Latest / Mechanical Engineering Made Simple / (#25) The Engineering Secrets of HVAC: Why Cutting Fan Speed Tanks Energy Costs and the Physics of VAV Systems
Transcript
- 0:00Welcome back, design jockeys, to Mechanical Engineering Made
- 0:02Simple. Today we are taking a really
- 0:05deep dive into the actual engineering behind controlling
- 0:08our indoor environments. We're going way past just, you
- 0:11know, fiddling with a thermostat.
- 0:12We're talking system architecture, thermodynamics,
- 0:15the real physics needed to keep a modern building comfortable
- 0:19all year long, no matter what's happening outside.
- 0:21That's exactly right. And today we're drawing on some
- 0:23core engineering fundamentals, design practices from pretty
- 0:27technical guidelines on indoor environmental control.
- 0:30We'll focus mostly on central HVAC systems, how you select the
- 0:34key components and that really complex job of air distribution,
- 0:38you know, duct design. OK.
- 0:40And before we jump into the deep end, here's our goal for you
- 0:42today. Stick with us and we're going to
- 0:45unpack maybe the biggest secret in HVAC efficiency.
- 0:49We'll show you why making a variable air volume fan a VAV
- 0:52system run at half speed doesn't just cut power use in half.
- 0:55Oh no, it absolutely tanks. It drastically reduces it, and
- 0:59that leads to, well, astonishing savings and operating costs for
- 1:02big buildings. It's a fundamental engineering
- 1:05trade off that honestly, it changed commercial design.
- 1:08All right, let's start unpacking this right at the core, the
- 1:10absolute heart of the operation, the central system doesn't
- 1:14matter if it's built up equipment, you know, constructed
- 1:16piece by piece on site or big sub assembled units shipped in.
- 1:21This is the engine room for year round conditioning.
- 1:23Yeah, the. Engine room.
- 1:25Good analogy. We're talking everything.
- 1:27The boiler for heat, the chiller for cooling, all the pumps, the
- 1:30piping and crucially, the air handling components.
- 1:33Those are the bits that actually touch the air going into the
- 1:36space. Right.
- 1:37And I guess the first big decision engineers face is how
- 1:40that conditioned air actually gets delivered.
- 1:42Exactly. And today we're focusing on what
- 1:45are called all air systems. That just means the system uses
- 1:49only air movement to handle both the sensible part, the
- 1:52temperature change, and the latent part, which is moisture
- 1:55control. And the type of system you
- 1:57choose dictates how much control you get in different areas or
- 2:00zones. Absolutely.
- 2:02The simplest setup is usually a single path system.
- 2:04These are pretty basic. All the air gets conditioned to
- 2:07one single temperature and then that same air goes through
- 2:11common ducts to every single area.
- 2:12OK, so. Cheap, but maybe not ideal if I
- 2:15have an office facing the sun and one facing north.
- 2:18They both get the exact same air temperature, yeah, which can be
- 2:22limiting. Right.
- 2:23Seems very limiting for complex places like, I don't know, a
- 2:26hospital or a university building where the heating and
- 2:29cooling needs are just all over the map, correct?
- 2:31So that must be where the dual path systems come in to play.
- 2:34You got it. Dual path is for hyper precise
- 2:36temperature delivery. You actually maintain 2
- 2:39completely separate air streams in ducts, 1 cold, one warm, and
- 2:43then these streams get mixed either right at the end just
- 2:46before the air enters the room. That's a true dual duct system.
- 2:49Or sometimes they're blended centrally back at the main fan
- 2:52unit. OK, more complex, but you get
- 2:55that fine control. Exactly.
- 2:56The complexity pays off because you can satisfy, you know, a
- 2:59freezing corner lecture hall and an overheating server room down
- 3:03the hall at the same time. OK, now let's talk about
- 3:05something that sounds, well, frankly nuts on the surface.
- 3:08The reheat system. Are you telling me engineers
- 3:11actually design systems that chill air down maybe to like 13°
- 3:15C essentially, only to then use more energy locally to heat it
- 3:20back up to maybe 18° C? That just sounds incredibly
- 3:23wasteful. Why?
- 3:24It does sound like a thermodynamic crime, doesn't it?
- 3:26But reheat is sometimes necessary.
- 3:28It's used when you need absolutely tight control over
- 3:32both temperature and humidity in a space, or maybe for perimeter
- 3:36zones that get wildly different sun exposure.
- 3:38So you often have to cool the air quite a bit just to wring
- 3:41the moisture out. That's the latent cooling part.
- 3:43And if doing that makes the space too cold, well, you have
- 3:45to add some sensible heat back in to keep people.
- 3:47Comfortable. OK, so the main goal there is
- 3:50humidity control 1st and then you fix the temperature
- 3:53afterward if you overshot. That's the idea, and to try and
- 3:56claw back some of that massive energy penalty.
- 4:00Good designs absolutely must use something called Reset control.
- 4:04This basically tells the system to keep the cold air coil
- 4:08running at the absolute warmest temperature it can while still
- 4:11meeting the cooling and dehumidification needs.
- 4:14It minimizes how much reheating you have to do later.
- 4:16OK, so reheat is the sort of necessary evil in some cases.
- 4:20Then the modern hero must be the variable air volume system VAV.
- 4:25Absolutely. VAV is just brilliant.
- 4:27It handles varying lows not by messing with temperature
- 4:29directly like reheat does, but simply by changing the volume of
- 4:33air supplied through a single duct.
- 4:35Room gets too warm? Open the damper, give it more
- 4:38cool air. Rooms getting chilly?
- 4:39Throttle that air flow way back. So each outlet, each diffuser
- 4:43basically becomes its own little controllable zone, Pretty much.
- 4:46Which means lower initial costs, right?
- 4:48Fewer ducts? Simpler controls maybe?
- 4:49Generally yes, single duct ones are cheaper.
- 4:52And the big one, the lowest operating costs of pretty much
- 4:55any all air system, especially in big buildings where one side
- 4:58is hot and the other's cold. That's the key advantage,
- 5:01especially with low diversity and VAV tech has gotten really
- 5:04good. Modern systems can throttle the
- 5:07air volume way down, sometimes as low as 10% of the maximum
- 5:10design flow. 10% Wow. Yeah, which makes it practical
- 5:13even for those tricky perimeter areas with huge swings and
- 5:17cooling needs. We should add, though VAV is
- 5:20primarily a cooling system at heart, it really shines in
- 5:22buildings with big internal loads.
- 5:25Think offices, data centers, places like that.
- 5:27OK, we've got the basic architectures.
- 5:29The what? Let's switch gears to the how
- 5:31much. If VAV is all about varying air
- 5:34volume, how does an engineer figure out the maximum volume
- 5:38they need to plan for? So we start with smaller
- 5:41systems, light commercial cooling stuff under say 10 tons
- 5:45or 35 kilowatts. OK.
- 5:46Yeah. For that kind of typical light
- 5:48commercial packaged unit, when you look at the manufacturer's
- 5:51data, you'll usually see a coil sensible heat factor, the SHF.
- 5:54It's typically around 0.75 to maybe .8.
- 5:58Sensible heat factor SHF. OK, what does that tell us?
- 6:01It's a critical number. It tells you what fraction of
- 6:04the units total cooling power is actually going towards lowering
- 6:08the air temperature. That's the sensible part.
- 6:10The rest is going towards removing moisture, the latent
- 6:13part. So an SHF of .8 means 80% of the
- 6:17cooling energy drops the temperature, 20% pulls out
- 6:20humidity. Exactly, and getting that
- 6:22balance right is crucial for comfort.
- 6:24People feel sticky if the latent load isn't handled, even if the
- 6:27temperature is OK. Now for just rough sizing,
- 6:30getting a ballpark air quantity for this kind of equipment,
- 6:34there is a common rule of thumb engineers use.
- 6:37The air quantity needed is typically about 400 CFN per ton
- 6:41of cooling. 400 cubic feet per minute per ton.
- 6:44Or in SI units, that's about 0.0537 cubic meters per second
- 6:50per kilowatt of cooling. You use that to get your total
- 6:52air flow, and then you divide that total amount among the
- 6:55different rooms based on how much cooling each specific room
- 6:58actually needs. OK, that sounds reasonably
- 7:01straightforward for a basic calculation like a snapshot in
- 7:03time, but you mentioned earlier that figuring out the real
- 7:07energy use over a whole year is actually way more complicated
- 7:11than just that rule of thumb. What makes it so tricky?
- 7:13It's the building itself. The biggest complicating factor
- 7:16by far is the thermal energy storage in the building
- 7:19structure. Think about it, The heavy
- 7:21concrete floors, the thick walls, even the furniture
- 7:24inside. They all soak up heat during the
- 7:26day like a giant thermal battery.
- 7:28And then they release it later. Exactly.
- 7:30They release it slowly hours later.
- 7:32So the sun might be strongest outside at, say, 2:00 PM hitting
- 7:35the walls, but the actual peak cooling load the HVAC system
- 7:39feels might not happen until 5:00 PM or even later as all
- 7:43that stored heat bleeds back out into the space.
- 7:46Precisely. You get this time lag, and the
- 7:49peak load the system sees can be quite different from the peak
- 7:51instantaneous load calculated from just weather and internal
- 7:55gains. So to get a truly reliable
- 7:58estimate of how much energy the building will use over a year,
- 8:01you really need a complex hour by hour computer simulations.
- 8:05These use typical weather data for the location and model how
- 8:08the building mass absorbs and releases heat.
- 8:11Simple hand calculations like for houses are really just
- 8:15adapted using average compressor runtime data from studies.
- 8:18You absolutely have to account for that building inertia.
- 8:21Got it. That thermal mass changes
- 8:22everything for accurate energy prediction.
- 8:25OK, so the building mass determines the load, but the
- 8:28fans are the muscles doing the work to meet that load.
- 8:32Let's talk about the air movers themselves.
- 8:33Right. The main workhorse, the one you
- 8:35see most often in HVAC, is the centrifugal fan.
- 8:38It's incredibly versatile. It can move small or huge
- 8:41amounts of air, and it can work against low or very high
- 8:43pressures, which makes it great for complex duct systems.
- 8:46OK, centrifugal, what's the alternative?
- 8:48Then you have axial flow fans, think venaxial or two back seal
- 8:52types. They look more like a propeller
- 8:54and a tube. These guys move massive volumes
- 8:57of air, but they generally can't push against high pressures as
- 8:59well, and they tend to be noisier.
- 9:02OK, different tools for different jobs.
- 9:06Now, when we talk about turning electricity into moving air,
- 9:09efficiency is key. How do we measure fan
- 9:12efficiency? There are two main ways.
- 9:14The most common one in standard US practice is total fan
- 9:17efficiency, which we write as ETA sub T Conceptually, it's
- 9:21just a ratio. How much useful air power did we
- 9:23get out compared to the electrical power we put into the
- 9:26fan motor shaft? And there's an equation for
- 9:28that. Yep, the standard form is ETA
- 9:30sub T = Q times the change in total pressure, which is P sub T
- 9:341 -, P sub T2 all divided by 6350 times the shaft power W sub
- 9:40dish. Basically flow rate times
- 9:42pressure change divided by input power with a conversion
- 9:45constant. OK, so that lets you check if
- 9:47the fan is performing as advertised and you mentioned a
- 9:50second efficiency. Right.
- 9:51There's also static fan efficiency ETA subsets.
- 9:54It's calculated almost the same way, but it uses the change in
- 9:57static pressure instead of total pressure.
- 10:00A slightly different perspective on performance.
- 10:02Got it. OK, now for the really cool
- 10:03part. This is where the Vav magic
- 10:05happens. It's like fan loss.
- 10:08These are fundamental right. Absolutely fundamental.
- 10:10These govern how fans behave when you change their speed.
- 10:13There are three main laws that are incredibly useful.
- 10:16One, capacity. The volume of air moved your
- 10:20CFM, or cubic meters per second is directly proportional to the
- 10:23fan speed. Speed goes up 10%, flow goes up
- 10:2610%. Simple.
- 10:28Linear relationship makes sense to.
- 10:30The pressure the fan develops is proportional to the square of
- 10:33the fan speed. Speed goes up 10%, pressure goes
- 10:35up 21%. That's 1.1 ^2.
- 10:38Square law for pressure, OK. And three, this is the big one.
- 10:41The power needed to drive the fan is proportional to the cube
- 10:45of the fan speed, the. Cube right?
- 10:47So if you double the fan speed. You need 8 times the power 2 ^3.
- 10:50And conversely if you cut the fan speed in half like AVAV
- 10:53system does when the load drops. You don't use half the power,
- 10:56you use 1/2 ^3 of the power. Which is 1/8.
- 11:00You only use 12 1/2 percent the original power.
- 11:03Precisely that cubic relationship is the absolute
- 11:07game changer for VAV energy savings.
- 11:10Wow, so even though putting in the variable speed drives the
- 11:14VFD's or magnetic couplings costs more upfront?
- 11:19The drastically lower power consumption over the building's
- 11:22life just blows away that initial cost.
- 11:24That single piece of physics is why VAV dominates large
- 11:28commercial buildings. From an operating cost
- 11:30perspective, it's just huge savings.
- 11:32Amazing physics paying the bills.
- 11:34You could say that now, shifting from the powerhouse, the fan
- 11:37room, let's think about the delivery network, the ducts.
- 11:40Ultimately the goal of all this duct work, the air distribution
- 11:43system, is to create the right mix, temperature, humidity, air
- 11:47movement right there in the occupied space where people
- 11:49actually are. We need to achieve what we call
- 11:51acceptable thermal comfort. And just like energy is lost in
- 11:54wires, energy is lost in ducts due to friction, right?
- 11:57There's physics governing that too.
- 11:58Oh, absolutely. We use the total head
- 12:00relationship to understand it. The detailed equation is
- 12:03complex, but the core idea is simple.
- 12:05OK, give us the concept. The total pressure of the air,
- 12:08let's call it P sub O, Always, always decreases as the air
- 12:11flows down the duct. So if you measure it at .1 P sub
- 12:15O1 and then downstream at .2 P sub O2P, sub O1 will always be
- 12:20higher. The difference is the energy
- 12:22lost to friction, what we call lost head.
- 12:25Often written as I sub F. So mathematically something like
- 12:29P sub O1 divided by density rho, ignoring the G sub C factor for
- 12:34simplicity here equals P sub O2 divided by rho plus that lost
- 12:39head term I sub F. Essentially, yes.
- 12:42P sub O one over rho equals P sub O2 over rho plus I sub F
- 12:45Total pressure drops because of friction loss, and engineers
- 12:48spend a lot of time trying to minimize that.
- 12:49I sub F because every bit of pressure the fan has to generate
- 12:52to overcome that loss costs energy, costs money.
- 12:54Makes sense, and one way to minimize loss is choosing the
- 12:57duct shape, right? You often see rectangular ducts
- 12:59because they fit nicely above ceilings, but circles are better
- 13:02aerodynamically. That's correct.
- 13:04For the same cross-sectional area carrying the same amount of
- 13:07air, a rectangular duct will always have more friction loss
- 13:11than a perfectly round duct. It's just physics.
- 13:14More surface area for the air to drag against, relatively
- 13:17speaking. So how do designers account for
- 13:19that when they're sizing rectangular ducts?
- 13:21They use a concept called the equivalent diameter, usually
- 13:24written as D sub E. There's a specific formula for
- 13:27it. D sub E equals 1.3 * ( A * B
- 13:33close parenthesis raised to the power of 5/8, all divided by ( a
- 13:37+ b ) raised to the power of 1/4, where A&B are the side
- 13:42lengths of the rectangle. OK, a bit complex, but the point
- 13:45is. The point is, it lets you
- 13:46calculate a circular duct diameter that would have the
- 13:49exact same friction loss per foot as your rectangular duct,
- 13:52so you can then use standard friction loss charts or software
- 13:55designed for circular ducts even when you're actually installing
- 13:59rectangular ones. It standardizes the calculation.
- 14:01Clever. OK, so once you know how to
- 14:03calculate friction, how do you actually lay out the whole duct
- 14:07system? What are the main design
- 14:08methods? Maybe for standard low velocity
- 14:11systems first? There are two main traditional
- 14:14approaches. The first is the equal friction
- 14:16method. It's pretty much what it sounds
- 14:17like. You design the system so that
- 14:20the pressure laws per foot of duct is the same everywhere for
- 14:24the main ducts on all the branches.
- 14:26OK, sounds equal. Simple.
- 14:29It's relatively simple to calculate, yes, that's its main
- 14:32advantage, but the downside is that the duct runs going to the
- 14:36nearest rooms will have very little total pressure loss
- 14:39compared to the runs going to the farthest rooms.
- 14:42So you end up needing to choke down the airflow to the closer
- 14:45rooms with dampers. Exactly.
- 14:47You often need significant dampering on the shorter runs to
- 14:50balance the airflow, and those dampers can be noisy if you have
- 14:53to close them down a lot. That's a major comfort issue.
- 14:55Right, Nobody wants a hissing diffuser overhead, so equal
- 14:59friction is maybe easy for the designer but potentially
- 15:03annoying for the occupant. What's the alternative?
- 15:06The alternative is often called the balanced capacity method,
- 15:10sometimes static regain, though that's more specific.
- 15:13The goal here is much more sophisticated.
- 15:15You try to size the ducts, such as the total pressure loss from
- 15:19the fan to every single air outlet is naturally equal or
- 15:22very close to equal. So ideally you wouldn't need
- 15:25much dampering at all. That's the goal.
- 15:27It should theory theoretically self balance the airflow to each
- 15:30outlet based purely on the duct sizing.
- 15:34It's much more accurate in terms of delivering the intended
- 15:36airflow, and usually results in a quieter system.
- 15:39But it's significantly more complex to design.
- 15:42It takes more calculation time, more iteration.
- 15:45OK, trade-offs as always. Now what about those situations
- 15:48where space is just incredibly tight?
- 15:50Like cramming ducks into the ceiling of a high rise building
- 15:54where every inch cost money. Right, when space is really at a
- 15:57premium, maybe due due to high construction costs or just
- 16:00architectural constraints, designers often shift to high
- 16:02velocity systems. Instead of large ducts with air
- 16:05moving slowly, you use smaller ducts with air moving much
- 16:08faster. Which means you need more
- 16:10pressure from the fan to overcome the higher friction.
- 16:13A lot more pressure, yes. You might see friction rates up
- 16:16to say 0.7 inches of water gauge per 100 feet of duct, which is
- 16:22quite high. But you can't just blast air
- 16:24into a room at that speed and pressure.
- 16:25It'd be like a hurricane. Exactly.
- 16:28So high velocity systems rely heavily on specialized terminal
- 16:31boxes located near the actual room or space.
- 16:35These boxes are crucial. They take that high pressure,
- 16:37high velocity air from the small duct.
- 16:39They throttle it down to reduce the pressure and velocity.
- 16:42They often have controls to regulate the flow volume like
- 16:45AVAV box. And very importantly, they
- 16:48contain sound attenuating materials to reduce the noise
- 16:52before the air finally enters the occupied space through a
- 16:55diffuser. So the terminal box is like a
- 16:57combination and pressure reducer, flow controller and
- 17:00muffler all in one unit near the room.
- 17:02That's a pretty good description.
- 17:03Yeah. OK, let's pull this all back
- 17:05together. We've gone through systems,
- 17:06sizing, fans, ducts, but the whole point, the entire goal of
- 17:10all this intricate mechanical engineering is ultimately about
- 17:13the people in the building. It's about human comfort.
- 17:16Right. Comfort isn't just temperature,
- 17:17is it? Not at all.
- 17:19It's a complex mix. It involves the air temperature,
- 17:21yes, but also the radiant temperature from surfaces around
- 17:25you, the humidity level, and how much the air is moving.
- 17:28Get any of those wrong and people feel uncomfortable.
- 17:31We actually have a standard for this, HHRA Standard 55, which
- 17:34tries to define the conditions under which at least 80% of
- 17:38occupants will find the environment thermally
- 17:40acceptable. That's kind of the benchmark.
- 17:4280% so you can't please everyone, but that's the target.
- 17:46And besides comfort, there's the health aspect, the actual air
- 17:49quality you have to bring in fresh air.
- 17:51Absolutely non negotiable. You need minimum outdoor air
- 17:54ventilation rates primarily to dilute the carbon dioxide that
- 17:58people breathe out, but also other indoor pollutants.
- 18:01The baseline minimum is generally never less than 15
- 18:04CFM. That's cubic feet per minute, or
- 18:06about 7.5 liters per second of fresh outdoor air per person.
- 18:10That's a fundamental safety requirement.
- 18:12And thinking bigger picture, this ties into environmental
- 18:15control generally, doesn't it? The HVAC system isn't just doing
- 18:18temperature, it's often acting as an air cleaner too.
- 18:21It really is, especially when you consider outdoor air
- 18:24quality. Many specialized air handling
- 18:26systems are designed specifically to deal with or at
- 18:29least mitigate common outdoor air pollutants, things
- 18:32classified as criteria pollutants.
- 18:33We're talking carbon monoxide, nitrogen dioxide, sulfur
- 18:36dioxide, ozone, and especially particulate matter.
- 18:39PM 2.5 and PM 10. The filtration choices, the air
- 18:42exchange rates, maintaining building pressure, these are all
- 18:45critical for protecting occupants from what might be
- 18:47outside. So the mechanical system becomes
- 18:49a key part of the building's defense against pollution.
- 18:53Fascinating overlap. OK, that brings us to our final
- 18:56provocative thought for you, our listeners, to chew on.
- 18:59We just spent time on how that cubic relationship in the fan
- 19:02laws makes VAV systems incredibly energy efficient over
- 19:05their lifetime because cutting speed saves so much power.
- 19:09So given that massive long term savings potential, why might a
- 19:12design team still sometimes choose a slightly noisier, maybe
- 19:16less efficient constant volume fan, like a simple centrifugal
- 19:19fan, if doing so significantly simplifies the ductwork layout,
- 19:23maybe uses less material initially, lowers the first cost
- 19:26of the project? Think about that inherent
- 19:28engineering tension, the trade off between spending less money
- 19:32upfront versus saving much more money over decades of operation.
- 19:35Where do you draw the line? Until the next equation design
- 19:37junkies, we are mechanical engineering made simple.