- 0:00Welcome back to Maintenance Monday.
- 0:01I'm James Couch, and with me again is Laura Mitchell.
- 0:04Today we're gonna tackle one of the sneakiest problems in food and CPG
- 0:08plants: micro stops.
- 0:08Hey everyone.
- 0:12Micro stops are one of those things that make people roll their eyes
- 0:15until they see the numbers, and then suddenly everybody cares.
- 0:15Exactly.
- 0:21So let's get plain about what we mean.
- 0:23A micro stop is a short, usually unplanned interruption.
- 0:27Five seconds, thirty seconds, maybe a minute.
- 0:30The line pauses, hiccups, you clear it,
- 0:33and you keep going.
- 0:34It doesn't feel like downtime,
- 0:36but it absolutely is.
- 0:36On a typical food or CPG line,
- 0:41think about a labeler that keeps misapplying labels,
- 0:44a film roll on a vertical form-fill-seal that wrinkles and has to be
- 0:48rethreaded a little, a checkweigher kicking out product over and over,
- 0:53or a simple photo-eye that keeps getting blocked by product skew.
- 0:53Right,
- 0:58and the line "looks" like it's running.
- 1:00You walk past and you see cases moving,
- 1:02product going into bags, cartons closing.
- 1:05But if you sat there with a stopwatch,
- 1:07you'd see that every couple of minutes,
- 1:09something hangs it up for ten,
- 1:11twenty secondsAnd from an OEE perspective,
- 1:13those micro stops are killers.
- 1:15They chew away at Availability,
- 1:18and sometimes Performance and even Quality,
- 1:21but they rarely show up in the same way that a big one-hour breakdown
- 1:24does.
- 1:24Let me put numbers on it.
- 1:27Say you've got a packaging line that loses,
- 1:29on average, ten seconds every three minutes to one thing or another.
- 1:33That doesn't sound like much.
- 1:34But over a twelve-hour shift, that's about forty minutes of lost runtime.
- 1:39Over a week, that's several hours.
- 1:41Over a year, that's days of production you thought you had but never
- 1:45actually ran.
- 1:45And the tricky part is that in many plants,
- 1:49anything under, say, two or three minutes doesn't get logged as downtime.
- 1:53The operator just clears it and moves on.
- 1:56The system either treats it as running or maybe just a "minor stop" with
- 2:01no detail.
- 2:01I've been in plants where planners swear they can run X pounds
- 2:06per hour because the spreadsheet says so,
- 2:08but the line never hits that rate.
- 2:10When we dig in, it's not because of giant breakdowns.
- 2:13It's because of those hundreds of tiny interruptions on conveyors,
- 2:17labelers, cartoners, and inspection equipment.
- 2:17And in food especially,
- 2:22the pressure is high-tight order windows,
- 2:25shelf life, hard cutoffs for shipping,
- 2:28and then you've got to stop for sanitation.
- 2:30So you can't afford to just pretend these micro stops don't exist.
- 2:34They're quietly stealing capacity you really need.
- 2:34So,
- 2:38big picture: micro stops often sit below the radar of your downtime reports,
- 2:43but they are absolutely real, and they absolutely drag your OEE down.
- 2:47The question is: why do they stick around,
- 2:50and why doesn't anyone seem to own them?
- 2:50That's where we're headed next-into
- 2:54the human side.
- 2:55How operators see micro stops,
- 2:58how maintenance sees them, and why those perspectives often clash.
- 2:58Let's
- 3:03start with sanitation, because in food and CPG it's a major player.
- 3:07Sanitation can either be maintenance's best friend or their worst enemy.
- 3:07Yeah,
- 3:13absolutely.
- 3:14Good sanitation is gold.
- 3:16When it's planned well and executed with maintenance in mind,
- 3:19it lets you see things you can't see when the line's covered in product:
- 3:23leaks, cracked welds, loose guards,
- 3:25damaged cables, worn components.
- 3:27You can catch problems before they become big downtime events.
- 3:27But when
- 3:32sanitation is rushed or not coordinated?
- 3:35I've seen teams blast away with high-pressure hoses,
- 3:38knock sensors out of alignment,
- 3:40wash lubricant out of bearings,
- 3:42leave moisture in junction boxes,
- 3:45or put components back just a little bit off.
- 3:48And what do you get the next day?
- 3:50A line full of micro stops.
- 3:50Exactly.
- 3:54I remember a case in a ready-to-eat line where we had a vision system
- 3:58and a checkweigher right after a slicer.
- 4:00After sanitation, the next shift would fight constant short stops: misreads,
- 4:05false rejects, conveyor slipping just a bit.
- 4:08Maintenance got called for "equipment issues," but when we traced it
- 4:12back, most of it was how things were being disassembled and reassembled
- 4:16in sanitation.
- 4:16And that's where the blame game starts.
- 4:20Production blames maintenance: "You guys didn't fix it right." Maintenance
- 4:25blames operations and sanitation: "You're beating up the equipment and washing the
- 4:25grease out."
- 4:30Quality's in the middle saying,
- 4:32"We have to clean to this standard or we're shut down."At the end of
- 4:36the day, the equipment doesn't care who you blame.
- 4:39It only cares how it's treated,
- 4:41how it's cleaned, and how it's maintained.
- 4:43If those groups aren't working together,
- 4:45the line is going to tell you-through micro stops and breakdowns.
- 4:45Let's
- 4:50talk about operators for a minute.
- 4:52On a food line, operators are juggling a lot: paperwork,
- 4:56label verification, allergen checks,
- 4:58metal detector tests, QC pulls,
- 5:01watching for rework, making sure product looks right.
- 5:04When a micro stop happens, clearing a small jam or bumping the start
- 5:08button just feels like part of normal life.
- 5:08That's right.
- 5:12From the operator's point of view,
- 5:14they're "keeping things running." They don't want to call maintenance
- 5:17every time the labeler kicks out a case or the film folds funny.
- 5:21They think, "If I can clear it in ten seconds, why
- 5:21bother logging it or calling anyone?"Meanwhile,
- 5:27maintenance is looking at things from the other side.
- 5:29They're seeing an occasional breakdown-maybe that labeler is "always"
- 5:34the one that fails-but they don't see the weeks of micro stops that came
- 5:38before the big failure.
- 5:40All that rich information is trapped in the operator's experience and
- 5:45never makes it into the system.
- 5:45And that drives maintenance crazy.
- 5:48Because you know something's wrong.
- 5:50You hear the stories-"Yeah, it's been acting up for a while"-but you
- 5:54don't have data or early warnings.
- 5:56You just get the emergency call when it finally quits: "Hey, we need you now,
- 5:56we're down."So
- 6:03part of stopping the blame game is reframing the relationship.
- 6:07We have to see operators as the first line of defense and maintenance
- 6:10as a partner, not the "fix-it crew" that shows up only when it's a disaster.
- 6:10Exactly.
- 6:16And that means two things.
- 6:18One, operators need to feel safe reporting small issues-"it sounds
- 6:18different, it hangs up now and then"-without
- 6:25getting blamed for "complaining." And two,
- 6:27mechanics need to be willing to go out,
- 6:30watch the line, and listen before it fully fails,
- 6:33not just when there's a red blinking light.
- 6:33When operations,
- 6:36sanitation, and maintenance meet together-maybe in a daily huddle-and
- 6:41talk about micro stops as a shared problem,
- 6:44not "yours" or "mine," that's where you start turning these hidden losses
- 6:48into improvement projects instead of arguments.
- 6:48And that's where some simple
- 6:53tools and habits can really help,
- 6:54like the three "S"s I'll introduce next.
- 6:57They give operators and mechanics a shared language for spotting early
- 7:01warning signs before those micro stops turn into full downtime.
- 7:01Let me
- 7:05share a simple rule of thumb I've used for years with operators and mechanics:
- 7:09the three "S"s.
- 7:10If it doesn't sound the same, smell the same,
- 7:13or look the same as it did yesterday,
- 7:15something is wrong.
- 7:15I love that because it's so easy to remember.
- 7:19You don't need a PhD in reliability.
- 7:21You just need to pay attention with your ears,
- 7:24your nose, and your eyes.
- 7:24Exactly.
- 7:28Sound: maybe a conveyor has a new rattle,
- 7:30a pump has a higher pitch, or an air cylinder is hissing longer than
- 7:34it used to.
- 7:34Smell: maybe you notice a faint burnt odor from a motor,
- 7:39or the smell of hot product where you never smelled it before.
- 7:42Sight: maybe you see more dust,
- 7:45pieces of film or labels piling up,
- 7:47product building up under a belt,
- 7:49a guard vibrating, or a sensor that looks out of alignment.
- 7:49Those three
- 7:53"S"s-sound, smell, sight-are often the earliest sign of the micro stops
- 7:59we've been talking about.
- 8:00If the operator shrugs and says,
- 8:02"Eh, it still runs," that's when we know we're just banking a bigger
- 8:06failure later.
- 8:06And that's where monitoring comes in.
- 8:09We don't always have a fancy system,
- 8:12but most food and CPG plants have more tools than they use.
- 8:15You've got PLCs that can count stops,
- 8:18downtime tracking or OEE systems that can log short stops,
- 8:22and you can add simple reason codes like "labeler misapply," "film jam,"
- 8:26"case jam in packer," things like that.
- 8:26The key is to define what you want
- 8:31to capture.
- 8:32Maybe you say, "Anything over ten seconds, log it." Or,
- 8:36"If this happens more than three times in an hour, log it." You don't
- 8:41want to drown operators in data entry,
- 8:43but you do want patterns you can act on.
- 8:43Right.
- 8:46Then you take that information into a small,
- 8:49cross-functional review: an operator,
- 8:51a mechanic, maybe someone from quality or sanitation.
- 8:54Look at the top micro stops: where are they happening,
- 8:57and when?
- 8:58Right after sanitation restart?
- 9:00Right after changeovers?
- 9:02At a certain speed?
- 9:02From there,
- 9:04you attack the big hitters.
- 9:06Maybe you re-position a photo-eye,
- 9:08add a small guide rail, change how film is threaded,
- 9:11adjust speeds between upstream and downstream conveyors,
- 9:15or tweak the setup standard so it's repeatable.
- 9:17These are not million-dollar projects.
- 9:19They're usually simple, targeted changes.
- 9:19And here's where the PM program
- 9:24needs to dovetail with OEE and those micro-stop insights.
- 9:28If you see that a certain bearing starts creating micro stops around
- 9:31a certain run time, that's a clue for PM frequency.
- 9:35If a sensor gets out of alignment every sanitation,
- 9:38that's a clue for adding a PM or a sanitation check to put it back
- 9:38correctly.
- 9:38Exactly.
- 9:43Your PM program shouldn't just be something you wrote ten years ago and
- 9:47filed away.
- 9:48It should be living, fed by what OEE and downtime data are telling you.
- 9:53Micro stops are like the whisper from the equipment before it starts
- 9:57shouting at you with a full breakdown.
- 9:57And when you track PMs at the asset
- 10:02level-this motor, that labeler,
- 10:05this conveyor-you start to see which assets are the real repeat offenders.
- 10:09Then you can decide: do we improve the PM,
- 10:12change the way we operate it, train people differently,
- 10:15or even look at an upgrade?
- 10:15And just as important,
- 10:19you log those findings and actions in your CMMS,
- 10:22not just in someone's notebook.
- 10:24That way the next person, or the next shift,
- 10:27or the next maintenance leader,
- 10:29sees the history and doesn't start from zero every time.
- 10:29So to pull this
- 10:34together: micro stops eat away at OEE in food and CPG plants.
- 10:39Sanitation can either expose issues or create them,
- 10:42depending on how well we coordinate.
- 10:44And the relationship between operators and mechanics-built around the
- 10:48three "S"s and good communication-is what lets you catch problems early.
- 10:48When
- 10:53we connect what we see on the floor to what we do in the PM program,
- 10:56and we capture it in the CMMS,
- 10:58that's when we stop playing the blame game and start playing as one team.
- 11:03Equipment performance becomes a shared responsibility,
- 11:07not just maintenance's problem.
- 11:07And that sets us up nicely for our next
- 11:11episode.
- 11:12We're going to dig deeper into the CMMS-how to use it not just as a work
- 11:17order system, but as a tool to sustain these micro-stop reductions,
- 11:21refine PMs, and keep downtime moving in the right direction.
- 11:21I'm looking
- 11:26forward to that one.
- 11:27Thanks for listening to Maintenance Monday.
- 11:29I'm Laura Mitchell......and I'm James Couch.
- 11:33Take a walk on your floor this week,
- 11:35listen, look, and smell.
- 11:37If it doesn't sound the same, smell the same,
- 11:39or look the same as yesterday,
- 11:41speak up.
- 11:42We'll talk to you next time.