Latest / Road Maps for Texas Local Agencies / Recycled Asphalt Pavement (RAP): What Local Texas Agencies Need to Know
Transcript
- 0:05SPEAKER_01: You know, Dennis, most people are not aware that the most recycled material in the world is recycled at call pavement that are known as RAF.
- 0:13SPEAKER_01: And we're going to talk about that in this episode.
- 0:16SPEAKER_00: Before we have that conversation, this episode safety here is on back-to-school traffic awareness in school zone.
- 0:24SPEAKER_00: Have a few tips here.
- 0:25SPEAKER_00: Number one, give students extra room and don't assume that they are paying attention to their vehicle, especially if the kids get uh going back to school just fall.
- 0:35SPEAKER_00: Uh number two, don't block crosswalks when you're stopped at a red light or a stop sign.
- 0:40SPEAKER_00: Uh the next is uh reduce your speed whenever you see a school bus, even if its lights aren't on.
- 0:46SPEAKER_00: Uh the next is uh be careful around railroad crossings.
- 0:49SPEAKER_00: Uh, school buses are legally required to stop at those.
- 0:53SPEAKER_00: And uh finally remember that uh texting while driving is illegal in Texas.
- 0:59SPEAKER_00: This safety share and others are available on our Text Apple website.
- 1:03SPEAKER_00: And now let's start our conversation on RAP.
- 1:06SPEAKER_01: So today we're going to talk about recycled asphalt pavement, better known as RAP.
- 1:11SPEAKER_01: Um, you know, we've talked about this when we did our 341M uh podcast a few months back.
- 1:18SPEAKER_01: Um so RAP is uh really basically it's the millings that are collected off a previous asphalt pavement.
- 1:28SPEAKER_01: Uh we go in, sometimes we're going to redo a road and we'll mill up and we'll stockpile the previous asphalt material.
- 1:35SPEAKER_01: You know, RAP is the most recycled product or material in the United States.
- 1:42SPEAKER_01: There are millions and millions of tons a year stockpiled.
- 1:47SPEAKER_01: And um, if we if we take that, what is now aggregates that is coated with binder as a stockpiled material, we can reintroduce it in percentages into new virgin mix, and we can get a lot of uh benefits.
- 2:03SPEAKER_01: There's you know, you're you're checking the box on sustainability, um your costs, savings.
- 2:09SPEAKER_01: Costs, you're saving a lot of money, and uh and you're getting some performance uh benefits by using carefully stockpiled, and we're gonna get into that here today.
- 2:20SPEAKER_01: So uh, but Dennis, what are some of the misconceptions about wrap pavement?
- 2:23SPEAKER_01: Because it does get a little bit of a black eye so far.
- 2:25SPEAKER_00: Yeah, yeah.
- 2:26SPEAKER_00: One of the misconceptions is that since it is a recycled material, it's obviously going to be less quality and you'll have lower performance.
- 2:32SPEAKER_00: And uh when used responsibly, we know that that's not the case.
- 2:36SPEAKER_01: So uh maybe we could touch on um what's uh if we're making a business case for using wrap, what would you uh you know, obviously we talked about cost and we talked about sustainability, but uh it's what does that really look like?
- 2:51SPEAKER_00: Well, it's readily available, it's already at the plant, and um it'll uh require the the mix that's going to be produced that day to have less new materials going into it, so it's less trucking demand um and uh less binder demand uh that you'll need to have uh coming into the plant.
- 3:07SPEAKER_00: Um it's uh you know, so from a supply chain standpoint, that's less new material that has to be ordered to operate that day.
- 3:14SPEAKER_00: And so uh typically your production costs will be less because it's already there and it's available.
- 3:19SPEAKER_01: So I think that you know, when I'm talking with local agencies, uh, you know, we hear there's a lot of them around the state that they say we don't allow wrap, and they say, well, why not?
- 3:32SPEAKER_01: And we're saying, well, we just because it's no good.
- 3:34SPEAKER_01: And but I think there's a bit of a lack of understanding.
- 3:37SPEAKER_01: However, the it is somewhat grounded in truth.
- 3:41SPEAKER_01: Uh there have been probably a lot of projects in the past where we use too much wrap uh in a mix, or we used wrap material that was not processed properly.
- 3:57SPEAKER_01: And um there is uh a term called fractionating wrap.
- 4:02SPEAKER_01: Um maybe you could talk a little bit about that and about why it's really important that we do that.
- 4:07SPEAKER_00: Yeah, so part of the part of the uh the wrap uh fractionating process is where we we take the wrap material and we process it down to get it to a consistent gradation.
- 4:17SPEAKER_00: We want to make sure we get it down to the uh the basic the rocks that are coated with aggregate, and uh then we're gonna want to test that uh that material to make sure it meets the criteria we're looking for.
- 4:27SPEAKER_00: The main thing we're looking for is that we talked about aggregate size, uh, the gradation.
- 4:31SPEAKER_00: We want to we want to know the asphalt content of that stockpile, and then we want to make sure that we have screened off all the deleterious materials.
- 4:39SPEAKER_00: That's a big word.
- 4:40SPEAKER_00: That's mainly all the debris and things that aren't going to help this uh this mix perform.
- 4:45SPEAKER_01: Yeah, and and so when we're when we fractionate this this wrap stockpile of the stuff that's come off project, and there's another thing too, when we talk with our producers, and it's it's really it's just a function of how much space do they have.
- 4:58SPEAKER_01: They can't, they they are constantly getting millings in from other projects.
- 5:04SPEAKER_01: And if you talk to them, I mean, they're this stuff's all going in a giant pile, right?
- 5:10SPEAKER_01: And uh, well, I mean, for the most part, maybe maybe there's a giant project that's got millings that they're gonna set aside somewhere else to use on that same project as an overlay.
- 5:20SPEAKER_01: But a lot of times there's a blend of all these different previous projects where they've milled up the the the uh hot mix and it it it gets it gets uh put into this uh you know mountain of wrap material at a at a plant uh location.
- 5:37SPEAKER_01: And by fractionating this material, we can fractionate it into finer aggregates, coarser aggregates, and as we've talked about in the past uh in other in some of our other podcasts, you know, you you the smaller the rock, and this stuff has it was previously out mixed, so it's got binder on it, and that finer wrap stockpile that has been set up and fractionated and put into that is going to have a higher asphalt content on it.
- 6:08SPEAKER_01: And so we we try to look at okay, what is the effective binder content of this wrap stockpile?
- 6:15SPEAKER_01: Because some of this stuff will add some good properties if properly processed.
- 6:21SPEAKER_00: You know, it's stiffer and it'll give you, it'll it can make a softer binder uh uh stronger.
- 6:26SPEAKER_00: Um, and and so I guess number one, if it's not fractionated, um, it's not in the modern specification.
- 6:32SPEAKER_00: So another plug for 341M.
- 6:33SPEAKER_00: We're only talking about fractionated wrap.
- 6:36SPEAKER_00: Um, yeah, and then you want to make sure that you're you're checking two things.
- 6:39SPEAKER_00: Uh the specification has a maximum just wrap content.
- 6:42SPEAKER_00: We also we want to look at the recycled binder ratio.
- 6:45SPEAKER_00: We want to uh check two of those things uh to make sure we're using the appropriate amount of wrap.
- 6:50SPEAKER_00: And a lot of times where I'm from in the Houston area, the recycled binder ratio usually controls that.
- 6:55SPEAKER_00: So don't just look at that one percentage.
- 6:58SPEAKER_01: Right, right.
- 6:58SPEAKER_01: And um, you know, and I think one of the benefits of what we what we see and what is allowed, and of course, it needs to be looked at.
- 7:05SPEAKER_01: I mean, the whole thing goes back to we need to engineer this.
- 7:08SPEAKER_01: This wrap needs to look like and be treated like any other qualified material source.
- 7:14SPEAKER_01: Yep.
- 7:15SPEAKER_01: Um we have very rigorous control over aggregates that go into hot mix.
- 7:19SPEAKER_01: Yeah, we're checking stockpile gradations, and we should we should treat this material exactly the same way.
- 7:24SPEAKER_01: And I think some of the uh, you know, another kind of business case about wrap is when you're using wrap in intermediate or base layers, which you'll allow typically a higher percentage, but you shouldn't just say we're gonna use this amount percentage of wrap without running it, testing it, going and developing a job mix formula and and running all the testing like you would do on a regular hot mix project.
- 7:51SPEAKER_01: Uh but what we have seen from a beneficial standpoint is uh what we call uh is called uh grade dumping of the of the binder.
- 7:58SPEAKER_01: So if you were to have say a 70 minus 22 asphalt binder in an intermediate layer, you know, it's gonna be heavy duty pavement, you may get some of the effective binder from that wrap.
- 8:09SPEAKER_01: And because it's stiffer, you might be able to say, hey, we're gonna be able to use a 64 minus 22.
- 8:15SPEAKER_01: And still get the same performance that we would have.
- 8:18SPEAKER_01: Yeah, and and so that that that goes in directly into a uh a cost savings for a local agency because that producer, you know, the more modified a binder is, then the more it's gonna cost.
- 8:30SPEAKER_01: And but you don't want to substitute costs for not getting performance.
- 8:35SPEAKER_01: So you you you have some real benefits there um from a business standpoint.
- 8:40SPEAKER_01: Um and I think you know, we touched on the sustainability, but let's talk about that a little bit.
- 8:44SPEAKER_00: It's it's an important uh it's an important um uh topic.
- 8:47SPEAKER_00: And you know, a lot of our uh local agencies uh that that's a metric that they score themselves on.
- 8:52SPEAKER_00: Uh we mentioned, you know, um uh RAP is uh the most recycled material in the U.S.
- 8:58SPEAKER_00: Um and so it's something that uh that could that can uh help us feel good about the road we're putting down while also saving money and uh and getting the performance we're looking for.
- 9:07SPEAKER_01: Yeah, and I think that um one of the things that uh it's not just local agencies that have agencies that have had issues with wrap in the past.
- 9:17SPEAKER_01: Um, you know, we always you know uh the hot mix industry forever gets, you know, we we kind of say, you know, there's always these things.
- 9:26SPEAKER_01: Uh 25, 30 years ago, you know, they were saying, you know, we can grind up, you know, we're there are toilet factories that are making porcelain toilets and they're like these things, anything.
- 9:38SPEAKER_01: And we always talk about, you know, we don't want asphalt roadways to be linear landfills, right?
- 9:44SPEAKER_01: You know, so let's be careful about what we're putting in there.
- 9:47SPEAKER_01: But uh, you know, by by qualifying this material, you know, you're you're actually gonna get some really good uh good performance.
- 9:56SPEAKER_01: And uh, you know, so I I think that one of the good things is that Techstot recognized because there are some districts on the Textdot highway system and that covers the whole state, yeah.
- 10:08SPEAKER_01: Where they where they don't allow RAP.
- 10:10SPEAKER_01: Now they're starting to again, and luckily the relationship between TechSappa and TechStot, particularly the materials and test division, uh we have uh we have developed, and Textot has a uh a uh guidance document on best practices for stockpile management, and that's something that we uh you can go to TechSot's website, look under guidance documents in the materials and test division.
- 10:35SPEAKER_00: We can share it on the blog here.
- 10:36SPEAKER_01: We can share it on our blog and we'll have that link.
- 10:39SPEAKER_01: Um but you you really ought to take a look at that and make sure that those recommendations in that guidance document you tell uh if you're a a city or a county and you're spec in a project, you say, hey, we'll make sure that we're adhering to these things that are in this guidance document if we're gonna allow RAP.
- 10:57SPEAKER_00: Um but and an easy way to do that is with 341M.
- 11:02SPEAKER_00: And it starts with the fractionation and the processing uh part of that uh to get to generate that stockpile so we can run reliable tests of that material.
- 11:11SPEAKER_00: Again, asphalt content, gradation, and any uh deleterious are out of there.
- 11:16SPEAKER_01: Get that stuff out of there, and um we uh uh we've seen some really good projects.
- 11:23SPEAKER_01: Uh I think that Text Dot is definitely back on track with allowing it.
- 11:27SPEAKER_01: Now, talk a little bit about the percentages though, because um we don't allow the same amount of wrap, depending on where it is in a in a pavement layer, right?
- 11:37SPEAKER_01: I mean, we have what we call our asphalt base materials.
- 11:39SPEAKER_01: These are typically our you know our bigger rock, our type B, uh in some instances C, um dense graded material that will be further down.
- 11:50SPEAKER_01: We're seeing, you know, there's a there's an allowance of a higher percentage of wrap in that particular spot in that pavement section.
- 11:57SPEAKER_01: Um as we move up, we get into uh what we call an intermediate layer.
- 12:02SPEAKER_01: We're allowing less than we would in the base layer, right?
- 12:06SPEAKER_01: Um and then in the surface layer, we're allowing even less, but we are allowing it.
- 12:11SPEAKER_01: What was that breakdown on that?
- 12:13SPEAKER_00: Yeah, so uh the remember we're looking at two different things.
- 12:16SPEAKER_00: We're looking at the just the sheer volume of the wrap material, but we're also looking at the recycled binder content.
- 12:22SPEAKER_00: And so um that's there in 341M.
- 12:24SPEAKER_00: And and really what we're looking for is uh is a more consistent uh uh material there in the surface uh that we're uh that you know the risk profile is different between the surface versus the base, and that's reflected in the spec.
- 12:37SPEAKER_01: Yeah, and I think the table is in that specification, both for text out on their 341 spec, but our 341M mirrors that and has that table in there.
- 12:46SPEAKER_01: And the so on a surface mix, what's considered a surface mix, the maximum allow was 20%.
- 12:51SPEAKER_01: Yep.
- 12:52SPEAKER_01: Now we are not seeing it always, you know, that doesn't mean go out and put 20% in it.
- 12:57SPEAKER_00: Well you still have to meet it.
- 12:58SPEAKER_00: And uh, as we mentioned, we've had uh several case studies where the recycled binder ratio will stop you before you get to 20%.
- 13:04SPEAKER_00: So that is a sanity check.
- 13:06SPEAKER_00: And then with just the the general mix design process, we're also checking uh, you know, the hamburg wheel test, looking for uh rutting potential of that surface mix, um, uh as well as you know a few other tests looking at cracking.
- 13:19SPEAKER_00: So we are running performance tests on it, so we're not just blindly um maxing out the wrap content without making sure that that mix does meet the performance criteria.
- 13:27SPEAKER_01: Yeah, well, you know, we've got uh that that's right, that's right, and that it's a great point.
- 13:31SPEAKER_01: And this is a really big state.
- 13:33SPEAKER_01: I know we've talked about this and we will always talk about it, that you know, we're trying to use local materials as best as we can because we need to, you know, maximize the cost savings, the efficiency of production and all of these things.
- 13:47SPEAKER_01: Um and so certain areas of the state may lend themselves to a different percentage of wrap that seems to work based on kind of what are those aggregates in that area, how did the binder adhere to those aggregates?
- 14:00SPEAKER_01: What's that effective asphalt content of that wrap material?
- 14:04SPEAKER_01: And so, you know, I was down in in far south Texas and visiting with them, and you know, I some of our big producers, members down there, you know, they're saying, hey, you know what, our sweet spot in the surface, I know it says you can use 20, but we're finding that we're somewhere around 8, 9% or something like that.
- 14:20SPEAKER_01: And so whatever it really ends up being, depending on where you are, is something that you test and you will find what works really does work.
- 14:31SPEAKER_01: And I think that educating cities, counties, local agencies, developers that are working for cities and counties, building subdivisions if you're going to allow RAP, there is a way, as you say, a sanity check.
- 14:43SPEAKER_00: Uh run some tests.
- 14:46SPEAKER_00: Absolutely.
- 14:47SPEAKER_01: Rule of thumb is a good thing to uh a starting point, but rule of thumb is not uh detailed engineering.
- 14:56SPEAKER_01: No, it's not.
- 14:57SPEAKER_01: There are ways to make sure that we're getting this.
- 14:59SPEAKER_01: So that's it.
- 15:00SPEAKER_00: And we can have some, we do run those tests and we can uh run the mix design, we can have some confidence in the amount of wrap we're using.
- 15:05SPEAKER_01: Yep.
- 15:06SPEAKER_01: I think at the end of the day, what we're what we're really want to drive home is that let's utilize wrap because not because we have a well, we have a lot of it, so let's use it, but not let's use it so that we can get rid of wrap.
- 15:22SPEAKER_01: Let's use it because if it's done right, you're actually going to enhance that mix.
- 15:28SPEAKER_01: And there's a lot of things, you know.
- 15:29SPEAKER_01: The talk a little bit about, you know, in the balanced mix design research that's going on right now, and there's a lot of test sections around the state where balanced mix design, we're trying to come up with these pavements that you know we're resisting rutting, but we're also resisting cracking, and those two things work kind of at at odds, and we're trying to balance you know the control of that.
- 15:54SPEAKER_00: And so rap uh rap is rap's a big one um in you know, we're looking at what are the appropriate percentages or how high could you go and uh not sacrifice performance because that's that's kind of what we're talking about.
- 16:07SPEAKER_00: You know, wrap doesn't always equal lower performance.
- 16:10SPEAKER_00: So the the balanced mix design process is really pushing the envelope on that to see what's reasonable for that particular wrap in those mixes uh and and developing a process to make this better so our tests will get better and uh to get that into practice to see um if we can uh uh get these uh even more benefit from using wrap.
- 16:29SPEAKER_01: Yeah, I mean the uh you know the balanced mix design, that whole process is really it's not just looking at volumetrics, it's not just looking at the quantity of, you know, uh in typical volumetrics, you're looking at quantities of different components to meet this volumetric design, but then we need to have some of these mechanistic empirical checks that will also look at, okay, it's not necessarily totally about volume, it's you know, it's not about quantity, it's about quality.
- 17:03SPEAKER_01: You know, so we're trying to balance that out, and it's uh been a lot of good work, and wrap is uh definitely of one of the things that are being looked at in that process.
- 17:11SPEAKER_00: Yeah, there'll be still some new test methods and things like that that'll come online, so that's definitely an exciting place to where where industry's headed you.
- 17:18SPEAKER_01: And I mean, I think you and I have talked about this uh and we do at Tech Sappa quite a bit that a local agency get contact us and let us come in and talk to you about rap use because there are you know, I say mountains.
- 17:33SPEAKER_01: There's a lot of rap, maybe not mountains, uh hills, right?
- 17:36SPEAKER_01: Uh we know the hill country.
- 17:38SPEAKER_01: But we we have uh we've got a lot of rap very close to pretty much every city and county in the state, and we really ought to be using it, and it it goes a long way for performance and uh and uh sustainability and cost.
- 17:56SPEAKER_00: Absolutely.
- 17:56SPEAKER_00: You know and if you have any questions about how to get those stockpiles checked, um you know let us know.
- 18:02SPEAKER_00: We can help.
- 18:02SPEAKER_00: Absolutely.
- 18:03SPEAKER_01: Larry, you know what time it is?
- 18:05SPEAKER_01: It's time for our top 10 list.
- 18:07SPEAKER_01: The top ten reasons you know you are hooked on raft.
- 18:11SPEAKER_01: Reason number 10, you hear the phrase old pavement and immediately think that's not old, that's inventory.
- 18:17SPEAKER_00: Reason number nine, you insist that the only way to be a hero of your city and county is by saving money, helping the environment, and providing a high quality construction material is through the user raft.
- 18:28SPEAKER_01: Absolutely.
- 18:29SPEAKER_01: Reason number eight, you would rather see a milling machine pull up out front than the Uber Each craft.
- 18:36SPEAKER_00: Reason number seven, you told someone completely seriously an old roadways trash is a new roadways craft.
- 18:44SPEAKER_01: Reason number six, you can estimate raft content faster than you can remember your Netflix pathway.
- 18:51SPEAKER_00: Reason number five, you take offense when someone calls raft leftovers.
- 18:55SPEAKER_00: Leftovers?
- 18:56SPEAKER_00: That's a highly engineered recycled constructed material.
- 18:59SPEAKER_01: Absolutely.
- 19:00SPEAKER_01: Reason number four, if you missed the first quarter of the big game because you prefer to finish explaining the importance of fractionated raft to stockpile manufacturing.
- 19:09SPEAKER_00: Reason number three, if you explain the circular economy so often that your kids think that raft is a super good, reason number two.
- 19:28SPEAKER_00: And reason number one is why you know that you are hooked on raft.
- 19:32SPEAKER_00: If you know you're an asphalt nerd when someone says that's a lot of raft, you ask them the final why.
- 19:39SPEAKER_01: This episode's project of the month comes from uh the city of Midland and our partners out there within the city.
- 19:45SPEAKER_01: This project was the final piece of the city's$100 million bond program.
- 19:50SPEAKER_01: It's a high-profile project in the middle of the city on Main Street from Wadley Avenue to Ohio Street.
- 19:57SPEAKER_01: The project section was significant and included 9,240 tons of type C dense graded mix and 6,100 tons of type D densecrated surface mix.
- 20:09SPEAKER_01: The city of Midland has adopted the Tech Sapa 341M specification, so quality control and quality assurance requirements were at a high level, and they achieved a smooth, high-quality, final product.
- 20:21SPEAKER_00: Doesn't get any more high profile than Main Street.
- 20:24SPEAKER_01: Yep, no, no, that's right.
- 20:25SPEAKER_01: And it's it is right down there in town.
- 20:27SPEAKER_01: And uh I do want to emphasize that uh we've got a lot of good partners out there in West Texas that have been adopting 341M and have uh worked with the contractor and producer members in the area, and they are really all on board to try to get the best quality hot mix they can get out there.
- 20:44SPEAKER_01: So we really applaud it.
- 20:46SPEAKER_01: Thank you for tuning in to this episode of Roadmaps.
- 20:48SPEAKER_01: And remember, stay flexible.
- 20:54SPEAKER_01: Thanks for tuning in for this month's episode of Roadmaps.
- 20:58SPEAKER_01: If you enjoyed today's episode, feel free to like and subscribe, and follow us on our social media channels at Texas Paul Paven Association.
- 21:07SPEAKER_01: Stay flexible and looking at next time.