- 0:09Speaker 1: You're listening to a podcast from Newstalks. The'd be follow
- 0:12Speaker 1: this and our wide range of podcasts now on iHeartRadio.
- 0:17Speaker 2: Jack Team.
- 0:17Speaker 3: And as part of its housing push, the government has
- 0:19Speaker 3: announced plans to make councils do building inspections remotely. Minister
- 0:24Speaker 3: for Building and Construction Chris Pinks is the building process
- 0:27Speaker 3: takes way too long and this will make things easier
- 0:30Speaker 3: and cheaper. Some councils already use remote inspections, but uptake
- 0:35Speaker 3: at the moment is low and practice is vary. Malcolm
- 0:38Speaker 3: Fleming is the CEO of New Zealand Certified Builders and
- 0:41Speaker 3: is with us this evening. Good a Malcolm good evening, Jack,
- 0:45Speaker 3: So talk to us a little bit about how a
- 0:47Speaker 3: remote inspection actually works.
- 0:50Speaker 2: So remote inspection works like this, so a builders ready
- 0:54Speaker 2: for their inspection, and it could work just as well
- 0:58Speaker 2: in a very remote location and we've been trying the
- 1:00Speaker 2: McKenzie country, or could be work in a very traffic
- 1:03Speaker 2: congested place like Auckland. And so it would work like
- 1:06Speaker 2: this that the builder would have a video, have the
- 1:11Speaker 2: camera and be directed by a Building in council inspector
- 1:16Speaker 2: back at their base and asking them to show particular
- 1:19Speaker 2: parts of the building that they wanted to.
- 1:20Speaker 3: Check, right, Okay, So and when you say a camera,
- 1:23Speaker 3: is it just their.
- 1:23Speaker 2: Phone the phone, Yes, the phone would do.
- 1:26Speaker 3: Right. So you basically just do like a zoom call
- 1:29Speaker 3: or a FaceTime call, just a video call between the
- 1:32Speaker 3: inspector back and the office, the builder and the building.
- 1:35Speaker 3: And how many things would they be inspecting during one
- 1:38Speaker 3: of these digital inspections.
- 1:41Speaker 2: What depends on what the building inspection was for. Some
- 1:46Speaker 2: of those building inspections are for specific items, for example,
- 1:52Speaker 2: some structural steel that's been put in place, some tanking
- 1:55Speaker 2: that's gone on going on underneath, some tiling, some specifics
- 1:59Speaker 2: like that. Or it could be for a pre line
- 2:02Speaker 2: inspection which is quite a significant miles, or a final
- 2:06Speaker 2: inspection had been to the projectories.
- 2:08Speaker 3: Yeah right, So say, like for a typical house, what
- 2:11Speaker 3: would be the inspection that at the moment takes the
- 2:14Speaker 3: longest period of time.
- 2:17Speaker 2: That would likely be pre line inspection. My sort of
- 2:21Speaker 2: view of NJEDCB that remote inspections wouldn't be for those
- 2:25Speaker 2: big milestone inspections. It would work very well in tandem
- 2:31Speaker 2: with some other tools that are available for some of
- 2:36Speaker 2: the smaller aspects, which can be quite time consuming and
- 2:39Speaker 2: builders are often waiting on site for building inspectors to
- 2:44Speaker 2: be able to arrive on site, and so the whole
- 2:47Speaker 2: projects at a standstill.
- 2:49Speaker 3: Yeah, that kind of makes sense. So what when you
- 2:52Speaker 3: say there'd be small projects, what kind of inspections do
- 2:55Speaker 3: you mean?
- 2:57Speaker 2: Well, sort of talking about so if you worked in
- 3:00Speaker 2: tandem with other things like say producer statements for example,
- 3:04Speaker 2: which engedcvs are quite keen on. So what I'm talking about.
- 3:08Speaker 2: So if we look at the tanking example previously, if
- 3:12Speaker 2: you allowed the applicator provide a producer statement to reflect
- 3:17Speaker 2: that it's been applied in accordance with the manufacturer's requirements,
- 3:22Speaker 2: that creates a level of certainty. It's a paper trail,
- 3:25Speaker 2: and then all what we required. Then rather than a
- 3:27Speaker 2: physical inspection, a video inspection, the remote inspection would be
- 3:32Speaker 2: the tick box required to give the confidence to the
- 3:34Speaker 2: building consent authority.
- 3:36Speaker 3: That just seems incredibly sensible to me. What is the downside?
- 3:40Speaker 3: You know there must be some downsides to not having
- 3:42Speaker 3: inspectors there in person.
- 3:44Speaker 2: Well, I've seen this of the commentary around and I
- 3:47Speaker 2: think it's accurate that there could be mis representation by
- 3:51Speaker 2: some builders in terms of our control on the camera
- 3:54Speaker 2: where it goes our view NZCB that this should only
- 3:59Speaker 2: be available to LBP builders and also LBP builders who
- 4:05Speaker 2: have got a proven track record with the council.
- 4:08Speaker 3: Right, Okay, so councils that already have so builders that
- 4:11Speaker 3: already have a relationship with council but have also been
- 4:14Speaker 3: shown to produce high quality buildings that meet standards over
- 4:18Speaker 3: a period of time.
- 4:20Speaker 2: That and also for building inspections, are well prepared and
- 4:24Speaker 2: that they don't have rework that needs a reinspection because
- 4:28Speaker 2: that takes takes time. Those builders who don't use the
- 4:33Speaker 2: council as a building a control system and a review
- 4:43Speaker 2: and sort of having to teach them what does and
- 4:46Speaker 2: what cannot happen. So I need if they restrict it
- 4:51Speaker 2: to LBPS and those with track records, that will provide
- 4:54Speaker 2: the conference to life.
- 4:55Speaker 3: Yeah right, So I'm just just trying to play things
- 4:57Speaker 3: out in my mind here. If there were a scenario
- 5:00Speaker 3: whereby a builder was having a remote inspection, the inspector
- 5:04Speaker 3: wasn't totally happy with something and needed to inspect it
- 5:07Speaker 3: in person, that would require not only the digital inspection, right,
- 5:11Speaker 3: but also an on site visit in order to sort
- 5:15Speaker 3: out exactly what was wrong.
- 5:17Speaker 2: What you're describing, I think would require a physical inspection
- 5:20Speaker 2: to follow up. And we're sort of advocating that physical
- 5:24Speaker 2: inspections should not be done away from entirely. For the
- 5:27Speaker 2: milestone one we talked about earlier, they should still be
- 5:31Speaker 2: in place.
- 5:31Speaker 3: Yeah, and the final I just wonder how it's kind
- 5:35Speaker 3: quite hard to know, given we only have limited use
- 5:38Speaker 3: of remote inspections at the moment, but from the councils
- 5:40Speaker 3: that are using them in the moment at the moment,
- 5:42Speaker 3: do you have any idea how often a building inspector
- 5:46Speaker 3: would end up doing both the video inspection and then
- 5:50Speaker 3: having to go out on site as well.
- 5:54Speaker 2: That's a good question. I don't have an answer to that,
- 5:56Speaker 2: But what would suggest that right now there is not
- 6:01Speaker 2: buildings because of the lower volume of building consents well
- 6:05Speaker 2: down with that work? Yeah, right eighteen months ago, Jack,
- 6:09Speaker 2: this is a really great opportunity to start sort of
- 6:11Speaker 2: rolling some of these initiatives out. And as I said
- 6:14Speaker 2: on its own, I don't think it's a panacea, but
- 6:16Speaker 2: in use with conjunction with other tools that are available
- 6:21Speaker 2: to the building consent authorities, I think together they could
- 6:24Speaker 2: create some efficiencies it's not going to reduce the material
- 6:27Speaker 2: cost to build, but it will help reduce time, and
- 6:31Speaker 2: project time is money.
- 6:33Speaker 3: Yeah right, yeah, so how much time could they say?
- 6:37Speaker 3: What are the potential upsides if this new system works well.
- 6:41Speaker 2: Well in a busy building consent environment. So we were
- 6:45Speaker 2: eighteen months ago waiting around for projects for building inspections
- 6:52Speaker 2: that could add weeks to a project if you're thinking
- 6:56Speaker 2: about the finance holding costs to the property owner associated
- 7:01Speaker 2: with that, each week that goes by is a cost,
- 7:05Speaker 2: and it's also additional days and weeks that contractors are
- 7:10Speaker 2: on site. Yeah right, Okay, it comes to the cost.
- 7:13Speaker 3: Yeah. I mean the thing that I'm sure many of
- 7:15Speaker 3: our listeners will immediately think about it as something like
- 7:18Speaker 3: the leaky homes saga and worry that any relaxation of
- 7:23Speaker 3: oversight in the building and construction sector will ultimately lead
- 7:27Speaker 3: to a degradation and quality and we could find ourselves
- 7:29Speaker 3: with the FIASCA that we have in the past. What
- 7:31Speaker 3: would be your message to those people?
- 7:34Speaker 2: So my message to those people is to mitigate risk,
- 7:38Speaker 2: and you can do that by ensuring that you're build
- 7:41Speaker 2: a trade qualified and aligned with the trade association that
- 7:46Speaker 2: in combination with those suggestions that remote inspections not be
- 7:52Speaker 2: available to everybody as a discretion of the Council LVPS
- 7:57Speaker 2: and those with a good track record that should mitigate
- 8:00Speaker 2: risk for the home owner.
- 8:01Speaker 3: And Malcolm, as you mentioned, construction consents are well down
- 8:05Speaker 3: on where they were even just twelve months ago. So
- 8:07Speaker 3: how long will it take before for this is standardized
- 8:09Speaker 3: across the country do you think?
- 8:11Speaker 2: Well, the government is going at pace with the whole
- 8:17Speaker 2: range of building consenting changes and proposals. This is the
- 8:23Speaker 2: second one this week, for example, so they've certainly got
- 8:28Speaker 2: the bit between the teeth and all them. Their main
- 8:32Speaker 2: driver is to reduce the cost of building in this
- 8:36Speaker 2: country and there'd be no argument from Promistry that we
- 8:42Speaker 2: do have high building costs or anything that can do
- 8:46Speaker 2: lead towards reducing that is to be applauded. So they're
- 8:51Speaker 2: on the right track. They've got to start getting coordinated
- 8:54Speaker 2: with some of these ideas and start bringing them together
- 8:57Speaker 2: and work with industry.
- 9:00Speaker 3: Well see, thanks Malcolm, appreciate your time. That is Malcolm Feming,
- 9:02Speaker 3: the CEO of New Zealand Certified Builders.
- 9:06Speaker 1: For more from us talks there be live on air
- 9:09Speaker 1: or online and keep our shows with you wherever you
- 9:12Speaker 1: go with our podcasts on iHeartRadio,