- 0:00Speaker 1: Welcome back to the Deep Dive. You know, we spend
- 0:02Speaker 1: so much time on this show talking about the final product,
- 0:05Speaker 1: the big skyscraper, the massive bridge. But I was walking
- 0:08Speaker 1: past the construction site the other day and they were
- 0:12Speaker 1: pouring the second floor of a new high rise and
- 0:15Speaker 1: it hit me. I wasn't really looking at the building.
- 0:17Speaker 1: I was looking at this huge, almost chaotic tangle of
- 0:21Speaker 1: wood and steel that was holding it all up.
- 0:24Speaker 2: You were looking at the phantom structure the building before
- 0:26Speaker 2: the building exactly.
- 0:27Speaker 1: And then you realize once that concrete is dry, all
- 0:30Speaker 1: of it just vanishes, It gets taken down, disappears, but
- 0:34Speaker 1: for that short time, it's the most critical thing on
- 0:36Speaker 1: the entire site. So today we're digging into the engineering
- 0:40Speaker 1: of that temporary world. We're exploring form work for concrete
- 0:43Speaker 1: structures based on the classic text by Purifoid and Overlender.
- 0:47Speaker 2: It's such a great topic because it really flips the script.
- 0:50Speaker 2: Most people think the structure is just the concrete and
- 0:52Speaker 2: the steel rebar, but the form work, the mold is
- 0:55Speaker 2: a seriously complex structural system all on its own. It
- 0:59Speaker 2: has to handle these massive loads, it has to be
- 1:01Speaker 2: incredibly precise, and most importantly, it has to be safe.
- 1:05Speaker 2: If the form work fails, the whole building fails. Yeah,
- 1:09Speaker 2: and that can be catastrophic.
- 1:10Speaker 1: And the thing that just blew me away in the
- 1:12Speaker 1: reading was the money, the economics of it. I just assumed,
- 1:15Speaker 1: you know, on a concrete job, the expensive part is well,
- 1:18Speaker 1: the concrete or maybe all that steal. But the authors
- 1:22Speaker 1: say that's often not true at all.
- 1:23Speaker 2: No, it's frequently the opposite. For a lot of standard structures.
- 1:27Speaker 2: The cost of the form work can be anywhere from
- 1:30Speaker 2: say thirty five to sixty percent of the total cost
- 1:33Speaker 2: of the concrete work.
- 1:34Speaker 1: Sixty percent, you're saying you spend more on the temporary
- 1:37Speaker 1: mold than on the actual stuff that stays there forever.
- 1:40Speaker 2: You often do.
- 1:41Speaker 1: Yeah, that just seems incredibly inefficient. Like if I'm buying
- 1:45Speaker 1: a cake, I don't want to pay more for the
- 1:47Speaker 1: pan than for the actual cake.
- 1:48Speaker 2: Well, it's not just the materials that's the key. The
- 1:51Speaker 2: real killer is the labor. You have to think about
- 1:54Speaker 2: what you're doing. You're building custom cabinetry basically, but you're
- 1:58Speaker 2: doing it on an industrial se outside in the mud,
- 2:01Speaker 2: in the rain. You have crews of carpenters measuring, cutting,
- 2:06Speaker 2: assembling these precise forms. Then after the poor they have
- 2:09Speaker 2: to carefully take it all apart. Again, that's a huge
- 2:11Speaker 2: labor cost.
- 2:12Speaker 1: Okay, So if I'm an engineer or an architect, my
- 2:14Speaker 1: design choices are hitting that labor build directly. The book
- 2:18Speaker 1: talks about three concepts for economy design, repetition, dimensional standards,
- 2:24Speaker 1: and dimensional consistency. Let's start with repetition. That sounds obvious.
- 2:28Speaker 2: It sounds obvious, but you would be amazed how often
- 2:30Speaker 2: it's ignored for a small aesthetic tweak. If you've got
- 2:33Speaker 2: a ten story building, you want the layout of floor
- 2:36Speaker 2: two to be identical to floor three, and floor four
- 2:38Speaker 2: and so on, because then the crew can just strip
- 2:41Speaker 2: the forms from the second floor, a crane lifts them up,
- 2:43Speaker 2: and they put them right back in place on the
- 2:45Speaker 2: third no changes.
- 2:46Speaker 1: But if I the architect, decide to move a beam
- 2:50Speaker 1: six inches over on the third floor for some reason.
- 2:52Speaker 2: Then the crew has to stop. They have to tear
- 2:54Speaker 2: the form apart, cut new plywood, rebuild the supports, and
- 2:58Speaker 2: you've just lost a day or two of labor. That
- 3:01Speaker 2: tiny change just cost the project thousands.
- 3:04Speaker 1: Wow. Okay, so that leads to dimensional standard. This is
- 3:07Speaker 1: about using off the shelf sizes or like not being
- 3:09Speaker 1: weird exactly.
- 3:11Speaker 2: Plywood comes in four by eight foot sheets, Lumber comes
- 3:14Speaker 2: in standard sizes. If you design a column that's say
- 3:18Speaker 2: sixteen inches square, that works perfectly with standard cuts. But
- 3:22Speaker 2: if you design it to be fifteen inches square, a
- 3:24Speaker 2: carpenter has to take every single piece of plywood and
- 3:27Speaker 2: rip one inch off the side.
- 3:29Speaker 1: You're paying a skilled worker to make sawdust.
- 3:31Speaker 2: Yes, you're paying for their time to cut it, and
- 3:33Speaker 2: you're paying for the wood you just threw away. It's
- 3:35Speaker 2: a lose lose. But the third one dimensional consistency is
- 3:39Speaker 2: where I see the most friction on a job site.
- 3:42Speaker 1: This was the one that felt really counterintuitive. It's about
- 3:44Speaker 1: column sizes. As you go up a building, the load
- 3:47Speaker 1: gets lighter. Right, So the engineer and me says, okay,
- 3:49Speaker 1: make the columns on the top floor smaller, save a concrete.
- 3:52Speaker 2: And you're not wrong mathematically, But think about the form work.
- 3:56Speaker 2: If your column on floor one is thirty inches and
- 3:59Speaker 2: you shrink get to twenty four inches on floor two,
- 4:02Speaker 2: what do you have to do to that form?
- 4:03Speaker 1: You have to rebuild the whole thing, take it apart,
- 4:06Speaker 1: make the box smaller.
- 4:07Speaker 2: Right, All that labor unbolt it, cut it, rebrace it.
- 4:10Speaker 2: It's expensive. Purifoy and Oberlinder argue it's almost always cheaper
- 4:15Speaker 2: to just keep the colum the same size thirty inches all.
- 4:17Speaker 1: The way to the roof, even though you're technically wasting
- 4:19Speaker 1: a little concrete up top.
- 4:21Speaker 2: Yes, because the cost of that extra concrete is I mean,
- 4:24Speaker 2: it's peanuts compared to the labor savings of just popping
- 4:27Speaker 2: the form off, lifting it up, and clamping it back on,
- 4:29Speaker 2: no saw cuts needed.
- 4:31Speaker 1: That's a huge lesson designed for the build, not just
- 4:34Speaker 1: the final product. Okay, let's talk about the loads the physics,
- 4:38Speaker 1: because when that concrete truck shows up, you're not dealing
- 4:41Speaker 1: with a solid anymore. You're dealing with a.
- 4:43Speaker 2: Liquid, a very heavy, very abrasive liquid. Fresh concrete is
- 4:47Speaker 2: about one hundred and fifty pounds per cubic foot. That's
- 4:49Speaker 2: almost two and a half times heavier than water. So
- 4:52Speaker 2: it exerts this huge hydrostatic pressure.
- 4:55Speaker 1: The book gives the formula P equals wh pressure is
- 4:59Speaker 1: weight time height. So a ten foot wall has massive
- 5:02Speaker 1: pressure at the bottom. But concrete doesn't stay a liquid,
- 5:08Speaker 1: it hardens. How does that play into it?
- 5:10Speaker 2: That is the single most critical variable. It's not just height,
- 5:14Speaker 2: it's the rate of placement, how fast you pour. Right,
- 5:16Speaker 2: if you pour that ten foot wall really slowly, maybe
- 5:19Speaker 2: two feet an hour, the concrete at the very bottom
- 5:23Speaker 2: has had five hours to start stiffening up. By the
- 5:25Speaker 2: time you're done, it starts to hold itself.
- 5:27Speaker 1: Up, so the pressure on the forms goes down.
- 5:29Speaker 2: Exactly, it stops acting like a pure liquid.
- 5:31Speaker 1: Yeah.
- 5:31Speaker 2: But if you're in a rush and you dump all
- 5:33Speaker 2: ten feet in one hour.
- 5:34Speaker 1: Then you get the full liquid pressure at the bottom. Yeah,
- 5:37Speaker 1: that's when things go boots.
- 5:38Speaker 2: That's when you get a blowout. You literally burst the
- 5:40Speaker 2: forms apart.
- 5:41Speaker 1: And temperature plays a role here too, right, Yeah, cold
- 5:43Speaker 1: weather must make this worse.
- 5:45Speaker 2: Oh significantly, the chemical reaction hydration. It slows way down
- 5:49Speaker 2: in the cold, So on a forty degree day, that
- 5:51Speaker 2: concrete stays liquid much much longer. A poor rate that
- 5:55Speaker 2: was perfectly safe in the summer could cause catatastrophic failure
- 5:59Speaker 2: in the winter because that pressure just doesn't go away wild.
- 6:02Speaker 1: So let's visualize the system that resists that pressure. Say
- 6:07Speaker 1: we're standing on the first floor and we're looking up
- 6:09Speaker 1: at the forms for the second floor slab. It's like
- 6:11Speaker 1: a forest of posts. What are we looking at?
- 6:14Speaker 2: Okay, let's follow the load. The wet concrete itself is
- 6:18Speaker 2: sitting directly on what we call the sheathing or decking.
- 6:22Speaker 2: This is usually a high grade plywood, often something called
- 6:25Speaker 2: ply form.
- 6:26Speaker 1: Okay, so plywood holds the concrete. What's holding up the plywood?
- 6:29Speaker 2: The plywood is sitting on. Joists. These are smaller wood beams,
- 6:32Speaker 2: like two by fours or maybe four by fours, and
- 6:35Speaker 2: they're spaced pretty close together, maybe twelve or sixteen inches apart.
- 6:38Speaker 1: Got it. So decking, then joists. What's next?
- 6:42Speaker 2: The joists transfer their load to the stringers. These are
- 6:44Speaker 2: bigger beams running perpendicular to the joists, maybe a four
- 6:47Speaker 2: by six or even a light steel beam. They collect
- 6:50Speaker 2: the load from a bunch of joists, and.
- 6:52Speaker 1: Then finally those stringers have to get the load to
- 6:54Speaker 1: the ground.
- 6:54Speaker 2: And that's the job of the shores. The vertical posts
- 6:57Speaker 2: today they're usually adjustable steel poles, but they can be timber.
- 7:01Speaker 2: They take all that weight down to the floor below.
- 7:03Speaker 1: Decking to joists to stringers to shores. It's a whole structural.
- 7:07Speaker 2: Hierarchy precisely, and every single one of those pieces has
- 7:11Speaker 2: to be checked for three things, bending, shear, and deflection.
- 7:16Speaker 1: Bending and sheer. I get that's things breaking, But why
- 7:19Speaker 1: is deflection such a big deal. It's just sagging, right,
- 7:21Speaker 1: It's not failing.
- 7:22Speaker 2: It's a quality issue, a huge one. The standard limit
- 7:25Speaker 2: is usually thirteen hundred and sixtieth of the span. If
- 7:29Speaker 2: your form SAgs more than that under the wet concrete,
- 7:32Speaker 2: your finished floor will have a permanent dip in it.
- 7:35Speaker 1: Oh, you're casting a mistake right into.
- 7:36Speaker 2: The building exactly, and fixing that later is a nightmare.
- 7:40Speaker 2: So you design the forms to be incredibly stiff, not
- 7:42Speaker 2: just strong.
- 7:43Speaker 1: That's for slabs, but wall forms are different. The pressure
- 7:47Speaker 1: is sideways. You can't push shores under a wall.
- 7:49Speaker 2: Right, So for walls you're basically making a sandwich. You
- 7:52Speaker 2: have plywood and studs on both sides. To keep the
- 7:55Speaker 2: two sides from just flying apart, you use ties.
- 7:57Speaker 1: Those are the little metal rods you see going through
- 7:59Speaker 1: the concrete.
- 8:00Speaker 2: Sometimes yep, it's a metal strip that goes straight through
- 8:03Speaker 2: the wall and connects the forms on both sides. It
- 8:06Speaker 2: works intension. It's what holds the whole thing together against
- 8:09Speaker 2: that bursting pressure. Without ties, you'd need impossibly huge external braces.
- 8:15Speaker 1: What happens to the tie when you're done? Does it
- 8:17Speaker 1: stay in there?
- 8:18Speaker 2: The middle part of it stays embitted in the concrete forever.
- 8:21Speaker 2: You just snap the ends off in a little recess
- 8:23Speaker 2: patch the hole, and it's gone.
- 8:25Speaker 1: I want to ask you about one weird thing from
- 8:27Speaker 1: the book Under Foundations. It mentioned void forms. Yeah, using
- 8:32Speaker 1: cardboard boxes under a concrete beam. That sounds like a
- 8:36Speaker 1: terrible idea.
- 8:37Speaker 2: It sounds totally sketchy, but it's brilliant engineering. It's for
- 8:40Speaker 2: places with expansive clay soils. Okay, that kind of soil
- 8:44Speaker 2: swells up when it gets wet, hees, if your foundation
- 8:47Speaker 2: beam is sitting right on it, that swelling can literally
- 8:49Speaker 2: lift your building up and crack it.
- 8:51Speaker 1: So you need an air gap under the beam.
- 8:53Speaker 2: You need an air gap, but you can't pour concrete
- 8:56Speaker 2: over thin air, So you use these really strong wax
- 8:59Speaker 2: coated cardboard boxes. They're strong enough to hold the weight
- 9:02Speaker 2: of the wet concrete while it cures, But over the
- 9:05Speaker 2: next few months, the moisture in the ground just disintegrates them.
- 9:09Speaker 2: They rot away, leaving a void, leaving the exact void
- 9:12Speaker 2: you need. So when the soil heaves, it just pushes
- 9:16Speaker 2: up into that empty space instead of your building. It's
- 9:19Speaker 2: a material designed to fail at the perfect time.
- 9:21Speaker 1: That's incredible. Okay, let's pivot to the most serious part
- 9:24Speaker 1: of this safety. The book makes it pretty clear that
- 9:27Speaker 1: when form work goes wrong, it goes very wrong.
- 9:30Speaker 2: It does, and a lot of failures come down to
- 9:33Speaker 2: underestimating what we call impact loads. You can't just calculate
- 9:36Speaker 2: the static weight of the concrete.
- 9:38Speaker 1: What do you mean by that, Well.
- 9:39Speaker 2: Picture a crane dropping a two ton bucket of concrete
- 9:42Speaker 2: from a few feet up. That's not a gentle placement.
- 9:45Speaker 2: It's a dynamic shockwave that slams into the forms. Or
- 9:48Speaker 2: think about workers driving motorized buggies full of concrete across
- 9:51Speaker 2: the deck.
- 9:52Speaker 1: So you have to over engineer it.
- 9:53Speaker 2: Standard practice is to add a construction live load on
- 9:56Speaker 2: top of everything, maybe fifty even seventy five pounds square foot,
- 10:01Speaker 2: just to account for the workers, their equipment, and those
- 10:03Speaker 2: sudden impacts. You never ever designed just for the concrete.
- 10:08Speaker 1: Then there's the other critical moment, taking the forms down, stripping,
- 10:13Speaker 1: and this is where the difference between a column and
- 10:15Speaker 1: a slab is like a life or death.
- 10:18Speaker 2: Decision absolutely think about what they're doing. A vertical column
- 10:21Speaker 2: is in compression. Once the concrete is hard enough to
- 10:24Speaker 2: hold its own shape, which can be just twelve to
- 10:26Speaker 2: twenty four hours, you can usually strip the forms. It's
- 10:29Speaker 2: just holding itself up.
- 10:30Speaker 1: But a slour slab is basically a bridge.
- 10:32Speaker 2: It's a bridge, it's spanning an open space. It's fighting
- 10:35Speaker 2: gravity with its bending strength, and concrete takes a long
- 10:39Speaker 2: time to get to its full strength, up to twenty
- 10:41Speaker 2: eight days. If you strip the forms from under a
- 10:43Speaker 2: slab after just one day, it will almost certainly collapse.
- 10:47Speaker 1: So you have to leave all that expensive formwork just
- 10:49Speaker 1: sitting there for weeks. That must kill the schedule.
- 10:51Speaker 2: This is where a process called reshoring comes in. It's
- 10:54Speaker 2: a very delicate dance. You might strip the main form work,
- 10:58Speaker 2: the plywood and joyce to you on the floor above,
- 11:01Speaker 2: but you immediately, and I mean immediately, put individual posts
- 11:05Speaker 2: back in the reshorts. They go right up against the
- 11:08Speaker 2: new concrete slab to keep supporting it as it finishes cuing.
- 11:12Speaker 1: So you're swapping the form work system for a simpler
- 11:14Speaker 1: shoring system exactly.
- 11:16Speaker 2: But if you do it wrong, if you strip too
- 11:18Speaker 2: big of an area at once before reshoring, you can
- 11:21Speaker 2: overstress and permanently damage the slab. It needs very close supervision.
- 11:26Speaker 1: Let's get into some of the cool tech, the specialized systems.
- 11:29Speaker 1: We're beyond two by fours now, let's start with slip forming.
- 11:32Speaker 2: Slipworming is amazing. You use it for really tall, continuous
- 11:36Speaker 2: things like silos or the core of a skyscraper. The
- 11:39Speaker 2: idea is you don't build the whole form at once.
- 11:41Speaker 2: You build a short ring of form work, maybe four feet.
- 11:44Speaker 1: Tall, and it just climbs.
- 11:46Speaker 2: It never stops. It's on a series of hydraulic jacks
- 11:49Speaker 2: that slowly continuously climb up steel rods. You're pouring concrete
- 11:55Speaker 2: into the top of this moving form. By the time
- 11:57Speaker 2: that concrete gets to the bottom of the four foot form,
- 12:00Speaker 2: it's just hard enough to hold its own shape as
- 12:02Speaker 2: the form slides past it.
- 12:03Speaker 1: It's like a three D printer for a building.
- 12:05Speaker 2: It really is. The logistics are crazy. It has to
- 12:07Speaker 2: run two hundred and four to seven. If you stop
- 12:10Speaker 2: the jacks, the concrete could stick to the form, and
- 12:12Speaker 2: then you've got a real problem.
- 12:14Speaker 1: Okay. Another one for high rises is the flying deck form.
- 12:17Speaker 1: That just sounds cool.
- 12:18Speaker 2: It is cool to watch. So in a big hotel
- 12:20Speaker 2: or a condo building where every floor is the same,
- 12:22Speaker 2: you don't build the forms piece by piece. You preassemble
- 12:26Speaker 2: a huge section of the floor form on the ground.
- 12:29Speaker 2: We call it a table. It might be a twenty
- 12:30Speaker 2: feet by fifty feet okay. You pour the slab on
- 12:33Speaker 2: top of it. Once it's cured, you lower the table
- 12:36Speaker 2: a few inches, put it on rollers, and literally push
- 12:38Speaker 2: the whole thing out the side of the building.
- 12:40Speaker 1: So you've got this massive table just hanging in mid
- 12:42Speaker 1: air exactly.
- 12:43Speaker 2: Then a crane hooks on, flies it up to the
- 12:46Speaker 2: next floor, and the crew just rolls it back into place.
- 12:49Speaker 2: It saves an enormous amount of labor.
- 12:51Speaker 1: I can't imagine guiding a two ton table into a
- 12:54Speaker 1: slot forty stories up.
- 12:55Speaker 2: It takes nerve and very calm weather.
- 12:58Speaker 1: Last one, bridges. How do you form a bridge deck
- 13:02Speaker 1: over a river. You can't put shores down.
- 13:04Speaker 2: No, you can't, So the form work has to hang.
- 13:07Speaker 2: It's suspended from the big steel or concrete beams that
- 13:10Speaker 2: are already in place. We use these heavy duty steel
- 13:13Speaker 2: hangers that drape over the top of the beams and
- 13:15Speaker 2: hold everything up from above and what.
- 13:17Speaker 1: About the edges, the overhangs for the sidewalk and stuff.
- 13:20Speaker 2: For that, you use overhang brackets. These are big triangular
- 13:23Speaker 2: steel frames that clamp onto the side of the outermost
- 13:26Speaker 2: bridge beam and cantilever out to hold that edge form.
- 13:29Speaker 2: The engineering on those has to be perfect.
- 13:31Speaker 1: Before we finish up. Let's touch on architectural concrete. This
- 13:35Speaker 1: is where the form stops being just structural and becomes
- 13:38Speaker 1: the finish right.
- 13:39Speaker 2: This is where the form work is the final look.
- 13:41Speaker 2: If an architect wants a wall that looks like it's
- 13:42Speaker 2: made of wood, you literally line the inside of the
- 13:45Speaker 2: form with rough boards to imprint that texture.
- 13:48Speaker 1: So the imperfections are the point. But what about the
- 13:51Speaker 1: seams between pores.
- 13:53Speaker 2: That's the challenge, the construction joint where one day's poor
- 13:56Speaker 2: stops and the next days begins. If you're not careful,
- 13:59Speaker 2: you get this ugly wavy line. So a good design,
- 14:03Speaker 2: we'll plan for that. You'll put a deliberate groove, a
- 14:06Speaker 2: rustication strip right where you plan to stop the poor.
- 14:10Speaker 1: You hide the scene by making it a feature.
- 14:12Speaker 2: You turn a bug into a feature exactly. It's planning
- 14:15Speaker 2: the construction as part of the architecture.
- 14:17Speaker 1: This has been amazing. We've gone from basic economics all
- 14:20Speaker 1: the way to flying tables and designing with cardboard. It
- 14:24Speaker 1: just reinforces that whole idea of the phantom structure being
- 14:27Speaker 1: as important as the final building.
- 14:29Speaker 2: Absolutely, a good engineer has to understand how things actually
- 14:32Speaker 2: get built.
- 14:33Speaker 1: Right, let's put that to the desk. It's time for
- 14:35Speaker 1: our view exercise. You've got a scenario for us.
- 14:38Speaker 2: I do so. Imagine you're the project manager on a
- 14:41Speaker 2: high rise. You are way behind schedule. Yesterday you poured
- 14:45Speaker 2: the concrete for the tenth floor. That includes the vertical
- 14:48Speaker 2: columns that will hold up the eleventh floor and the
- 14:50Speaker 2: horizontal floor slab of the tenth floor itself.
- 14:52Speaker 1: Okay, so columns and slab were both poured less than
- 14:55Speaker 1: twenty four hours ago.
- 14:56Speaker 2: Your foreman comes to you and says, Boss, I need
- 14:59Speaker 2: to get some forms moved. Can I strip the column forms?
- 15:02Speaker 2: And can I strip the forms under the slab? What
- 15:04Speaker 2: do you tell them?
- 15:05Speaker 1: Listener, think about it, columns versus the slab? Who is
- 15:09Speaker 1: doing what job?
- 15:10Speaker 2: The answer is, you can almost certainly strip the columns,
- 15:14Speaker 2: but you absolutely, under no circumstances can strip the slab.
- 15:19Speaker 1: Okay, break down the wy one last time.
- 15:21Speaker 2: The columns are in compression, they just need to hold
- 15:23Speaker 2: their own weight up, which they can do very quickly,
- 15:26Speaker 2: often in twelve to twenty four hours. But the slab
- 15:29Speaker 2: is in bending. It has to span a huge distance
- 15:31Speaker 2: and hold up its own massive dead weight. It has
- 15:34Speaker 2: not developed nearly enough strength yet to do that. If
- 15:37Speaker 2: you pull those forms, it will crack or worse, collapse.
- 15:41Speaker 2: Those forms have to stay for days, maybe weeks, or
- 15:44Speaker 2: be very carefully reshored.
- 15:46Speaker 1: Physics does not care about your project schedule, does not
- 15:48Speaker 1: care at all. A huge thank you to everyone for
- 15:50Speaker 1: joining us on this deep dive into form work for
- 15:53Speaker 1: concrete structures. It's a great reminder that some of the
- 15:56Speaker 1: most complex engineering is the part you never see in
- 15:59Speaker 1: the finished building.
- 16:00Speaker 2: That's right, next time you see a smooth concrete wall,
- 16:04Speaker 2: think about all the pressure it had to withstand. Stay
- 16:07Speaker 2: safe out there.