- 0:05Welcome to the Remodel Report, the show where
- 0:08we take the guesswork out of kitchen and bathroom
- 0:11remodeling. I'm Chris and today we're walking
- 0:14through something every homeowner wonders about
- 0:17before they start. What actually happens step
- 0:20by step from the very first conversation to the
- 0:24day the crew packs up and you're standing in
- 0:27a finished kitchen. With me as always is Jessica.
- 0:32Jessica, welcome back. Thanks, Chris. Glad to
- 0:35be here, because this is the topic that quietly
- 0:38decides whether a remodel feels exciting or exhausting.
- 0:42Today we're going through the six -step remodeling
- 0:44process that USA Cabinet Store uses across its
- 0:4713 showrooms. And the reason a defined process
- 0:50matters is simple. Most remodeling stress doesn't
- 0:53come from the hammering. It comes from not knowing
- 0:55things. What will this cost? What will it look
- 0:58like? Who do I call when something comes up?
- 1:01A good process answers those questions before
- 1:04anyone picks up a tool. Okay, so let's start
- 1:06with the question everyone asks first. How long
- 1:09does all of this take? Here are the on -site
- 1:11numbers, meaning once work actually starts in
- 1:14your home. A cosmetic kitchen update usually
- 1:17takes two to four weeks. A mid -range kitchen
- 1:20runs six to ten weeks. And a high -end renovation
- 1:23that moves walls or plumbing can take 12 to 20
- 1:26weeks, sometimes longer. Bathrooms are typically
- 1:29two to six weeks on -site. The keywords there
- 1:32are on -site. Design, ordering, and permits all
- 1:35happen before that clock starts, and we'll get
- 1:38to those. Good distinction. All right, take us
- 1:40through it. Step one. Step one is the consultation
- 1:44and your project goals. It's a free design consultation,
- 1:48about 60 minutes, with no obligation and no charge.
- 1:51You can do it at a showroom, in your home, or
- 1:54virtually. And you don't need to show up with
- 1:56a finished plan. Rough measurements are great.
- 1:59But ideas alone are fine, too. You talk through
- 2:02your goals, your budget, your style, and your
- 2:04timeline with the designer. What you walk away
- 2:07with is a project brief and a clear recommended
- 2:10next step. Your job in this step is simply to
- 2:13share your wish list, your budget, and your timeline
- 2:15honestly. I like that ideas alone are fine part
- 2:19because a lot of people put off calling anyone
- 2:21until they feel ready. What's step two? Step
- 2:25two is measurements and discovery. A designer
- 2:28and a measure specialist gather exact measurements,
- 2:31identify layout constraints, and sort out what
- 2:34needs to stay, what can move, and what should
- 2:36change. One detail worth knowing. For homes built
- 2:40before 1978, this step includes lead paint testing,
- 2:45which is a smart thing to settle before any walls
- 2:47get opened up. You receive measured drawings
- 2:50and a clear picture of your site constraints.
- 2:53Your role is to provide access and flag anything
- 2:55you definitely want to keep. And then comes the
- 2:58fun part, I'm guessing. It really is. Step three
- 3:02is 3D design and layout review. A designer and
- 3:05a 3D specialist build out your space so you can
- 3:08see cabinet placement, storage, how the countertops
- 3:11flow, where the fixtures land, and the overall
- 3:14look, all before anything is ordered. This is
- 3:17the answer to one of the most common worries,
- 3:19which is, I just can't picture the result. You
- 3:23review the renderings, mark the changes you want,
- 3:26and approve a direction. And honestly, it's a
- 3:29lot cheaper to move a cabinet on a screen than
- 3:31on a wall. That's a great way to put it. Okay,
- 3:34step four is where I would personally get lost.
- 3:37Materials. You're not alone. Step four is material
- 3:41selection, and it's where decision fatigue usually
- 3:44hits. Cabinets, countertops, tile, fixtures,
- 3:48hardware, flooring, finishes. Instead of guessing
- 3:52on your own, you compare samples with your designer
- 3:54and make the selections together. A nice detail
- 3:57here. Countertops are templated and installed
- 4:00by USA Cabinet Store's own team as part of the
- 4:02project, so that's not a separate contractor
- 4:05you have to chase. You come out of this step
- 4:07with a final selection sheet that covers every
- 4:09material. And then we get to the part everyone
- 4:12is nervous about. Money. Step five is scope,
- 4:16estimate, and approvals. Your designer and your
- 4:18project manager walk you through a detailed scope
- 4:21and a line item estimate. covering product details,
- 4:24labor expectations, budget drivers, and any change
- 4:28decisions. It also helps to know the typical
- 4:31budget split going in. Cabinets are usually 30
- 4:34to 40 percent of the budget. Labor runs 20 to
- 4:3835 percent on a cosmetic project and 35 to 50
- 4:42percent on a full remodel. Appliances take 10
- 4:46to 20 percent and countertops 10 to 15 percent.
- 4:50Interesting that labor jumps that much on a full
- 4:52remodel. Can you give people a ballpark on the
- 4:54overall cost? Sure. The average cost of a kitchen
- 4:58remodel nationally is about $27 ,000 to $35 ,000.
- 5:02And in Northern Virginia, it runs roughly twice
- 5:05that. And yes, labor climbs on bigger projects,
- 5:09because moving plumbing, electrical, and walls
- 5:11is where the hours go. The final number depends
- 5:14on room size, layout changes, the cabinet line,
- 5:18the countertop material, tile, fixtures, plumbing,
- 5:23electrical flooring, permits, and the installation
- 5:25scope. The whole point of step five is that you
- 5:29see all of that before you order anything, not
- 5:32halfway through the job. Okay, step six, ordering,
- 5:35scheduling, and installation. What should people
- 5:37expect on lead times? Cabinets set the pace and
- 5:40the clock starts at final design sign -off. Locally
- 5:43stocked ready -to -assemble cabinets can be available
- 5:46in a matter of days. Stock lines take about two
- 5:49to five weeks. Semi -custom runs 5 to 9 weeks,
- 5:53and custom takes 7 to 11 weeks. Permits, when
- 5:56they're needed, take about 1 to 2 weeks for a
- 5:58simple job, or 3 to 6 weeks if there's structural,
- 6:02electrical, or plumbing work. Then the on -site
- 6:05work begins, run by a project manager together
- 6:07with the installers and the delivery team. Your
- 6:10role at this stage is mostly to be available
- 6:12for delivery and for the final walkthrough, where
- 6:16everything gets reviewed and the project is closed
- 6:18out. One thing I hear from homeowners all the
- 6:20time is, I never knew who was actually responsible
- 6:23for what. How does this process handle that?
- 6:26With one clear path, one designer guides your
- 6:29plan, one project manager runs your install,
- 6:33and you have one point of contact for every question
- 6:35from the first consultation all the way through
- 6:38the final walkthrough. On top of that, there's
- 6:41a scope confirmation habit built in. Measurements,
- 6:45product details, Installation expectations and
- 6:48change decisions all get confirmed before the
- 6:51work moves forward. That's what keeps surprises
- 6:54small. Love that. Let's wrap up with the key
- 6:57takeaways. If someone remembers four things from
- 6:59this episode, what should they be? One, see it
- 7:03before you build it. A 3D design lets you fix
- 7:06layout problems on a screen instead of on site.
- 7:09Two, know where your money goes before you order,
- 7:13with a line item estimate and that typical budget
- 7:15split in mind. Three, remember that cabinet lead
- 7:19times and permits come before the onsite clock
- 7:21starts, so plan your calendar around them. And
- 7:25four, know exactly who your designer and your
- 7:27project manager are, so you always know who to
- 7:30call. Perfect. If you're thinking about a kitchen
- 7:33or bathroom remodel, you can book a free 60 -minute
- 7:36design consultation with USA Cabinet Store at
- 7:39a showroom in your home or online. They have
- 7:4213 showrooms across seven states, Virginia, Maryland,
- 7:46North Carolina, Texas, New Jersey, Florida, and
- 7:50Tennessee. If you're still gathering ideas, browse
- 7:53their real kitchen and bath projects first. And
- 7:56if pricing is the big question, their budgeting
- 7:59questions guide is a great place to start. It's
- 8:02all at usacabinetstore .com. Jessica, thanks
- 8:05so much. Thanks, Chris, and thanks to everyone
- 8:08listening. Plan first, build second, and we'll
- 8:11see you next time on the Remodel Report.