Latest / Landing the Moon / LC 26: Starship's Orbital Refueling Demo Is Running Out of Runway
Transcript
- 0:15[Max] Okay, so get this.
- 0:16[Max] Yesterday,
- 0:17[Max] SpaceX launched a brand new spacecraft nobody really seen before,
- 0:21[Max] raised $25 billion in bonds the same morning, and somehow the most important thing they need to do for Artemis still hasn't happened.
- 0:30[Blake] That's quite a Tuesday.
- 0:32[Max] Right?
- 0:32[Max] Like they had a whole new vehicle,
- 0:34[Max] Starfall,
- 0:35[Max] a disc-shaped cargo capsule flew on a Falcon 9 out of the Cape and simultaneously priced a...
- 0:40[Max] raised a $25 billion bond sale that drew nearly $80 billion in orders.
- 0:46[Max] CNBC confirmed the size.
- 0:48[Blake] Walk me through why that bond number matters for Artemis, because on the surface those look like completely unrelated stories.
- 0:55[Max] That's exactly the thread we're pulling today.
- 0:57[Blake] Because the propellant transfer demo,
- 0:59[Blake] the ship-to-ship refueling test that Starship HLS actually depends on was supposed to be done by summer 2025.
- 1:06[Blake] Wikipedia is still listed as optimistically scheduled for 2026,
- 1:11[Blake] no confirmed launch date.
- 1:13[Max] Optimistically, that word is doing a lot of work.
- 1:16[Blake] It is, and Congress just advanced a House CJS bill with a $2.28 billion HLS line,
- 1:23[Blake] but that money can't move until a design certification review clears,
- 1:27[Blake] and that review is gated on the Demo.
- 1:29[Max] So we've got a hardware problem,
- 1:31[Max] a money problem,
- 1:32[Max] and...
- 1:33[Max] And plot twist,
- 1:34[Max] a company that just IPO'd piled on $25 billion in fresh debt and is burning cash on an AI division.
- 1:41[Blake] All three are connected.
- 1:43[Blake] That's the argument we're going to pressure test.
- 1:45[Max] We start with the propellant Demo itself,
- 1:48[Max] why its orders of magnitude harder than anything Starship has flown.
- 1:52[Max] First Segment right now.
- 1:58[Max] Okay, so back in October 2024,
- 2:01[Max] NASA said the Starship-to-Starship propellant transfer campaign was supposed to kick off around March 2025 and wrap up by Summer.
- 2:08[Max] March 2025,
- 2:09[Max] Summer 2025.
- 2:10[Max] Done.
- 2:11[Blake] And where are we?
- 2:12[Max] Mid-2026.
- 2:14[Max] Wikipedia puts it at optimistically scheduled for 2026.
- 2:18[Max] No launch date,
- 2:19[Max] no design certification review,
- 2:21[Max] nothing.
- 2:22[Blake] Walk me through what was supposed to happen,
- 2:24[Blake] like specifically.
- 2:25[Max] Right,
- 2:25[Max] so two Starships.
- 2:26[Max] One launches first,
- 2:28[Max] parks in low Earth orbit.
- 2:29[Max] The second launches three to four weeks later,
- 2:32[Max] chases it down,
- 2:33[Max] autonomously docks and transfers propellant. That was supposed to be a 2025 checkmark.
- 2:38[Blake] And nobody's done this before?
- 2:40[Max] Nobody's done this before.
- 2:41[Max] That's the thing people keep glossing over.
- 2:43[Max] Flight 3 back in March 2024 moved roughly 10 metric tons of liquid oxygen between tanks on the same vehicle.
- 2:50[Max] Same.
- 2:51[Max] Same vehicle,
- 2:52[Max] that's just plumbing.
- 2:53[Blake] So in-tank transfer and ship-to-ship are fundamentally different problems.
- 2:58[Max] Completely different animal.
- 2:59[Max] You've got two independently flying vehicles trying to dock in microgravity and then push cryogenic liquid through lines without the whole thing going sideways.
- 3:08[Max] Slosh dynamics,
- 3:09[Max] ullage management,
- 3:11[Max] pump cavitation risks.
- 3:12[Blake] Right,
- 3:13[Blake] you can't just settle the propellant the same way you would on the ground.
- 3:16[Max] Exactly!
- 3:17[Max] Gravity's not doing the work anymore,
- 3:19[Max] and NASA's
- 3:20[Speaker 3] -
- 3:19[Max] NASA's own people flagged in April twenty twenty four that SpaceX needed to fully understand the slosh dynamics before attempting ship to ship; that was the point of intermediate flights.
- 3:29[Blake] So the GAO already told Congress Artemis three is unlikely before twenty twenty seven; the propellant demo is the long pole.
- 3:37[Max] The long pole-and here's the math that actually stings:
- 3:40[Max] this demo has to prove the procedure works once-just once-before NASA will certify an architecture that has to work
- 3:47[Max] Per SpaceX's own HLS bid documents,
- 3:50[Max] something like fourteen tanker flights in sequence for a single lunar mission.
- 3:54[Blake] Fourteen!
- 3:56[Blake] Each one has to dock,
- 3:57[Blake] transfer,
- 3:58[Blake] and depart cleanly.
- 3:59[Max] Yeah,
- 4:00[Max] yeah, yeah,
- 4:00[Max] and they haven't done it once yet!
- 4:03[Max] So you've got a fifteen month slip on a demo that unlocks everything downstream,
- 4:07[Max] which raises the actual hard question.
- 4:09[Blake] Why is it still slipping?
- 4:11[Max] That's exactly where we need to go.
- 4:13[Max] The schedule failure is one thing.
- 4:15[Max] thing. The physics of what they're trying to pull off is another story entirely.
- 4:23[Max] So the physics side,
- 4:25[Max] because,
- 4:25[Max] Blake,
- 4:25[Max] this is where people hand wave the hardest.
- 4:28[Max] Walk me through it.
- 4:29[Max] Okay,
- 4:29[Max] so the big nasty problem is ullage.
- 4:32[Max] In zero gravity, your propellant doesn't sit at the bottom of the tank like it does on Earth.
- 4:36[Max] It floats around,
- 4:37[Max] stratifies,
- 4:38[Max] bubbles form.
- 4:39[Max] Those bubbles hit a feed line or a pump, and you get cavitation.
- 4:43[Max] Bad day.
- 4:44[Blake] And that's not something you just model your way out of.
- 4:48[Max] You can model it,
- 4:49[Max] but SpaceX's own updates page says they've been flying radio
- 4:52[Max] Radio-frequency propellant-gauging sensors on every recent Starship flight specifically to characterize this behavior in actual microgravity, which means the models aren't enough; they need real flight data.
- 5:04[Blake] Hmm.
- 5:05[Blake] And they've got that data from single vehicle tests.
- 5:09[Blake] But this demo is two separate ships.
- 5:11[Max] Yeah,
- 5:11[Blake] A target Starship waits in low Earth orbit,
- 5:14[Blake] the chaser launches three to four weeks later,
- 5:17[Blake] autonomously docks,
- 5:18[Blake] then transfers.
- 5:19[Max] Right.
- 5:20[Max] And Wikipedia's breakdown of the mission profile makes that gap explicit.
- 5:24[Max] It's not just docking, it's autonomous rendezvous after weeks apart,
- 5:28[Max] then threading cryogenic propellant through vacuum jacketed lines across.
- 5:31[Max] across a live interface between two vehicles that's a different animal and
- 5:36[Blake] So let me pressure test the scale question.
- 5:39[Blake] SpaceX's own HLS bid documentation uses Fourteen tanker flights as the conservative figure.
- 5:46[Blake] NASA Inspector General reporting puts other estimates at Fifteen even into the high teens.
- 5:51[Max] every one of those flights has to dock transfer and clear out cleanly miss one and depending on how far into the campaign you are
- 5:59[Max] your propellant in the depot is already boiling off while you wait for a stand down to end.
- 6:04[Max] There's no margin.
- 6:05[Blake] So the Demo isn't just proving the procedure works.
- 6:09[Max] It has to prove it well enough that NASA certifies an architecture that has to work a dozen or more times in sequence,
- 6:16[Max] one data point.
- 6:17[Max] That's what's on the table.
- 6:19[Blake] And the SpaceX updates page says both tests,
- 6:22[Blake] the long-duration flight and the transfer Demo, are still targeted for...
- 6:26[Blake] Good for 2026.
- 6:27[Blake] No hard dates.
- 6:29[Max] Targeted. Love that word.
- 6:30[Blake] Very load-bearing.
- 6:32[Max] And look,
- 6:33[Max] SpaceX has DragonEye navigation sensors going on Starship which have real heritage from dozens of ISS runs.
- 6:39[Max] That's not nothing.
- 6:40[Max] But heritage in a thirteen-ton Dragon versus an uncrewed Starship the size of a skyscraper?
- 6:45[Max] Different problem set.
- 6:46[Blake] Where does the actual data come from on whether this works?
- 6:50[Max] That's the honest answer.
- 6:52[Max] We don't have it yet. That's the whole point of the demo.
- 6:54[Blake] Speaking of what SpaceX does have flying,
- 6:57[Blake] they just put...
- 6:57[Blake] He just put Starshield in orbit yesterday.
- 7:00[Max] A completely different kind of problem,
- 7:01[Max] which is worth being precise about.
- 7:03[Max] That's the next thing we need to look at.
- 7:10[Max] Okay, so shifting gears,
- 7:12[Max] Starshield flew yesterday.
- 7:13[Max] Big disc-shaped thing.
- 7:15[Max] Looks like a giant hockey puck.
- 7:17[Max] 3.1 meters wide,
- 7:19[Max] launched on a Falcon 9 from SLC-40 at Cape Canaveral at 6:53 a.m.
- 7:24[Max] Successful flight.
- 7:26[Max] According to Spaceflight Now,
- 7:27[Max] it has no main propulsion.
- 7:28[Max] Nitrogen cold gas thrusters for attitude control only.
- 7:32[Max] So the launch vehicle does the deorbit work.
- 7:34[Blake] Walk me through what that actually proves for HLS.
- 7:37[Blake] Because I think some folks are going to see SpaceX hardware flew yesterday and assume it connects to Artemis somehow.
- 7:44[Max] Yeah,
- 7:45[Max] that's the trap.
- 7:46[Max] It proves SpaceX can fly a heat shield and stick a landing in the Pacific.
- 7:50[Max] That's real.
- 7:51[Max] The re-entry tech is maturing.
- 7:53[Max] But Starfall has zero propellant transfer capability.
- 7:56[Max] It's not a tanker. It's not a depot.
- 7:58[Max] It doesn't even have a main engine.
- 8:00[Blake] So the connection to HLS is...
- 8:03[Max] Basically indirect.
- 8:05[Max] You're building confidence in SpaceX's re-entry and recovery operations.
- 8:09[Max] Fine.
- 8:09[Max] But the ship-to-ship propellant demo,
- 8:11[Max] which is the actual HLS milestone,
- 8:14[Max] that's Starship-to-Starship cryogenic LOX transfer in orbit.
- 8:18[Max] Starfall is a commercial product aimed at pharmaceutical manufacturers and microgravity research customers.
- 8:24[Blake] Sure.
- 8:24[Blake] And SpaceX kept this thing almost entirely secret.
- 8:28[Blake] Secret.
- 8:28[Blake] The specs came not from SpaceX press releases but from FAA and FCC regulatory filings. They cut the webcast 10 minutes after liftoff.
- 8:37[Max] Super transparent company,
- 8:39[Max] as always,
- 8:40[Max] but okay,
- 8:41[Max] credit where it's due.
- 8:42[Max] The heat shield on Starfall is carbon fiber.
- 8:45[Max] It jettisons just before splashdown.
- 8:48[Max] Recovery vessels pull both pieces out of the Pacific.
- 8:50[Max] That's an interesting re-entry architecture.
- 8:52[Max] The FAA approved two demo flights,
- 8:55[Max] and this is the first.
- 8:56[Blake] So what does this actually tell us about SpaceX's priorities right now?
- 9:00[Max] Honestly, that they are building commercial revenue streams in parallel with the government contract work.
- 9:06[Max] Starfall targets orbital manufacturing,
- 9:08[Max] point-to-point cargo,
- 9:10[Max] markets that have nothing to do with Artemis.
- 9:12[Max] Next Big Future called it a low-cost capsule return system.
- 9:16[Max] That framing is all about commercial customers.
- 9:19[Blake] And that's worth noting because we're about to get into the financial picture where SpaceX's capital is actually flowing,
- 9:25[Blake] a company that just did a $25 billion bond sale.
- 9:29[Blake] Elon, the day after this launch,
- 9:30[Blake] is telling you something about what it thinks its growth engine is.
- 9:33[Blake] And it is not the HLS contract.
- 9:36[Blake] That's the thread we need to pull on next.
- 9:38[Blake] Let's pull it.
- 9:44[Blake] Sure. So Bloomberg reported today,
- 9:47[Blake] $25 billion in investment-grade bonds priced this morning, nearly $90 billion in orders.
- 9:54[Blake] That's the transaction.
- 9:55[Max] Dude,
- 9:55[Max] $90 billion in orders for $25 billion in paper?
- 9:59[Max] The market is literally throwing money at them.
- 10:01[Blake] Right. And walk me through the sequencing,
- 10:03[Blake] because this matters.
- 10:05[Blake] June 12,
- 10:06[Blake] IPO:
- 10:07[Blake] seventy five billion dollars raised.
- 10:09[Blake] June 16,
- 10:10[Blake] SpaceX exercises the option to acquire Anysphere,
- 10:14[Blake] Cursor's parent,
- 10:15[Blake] for sixty billion dollars in all stock.
- 10:17[Blake] June twenty fourth,
- 10:19[Blake] today the twenty five billion dollar bond sale prices.
- 10:22[Max] Twelve days.
- 10:24[Max] That's twelve days from IPO to debt market. That is a sprint.
- 10:28[Blake] CNBC confirmed the proceeds retire a twenty billion dollar bridge loan.
- 10:32[Blake] on SpaceX raised in March,
- 10:34[Blake] effective rate 4.58% that funded the xAI acquisition.
- 10:39[Blake] Annual interest drops from roughly $1.8 billion to $1.5 billion,
- 10:44[Max] Mm-hmm.
- 10:44[Blake] so they are genuinely cutting costs.
- 10:47[Blake] That part is defensible.
- 10:48[Max] Okay,
- 10:49[Max] but here's where I pump the brakes a little.
- 10:51[Max] xAI posted a $6.4 billion operating loss last year on $3.2 billion in revenue.
- 10:57[Max] That is a cash furnace.
- 10:59[Blake] And they are now inside SpaceX on the same balance sheet as Starlink and the HLS contract.
- 11:06[Max] Which means Starlink,
- 11:07[Max] the one that is actually profitable,
- 11:09[Max] is subsidizing everything—Grok,
- 11:11[Max] X,
- 11:12[Max] now Cursor.
- 11:13[Blake] S&P flagged the AI division as the riskiest part of the balance sheet when they assigned BBB Moody's gave them Baa1-both investment grade,
- 11:22[Blake] but barely.
- 11:23[Max] So now I want to ask the thing nobody's answering.
- 11:25[Max] Where does Starship HLS RND sit inside this capital structure?
- 11:30[Blake] That's the question.
- 11:31[Blake] Congress has $2.28 billion lined up for HLS in the FY 2027 House bill.
- 11:37[Blake] That money is appropriated, but NASA's design certification review still has to happen before they release further contract funds,
- 11:45[Blake] and that review is gated on the propellant transfer demo.
- 11:48[Max] Which hasn't happened, so you have government money pointed at the moon and private capital pointed at AI coding assistance.
- 11:55[Blake] The $60 billion Anysphere deal is all stock,
- 11:58[Blake] so it is not a
- 11:58[Blake] Not a cash drain,
- 11:59[Blake] but the debt is real.
- 12:01[Blake] Bloomberg Intelligence's Robert Schiffman said they will need more debt to fund expansion-eighty to a hundred billion dollars in total leverage,
- 12:09[Blake] his estimate.
- 12:10[Max] That is a lot of Falcon 9 launches to service.
- 12:13[Blake] And S&P expects negative free cash flow through 2029,
- 12:18[Blake] so the propellant demo is not just a technical milestone,
- 12:21[Blake] it is a contract funding unlock.
- 12:24[Blake] Slip that Demo another year and the HLS cash flow slides with it.
- 12:27[Max] That's the tension:
- 12:29[Max] congressional money is real and waiting,
- 12:31[Max] the physics milestone that releases it is not done,
- 12:34[Max] and the company collecting the contract is busy becoming an AI conglomerate.
- 12:38[Max] Humor it.
- 12:38[Blake] Congress is about to vote on exactly how much to keep vetting on that arrangement.
- 12:48[Max] So the Planetary Society ran a solid breakdown of the FY2027 House CJS bill.
- 12:55[Max] The numbers are not subtle: $2.28 billion for HLS,
- 13:00[Max] $8.93 billion for exploration overall.
- 13:04[Max] That's $1.14 billion above the FY2026 enacted level.
- 13:10[Max] Congress is all in.
- 13:11[Blake] And science takes the hit to pay for it. The Science Mission Directorate drops 17%.
- 13:17[Blake] Sent down to $6 billion; the trade-off is explicit:
- 13:20[Blake] moon program gets the money,
- 13:22[Blake] science gets cut.
- 13:23[Max] Right,
- 13:24[Max] but here's the problem that $2.28 billion cannot fix:
- 13:29[Max] the design certification review NASA requires before releasing further HLS contract funds to SpaceX is still gated on the propellant transfer Demo.
- 13:38[Max] Money appropriated and money released are two completely different things.
- 13:42[Blake] Walk me through the mechanics there. How does that gating actually work?
- 13:45[Max] Work.--SpaceX is on a fixed price,
- 13:48[Max] milestone based contract; NASA only pays after verified milestones.
- 13:53[Max] The propellant transfer is a milestone; no demo,
- 13:57[Max] no certification review; no certification review,
- 14:00[Speaker 3] no payment.
- 14:00[Max] Do no next contract tranche. The physics is the budget constraint now,
- 14:04[Max] not Congress.
- 14:05[Blake] So the appropriators did their job; the bill passed on a party line thirty two to twenty eight vote; NASA exploration gets a real bump; Administrator Isaacman's permanent lunar outpost by twenty thirty is explicitly endorsed; and then it all hits a wall called Orbital Rendezvous.
- 14:22[Max] Dude,
- 14:23[Max] you can't appropriate a successful docking maneuver,
- 14:26[Max] that's the whole problem.
- 14:27[Blake] And according to Starship's HLS updates page,
- 14:31[Blake] both the long-duration flight test and the propellant transfer demo are targeted for twenty twenty six,
- 14:37[Blake] but timing depends on how the V3 architecture flight test progresses-that's a lot of dependencies stacked up.
- 14:43[Max] Wikipedia's Starship HLS article is blunt about it all:
- 14:48[Max] neither the demonstration nor the design certification review had occurred as of March 2026.
- 14:53[Max] six.
- 14:54[Max] And the demo is still listed as "optimistically scheduled"
- 14:58[Max] for twenty twenty six.
- 14:59[Max] Optimistically.
- 15:01[Blake] The Senate is expected to act on its own CJS bill this month.
- 15:05[Blake] The HLS funding line is not going to be controversial there,
- 15:08[Blake] either,
- 15:09[Blake] so Congress will have done everything Congress can do.
- 15:12[Max] And then we're back to the vehicle:
- 15:14[Max] two Starships,
- 15:15[Max] ship to ship docking,
- 15:17[Max] cryogenic transfer in orbit:
- 15:19[Max] all of it has to actually fly.
- 15:20[Blake] Mm-hmm.
- 15:21[Max] That is the variable.
- 15:22[Max] Variable: not the politics,
- 15:23[Max] not the appropriations.
- 15:25[Blake] Which means we need to go on record:
- 15:27[Blake] does the demo fly before December thirty first?
- 15:31[Blake] That's exactly where this ends up.
- 15:38[Max] So,
- 15:38[Max] Blake,
- 15:39[Max] prediction time:
- 15:40[Max] does the ship-to-ship propellant transfer demo fly before December thirty first?
- 15:44[Blake] Walk me through the math first.
- 15:46[Blake] Wikipedia's got the demo listed as NET Late twenty twenty six.
- 15:50[Blake] SpaceX's own updates page says timing is driven by how V3 architecture tests go.
- 15:56[Blake] S33 introduced the vacuum jacket a cryogenic lines the demo needs; that's confirmed.
- 16:02[Blake] But the demo itself requires two Starship launches three to four weeks apart.
- 16:07[Blake] Has that ever happened?
- 16:08[Max] That's the thing-it has not,
- 16:10[Max] not once,
- 16:11[Max] two Starship flights,
- 16:12[Max] same window,
- 16:13[Max] sequenced. We're talking about achieving something brand new just to run the test.
- 16:17[Blake] Right.
- 16:18[Blake] And each of those flights needs its own FAA launch license.
- 16:22[Blake] Two sequential licenses,
- 16:24[Blake] three to four weeks apart,
- 16:25[Blake] that's never been tested either.
- 16:27[Max] Dude,
- 16:27[Max] the FAA licensing sequence alone gives me pause.
- 16:30[Max] But, okay,
- 16:31[Max] here's where I land.
- 16:32[Max] SpaceX's flight cadence in 2026 has been faster than any prior year.
- 16:36[Max] They've got two pads at Starbase now.
- 16:39[Max] I think the first launch of the demo pair gets off the ground before year end.
- 16:43[Max] I'm saying yes.
- 16:44[Blake] The first launch maybe,
- 16:46[Blake] but full demo,
- 16:47[Blake] meaning both vehicles rendezvous and complete the transfer,
- 16:50[Blake] that's a different question.
- 16:51[Max] Fair.
- 16:52[Max] I'm calling the first vehicle up before December thirty first,
- 16:56[Max] full transfer cert by end of Q1 twenty twenty seven,
- 16:59[Max] that one I'd go to fifty fifty.
- 17:01[Blake] 50-50.
- 17:02[Blake] That's not a prediction,
- 17:03[Blake] Max.
- 17:03[Blake] That's a coin flip.
- 17:05[Max] Fine.
- 17:06[Max] Okay,
- 17:07[Max] 60-40.
- 17:08[Max] Demo starts before year-end,
- 17:09[Max] full transfer certs slips to Q2 2027 because something in the autonomous rendezvous sequence surprises them.
- 17:16[Max] That's my official call.
- 17:17[Blake] Mine is cleaner.
- 17:19[Blake] The demo does not achieve full propellant transfer certification before March 31,
- 17:23[Blake] 2027.
- 17:24[Blake] The FAA too licensed sequencing problem alone.
- 17:27[Blake] own adds eight to twelve weeks of buffer you cannot compress.
- 17:31[Blake] And if V3 architecture has one more anomaly,
- 17:34[Blake] the program is already on booster nineteen after eighteen was destroyed in ground testing.
- 17:39[Blake] You're into Q3.
- 17:40[Max] Wait, that's actually pretty bearish.
- 17:43[Blake] It's the schedule math.
- 17:44[Blake] SpaceX's own updates page says timing depends on V3 progress.
- 17:49[Blake] V3 progress has not been linear.
- 17:52[Max] No argument there.
- 17:53[Blake] Right.
- 17:53[Max] This prediction goes on the board.
- 17:54[Max] Next episode we check it.
- 17:56[Blake] What to watch:
- 17:57[Blake] Any FAA license filing that names a long-duration orbital mission for Starship.
- 18:02[Blake] That's the first vehicle of the demo pair.
- 18:05[Blake] The day that application drops,
- 18:07[Blake] the clock actually starts.
- 18:08[Max] And until that filing exists,
- 18:11[Max] optimistically scheduled for 2026,
- 18:13[Max] is just a very polite way of saying nobody knows.
- 18:21[Max] Okay,
- 18:22[Max] so here is what we walked through today.
- 18:24[Max] A demo that was supposed to wrap up by summer 2025 is still sitting there unflown with no launch date,
- 18:31[Max] and the entire Artemis downstream schedule is hostage to it.
- 18:34[Blake] Fourteen tanker flights,
- 18:36[Blake] zero demos,
- 18:38[Blake] that's the math,
- 18:39[Blake] and congressional funding can't unlock a single HLS milestone payment until that propellant transfer actually happens.
- 18:47[Max] Meanwhile,
- 18:48[Max] SpaceX is out here doing a $25 billion bond sale 11 days after their IPO.
- 18:53[Max] Blake's been watching that capital structure,
- 18:55[Max] and it raises real questions about where the company's attention is pointed.
- 18:59[Blake] The FAA license filing for long-duration orbital space
- 19:02[Blake] But a Starship mission,
- 19:04[Blake] that's the concrete signal.
- 19:05[Blake] Watch for that.
- 19:06[Max] If this episode helped you track why Artemis keeps slipping,
- 19:09[Max] share it with someone who's still fuzzy on the moon program.
- 19:12[Max] Subscribe wherever you listen,
- 19:14[Max] it genuinely helps.
- 19:15[Blake] Thanks for being here.
- 19:16[Blake] We'll be back next week to see if any of our predictions age well.
- 19:20[Max] They never do.
- 19:21[Max] See you then.