Latest / Mechanical Engineering Made Simple / (#29) Lean Manufacturing Exposed: Jidoka, JIT, and the Cultural Science of Waste Elimination (Takt Time, OEE, and the Toyota System)
Transcript
- 0:00Get ready to torque your nuts, harden your springs, and forge
- 0:03your mind into a bulletproof study guide.
- 0:06We are Mechanical engineering Made Simple welcome you to the
- 0:10deep dive on a philosophy that well fundamentally changed how
- 0:14the world manufacturers everything Lean manufacturing
- 0:18and the legendary Toyota Production System or TPS.
- 0:21Yeah, and it's really more than just, you know, an efficiency
- 0:24Dr. This is a truly revolutionary engineering
- 0:27approach. It came from Tai Chi Ono, and
- 0:29it's deeply rooted in precise measurement and just this
- 0:33relentless focus on delivering actual value.
- 0:36It's really a total rejection of those old clumsy mass production
- 0:39methods. Right, the high inventory
- 0:41functional silos way of doing things.
- 0:44So our mission today is basically to give you the
- 0:46shortcut. We're going to breakdown the
- 0:47core concepts here. You know, the structural
- 0:49pillars, the key engineering metrics, and also the deep,
- 0:51often ignored cultural stuff. The cultural requirements.
- 0:54Yeah, the things you absolutely need to transform a plant into a
- 0:57highly flexible, responsive system.
- 0:59Basically, we're learning the science of waste elimination.
- 1:02And when it's implemented properly, the results are, well,
- 1:04they're dramatic. That's why we're diving in.
- 1:06The ultimate goal here, it's achieving huge resource savings.
- 1:10We're talking things like half the human effort on the factory
- 1:13floor. Half Wow.
- 1:15Yeah, half the floor space needed, half the investment in
- 1:18tooling and crucially, way less than half the inventory.
- 1:22And all that while delivering fewer defects to the customer.
- 1:26So quite something. Let's unpack this.
- 1:28Then let's start where Ono started.
- 1:30The absolute elimination of waste.
- 1:32The Japanese term is muda, right?
- 1:34That's it, Muda. So what exactly qualifies as
- 1:37muda in the TPS context? OK, so MUDA or waste, it's
- 1:41defined as basically anything that prevents the value added
- 1:45flow of material, you know, from goods all the way to the
- 1:47finished product. But the most critical part of
- 1:50this definition really is that the customer is a final judge.
- 1:53They decide if value has actually been created.
- 1:57That customer focus changes everything for engineering
- 2:00goals. So how do we figure out what's
- 2:02true value add? You mentioned 2 criteria.
- 2:04Yeah 2 non negotiable criteria and activity only adds value if
- 2:08it meets both. OK, first it has to physically
- 2:11add to the form fit or function of the product itself.
- 2:13Makes sense. 2nd, and this is the key, it has to be something
- 2:16the customer is actually willing to pay for.
- 2:18Willing to pay for OK, that distinction really does turn
- 2:21traditional thinking on its head.
- 2:24So things like transportation priced inspection waste.
- 2:27OK, but hold on, I have to push back a little here.
- 2:30Sure, If I don't transport a part, it never gets to the
- 2:33assembly line, right? And if I ship, say, complex
- 2:37engine parts without careful packaging, they'll arrive
- 2:39damaged. So isn't that protection kind of
- 2:42necessary? Isn't it value added in a way?
- 2:44Ah. You've hit the nail on the head
- 2:46there. That lets us distinguish between
- 2:48pure waste and what we sometimes call necessary waste.
- 2:52True lean thinking actually categorizes all non value added
- 2:55activities, even the necessary ones like protection and
- 2:58transport. As Mudo OK, the goal isn't just
- 3:01to get rid of the obvious pure waste, it's also to relentlessly
- 3:05minimize that necessary waste too.
- 3:07OK, that makes more sense. So the customer doesn't care
- 3:09that the material traveled, you know, 25,000 miles through 4
- 3:12suppliers exactly or about the three different types of
- 3:15internal packaging used. They just care about getting
- 3:17good value for their money. Precisely.
- 3:19And that relentless external focus on what the customer
- 3:23values, that's what drives lean manufacturing.
- 3:25That's what pushes the efficiency games through
- 3:28teamwork, open communications, smart resource use, and that
- 3:31idea of continuous improvement Kaizen.
- 3:34Right, Kaizen. So if value is the goal, we need
- 3:37the engineering structures to actually enforce it.
- 3:39And that brings us to those famous twin pillars of TPSJIT
- 3:44and judoka. We hear a lot about JIT just in
- 3:48time, but let's start with the Joker.
- 3:50That's the one engineers often find a bit counterintuitive.
- 3:53Like judoka, it's often translated as autonomation, or
- 3:56maybe automation with a human touch.
- 3:59It's really centered on using machines and people effectively
- 4:01together. But its core principle, the
- 4:04absolute directive, is this. No defective parts should ever
- 4:08be allowed to advance in the production system.
- 4:11OK. No defects forward.
- 4:14And that leads to the famous or maybe infamous Judoka paradox
- 4:17shutting down the entire line. Yes, why on earth is stopping
- 4:22production the smartest move? I mean, every traditional
- 4:24incentive screams keep the machines running no matter.
- 4:27What? Because judoka operates on this
- 4:28really profound principle, right?
- 4:30Quality is production. They're equal.
- 4:33If a defect happens, the line has to stop immediately.
- 4:37Often it's an operator pulling an and on cord the.
- 4:39And on cord. Right, and it stays stopped
- 4:41until the root cause is found and completely eliminated.
- 4:43So the paradox is clear. You shut down the system
- 4:46temporarily so the system can actually run continuously and
- 4:49predictably over the long haul. If you let bad parts move
- 4:52forward, you just contaminate everything downstream.
- 4:55That leads to massive, hidden, really expensive rework later
- 4:58on. So judoka creates this
- 5:00unshakable quality foundation you mentioned, Oneo the sources
- 5:04say he stressed they spent 7 focused years building that
- 5:07quality control foundation. Yes, seven years before they
- 5:10really embarked on quantity control.
- 5:11That level of patience it seems almost impossible today.
- 5:15It does, doesn't it? Seven years sounds like an
- 5:17eternity in modern business, but that cultural requirements
- 5:21stopping the line immediate root cause analysis.
- 5:24It has to be deeply institutionalized before you
- 5:26start trying to speed up the flow.
- 5:28TPS fundamentally it's a system of quantity control.
- 5:31That's JIT, but it's built entirely on top of a high
- 5:34quality foundation. That's Judoka.
- 5:37OK, let's talk about that quantity control then.
- 5:39JIT making what is needed only when it is needed.
- 5:44What are the key tools that enable that pulse system?
- 5:47You know, getting away from wasteful push scheduling well.
- 5:50The primary tools Kanban. It's really revolutionary.
- 5:52It's the practice of using physical cards or sometimes
- 5:55other visual signals. Like lights or empty bins.
- 5:57Exactly. Visual signals to smooth out the
- 5:59flow and create a demand driven pulse system.
- 6:01It triggers replenishment directly from consumption right
- 6:04at the next process step. It controls inventory, minimizes
- 6:08that huge waste of overproduction, and make sure
- 6:10flow is tied directly to actual customer withdrawal.
- 6:13OK, can man for poll and the other key tool, the one that
- 6:16attacks the old assumption that you have to run huge batches to
- 6:19be efficient SMED. SMED Single Minute Exchange of
- 6:24dyes developed by the brilliant Shiger Shingo.
- 6:29SMED is basically a batch destruction technique.
- 6:32Its whole focus is slashing changeover times, ideally down
- 6:35to a single digit number of minutes.
- 6:37Single digit minutes for a major machine changeover.
- 6:40That's the goal. By drastically reducing change
- 6:42over time, you drastically reduce the economic batch size.
- 6:45Smaller batches mean less waste in two key ways.
- 6:49Less excess capitalization tied up in tooling right, and less of
- 6:52that massive overproduction you need just to build buffer stock
- 6:55during those long changeovers. This directly enables JIT and
- 6:58dramatically cuts lead times. OK, so we have the philosophy,
- 7:01eliminate waste. We have the pillars, judoka for
- 7:03quality, JIT for quantity, enabled by tools like CON, Ban
- 7:06and SMAD. But how do we actually know if
- 7:09it's working? How do we measure success?
- 7:11That brings us to the engineering metrics.
- 7:12Let's start with the heartbeat of the line, tact time.
- 7:15Right talk time talked is the the design process cycle time
- 7:19you need to exactly match the customer's demand rate, but it's
- 7:24normalized to your actual roduction schedule.
- 7:26It sets the absolute pace and we calculate it using a pretty
- 7:29simple ratio. It's available work time divided
- 7:33by customer demand. So dollars available work time
- 7:36slash customer demand dollars. OK, let's walk through a quick
- 7:39example. Maybe conceptually so it's
- 7:41easier to follow without complex math on audio.
- 7:44Good idea. Let's imagine a plant needs to
- 7:47produce say 500,000 units per year.
- 7:49OK, Now based on your actual operating schedule, maybe 2
- 7:53shifts 5 days a week, minus holidays, breaks, planned
- 7:57downtime, you figure out your total available work time for
- 8:00the year in minutes or seconds. Right, the actual time you can
- 8:03produce. Exactly.
- 8:04So you take that total available time and you divide it by the
- 8:07500,000 units the customer wants.
- 8:09Let's say that calculation comes out to approximately 0.56
- 8:13minutes. 0.56 minutes. That's about 34 seconds.
- 8:16Right, about 34 seconds. So what does that 34 seconds
- 8:19actually mean for the engineers and the managers on the floor?
- 8:22It means that if you want to stay perfectly in step with
- 8:26customer demand without building up wasteful inventory or falling
- 8:30behind, you must produce 1 good saleable unit every 74 seconds.
- 8:36So it's a hard target. It's a hard target set by the
- 8:38customer. Essentially, if your current
- 8:40production cycle time for one unit is longer than 34 seconds,
- 8:44you get an engineering problem to solve.
- 8:46You won't keep up. And if it's much shorter?
- 8:48If your cycle time is, say, 20 seconds, you're going to build
- 8:52inventory like crazy expensive, unnecessary inventory.
- 8:56Tac time defines the rhythm. OK, TAC time sets the rhythm.
- 9:00Beyond that, what else measures the ultimate health of the whole
- 9:03process flow? What's the big picture metric?
- 9:06Lead time reduction. Tai Chiona always, always
- 9:09hammered this, he said. The key metric is, and I'm
- 9:12paraphrasing slightly, looking at the timeline from the moment
- 9:15the customer gives us an order to the point when we collect the
- 9:18cash. Order to cash.
- 9:19Order to cash and we are reducing that timeline by
- 9:22removing the non value added wastes.
- 9:25Short lead times, he argued, are the true guarantee of
- 9:28flexibility, good quality and stable processes.
- 9:31Makes sense. Faster flow means less chance
- 9:33for things to go wrong, less inventory sitting around.
- 9:36And finally, there's the big diagnostic tool for equipment
- 9:39performance. OEE, overall equipment
- 9:43effectiveness. Yes, OEE is crucial.
- 9:45It gives US1 clear number for overall production effectiveness
- 9:48combining 3 factors. The equation is dollars OEE
- 9:51equals A * Q * P dollars. OK, break that down, AQP.
- 9:55Right. So A is availability, is the
- 9:57machine running when it's supposed to be running, Q is
- 10:00quality yield, how many good parts are we making versus total
- 10:03parts started? And P is performance.
- 10:05How close is the machine running to its design cycle time or to
- 10:08tack time? So if your OEEE is low, where do
- 10:11you look first? Well, if your availability the A
- 10:13is low, that often points to serious instability.
- 10:16Machine breakdowns, long changeovers basically and cringe
- 10:19and problems needing judoka solutions.
- 10:21Cycle time losses, the performance factor, P not
- 10:25meeting the tact rate. That's often the low hanging
- 10:27fruit. Engineers can attack 1st to get
- 10:29through put up quickly, maybe through SMND or work balancing.
- 10:33And the tool used to actually see all this, to visualize the
- 10:36entire system before you start changing things.
- 10:38Value stream mapping VSM. VSM is absolutely the first step
- 10:42in any successful lean transformation.
- 10:44You have to do it. It charts every single
- 10:46literally, from raw materials coming in the door to the final
- 10:49customer delivery. And its specific purpose is to
- 10:52expose those huge amounts of hidden waste, unnecessary steps,
- 10:56delays, excess scrap, inventory, mountains.
- 10:59How's it different from just a regular process flow chart?
- 11:02Good question. A simple flow chart just shows
- 11:04the steps. VSM visualizes the entire system
- 11:08including information flow, inventory levels, cycle times,
- 11:10lead times. It shows the why you need to
- 11:12improve the overall system performance rather than just
- 11:15letting you optimize little isolated pieces of the process.
- 11:18It forces a system view. OK.
- 11:19We've covered the engineering tools, the metrics, tact, lead
- 11:22time, O EE, VSM, we've got Judoka, JIT, Conaban, SMED.
- 11:28But the sources and you hinted at this make it crystal clear.
- 11:32The tools, that's the easy part. The really difficult part is the
- 11:35culture. Absolutely.
- 11:37Why does management so often fail here?
- 11:38Why do they fail to institutionalized the change
- 11:41leading to that quick regression after some initial success?
- 11:44It often comes down to what's called the quick fix mentality.
- 11:47Management sees those massive low hanging fruit gains early
- 11:50on. Yeah, the easy wins.
- 11:52Exactly simple things, maybe cleaning U workstations with 5S,
- 11:56maybe some minor mad imrovements.
- 11:58They get excited by the initial jum in metrics right?
- 12:01But then they failed to institutionalized the deeper,
- 12:04harder cultural changes. They stopped doing the really
- 12:07difficult work, the system thinking the daily Kaizen.
- 12:09And that leads predictably backsliding regression.
- 12:13It takes time. It takes years.
- 12:14Ono himself spent over 30 years owning the TPS culture at
- 12:17Toyota. So expecting a complete
- 12:19sustainable transformation in say, 18 months, it's just not
- 12:23reasonable. It takes sustained effort and
- 12:24leadership commitment. So what are the key
- 12:26non-technical shifts? The cultural changes needed to
- 12:30fight that regression and make Lean actually stick.
- 12:34Well, the most fundamental 1 I think goes right back to judoka.
- 12:36It's creating a no blame environment.
- 12:39No blame. Explain that.
- 12:40Think about it. If you ask an operator on the
- 12:42line to pull that octolin cord to stop production because they
- 12:47see a defect and they know that stopping the line is going to
- 12:51result in them getting yelled at, maybe discipline punished
- 12:54for disrupting the flow, what are they going to do?
- 12:57Hide the defect, pass it on. Exactly.
- 12:59They'll hide it. So the entire engineering goal
- 13:02of judoka, instant fault detection and correction,
- 13:04becomes completely impossible without that cultural foundation
- 13:08of no blame. So the focus has to shift.
- 13:10Entirely from fault finding pointing fingers at people to
- 13:14fact finding pointing fingers only at the processes.
- 13:17Mistakes aren't reasons for punishment, they're seen as
- 13:20golden opportunities to learn and make the process itself more
- 13:23robust. That's a.
- 13:24Huge shift for many traditional management styles.
- 13:27Huge Another hurdle is fighting simplistic thinking, especially
- 13:31at the executive level. What do you mean by simplistic
- 13:34thinking? Well, executive teams.
- 13:35They often get energized by those simplified success
- 13:38stories. They read about case studies
- 13:40that conveniently ignore all the bumps and bruises, the political
- 13:43fights, the setbacks involved in real cultural change.
- 13:47They want to believe transformation is just a simple
- 13:49linear project plan. But any profound change journey
- 13:53involves complications. It involves confronting
- 13:56entrenched thinking, maybe taking a few wrong turns.
- 13:58That's messy. Cultural development is messy.
- 14:01It requires acknowledging that, embracing the learning that
- 14:04comes from the mass, and having the patience to work through it.
- 14:07OK, let's touch on standard work.
- 14:09To an operators, standard work can often feel like just more
- 14:12management paperwork, something that restricts their autonomy.
- 14:15How does it fit into this positive cultural shift?
- 14:18Yeah, standard work is probably one of the most misunderstood
- 14:21lean tools, especially in western imlementations.
- 14:24Yes, OK, it is a tool for management and auditors to
- 14:28ensure consistency, but that's not its primary purpose.
- 14:31In a true lean culture, its primary purpose is actually to
- 14:34enable Canizon continuous improvement.
- 14:37Standard work is simply the documentation of the current
- 14:40best known way to do the job safely, efficiently and with
- 14:44high quality. Right now it establishes the
- 14:47necessary baseline. So instead of being restrictive,
- 14:50it's actually the starting point for challenging the process.
- 14:53Precisely. You cannot systematically
- 14:55improve a process if you don't have a clear, agreed upon
- 14:58understanding of the current state.
- 15:01Standard work provides that baseline.
- 15:03It ensures we consistently do what's been shown to be
- 15:06effective. And by having it documented
- 15:08visually right at the workstation, you give the team a
- 15:11concrete structure they can measure against, analyze, and
- 15:13then challenge to find an even better.
- 15:15Way and transparency is key there.
- 15:17Absolutely. Using visual controls like those
- 15:19high junker boards for leveling production or the and on lights
- 15:22allows managers, team leaders, everyone to audit the work
- 15:25quickly to see if the process is running as designed in just a
- 15:28minute or two. That enables immediate feedback
- 15:30and those rapid response PDCA cycles.
- 15:32Plan, do, check, act. It really is abundantly clear,
- 15:36then, lean engineering isn't just about the tools and
- 15:39techniques, it's a deep systems thinking challenge.
- 15:42It involves psychology, sociology just as much as it
- 15:46involves hydraulics or mechanics.
- 15:48Great way to put. It the technical applications,
- 15:50you know, TAC time, SMDO, EE, they're profound, but it's the
- 15:56behavioral changes required that no blame culture, the discipline
- 16:00to actually stop the line when needed.
- 16:02That's what really separates the truly successful lean operations
- 16:06from the, well, the imitators. Indeed.
- 16:09And maybe a final thought to lead people with Remember the
- 16:12biggest waste of all, the one that often hides or enables all
- 16:16the other inefficiencies, It's inventory.
- 16:17Right inventory covers up problems.
- 16:19It does, but here's the twist. While inventory is definitely a
- 16:23waste, it's often also a necessary response to system
- 16:26variation just so you can maintain the required production
- 16:29rate. Therefore, if you really want to
- 16:31reduce inventory, and you should, you can't just decree
- 16:33cut stock levels. You have to 1st eliminate the
- 16:36underlying variation that makes the inventory necessary.
- 16:38So attack the root cause, not the symptom.
- 16:41Exactly. You can't solve an inventory
- 16:43problem by just cutting stock. You have to attack the real
- 16:46enemy. System variation, whether that's
- 16:49machine downtime, quality defects, supplier issues,
- 16:52whatever it is causing the instability.
- 16:54A powerful final point. Attack variation first until the
- 16:58next equation. Design junkies.
- 17:00We are mechanical engineering made simple.