 6:47network. Stakeholders.
- 6:49That word gets used a lot. How are we defining it here in
- 6:51this systemic lean context? Good question here.
- 6:55A stakeholder is basically any group or individual who can
- 6:58affect or is affected by the enterprise's value creation
- 7:01processes, directly or indirectly.
- 7:03That sounds incredibly broad. Customers, employees, suppliers,
- 7:09sure. But regulators?
- 7:11The media? Local communities.
- 7:13Yes, potentially all of them. Which leads to the next critical
- 7:16question. How do you figure out who
- 7:19actually matters most? You can't cater to everyone
- 7:21equally all the time. So how do you prioritize?
- 7:24How do you map their relevance? Or what's the term?
- 7:27Salience. Stakeholder salience.
- 7:29It's generally seen as having three key attributes.
- 7:32First is power. Power meaning.
- 7:34Influence. Exactly, the ability to make the
- 7:37enterprise do something it wouldn't otherwise do.
- 7:39This could be coercive power like a regulator threatening
- 7:42fines, utilitarian power like a major customer threatening to
- 7:45walk, or even symbolic power like negative media coverage
- 7:48hurting your brand. OK, power, what's #2.
- 7:51Legitimacy. This is about perception.
- 7:53Is the stakeholders claim or action seen as desirable, proper
- 7:56or appropriate within the norms and values of the organization
- 7:59or society? So does the stakeholder have a
- 8:02right to make this demand? Sort of.
- 8:04A union demanding safer working conditions usually has high
- 8:07legitimacy. A competitor spreading false
- 8:09rumors has very low legitimacy. Got it.
- 8:12Power, legitimacy and the third attribute.
- 8:16Criticality. This one often involves time
- 8:19sensitivity or the sheer importance of the claim to the
- 8:22stakeholder. OK, explain criticality a bit
- 8:25more. Think of a small supplier who is
- 8:27about to go bankrupt if you don't pay their overdue invoice
- 8:30today. That's high criticality due to
- 8:32time sensitivity. Or think of a community group
- 8:35demanding you address toxic runoff that's vital to their
- 8:38local environment. The importance of the claim
- 8:41itself gives it criticality. So power, legitimacy,
- 8:44criticality, you use these three factors to sort of triage the
- 8:49stakeholder network and figure out who needs attention when.
- 8:51That's the idea, and it helps make sense of that complex web.
- 8:54And there are conceptual models to help visualize this.
- 8:57Like the one mentioned in the research the the water drop
- 8:59model. Yes, the water drop model.
- 9:01It's a qualitative tool, not quantitative, but it helps
- 9:04picture the relationships. Imagine the company as the point
- 9:07where a stone hits the water, the first ripple right next to
- 9:11the impact point. Those are your primary
- 9:13stakeholders, key suppliers, your core employees, your most
- 9:17loyal customers. They have direct, frequent
- 9:20interactions and high interdependence with the firm.
- 9:22And the ripples spread outwards. Exactly.
- 9:25Those primary stakeholders have their own stakeholders, their
- 9:28suppliers, their employees, their communities.
- 9:30These become your secondary stakeholders.
- 9:33Think government agencies, the media, activist groups.
- 9:37Their influence on your firm is often mediated through those
- 9:40primary stakeholders. A new regulation secondary
- 9:43impacts your supplier primary, which then impacts you.
- 9:47So it shows these nested recursive relationships.
- 9:51Your connection with the supplier isn't just about price,
- 9:53it's influenced by their relationship with their bank or
- 9:56their local government. Precisely, it highlights the
- 9:58interconnectedness of the whole system.
- 9:59Which actually provides a really smooth transition.
- 10:02If the extended enterprise is the sensitive interconnected
- 10:05system, then managing the physical flow of goods through
- 10:08it. The supply chain also needs a
- 10:10systemic approach to avoid creating chaos.
- 10:13Absolutely. Which brings us squarely to
- 10:15Hijunka. Hijunka, a Japanese term right
- 10:18from Toyota Production System. That's right.
- 10:20It literally means leveling. It's the process of smoothing
- 10:24out production, both in terms of overall volume and the mix of
- 10:27different products being made. It's fundamental to TPS
- 10:30stability. And it's designed to combat.
- 10:32Yeah. What's that classic supply chain
- 10:34problem? The bullwhip effect.
- 10:35The dreaded bullwhip effect, Yes hi Junka, is the antidote.
- 10:39The bullwhip often happens because of perfectly rational
- 10:42local optimization decisions that cause massive upstream
- 10:46volatility. Give us an example of that local
- 10:49optimization causing trouble. OK, imagine a trucking planner
- 10:52for a regional distribution network.
- 10:55Their main performance metric might be truck fullness to
- 10:58minimize transportation cost per unit.
- 11:01Seems sensible, right? Yeah, you want full trucks?
- 11:03So to get full trucks, the planner waits until they have a
- 11:06large order for a specific product, say product A going to
- 11:09a specific warehouse. They sent a massive batch, maybe
- 11:13a whole weeks or months worth all at once, then maybe nothing
- 11:16for days. OK, see where this is going?
- 11:18That big batched order hits the central warehouse or factory
- 11:21like a shockwave. They see a huge spike in demand
- 11:24for product A, so they scramble, ramp up production, maybe pay
- 11:27overtime, only for the next signal from that region to be 0
- 11:31for product A, but maybe now a huge spike for product B.
- 11:35The regional centers swing wildly between being swamped
- 11:38with inventory and being completely starved, and that
- 11:41variability gets amplified further and further upstream.
- 11:44It's classic sub optimization, making one small part look
- 11:47efficient while crippling the whole system's performance.
- 11:50Exactly the lean approach using Hijunka says forget optimizing
- 11:54individual truckloads locally, we need to establish a level
- 11:57predictable flow for the system. So maybe the Hijunka control
- 12:01dictates sending say, 4 smaller mixed load trucks every single
- 12:05day to that regional warehouse. The volume is level, the mix is
- 12:08level. Even if the trucks aren't always
- 12:10100% full. Even then, because that
- 12:12stability, that predictability, is incredibly valuable, it
- 12:15dramatically reduces the signal variability going upstream.
- 12:18And that stability allows the manufacturing plants to.
- 12:22Optimize globally, Precisely when the factory sees a smooth,
- 12:26predictable demand signal, they can stop reacting to phantom
- 12:30spikes and troughs. They can implement much more
- 12:32sophisticated scheduling, maybe moving towards producing every
- 12:36part every day in smaller quantities, rather than doing
- 12:39massive inefficient changeovers between huge batches.
- 12:42So leveling the downstream flow enables efficiency upstream.
- 12:46That's the core idea, and implementing this often requires
- 12:49more than just organizational changes.
- 12:51You need the analysis to back it up.
- 12:53Right, These aren't just policy decisions.
- 12:55You need the numbers. Absolutely.
- 12:56Technical modeling, simulation. They're critical.
- 13:00You might use simulation to combine compare different
- 13:02distribution strategies. You definitely use financial
- 13:05tools like net present value analysis to compare the total
- 13:08system costs of say the full truckload batching scenario
- 13:11versus the level flow high junk a scenario factoring in
- 13:14inventory cost, stock out cost overtime, everything.
- 13:17These quantitative tools are essential for synthesizing all
- 13:20the different factors logistics, finance, production and helping
- 13:24everyone reach consensus on the best system level design.
- 13:27It really strikes me how this all ties together.
- 13:29Whether we're talking about RTCE managing design risk early on or
- 13:33high junk a managing supply chain variability later, the
- 13:37underlying principle is this holistic systems view across the
- 13:42entire value stream. That's the essence of it.
- 13:44Product development, manufacturing, distribution.
- 13:48They aren't separate fiefdoms, they're interconnected parts of
- 13:511 value creating system. So the goal of a truly lean
- 13:54enterprise is this deep integration.
- 13:57Yes, and if you accept that the enterprise is a complex system,
- 14:01then its ability to adapt and evolve successfully seems to
- 14:04depend on something researchers call complexity partitioning.
- 14:08Complexity partitioning OK, sounds intriguing.
- 14:11How would you explain that in maybe simpler terms for an
- 14:14engineer on the ground? Think about biology like the
- 14:16human genome. It's a master class in
- 14:18partitioning complexity. You have parts that are
- 14:21incredibly stable and conserve the core protein coding genes,
- 14:24the exons. They represent the reliable,
- 14:26proven functions. Variability there is usually bad
- 14:29OK. The stable core.
- 14:30But then you have other vast regions of DNA, historically
- 14:33called junk DNA, which exhibit much higher variability.
- 14:37These regions are now understood to be crucial for regulation,
- 14:40for enabling architectural recombination, for innovation,
- 14:43for trying out new structures without breaking the core
- 14:46functions. So high stability in some areas,
- 14:48high variability allowed in others.
- 14:50Exactly. A successful lean enterprise
- 14:52arguably needs to do the same thing.
- 14:54It needs to strategically decide where to enforce stability and
- 14:57low variability. Think standardized core
- 14:59processes, validated multi use components that level high junk
- 15:03a schedule, protect the essential value stream.
- 15:06But it also needs areas where flexibility, experimentation and
- 15:10innovation can thrive. Maybe in exploring new product
- 15:13features, trying radical process improvements and contain pilots
- 15:17or allowing more architectural freedom and non critical
- 15:19modules. So you partition the system to
- 15:23protect the stable core. Innovate at the edges.
- 15:25That seems to be the pattern. You need both stability for
- 15:28efficiency and reliability and controlled variability for
- 15:30adaptation and future growth. Finding that balance, that's the
- 15:34ongoing strategic challenge. Protecting the core value stream
- 15:37while enabling dynamic change elsewhere.
- 15:39A fascinating thought to end on until the next equation.
- 15:42Design Chuckies TuneIn every morning at 11.