Latest / USA Cabinet Store Remodeling Podcast / Shower-to-Bathtub Conversion: Costs, Steps & Permits
Transcript
- 0:04Welcome back to the Remodel Report, the show
- 0:07where we walk you through real home projects
- 0:09from the first swing of the hammer to the final
- 0:12finishing touch. I am Chris, and as always, I
- 0:16am joined by our remodeling expert, Jessica.
- 0:19Today we are tackling a project a lot of homeowners
- 0:22dream about, but very few understand before they
- 0:25start. We are converting a shower into a bathtub.
- 0:30Jessica, this one sounds simple on paper, but...
- 0:32It is anything but, right? It really is, Chris.
- 0:36On the surface, people think you just pull out
- 0:38the shower and drop in a tub. But a shower -to
- 0:41-bath tub conversion touches almost every system
- 0:43in that bathroom. Plumbing, the drain location,
- 0:46the framing under the floor, waterproofing, and
- 0:49of course, the finishes. When it is done right,
- 0:52though, you take a plain stall shower and turn
- 0:55it into a relaxing, spa -like retreat that adds
- 0:58comfort, resale value, and real style to the
- 1:01home. So today we are going to cover the benefits,
- 1:04the tub options, the full step -by -step process,
- 1:08the budget, and even the permit rules here in
- 1:10our area. Perfect. Let's start with the why.
- 1:13If someone already has a working shower, why
- 1:15go through all of this to add a tub? Great question.
- 1:18And there are four big reasons. First, the spa
- 1:21experience. A new tub with surrounding tile,
- 1:25stylish faucets, and high -end glass doors completely
- 1:28changes the mood of the room. Add the right lighting
- 1:32and decor and it becomes a place to soak the
- 1:34stress away. Second, functionality and value.
- 1:39A tub gives you versatility. You can still take
- 1:42a standing shower, but now you can also soak.
- 1:45And homes with both a tub and a shower tend to
- 1:47appeal to more buyers. Third, water and energy
- 1:51savings. Newer fixtures are flow restricted and
- 1:54pairing them with on -demand hot water can cut
- 1:56your bills. And fourth, accessibility and safety.
- 2:00Walk -in tubs offer a low threshold for easy
- 2:03entry, and you can add grab bars and non -slip
- 2:06flooring, which is a big deal for children, seniors,
- 2:08or anyone with mobility concerns. That accessibility
- 2:11point is huge, especially for families planning
- 2:14to age in place. So when someone decides they
- 2:17want a tub, what are their actual options? What
- 2:20kinds of tubs are we talking about? There are
- 2:22really two main paths. The first is a standard
- 2:25bathtub. This is the most common and most affordable
- 2:28choice, usually an alcove or a platform tub in
- 2:31acrylic or enameled steel. You can get rectangular,
- 2:35oval, or corner shapes, and you can splurge on
- 2:38extras like bubble massage jets or an inline
- 2:40heater. The second path is a walk -in tub. These
- 2:43have a door so you step right in instead of climbing
- 2:46over a wall. They come with inward or outward
- 2:49swinging doors, non -slip floors, support bars,
- 2:53A, D, A, compliant powered seats, and therapeutic
- 2:57jets. The right choice really comes down to your
- 3:00needs, your taste, and your budget. Which is
- 3:03exactly why we always recommend working with
- 3:05a professional bathroom remodeler before you
- 3:07commit. Okay, so the tub is chosen. Before any
- 3:11demolition starts, what does the prep work look
- 3:13like? I imagine you cannot just start ripping
- 3:15things out. Definitely not. Good prep is what
- 3:19keeps the project smooth. Step one is to consult
- 3:22the experts and review your goals, your options,
- 3:25and your budget, and make sure permits and building
- 3:27codes are handled. Step two is thinking through
- 3:30demolition and structure, because the weight
- 3:33load for a tub is very different from a shower,
- 3:35especially with cast iron or stone. You have
- 3:39to check the floor joists, the drain location,
- 3:41the plumbing, and the ventilation. Step three,
- 3:45and people always forget this one, order your
- 3:47tub early. Custom or specialty tubs can take
- 3:50four to six weeks to arrive, so ordering late
- 3:53stalls the whole job. And step four, buy all
- 3:57your fixtures and materials ahead of time. The
- 4:00faucets, the doors, the tile, the lighting. Having
- 4:03everything on site means no scrambling once the
- 4:06crew starts. That ordering tip alone probably
- 4:09saves people weeks. All right, prep is done.
- 4:13Walk me through tearing out the old shower. What
- 4:17is the right order? You want to be methodical
- 4:19so you protect everything that is staying. First,
- 4:23shut off the water supply lines feeding the shower
- 4:26valves so nothing leaks while you work. Then
- 4:29remove the shower drain, unscrewing the top plate
- 4:32and the pipe body from below and plug the hole
- 4:34so debris does not fall through. Next, take out
- 4:37the shower base, carefully breaking up that mortar
- 4:40bed while protecting the floor. After that, extract
- 4:44the surround walls or tile without damaging the
- 4:46wall structure you need for the tub. And finally,
- 4:49remove the plumbing fixtures, the shower head,
- 4:52handles, valves, and any diverter spout, and
- 4:55cap the supply lines. One serious note here.
- 4:58If you find asbestos or any hazardous material,
- 5:01it has to be handled according to federal and
- 5:03local regulations. That is not a do -it -yourself
- 5:06moment. Good safety call. So now the space is
- 5:09blank and ready. This is where the new tub goes
- 5:11in. What does a proper installation involve?
- 5:14This is the precision part. You position and
- 5:17level the new tub exactly where you want it,
- 5:20using shims to get it perfectly flat, and you
- 5:23mark where the plumbing cutouts go. Then you
- 5:26install the drain and waistlines with proper
- 5:28fittings, and you confirm the slope, which is
- 5:31typically a quarter inch per foot for good water
- 5:33flow, and you leak check it. Next come the structural
- 5:37modifications, strengthening the subfloor and
- 5:40adding blocking to handle that extra weight.
- 5:43If you're adding an air bath or a heated or electronic
- 5:45tub, Now is the moment to wire and plumb those
- 5:48features while the walls are still open. Then
- 5:51you waterproof the surrounding walls with backerboard
- 5:53above the lip, and seal the seams and plumbing
- 5:56penetrations with a membrane -like red guard.
- 5:58And only after that do you install the surround,
- 6:01whether that is acrylic panels, tile, or decorative
- 6:04wall panels. You mentioned the drain. A lot of
- 6:07people assume they can just reuse the existing
- 6:09shower drain, can they? That is one of the biggest
- 6:12misconceptions, and the answer is no. Showers
- 6:15have a center drain, but tubs need a side -mounted
- 6:18drain, usually 8 to 15 inches from the end wall.
- 6:22That means cutting into the subfloor, running
- 6:24new drain lines at that quarter inch per foot
- 6:27slope, and possibly re -venting to meet plumbing
- 6:29code. You really want a licensed plumber to assess
- 6:33it. And the weight is the other surprise. A filled
- 6:37cast -iron tub can weigh 500 to 800 pounds, compared
- 6:40to 150 to 200 for a shower base. That usually
- 6:44means sistering the floor joists or adding solid
- 6:47blocking, and ideally a structural engineer calculating
- 6:51the load so you never get sagging or worse. So
- 6:53the tub is in, sealed, and structurally sound.
- 6:56Now we get to the fun part, the finishing touches.
- 7:00Walk me through the doors and the hardware. This
- 7:03is where it starts to feel like a finished space.
- 7:05Start with your tub filler faucets, chosen to
- 7:08match your hardware finish and mounted to code,
- 7:10with anti -scald valves integrated properly.
- 7:13Then add a diverter tub spout, which lets you
- 7:16switch between filling the tub and running the
- 7:18shower head with a simple lever. Next, custom
- 7:22shower doors. Semi -frameless glass actually
- 7:25makes a small space look larger while adding
- 7:27elegance. And you can choose hinged or sliding
- 7:30styles. Just be sure every edge is sealed against
- 7:33leaks. And do not overlook built -in storage.
- 7:37Recessed niches, a glass front medicine cabinet,
- 7:40and floating shelves keep your essentials close
- 7:43but the space clean and uncluttered. I love that
- 7:45small spaces look bigger with the right glass.
- 7:48Let's talk design and decor. How do people make
- 7:51this space feel like their own? The options are
- 7:54almost endless, and it comes down to the look
- 7:56and feel you want. Lighting sets the mood. Anything
- 8:00from sleek LED strips for a modern spa to vintage
- 8:03wall sconces for old Hollywood glamour. For flooring,
- 8:07think heated stone mosaic, marble, rich wood
- 8:10plank patterns, or easy clean porcelain that
- 8:13resists moisture. Backsplashes and accents are
- 8:17where you can really have fun. Natural stone
- 8:19waterfall edges, glass or quartz mosaic, even
- 8:23three -dimensional wave tile. Then layer your
- 8:26textures and colors, maybe a classic white tub
- 8:29against colorful tile, or an all -neutral palette
- 8:32for a seamless look. And do not overlook the
- 8:35hidden health and accessibility touches, germ
- 8:38-resistant brass fixtures, even a HEPA air purifier
- 8:42for humidity, plus low thresholds and lever handles
- 8:45that make the space easier for everyone to use.
- 8:48Okay, the question everyone is really waiting
- 8:50for. What does all of this cost? Let's break
- 8:53it down. The tub unit itself runs anywhere from
- 8:56$500 for a basic model to $3 ,500 or more for
- 9:00high -end or specialty walk -in tubs. Installation
- 9:04labor typically lands between $2 ,000 and $5
- 9:07,000, depending on complexity. And the surround
- 9:10finishes, the tile, glass doors, lighting, and
- 9:13hardware add another $500 to $2 ,500. For a complete
- 9:18mid -grade tub and shower combo, you are usually
- 9:21looking at around $6 ,000 all in. To put that
- 9:25in context, Bob Villa reports the average homeowner
- 9:28spends between $3 ,000 and $8 ,000 on this kind
- 9:31of conversion. And here's the part people miss.
- 9:34Labor alone is usually 60 to 70 percent of the
- 9:37total, so the install is where most of your money
- 9:40goes. That labor percentage really reframes the
- 9:43budget. Now, a lot of our listeners are right
- 9:45here in Northern Virginia. Are there local rules
- 9:48they need to know about? Absolutely, and this
- 9:51trips people up. In Fairfax County, a shower
- 9:54to bathtub conversion almost always requires
- 9:56both plumbing and building permits, and those
- 9:59go through DPWES. the county department, using
- 10:03the ePlan portal. You submit proof of ownership,
- 10:06plans, and plumbing specs. Permits are mandatory
- 10:09any time you relocate a drain or make structural
- 10:11changes, and skipping them can void your insurance,
- 10:15cause legal headaches when you sell, and lead
- 10:17to fines. Budget roughly $100 to $500 for permits.
- 10:22On cost, Fairfax tends to run toward the higher
- 10:25end of the national range because of labor rates
- 10:27and strict code compliance. So most homeowners
- 10:30here spend around $6 ,000. And one more tip.
- 10:34Make sure your contractor holds a valid DPOR
- 10:37Class A license and a Fairfax County BPOL license.
- 10:42That protects you. Smart. Let's do a quick lightning
- 10:45round of the questions we hear most. Can people
- 10:48DIY this? How long does it take? And does it
- 10:51actually help resale? Quick answers. DIY. Only
- 10:55if you have real plumbing and carpentry experience,
- 10:58because a mistake can cause water damage or mold
- 11:01that costs more than the labor you saved. Timeline.
- 11:05A professional conversion usually takes five
- 11:07to ten business days, longer if your custom tub
- 11:10has that four to six week lead time. Resale.
- 11:14It depends. Adding a tub to create a full bath
- 11:17can boost value, and about 65 % of home buyers
- 11:20want at least one tub in the house. But you never
- 11:23want to remove your only shower or your only
- 11:25tub, because that limits your appeal. And a fun
- 11:29one people always ask. The military method of
- 11:32showering. 30 seconds to get wet, water off while
- 11:36you soap up, 30 seconds to rinse, using under
- 11:39two gallons instead of the 25 to 50 a bath can
- 11:42use. A nice water saving trick once your new
- 11:45tub is in. That is a great rundown. Jessica,
- 11:48if someone takes just a couple of things away
- 11:49from this episode, what should they be? Three
- 11:52things. One, plan before you demo. Order your
- 11:56tub early, line up your materials, and confirm
- 11:58your permits. Two, respect the drain and the
- 12:01weight. You cannot reuse a shower drain, and
- 12:05a full tub is far heavier than a shower, so plumbing
- 12:08and structure are not optional. And three, lean
- 12:11on professionals for the parts that matter, the
- 12:14waterproofing, the slope, the load calculations.
- 12:18Get those right, and you end up with a tub that
- 12:20is leak -free, safe and beautiful for years.
- 12:23Could not have said it better. If you are thinking
- 12:26about a shower to bathtub conversion, the team
- 12:28at USA Cabinet Store can guide your project from
- 12:31concept to completion. With showrooms across
- 12:33Virginia, Maryland, North Carolina, Texas, Florida,
- 12:36and beyond, you can book a complimentary consultation
- 12:39at usacabinetstore .com to get a custom quote
- 12:43built around your space, your style, and your
- 12:45budget. Jessica, thanks as always for breaking
- 12:48this one down. My pleasure, Chris. Thanks for
- 12:51listening everyone. Go enjoy that soak and we
- 12:54will see you on the next episode of the Remodel
- 12:56Report.