Latest / Reliability Maintenance / Fixing MTBF and MTTR Traps on the Food Plant Floor
Transcript
- 0:00Welcome to Maintenance Monday from the FSO Institute.
- 0:03I'm Laura Mitchell, and with me is James Couch.
- 0:06Today we're laying the foundation, and we're starting with a number.
- 0:10OxMaint puts unplanned downtime at about $180,000 a year for each critical
- 0:16production line.
- 0:17And that's before you count the repair bill.
- 0:19The same source says an emergency repair costs about 4.8 times a planned one.
- 0:26So reliability isn't about fixing machines.
- 0:30It's an operating discipline that keeps assets performing as designed,
- 0:34with minimal unplanned interruptions.
- 0:36The targets are availability above 95 percent on critical lines,
- 0:41and a planned maintenance ratio above 70 percent.
- 0:45Below 70, you're running a reactive plant.
- 0:48Here's what bothers me, though.
- 0:49Plenty of plants have a scorecard, and the scorecard still tells them the wrong
- 0:54story.
- 0:55Operations sees a volume shortfall, maintenance sees a machine that was fine,
- 1:00and everybody points at somebody else.
- 1:03Because the metrics are often miscalculated.
- 1:06iFactory AI says the main trap in FMCG and food plants is mixing up clock time and
- 1:13operating time.
- 1:14MTBF, mean time between failures, should be total operating hours divided by the
- 1:20number of failures.
- 1:22If you divide across every shift hour, you've counted sanitation,
- 1:27changeovers, planned maintenance, and the time the machine sat blocked or starved.
- 1:32So a line that's tearing itself up during heavy production can look healthy,
- 1:36because the idle hours dilute the failures.
- 1:39Right.
- 1:39The degradation is real, and the average hides it.
- 1:43The second trap is definitions.
- 1:46Say Shift One wipes a photo eye for five minutes and calls it a minor adjustment.
- 1:51Shift Two does the same wipe and logs an unplanned equipment failure.
- 1:56Now your baseline is meaningless, because you're comparing two different
- 2:00definitions.
- 2:01And that's where the finger pointing starts.
- 2:04Shift Two looks like it runs the worst equipment, when really it just writes things
- 2:08down.
- 2:09Exactly.
- 2:09Same thing with MTTR, mean time to repair.
- 2:13Most people hear a high MTTR and think the technician is slow.
- 2:17But MTTR is the whole clock: diagnosis, waiting on parts, the actual repair,
- 2:24and the restart verification.
- 2:26The creator's brief cites studies showing parts wait can be more than half of total
- 2:31MTTR.
- 2:32OxMaint gives an example of a 45 minute repair stretched to six hours because a $40
- 2:39seal wasn't in stock.
- 2:40So that's forty minutes of wrench time inside a four to six hour outage.
- 2:44If you score the technician on the outage, you've blamed the wrong thing.
- 2:49Let's put numbers on equipment.
- 2:50What should a plant expect, and where does it get dangerous?
- 2:54These are industry ranges, so treat them as reference points,
- 2:57not promises.
- 2:59iFactory's figures: packaging lines run 200 to 500 hours MTBF with
- 3:06repairs of half an hour to an hour and a half.
- 3:10Filling machines run 150 to 400 hours.
- 3:14Labelers run 100 to 300 hours, with fast repairs.
- 3:19Conveyors run 300 to 800, and industrial mixers 400 to 1,200.
- 3:26OxMaint says anything under 80 hours on a critical asset signals serious risk,
- 3:33either a PM program gap or an asset near the end of its life.
- 3:37And food plants make those baselines harder.
- 3:40Sanitation can mean water above 140 degrees Fahrenheit under high pressure,
- 3:46chlorinated alkaline detergents, acid rinses.
- 3:49That beats up elastomer seals, strips food grade lubricant,
- 3:54and can get into electrical enclosures and photo eyes.
- 3:57So the risk isn't spread evenly.
- 3:59It piles up after sanitation startup and during changeovers.
- 4:04Slicers, checkweighers, metering pumps, cartoners, they can drift or fail right
- 4:09after reassembly if nobody audits the centerline settings.
- 4:13Now the encouraging part, two cases from iFactory.
- 4:17A biscuit plant in Maharashtra found nozzle clogging caused 45 percent of its
- 4:22filling line stoppages.
- 4:24They added a disciplined operator inspection and nozzle setup routine before every
- 4:28shift.
- 4:30MTBF went from 90 hours to 210 within three months.
- 4:35No big capital project, just operators doing the first line of defense work.
- 4:39And the second case is the dairy plant in Punjab.
- 4:43Packaging line MTTR dropped from 2.5 hours to 1.1, about a 56 percent
- 4:50cut.
- 4:50They looked at failure frequency in the CMMS and kitted three high wear seals and
- 4:56sensors right at the line, so nobody walked to the crib.
- 5:00Which shows why ownership has to be spelled out.
- 5:02Operators run centerlines and check with sight, sound, and smell.
- 5:07Maintenance technicians do precision repairs and feed back what the PM missed.
- 5:12Engineering goes after chronic defects.
- 5:15Leadership funds the right spare parts and clears roadblocks.
- 5:20So here's the technique.
- 5:21When a shift scorecard shows a shortfall, don't ask who failed.
- 5:26Ask which kind of loss it was.
- 5:28Was it instability, a low MTBF from recurring micro jams and seal leaks?
- 5:35Or was it drag, a high MTTR from missing parts and slow diagnosis?
- 5:40Those need different fixes, and different people.
- 5:43Which gives us this week's challenge.
- 5:45Take your top downtime event from last week and split the repair into four pieces:
- 5:52diagnostic time, parts wait, hands on wrench time, and startup centerline
- 5:58verification.
- 5:59Then see which piece is biggest.
- 6:02And I'd bet it's not the wrench.
- 6:04The win to celebrate is the first time a supervisor and a technician look at that
- 6:09breakdown together and agree on what actually cost them the shift.
- 6:13That's Maintenance Monday.
- 6:14Next week, we go deeper into MTBF and how to raise it on the floor.
- 6:18Until then, reliable equipment creates reliable results.