Latest / Deep End Era. Engineering with Sankalp

Planning, Verification and Building Your Own (Harness Design, Part 3)
Ines's agent now either gives up too early or keeps going after it's done. Fan, Zhang et al.'s planning ablation explains both. A persistent to-do list added 11.6 points for Nemotron-3 30B (median run 5 turns without it, 40 with it). It cut SWE-Bench cost by about 30% for Nemotron-3 550B and 32% for Mistral Medium 3.5 by trimming redundant verification, with a small, non-significant drop in accuracy. The episode covers verification and tests that give wrong answers, SWE-Bench Verified contamination and the SWE-Bench Pro retraction, the harness as a hidden variable in leaderboards, latency and…
The skinny
The skinny isn't ready yet — notes appear once the transcript is processed.