- 0:00well, hi everyone.
- 0:01Welcome to On the Lake with James ov.
- 0:03I'm here today to give you the real deal on site development, and construction costs for your cottage project in Muskoka, Halliburton, the coauthors, even the Quinny.
- 0:12We've been working on all of them, and guess what?
- 0:14I've got real costs for you and real time schedules and all that.
- 0:19I'm gonna let you know what it takes to build your dream.
- 0:21Let's listen in and let me know what you think.
- 0:24your are listening to On the Lake, the podcast that explores the rhythms of waterfront living and what it takes to build your dream Lakeside home on the Canadian Shield.
- 0:33And now for your host, James Pitcher Pav.
- 0:36Ah.
- 0:37The reality of building a cottage, how much does it cost, James?
- 0:42I'm asked how much is it going to cost to clear our site, get the hydro in, get the septic built water supply.
- 0:54Access to the site in the winter and the summer.
- 0:57There's a lot that goes into a cottage build before the build.
- 1:01This is why when we hear construction costs, how much does it cost to build?
- 1:05Is it$400 a square foot?
- 1:06Is it$500?
- 1:07Is it$800?
- 1:09Why do there cottage cost so much?
- 1:11Well, here's some of the factors to consider.
- 1:14You have the amazing cottage, uh, property in a lot of cases we're we need to clear the land.
- 1:21There's bed work on the site.
- 1:22Sometimes there's a little bit of blasting to be done, and we would need to make sure that we can get our services in.
- 1:29Now, this varies with every project site I build and design cottages, luxury homes in Muskoka, in the Kartha via Quinte and elsewhere.
- 1:43And every property, every site's a little bit different.
- 1:46So even before we are looking at construction costs.
- 1:51I can be assured by the, the data that I've developed from our projects that chances are that there are between 40 to hundred thousand dollars worth of site clearing.
- 2:05Now, in addition to that, there's permit fees, consultants, engineering consultants.
- 2:10That is, which can add 60 40 to 60, uh, thousand to a project for a one of a kind project that is.
- 2:20And then there are the actual construction costs.
- 2:22Now instead of the actual construction costs, what I like to go buy is.
- 2:26What did they get built and how much did it cost?
- 2:28Like what is the real deal on the cost?
- 2:31So when people come in and I say, our sweet spot has been around$600 per square foot for the types of projects that we have done for the specifications that we have done, you can rest assured that that's backed up by data.
- 2:45Now if you're asking a contractor or a builder and they're telling you, oh, for certain we can get this thing built for 350 bucks a square foot, well.
- 2:54That would be difficult for the type of quality people are expecting for their special project.
- 3:00So if it is a, if your builder is, uh, familiar or, or comfortable building a track style subdivision style place for you, if it's a investment or if it's a resale, uh, yes, everything's possible, that's a possibility.
- 3:15But for the types of projects that we do, a lot of them will come in that, um, 6, 6 50 range.
- 3:22That gets you good materials, and that is based on cost, relationships that we have with suppliers and trades.
- 3:30We can get a lot of cottage built, at those costs.
- 3:32Now the caveat is if you have super specific tastes, the sky's the limit.
- 3:40And a lot of the cottage that you see built, they will come in.
- 3:43Yes, they will come in$800 a square foot, even higher.
- 3:45So I like to get people started in the, uh, in the realistic zone.
- 3:49Now.
- 3:51So the way that I think about it is this, James, show us a cottage that you have built and what were the costs and what, what were the timeframes and, and you'll find that a lot of cottages, well, let's put it this way.
- 4:05How much does the cottage cost to build?
- 4:07Let's think about how much cottage you need for of all, if you're building a four to five or 6,000 square foot cottage, it's not really a cottage anymore.
- 4:14And even if you're building it for$400 a square foot.
- 4:18The costs are going to get up there.
- 4:20So if that's within your inclinations and your means, that's great, but I like to look for the sweet spot to get people started off a good specification with realistic costs.
- 4:31I like to start with good foundations, strong materials, Douglas fir glass, granite quarry, granite and or limestone someplace, hardwood floors, reclaimed hardwood.
- 4:45We have a pretty good specification.
- 4:48But the important thing to do is to get it down on paper, get a design down, lay it out, and then compare it to current projects that you've done.
- 4:58Now, some current projects, let's talk about different areas in the musk, in Muskoka, rock hard granite.
- 5:06Obviously it's rock hard because it's granite on your site.
- 5:10If we're looking to control costs, we should consider the site.
- 5:13If you have a perfect, what you consider a perfect, uh, property.
- 5:17On Lake Bays or, or another lake with a lot of bedrock on it, lake Muskoka, and there's this knob of bedrock blocking your view.
- 5:25Well, how much are you willing to pay to, uh, get rid of it?
- 5:29Is it worth 20 grand?
- 5:31Is it worth more?
- 5:32In a lot of cases, this rock blasting is ranging from I see people spending from 50 to$200,000 on it.
- 5:39I would suggest the first thing that's gonna save you money today, and you will thank me all summer long, is if there's that much blasting to do.
- 5:47Maybe you should reconsider the, the property that you're on, because if you have to rework it so much, maybe it's not the right property for you.
- 5:54It's going to eat up a lot of budget.
- 5:56That's the first thing.
- 5:57That's what I see up in, in Muskoka now on, uh, lake Simco and Georgian Bay here at Lake Huron.
- 6:04Remember, I've done projects on a lot of different areas, and the characteristics of their sites are different in a lot of cases.
- 6:11You're on sand and possibly over bedrock.
- 6:14So if we can, uh, we can reduce the site development and we can, instead of building basements, because the water table is high already, why not looking?
- 6:23Look at doing, helical piles, for example.
- 6:26That'll save you 50 or 60 grand over even more over digging and doing full foundation.
- 6:34So we're not talking about con square foot costs, we're talking about scope of what you do.
- 6:38Where should your smart money go that you've worked for and want to, um, focus upon a beautiful cottage and finishes rather than digging holes in the ground.
- 6:49Now, uh, something else that is possible too is in, in other areas like on, on quinte, we have limestone as well, and, uh, it's about four feet down results in a high water table as well.
- 7:02Can we do partial basements and, and so forth?
- 7:05I guess the thing that I'm saying is based on.
- 7:08Real projects that we're working on now, there are usually two or three solutions to, cite, uh, challenges.
- 7:17So let's find out what the most resourceful way to work is, and you'll find that you can save a lot of money and get better results as well.
- 7:26Here's something else that people ask about.
- 7:28Can I reuse existing hydro?
- 7:30Yeah.
- 7:30In some cases you can, in some cases you need to bring a, a new line in.
- 7:34Is it.
- 7:35On an island, well, before you purchase a property, it, it would be helpful to know if there's a old, copper line in there.
- 7:41'cause that'll save a lot of cost.
- 7:43We can reduce, septic if you have a high bedrock, this is going to limit the areas on the site where you can, uh, lay out a, a septic field that can increase the cost if we're going for reduced bed sizes.
- 7:58However, the reduced bed size for some of the new systems.
- 8:02Might result in allowing you to have a, uh, expanded floor plan that might increase the cost.
- 8:09It might reduce the cost if you don't have to be so complex with your layout to fit a tight site.
- 8:13So what I'm getting at is we look at the overall, cost of developing a site, which include blasting hydro, bringing in roads, something else.
- 8:24Where are you getting your water from?
- 8:25Well, are you getting it from the lake that that's not too costly?
- 8:29Do you need to drill a well?
- 8:30What do you, if you have granite, four or five feet down?
- 8:34So there's, there's some opportunities there to look at different well types.
- 8:37Uh, also if we're digging into the, uh, if we're, if we're, uh, digging into the site, your heating system.
- 8:46So can we save money by, specifying, uh, propane, forced air?
- 8:51For a traditional place, that's not bad.
- 8:52There's places to hide the ducks, but if it's a modern place, you don't really wanna see the ducks everywhere.
- 8:56Maybe we could look at inflow, radiant heating.
- 8:58Maybe we can look at geothermal.
- 9:00Geothermal is great.
- 9:01Where are you gonna run the tubes?
- 9:03Well, you can run it in the lake if locally you're allowed to do that.
- 9:07And there's a condenser and a boiler that can condense the water so you release the heat, even a small amount of temperature differential.
- 9:16Results in a warmly heated place, but you need a place to run the the tubes.
- 9:20So in the lake's, not too bad to your thermal cost more money, but over the course of seven or eight years, it pays off for itself.
- 9:27It makes sense.
- 9:28Um, if you're on the bedrock, uh, you could, uh, d trenches and that costs a little bit more.
- 9:35But you can lay your pipes s above the bedrock and cover it up with the back soil.
- 9:40The backfill, um, it costs a little bit more.
- 9:43So let's compare the costs and then if not, if you're on a soft site, like if you're on, uh,, just a north cotus and you're not over bedrock, or if you have some spaces in the limestone that's underneath there, sometimes it's fractured.
- 9:56It's gotta pickle around.
- 9:57With a mini excavator, you might find that you can put your tubes down vertically in a well, that saves space.
- 10:02It's just one well hole, and you're not doing a lot of trenching.
- 10:04So far the benefit is that.
- 10:06Before you even get into the construction cost, let's figure out how to best deal with your site.
- 10:10That's the best thing you can do so far.
- 10:12So already, hopefully we've saved a little bit of money and narrowed down the scope for you a bit.
- 10:17Next, how much do we spend on the cottage?
- 10:20For a lot of clients, uh, this is their cottage.
- 10:23They're selling their place in the city.
- 10:24Yeah, they're going to, um, use their cottage as a cottage for a while, and then they, uh, typically will, will move there.
- 10:32So in that case, it's built like a house.
- 10:34They sell their place in the city.
- 10:36It's a pretty good trade, and you're gonna get a, a pretty spectacular, uh, change of scenery when, when you, uh, live at your cottage, which is no longer cottage these days.
- 10:46By the way, folks, these are, uh, let's call them, uh, uh, more of a, luxurious.
- 10:53Uh, wilderness Home.
- 10:54Maybe that's a better way to describe them.
- 10:56I like to work in 3D modeling.
- 10:57This is what, what I do, and physical modeling, but with the, with, with my, uh, software, which I've, modified and, and, and made very specific to cottage construction, what I can do is I can work with your layouts and then we can use different, specify different materials.
- 11:13Our clients like a lot of, uh, natural materials, reclaimed hemlock floors, polished concrete floors, west Coast Douglas for timbers, oversized glass.
- 11:23A lot of the clients right now, they've gone from the traditional style more to a contemporary, almost like a West coast modern style.
- 11:30And the thing about it is that you can have the open spaces, but it doesn't have to be all cold and austere.
- 11:35You can get a lot of warmth outta the materials, and they really suit themselves to the, forested lake fronts up north.
- 11:42It just, it's a good fit.
- 11:44So I like to start you on the, on the right spec and instead of only talking about the, the square foot costs, our projects.
- 11:54Some people will, will argue against it, but it's not, A lot of our projects, they're probably worth 800 a square foot.
- 12:02Our sweet spot, my sweet spot's been 600 to six 50.
- 12:05There's just what I end up being able to get deals and costs on.
- 12:11So if you're looking at a 2000 square foot cottage, 600 bucks a square foot, there's your math.
- 12:18Okay.
- 12:19A lot of projects come into 1.2 to 1.6 million.
- 12:22I would say the cottage process, if you're in that range, if that makes sense to you, either through your own resources or you're selling a place in the city, it makes sense because you get good value and a completely new, uh, lifestyle with a, with a new cottage working that way, we start with off with a good spec, and then you can increase your spec.
- 12:44You can make things simpler, but you're getting a lot of cottage that way.
- 12:47Now I'm gonna save you.
- 12:49A lot of money with my, my next, uh, opinionated, uh, uh, thought here.
- 12:54So I have a lot of clients that will come in and they're looking for the four to 5,000 square foot place.
- 13:00Now that's a lot of, that's a lot of, uh, uh, construction there.
- 13:05And if it's a cottage or even a home or a lot of clients that will retire after their professional careers, do you really need, like what is the benefit of the, of the.
- 13:18Excessively large places.
- 13:20And if this is your goal, uh, it's no problem.
- 13:23Call me and right away we'll start on your five, six, 10,000 square foot place.
- 13:27But realistically, you can build a really beautiful place.
- 13:31Like anywhere from 1200 to 2,800 square feet with maybe 2,500 is, is a real sweet spot.
- 13:41You can build a lot of place and it's not necessary to build these endless constructions.
- 13:46I would rather that you focus on a well designed, well laid out place.
- 13:51Let's start off a little smaller because these projects get bigger anyways, like guaranteed, and let's track the cost and then see where you end up.
- 14:00This is the way to think about things.
- 14:02The way not to get misled is to, uh, avoid.
- 14:06Asking everyone and their dog and their uncle, what things cost because you don't know what things cost until you actually specify it.
- 14:14You have actual quantities and you have options, and you have some strategy.
- 14:19So I have some, uh, takeaways, uh, for you.
- 14:23Uh, first of all, let's stop thinking about square footage.
- 14:26Let's talk about overall project costs.
- 14:28The way to do that is we get on a phone.
- 14:30You tell me, uh, what you wanna build, how you wanna build it, show me an example, and then we start preliminary modeling.
- 14:37And I get you real costs based on the exact costs that I've been, uh, uh, paying out on our last, like say five to 10.
- 14:46Well, let's tighten it up.
- 14:46Last three to four projects is the real current cost.
- 14:49There is no other cost other than the real current cost that I can get for you.
- 14:53If you're doing a fall build, I'll tell you now what we anticipate the cost to be.
- 14:58Then we should have a look at your site and see what it's all about and see, how much work it is to get it up to date.
- 15:05Get all the services in cleared out, and then, uh, have a plan, like a construction plan.
- 15:11Uh, where are the disposal bins going to be?
- 15:13Can we can some workers siting, or sorry, some a little lodging, uh, for the workers.
- 15:18Sometimes they, they like to, uh, they'll work at odd times, uh, sometimes to keep schedules going.
- 15:25Power and all that.
- 15:27Let's get those costs under control and I'll give you real costs, not the guesstimate cost.
- 15:33And then, we'll, we can set up a, a budget for hard and soft costs for all of your projects so you know exactly where the money goes.
- 15:42And then we'll even give you a contingency plan.
- 15:44It'll tell you every single possible thing that can happen because they can and do happen.
- 15:48And luckily we have, we, we have a plan on.
- 15:52Based on what we've experienced, you know, you learn things the hard way in careers.
- 15:56We, uh, have a way to, uh, address and improve upon our designs when things come up.
- 16:02So that's the big four.
- 16:04And what I would encourage you, uh, to do if you wanna a quick, uh, giveaway to make this worthwhile for you.
- 16:10I have, uh, uh, two companies they serve different functions.
- 16:14I'm a registered architect and the company is Lakeside Architecture Inc.
- 16:17You can check out the website, lakeside architecture.ca.
- 16:20If you get on there, download your, your absolutely free design, your dream, design guide just to get your ideas down and have a look at some of the projects on there.
- 16:31You can even subscribe to on the lake if you're just looking for ideas.
- 16:35And when it comes down to it, let's work out a preliminary design and get you the real cost so there's no guessing, and we can actually design what you want.
- 16:44And what fulfills your dream rather than what someone has built someplace else?
- 16:49All the work I do is completely custom and it's, guided by the.
- 16:52Uh, clients have vision, so I wanna make sure that we get it right, but we get you the cost as well.
- 16:57And then you can flip over to the other, super exciting website.
- 17:01It's Lakeside Construction Management, Inc.
- 17:03Just look it up and there's links to, uh, Instagram and so on.
- 17:07You can see the current build, uh, just out of necessity.
- 17:10I've had to be a very hands-on, uh, designer over the years just to get things done, get them on budget, get them on time, get them built strong.
- 17:18So there you'll see like current projects and you'll see more of the, the software and the pricing, and the, actual specifications that were built.
- 17:26So please do check out those two websites and then I would be more than delighted if you could meet me on the next episode.
- 17:33I promise it'll be exciting.
- 17:35Shoreline rules and setbacks.
- 17:37Yes, we can get them under control and get things built for you.
- 17:40Thanks again.
- 17:41I'm James OV Lakeside.
- 17:43Bye for now.