- 0:07Jeff Cranson: Hello, welcome to the Talking Michigan Transportation Podcast.
- 0:10Jeff Cranson: I'm Jeff Cranson.
- 0:12Jeff Cranson: Today I'm going to revisit a topic from a couple years ago.
- 0:19Jeff Cranson: That's the 96 Flex Route in western Oakland County, one of the biggest, probably highest profile road projects going around the state.
- 0:28Jeff Cranson: This is the second flex route, which is a term we use at MDOT for a freeway that allows for the shoulder to be used as a travel lane during certain times peak travel times in the morning and afternoon.
- 0:41Jeff Cranson: U.
- 0:42Jeff Cranson: S.
- 0:42Jeff Cranson: 23, north of Ann Arbor, was the first.
- 0:44Jeff Cranson: This will be the second Very high volumes of both commercial and commuter traffic on that corridor.
- 0:52Jeff Cranson: Brian Travis is the project manager working out of the Oakland Transportation Service Center for MDOT.
- 0:57Jeff Cranson: He's been on this since work began in 2022, and he's very excited to say that the work will be substantially done in the next few days, meaning that there will be three lanes of traffic restored on both bounds.
- 1:13Jeff Cranson: The actual flex route lanes the shoulders being used as travel lanes won't really be ready because of some other things that have to be done in prep until probably early 2025.
- 1:27Jeff Cranson: But most of the people who have been traveling that route endured the delays and the slowdowns for the last couple of years.
- 1:35Jeff Cranson: We'll be very excited about that, so I hope you enjoy the conversation.
- 1:39Jeff Cranson: So, as promised, I'm with Brian Travis, who is the MDOT project manager for the Flex Route.
- 1:47Jeff Cranson: That's the state's second Flex Route, so-called Flex Route, where the Federal Highway Administration allows in certain circumstances for the use of the shoulder as a travel lane during peak hours.
- 2:01Jeff Cranson: During peak hours, as many of you know, us 23 north of Ann Arbor was the first, and the good news about that is there's a project in the works to extend that all the way to 96.
- 2:12Jeff Cranson: So now you'll be able to go, basically, from M14 just north of the city of Ann Arbor all the way to 96 near Brighton.
- 2:20Jeff Cranson: But Brian has been on before to talk about this project.
- 2:24Jeff Cranson: It's very exciting.
- 2:25Jeff Cranson: It's been a long time, it's certainly generated all kinds of grumbling and complaints and very soon you're going to have three lanes restored in each direction, right, Brian?
- 2:37Brian Travis: Yeah, we are.
- 2:38Brian Travis: We are very excited.
- 2:40Brian Travis: You know, it's been three seasons of construction out there, started in 2022.
- 2:44Brian Travis: Everyone knows you know how tough it.
- 2:47Brian Travis: Three seasons of construction out there started in 2022.
- 2:49Brian Travis: Everyone knows, you know, how tough it was to commute through there.
- 2:51Brian Travis: But the end is in sight.
- 2:51Brian Travis: So the end of this weekend, so end of the day, sunday, we are shooting to have three lanes open each direction on I-96.
- 2:59Brian Travis: That includes all exit and entrance ramps as well, which is great news for commuters.
- 3:05Brian Travis: We will have a little bit of work here and there, maybe a lane closure, shoulder closure, to finish up over the next month or so.
- 3:10Brian Travis: But for all intents and purposes the project is completed, open to traffic.
- 3:16Brian Travis: But you know we mentioned flex lanes, right?
- 3:19Brian Travis: Everyone's excited to see these flex lanes in action, the ramp meters we unfortunately will not open those at the same time as the freeway this weekend.
- 3:28Brian Travis: Those have to stay closed until early 2025.
- 3:32Brian Travis: We need to get traffic back into its normal alignment on those three lanes so that we can begin testing all of our electronic components the sensors, the cameras, things of that nature.
- 3:44Brian Travis: So the flex lanes won't be operational just yet, but I think everyone's going to be glad to have their normal travel lanes back.
- 3:52Jeff Cranson: Well, yeah, and before we get into the details on how the flex route works for the uninitiated and maybe talk a little bit about those ramp meters, which is not common at all in Michigan but is in a lot of other states, talk first about your satisfaction in hitting your target.
- 4:11Jeff Cranson: I mean, we've said all along fall of 2024, this will be before Halloween, so solidly in the fall and you're on budget, so I mean that's great for you and your team.
- 4:23Jeff Cranson: It is.
- 4:24Brian Travis: It's huge.
- 4:25Brian Travis: I mean these are gigantic projects.
- 4:27Brian Travis: We typically in the past haven't tackled projects this large, and so to have everything fall into place on our scheduled timeframe within budget, it's a testament to the contracting team and also our team internally at MDOT and our consultant partners.
- 4:45Brian Travis: Everyone came together day in and day out all three years, and I know that maybe that sounds cliche or people drive by and they don't see work happening.
- 4:56Brian Travis: Trust me, there was something happening every day out there, whether it was in the field or behind the scenes.
- 5:01Brian Travis: Very difficult to get this amount of work done, especially in Michigan with our unpredictable weather, our winters, and have everything come into place.
- 5:10Brian Travis: So I'm very pleased with the progress and where we're at.
- 5:14Jeff Cranson: Yeah, talk a little bit about that, because I hear it often and you hear it more than I do, especially when you probably tell friends and family on a weekend you know what you're working on and they drive through there and they say exactly that hey, I drove through there the other day and there was nothing going on.
- 5:29Jeff Cranson: Um, how do you, how do you answer that without you know pulling your hair out or being defensive?
- 5:36Brian Travis: Yeah, and I understand it is extremely frustrating along a long corridor like that and you might have a lane closed for for work happening in one spot, and so you try to explain, um, how we have to shift traffic around and how we have to do it safely, and that that's really what it comes down to is balancing, uh, moving traffic through the corridor, but also completing the work in a safe manner.
- 5:58Brian Travis: And so, uh to to do the work, you have to shift traffic around, you have to close lanes.
- 6:03Brian Travis: A good example is right now we're placing permanent pavement markings.
- 6:07Brian Travis: Everyone thinks that you know that's a truck going out and quickly spray painting lines on the road.
- 6:13Brian Travis: That's not the case.
- 6:14Brian Travis: You know these markings are recessed into the pavement, so they have to go through, they have to grind the pavement, then they have to place its tape.
- 6:22Brian Travis: You know they have to place the tape now by hand Very labor intensive, but you have to close lanes, you have to shift traffic to do it.
- 6:30Brian Travis: So a ton of moving parts and pieces out here and you know, again, jobs of this size they take this long.
- 6:39Brian Travis: Everyone thinks we can work overnight and get this done in a month.
- 6:43Brian Travis: To do a quality job you need you know these three years to do it.
- 6:49Jeff Cranson: So are you coming in right around that 270 million dollar figure?
- 6:55Brian Travis: Yeah, we are.
- 6:55Brian Travis: We'll end up a little bit above it, but nothing that's not unusual on a project this size.
- 7:02Brian Travis: You always have some unknowns with some extra quantities, extra additions to the project.
- 7:08Brian Travis: But yeah, for all intents and purposes.
- 7:11Brian Travis: Right there on budget.
- 7:13Jeff Cranson: So talk a little bit about some of those unknowns.
- 7:15Jeff Cranson: I'm sure you had several challenges along the way, but what were some of the biggest ones that you didn't anticipate and had to react to?
- 7:28Brian Travis: Yeah, I think a lot of the temporary things that we have to build out there just to maintain traffic.
- 7:34Brian Travis: A lot of times we have to widen the shoulder out, we have to repair the existing pavement and some of that stuff.
- 7:40Brian Travis: You don't know the condition of pavement or some things underneath of the roadway until you get out there.
- 7:46Brian Travis: So as we start removing pavement, digging down, if we have an area that needs material replaced because there's water underneath the roadway, poor soil conditions, we have to adjust on the fly, remove that material, add new materials.
- 8:09Brian Travis: So things of that nature are extras to the contract, unforeseen things that you don't know until you start digging out there, until you start really getting into the nuts and bolts of the project.
- 8:15Brian Travis: But really a project like this, although it's huge, it's very long, 12 miles it was fairly straightforward from a construction standpoint.
- 8:25Brian Travis: So there weren't a whole lot of huge surprises for us, which is always a good thing, right?
- 8:30Brian Travis: Not a whole lot of utility issues or things that slowed us down.
- 8:36Jeff Cranson: So what we really need, it sounds like, is an MRI for pavement.
- 8:41Brian Travis: We do.
- 8:41Brian Travis: That'd be great.
- 8:42Brian Travis: That would solve a lot of our issues, yeah.
- 8:45Jeff Cranson: Well, talk a little bit more about the details of why there has to be some time between really completing the project until when it can go online as a flex route and people can use the shoulders during those peak hours.
- 9:01Brian Travis: Sure, yeah, I mean our focus has been to get the physical construction done out here, return traffic to their normal lanes, but because of all the electronic components, the sensors, the cameras, all the fiber or wiring for lack of a better term all of that has to be tested, and that has to be tested under live traffic conditions, which we really haven't had because we've had traffic shifted onto one side of the roadway.
- 9:28Brian Travis: So you will see our contracting companies out in the electrical cabinets on the side of the road splicing fiber, doing testing, testing all the systems in the cabinets.
- 9:41Brian Travis: You might see signs being turned on and off, making sure everything works, everything is connected and it's accurately reading the traffic that's on the roadway.
- 9:52Brian Travis: Because that's the whole point of the flex route, right is, we can detect when traffic is heavy, we can open up that extra lane and also with the ramp meters, we can turn ramp meters on and off when that traffic on the freeway is heavy.
- 10:05Brian Travis: So it takes a while to get all that tested and make sure it's 100% ready to go, and that's why we'll have a couple of month lag time between opening the freeway and the flex lanes.
- 10:15Jeff Cranson: Well, we've found, obviously, that there was a learning curve for the US 23 flex route.
- 10:21Jeff Cranson: There's definitely a learning curve for zipper merges that are being used more commonly around the state on various projects, and there's going to be a learning curve for ramp metering right.
- 10:32Jeff Cranson: How do you think that will go in terms of people adapting?
- 10:35Brian Travis: Yeah, there will be.
- 10:36Brian Travis: I think it will go well.
- 10:38Brian Travis: We have all the signals in place.
- 10:40Brian Travis: They're at the end of the ramp, so people are starting to see the infrastructure there.
- 10:44Brian Travis: It will be a bit of a learning curve.
- 10:50Brian Travis: Typically, when you're on a freeway on-ramp, you're accelerating to get into the freeway traffic.
- 10:55Brian Travis: In this case you're going to have to watch the signal and most of the time it's going to be flashing yellow.
- 11:03Brian Travis: You can go right through.
- 11:05Brian Travis: But it's again during the rush hours that traffic's a little bit heavier that traffic will be metered.
- 11:13Brian Travis: So I think it will be fairly self-explanatory once it gets into operation and there's educational videos on our Driving Auckland website.
- 11:20Brian Travis: In fact, we're working on creating some shorter clips of the ramp metering just so it's easier to digest.
- 11:27Brian Travis: And with all of that education that we'll put out there as well as people seeing those signals go up, I don't think it's going to be too big of a learning curve for people and I think it would be a good thing for people and I think nobody should be driving Right, nobody should be driving that doesn't understand the basics of a traffic signal.
- 11:44Jeff Cranson: It's just that they'll see traffic signals in some traditional places.
- 11:47Jeff Cranson: Right, yes, we'll be right back, stay tuned.
- 11:52Safety Message: The Michigan Department of Transportation reminds you to slow down, follow all signs and pay attention when driving through work zones, because all employees deserve a safe place to work.
- 12:03Safety Message: Work zone safety: We're all in this together.
- 12:08Jeff Cranson: I guess I'm wondering you know what else you think will people have to adjust to?
- 12:14Jeff Cranson: You're going to have a lot of people saying, right away, wade.
- 12:17Jeff Cranson: I thought the whole idea here was to, you know, add that extra lane for you know when I'm commuting early in the morning or late in the day.
- 12:24Jeff Cranson: I guess as part of that, explain again and you have in the past, I think why that can't be a travel lane all the time.
- 12:33Brian Travis: Yeah, so we are I'll say, for lack of a better term stuck with our existing footprint of the roadway.
- 12:41Brian Travis: So, part of this project, we didn't expand the roadway.
- 12:45Brian Travis: The width that lane has always been there.
- 12:47Brian Travis: It's just used as a shoulder in the median.
- 12:49Brian Travis: To have it be a full-time travel lane, we would have had to expand our roadway laterally, make it wider.
- 12:58Brian Travis: To expand our roadway laterally, make it wider, and to do that we would have had to widen bridges, potentially buy right away, very, you know, cost prohibitive to do that, because you need that to be an actual 12-foot lane with a proper shoulder.
- 13:12Brian Travis: In this case it's an 11-foot shoulder that can be used as a travel lane only, you know, partially, during those peak times of the day, because once you're in that lane you're right up next to the median barrier while you have no shoulder.
- 13:26Brian Travis: So it doesn't meet our federal design standards to have as a full-time lane.
- 13:31Brian Travis: So it's really a creative way to utilize that extra pavement without incurring all that extra costs to widen the freeway, you know, create another full-time lane which really isn't needed most of the day.
- 13:44Jeff Cranson: And that federal design standard is for 12-feet lanes right, Correct 12-foot lane with a shoulder.
- 13:50Jeff Cranson: So talk a little bit about you know what else.
- 13:54Jeff Cranson: Between now and the spring, you and members of your team will be moving on to some other things.
- 13:59Jeff Cranson: In MDOT's metro region Still a lot of big work going on in some of the busiest freeways.
- 14:07Jeff Cranson: What do you have next?
- 14:09Brian Travis: Yeah, there is.
- 14:11Brian Travis: We'll have some cleanup work to do on this project.
- 14:14Brian Travis: We have a lot of paperwork to final out and finish up, but we'll be quickly moving down the corridor to the next section of I-696, which is from Lasser to Dequindre.
- 14:25Brian Travis: That starts in March of 2025.
- 14:28Brian Travis: So our team will pack up and head down that way and essentially that's another full reconstruction of the pavement there, reconstruction of of the pavement there.
- 14:42Brian Travis: Um, and when that's completed you know this entire corridor, basically from i-94 all the way to, you know, kent lake road, 275 and on 96 to kent lake road, it's all reconstructed, it's all new pavement.
- 14:50Brian Travis: So, um, really exciting time for us and my team.
- 14:55Brian Travis: You know we've been on this corridor for the last three years.
- 14:58Brian Travis: Uh, previous to that, we were in Macomb over on that section of 696 in 2018, 2019.
- 15:04Brian Travis: So excited to be moving on to the next one.
- 15:09Jeff Cranson: Yeah, I mean, when that's done, how much of 696 will have been rebuilt in the last few years?
- 15:16Brian Travis: Yeah, so we did the first piece in 2018 from Dequindre to 94.
- 15:21Brian Travis: So we've just done just about to wrap up I-275 to Lahser, which is about 10 miles.
- 15:28Brian Travis: The next section, Lahser to Dequindre, is about 10.
- 15:31Brian Travis: And then that section to Macomb was eight miles.
- 15:34Brian Travis: So 28, 30 miles of 696.
- 15:39Jeff Cranson: Which is just about all of it right.
- 15:42Brian Travis: Yeah, that's all of it.
- 15:43Jeff Cranson: Yeah, that's amazing.
- 15:45Jeff Cranson: What else besides that is coming in your sphere, I guess in 2025?
- 15:56Brian Travis: Yeah, I mean, that will be it for my team.
- 15:59Brian Travis: But you know out of our office we're still working on I-75 up in northern Oakland County.
- 16:04Brian Travis: That has another year or two, I believe, to complete the reconstruction up there.
- 16:10Brian Travis: From there we'll move on to more of our M routes, I believe like a Rochester Road type of project.
- 16:18Brian Travis: You know we're still a few years out from projects like that, but just looking ahead to see what funding we have for our biggest needs in Oakland County.
- 16:27Jeff Cranson: Do you think, you know, whereas from the day the U.
- 16:31Jeff Cranson: S.
- 16:31Jeff Cranson: 23 Flex Route opened, there was discussion about how it doesn't go far enough and all you've done is move a bottleneck further north?
- 16:40Jeff Cranson: Do you think that you'll have that same kind of discussion after 96 is open, or do you feel like the segment that it'll serve will really make a huge difference in congestion, will really make a huge difference in congestion?
- 16:53Brian Travis: I think it'll make a huge difference.
- 16:54Brian Travis: We will get the question about you know, what is the point of the flex lane if it's only going to drop off?
- 16:59Brian Travis: You're right, you're moving the bottleneck further down the line, which can be both things can be true.
- 17:08Brian Travis: Right, you might have another bottleneck, but you're also alleviating congestion in that 12-mile stretch.
- 17:11Brian Travis: So drivers will get used to you know.
- 17:15Brian Travis: They know this lane is going to end.
- 17:17Brian Travis: Let me merge over when I have a gap.
- 17:19Brian Travis: So I don't anticipate traffic getting worse by any means or creating issues.
- 17:25Brian Travis: It's just going to be an adjustment for drivers.
- 17:27Brian Travis: I'm pretty sure anybody that drives this corridor will be happy to have that extra lane because it does just get very congested and it it seems, you know, the population keeps moving further west down the corridor, um, lion township, brighton, that whole area.
- 17:44Brian Travis: So, um, not going to be a shortage of commuters that that are using that route and oh my gosh jeff when we, when we eventually connect the flex lanes too, I mean that's going to be huge.
- 17:55Jeff Cranson: Yeah, that growth in Livingston County and western Oakland County is still a real phenomenon, but I kind of have to believe since you started in 2022, you know, still coming off the tail end of the pandemic and more people have returned to the roads.
- 18:13Jeff Cranson: You've probably seen a huge difference in the last couple of years of travelers, right.
- 18:18Brian Travis: We have and that's been one of the biggest eye-opening aspects of this project.
- 18:22Brian Travis: You know our day-to-day is hard enough with just trying to put down the proper materials and get trucks in and out of the job.
- 18:29Brian Travis: But the live traffic out there day in and day out, the congestion, the crashes, the driver behavior, you know all of those things take a toll on the project team trying to maintain and do our job safely out there.
- 18:47Brian Travis: And so right, traffic volumes are heavy.
- 18:49Brian Travis: It doesn't seem like there's ever a good time to take a lane closure out there.
- 18:54Brian Travis: Saturday, sunday, monday, tuesday, it doesn't matter.
- 18:57Brian Travis: Traffic is just, it's always moving out there.
- 19:01Jeff Cranson: Well yeah, especially when you have an unexpected tiger appearance in postseason and then you transition into a really hot Lions team.
- 19:09Jeff Cranson: So yeah, it doesn't matter.
- 19:10Jeff Cranson: Well, hey, thanks Brian, that's very helpful.
- 19:15Jeff Cranson: I'm congratulations to uh, to you and everybody you're working with on this.
- 19:19Jeff Cranson: I know this is a huge milestone and, uh, I know that we can't really celebrate it in its entirety until the spring, but just getting those lanes open it's quite an accomplishment.
- 19:30Brian Travis: Yeah, appreciate it, Jeff.
- 19:31Brian Travis: Yeah, like I said, a lot of people have worked very, very hard on this project for the past three years, so we're all excited that it's going to be open to traffic here.
- 19:40Brian Travis: So appreciate the time today.
- 19:42Brian Travis: Sure thing.
- 19:43Jeff Cranson: I'd like to thank you once more for tuning in to Talking Michigan Transportation.
- 19:47Jeff Cranson: You can find show notes and more on Apple Podcasts or BuzzSprout.
- 19:51Jeff Cranson: I also want to acknowledge the talented people who help make this a reality each week, starting with Randy Debler, who skillfully edits the audio, Jesse Ball, who proofs the content, Courtney Bates, who posts the podcast to various platforms, and Jacke Salinas, who transcribes the audio to make it accessible to all.