- 0:00My big promise to you with our training today is going to be
- 0:03less time estimating with more profit.
- 0:06If you're like pretty much every contractor out there, last time
- 0:09you got to spend on estimating the better.
- 0:11And of course, profitability stems from estimating.
- 0:14If you've underestimated a project, you can run it as
- 0:17efficiently as you want. You're going to have a real hard
- 0:20time making making a profit on it.
- 0:21If you're out, you know 510% on your estimate.
- 0:24So why am I sharing this with you today?
- 0:2520 years of contracting experience myself, started on
- 0:28the tools, did pretty much every job between have my own general
- 0:32contracting business, have worked in some some large home
- 0:35building companies as well as other general contracting
- 0:37companies as well. So kind of know the ins and outs
- 0:39from various different sides of the industry.
- 0:42Systematized dozens of GC companies.
- 0:44So worked with a lot of different GC companies across
- 0:46the US and Canada as well as a few international ones as well
- 0:49and help them with their systems, processes and all those
- 0:52good things. And finally, the the purpose of
- 0:55these training as well as our company is to lead a movement
- 0:59towards systems leadership and generational wealth for
- 1:02contractors who want more than just staying busy.
- 1:05So what we've refined it down to and realized is that systems is
- 1:09what's going to generate the results.
- 1:11Systems though leadership falls apart.
- 1:12So we need the leadership in there as well.
- 1:14After you have great systems in place.
- 1:16And then finally thinking long term, what's the end game?
- 1:20You know, generational wealth, whether that's selling your
- 1:22business, passing it on, providing for your family so
- 1:25they never have to, you know, worry about money ever again.
- 1:27So that's what we're really all about.
- 1:29I want to start with the end of mine.
- 1:30So we're going to go through the training today.
- 1:32There's three kind of larger components to the training and
- 1:36through this I want you to imagine future state here.
- 1:40You know you're fishing with your buddies or your family or
- 1:42whoever and you're turning bigger than ever profits.
- 1:46You actually have time to get away and enjoy fishing or
- 1:49vacation or whatever you like to do and no more evenings and
- 1:52weekends estimating crunching numbers, trying to push bids
- 1:56through to the clients just to to stay busy.
- 2:00All right so let's move on. I'm going to be sharing with you
- 2:03the 3 tier estimating process. So this is 3 levels of
- 2:07estimating that I'm going to show you how you can utilize in
- 2:10your contracting business to help you save a lot of time and
- 2:14really fine tune your bid for specific type of client and
- 2:18their client journey to make sure that it makes sense for
- 2:21them and it makes sense for the amount of work you're doing for
- 2:24that that person. All right, So the first level of
- 2:28estimating, this is your ballpark budget.
- 2:30This is just basic kind of range numbers should take you about 5
- 2:34to 10 minutes. If you're super experienced and
- 2:37you know, like we did a project like this and this is exactly
- 2:39what it costs. You can probably just do this in
- 2:41your head or from past experience.
- 2:43But typically speaking, you're gonna use at least a little bit
- 2:45of calculation so that you have somewhat of a process to get a
- 2:50ballpark budget. You're gonna give a price range.
- 2:53So Mr. Mrs. Smith, based off of square footage for your house
- 2:57and location and kind of the level that you're looking for,
- 3:00your project is going to range from, you know, 600, just
- 3:04$750,000, something like that. You're going to use historical
- 3:08similar projects that you've done.
- 3:10You can use a quick spreadsheet or calculator.
- 3:12I like to have a spreadsheet for this because it's really easy to
- 3:16access on your phone. It can be in your Google Drive
- 3:19or you can have a link on your phone somewhere to a
- 3:21spreadsheet. You plug in a few key numbers
- 3:24and it'll give you a ballpark budget essentially.
- 3:27You could create a template in your project management software
- 3:30as well, but the estimating and using the app is not as
- 3:34generally as easy as just using a spreadsheet on your phone.
- 3:37So whatever works, even just some quick numbers like square
- 3:39footage, cost per builds or if you're doing remodels, you know,
- 3:43medium kitchen, large kitchen, you know, like you could use a
- 3:46couple of numbers, kind of plug them together, get a ballpark
- 3:49budget and you're using this to quickly qualify the lead.
- 3:52Typically you can do this probably over the phone or if
- 3:54they've emailed you, you ask for some information.
- 3:57Can you send me a picture of, you know, where you're planning
- 3:59to build or what's, you know, what's your lot size?
- 4:01What's the how big of a house do you want?
- 4:03If you got plans, you can just work off their square footage,
- 4:06but you're giving them that range to, to really qualify them
- 4:08and say, you know, is this inside your budget?
- 4:11If you're telling them it's, you know, $700,000 to, to build this
- 4:14house and they're coming back and saying, well, really we
- 4:17wanted to stay under 400. You know, there's a disconnect
- 4:20there and either they're not the right client for you or we need
- 4:23to go back to the drawing board. Or you need to set the
- 4:26expectations that you may not be able to achieve, you know, the
- 4:30size or the full extent, or maybe you've got to cut back on,
- 4:34you know, not finishing out the basement or not in the garage or
- 4:37the outbuildings or whatever rate to kind of bring in budget.
- 4:39But you could have that conversation super early with
- 4:42only spending about 5 to 10 minutes doing estimating, saving
- 4:45yourself a ton of time instead of, you know, going down that
- 4:47road of getting, plugging in a whole bunch of numbers and, and
- 4:50getting like a proper estimate or quote out to them.
- 4:53You're checking project feasibility.
- 4:55And your goal with the ballpark budget is to be within 15%
- 5:00somewhere in that range. You're, you're not looking to
- 5:03get, you know, specific, you're giving them a range and this
- 5:06gives them a scale of the project and the scope of it and
- 5:09lets them know kind of where things are at.
- 5:12So that's the ballpark budget. You probably have met, you know,
- 5:15clients have leads coming out to you all the time where you can
- 5:18give them a quick budget and it's, you know, nowhere in their
- 5:21range and, and pretty much that's where the conversation
- 5:23ends. Of course, you, you don't want
- 5:24to like tell clients that, OK, well, you know, we can't do
- 5:28anything for you. Of course you want to kind of
- 5:29explore and see how you can make the project work.
- 5:32But if it's just too far out, you essentially have to move on
- 5:35and just save yourself the time and energy, move on to greener
- 5:38pastures and, and better clients who's, you know, more in line
- 5:41with their budget. Next up would be the rough
- 5:43budget. So this is typically gonna take
- 5:45you anywhere from one to two hours.
- 5:47Most of the time, this would be a free estimate.
- 5:50If you are bombarded with work and you've got more than enough
- 5:54projects to bid on, you may even charge a small fee for a rough
- 5:58budget. And you know, you'd have to kind
- 6:01of create a little bit of an offer or whatever, a way of
- 6:03selling it. But it could be, you know, hey,
- 6:05for $400.00 or $200, $1000, whatever it may be, you know,
- 6:10we'll provide you with with a rough estimate based off of, you
- 6:12know, our general pricing or whatever.
- 6:14But typically speaking, this would be a service you provide
- 6:16for free. Because when you can give
- 6:18someone something and you want to show some goodwill towards
- 6:21them and their project, you do it for free.
- 6:23You're more likely to kind of move to a sale and get into a
- 6:26pre construction service agreement, which is the the goal
- 6:30of that first step to be working with the client.
- 6:32You of course do this after you pass the ballpark in qualifying.
- 6:35So you can have qualifying questions that are part of your
- 6:37lead process beyond just budget. You want to know, is that the
- 6:40type of project you want to do? Is it, you know, are they
- 6:42located in your area? When are they planning to start
- 6:45the project? So you're going to go through
- 6:47that, given that they passed the ballpark, you know, budgets
- 6:50within their range and all the qualifying questions.
- 6:53They'll then move on to rough budgeting.
- 6:55You'll use a template. So you'll have an estimating
- 6:57template for their project and you'll, you'll do proper
- 7:00takeoffs for the project, but you're just using your, your,
- 7:03your base numbers of square footage costs and generalized
- 7:07cost. And you're not kind of going
- 7:09into super high detail of getting bids from like
- 7:12subcontractors or suppliers, doing any kind of selections or
- 7:16diving into, you know, specific materials and stuff like that.
- 7:19It's, it's really just you're doing a detailed level of
- 7:22estimating, but you're not going into specific kind of costing
- 7:25and pricing, Going to use base pricing.
- 7:27A lot of allowances in a, in a, in a rough budget.
- 7:31You're again, you can have allowances for fixtures,
- 7:34flooring, any sort of selected materials, could even be
- 7:38allowances for things like landscaping if they've given you
- 7:41like a set of floor plans, but you have no idea what the lot
- 7:44looks like. Or you know what, if they've got
- 7:47any driveways and stuff like that, you're just gonna put
- 7:49allowances and, and just sort of like a, a bump kind of sum for
- 7:54certain parts of the project. If there's no good details on
- 7:57the plans and things like this, Typically speaking, in this
- 8:00rough budget, you want the number to come in as low as
- 8:03possible. You don't want to sell them
- 8:05something that's not feasible, but you're using really base
- 8:09pricing and general allowances. You're not doing like high end,
- 8:13you know, fixtures unless you're like just a super luxury builder
- 8:16and that's all you do. And you know, your clients are
- 8:18gonna be like luxury minded. But typically speaking, you
- 8:20wanna have this rough budget kind of on the lower side, very
- 8:23base. And then when you go into a PC
- 8:26SA and go through the actual drill down budget, which we're
- 8:29going to get to in, in a moment here, that's when you start
- 8:32getting selections And it's like, oh, well, we budgeted for
- 8:35a standard, you know, bathtub of whatever $400.00, the one you
- 8:39want, it's going to be 600. So that's, you know, additional
- 8:41and they can kind of see how their decisions as during the
- 8:44selections are, is leading to the, the increased budget
- 8:48overtime. You know, they may start at
- 8:50600,000. You know, they're probably going
- 8:52to end up at 7 or 800,000 by the time they start including
- 8:56everything. But as far as a rough budget
- 8:58goes, it's sort of like we can do a project for this price
- 9:01with, you know, kind of base materials.
- 9:03Although you know that once you kind of move into the, into
- 9:07their actual selections, they're probably going to go higher with
- 9:09the budget, which is just a natural kind of course.
- 9:11But you're doing that before you move into the project, after
- 9:14they've accepted the proposal. This is really a set up for the
- 9:17pre construction agreement. This allows you to present a
- 9:20preconstruction agreement and a, a proposal.
- 9:23And they've already kind of worked with you.
- 9:24They've seen the level of detail you're putting into this
- 9:26estimate and you've already got a pretty good budget in place
- 9:31that's ideally within 10% of what the final budget is going
- 9:35to be. 5 to 10% is, is ideal, but depending on, you know,
- 9:38where things go with the preconstruction, it can
- 9:41fluctuate. So that's a rough from here.
- 9:43You would then propose that they work, they go into PC USA and
- 9:46that moves us on to our drill down budget making sense for
- 9:50everybody. Can you see, like I know when I
- 9:52started general contracting, I was just like, I I wanna give
- 9:55like button down pricing, get quotes from Subs and and
- 9:59everything from, you know, for my clients and present them kind
- 10:02of at the final approval go above and beyond.
- 10:05But in reality, I was spending so much time estimating that
- 10:09really wasn't necessary at the time.
- 10:11And this erative process, it's kind of like essentially, if if
- 10:16there is like kind of steps to the pricing, you can see like
- 10:19you go to buy a new car, right? They tell you, you know, they're
- 10:21going to show you the base price, which is, you know,
- 10:23$20,000, let's say. And of course you're gonna want,
- 10:26you know, the upgrades, whatever it may be, AC sunroof, the, you
- 10:30know, extended warranty package. And you're going to end up at 25
- 10:33or 30. It's just that's kind of the the
- 10:35model here. But to get them in the door and
- 10:37to get them, you know, if they want the base, you can do the
- 10:40base and, and you work from there.
- 10:42Yeah. So tell us here.
- 10:43I've been presenting that final proposal costs and I'm starting
- 10:46to see it isn't efficient for me.
- 10:49Yeah, definitely. And not every client or every
- 10:52situation is gonna fall specifically into perfect
- 10:54buckets like this. But you can see as a general
- 10:57rule of of process, this can save you a bunch of time still
- 11:01gives the the client a lot of detail and you're still
- 11:04providing a wonderful service. But you just you don't need to
- 11:07go all the way to the end if there's already a disconnect
- 11:10earlier on. All right, So moving into the
- 11:12drill down, typically speaking, this is after you have a
- 11:15preconstruction services agreement.
- 11:17You are going to be paid for this drill down budget 5 to 10
- 11:21hours plus depending on the complexity and size of the
- 11:24project. But this is where you're, you're
- 11:26doing your preconstruction agreement signed, you're doing
- 11:28selections with the client either yourself.
- 11:31Typically speaking, you're gonna have a designer, interior
- 11:33designer either in-house or working with one and they're
- 11:37helping the client do the selections.
- 11:39But you need to know those because you're going to get
- 11:41supplier pricing, you're going to plug in numbers.
- 11:42It's going to be a very specifically placed and accurate
- 11:46budget for the client. And this is where you go above
- 11:49and beyond because essentially you're getting paid for your
- 11:51time and this. So yeah, you're tearing out
- 11:53bids, you're doing site visits, your maybe maybe meeting with
- 11:56engineers. You're doing like, you know,
- 11:58getting like geotech in there. Whatever you could be doing,
- 12:01like selective demo on doing environmental testing to see if
- 12:06there's, you know, any environmental issues for
- 12:09asbestos mold, whatever may be be if you're doing a tear down
- 12:12or remodel or what have you getting a bunch of clothes and
- 12:15you're helping with the design of the project value, you know,
- 12:18doing value add essentially budgeting.
- 12:20And if the client wants to change the scope and there's
- 12:23like, while this budget is kind of getting out of hand, maybe we
- 12:25can change this or we don't finish this, you know, no
- 12:27worries. I know this is a big pain point
- 12:30for contractors is like you present a proposal to the client
- 12:33and they're like, oh, that's more than we wanted.
- 12:35Or we're now thinking maybe we don't want to double car garage.
- 12:38You might want, you know, a triple or maybe a single or
- 12:41whatever. And now you've got to go back to
- 12:43the drawing board, revise your estimate, go back, you know, and
- 12:45you've got this like back and forth with the client.
- 12:48When you're in this sort of a process here, Yeah, it takes
- 12:51time and it may be a little frustrating, but at least you're
- 12:53getting paid for your time. And this positions your company
- 12:56in a way that if you don't have project managers right now, if
- 12:59you don't have an estimator, you can hire someone because you can
- 13:02just kind of let them run with this.
- 13:04And if they want change is good. You know, they're on your
- 13:07payroll, the money's flowing through.
- 13:09So tell us how we paid for our time at this point.
- 13:11So what you missed earlier was our we do a rough budget, which
- 13:15is one to two hours and then we move into a drill down budget,
- 13:18which is typically a paid for and you have a preconstruction
- 13:21service agreement. So the client signs that they're
- 13:23gonna pay for your services to go through and you're gonna
- 13:27create offer the scope of this training.
- 13:29We're we're, you know, we're keeping it tight here.
- 13:31So I'm not gonna go into the preconstruction service
- 13:33agreement. If you want help with that, just
- 13:34send me an e-mail or message later.
- 13:36I'll send you our guide for it. We've got a guide that kind of
- 13:38shows how to put one together. But essentially you've got an
- 13:41offer in place that they're going to get a budget.
- 13:42They're gonna get, you know, they're budget budgeting, get a
- 13:46schedule as well as, you know, go through the permitting
- 13:49process and whatever else that you need to do.
- 13:51But you present that you're gonna help them with everything
- 13:53so they're ready to build and, and then you move into the
- 13:55construction agreement. And the big goal of this drill
- 13:59down budget is ideally to be within 5% of the final cost and
- 14:02not necessarily 5% of your final cost, but the final cost of the
- 14:06project. There's typically going to be
- 14:07some change orders or something that comes up that's going to
- 14:10kind of like bump that that budget up.
- 14:12The decline is going to ideally pay for during the process.
- 14:15No estimate is 100% accurate, but by the time you've tendered
- 14:18everything, you've done selections, you've got supplier
- 14:21quotes, you plugged in all your numbers, you've gone through
- 14:23this iterative process back and forth to the client, you can
- 14:26kind of rest assured that you're estimating is, is really in a
- 14:29good accurate place both for the client to so they have, you
- 14:33know, trust in you and they've seen the level of detail you're
- 14:36going into. Plus for yourself moving into
- 14:38the construction side of thing, you know, there shouldn't be any
- 14:41big surprises for you ideally as you move through with the
- 14:44construction that's we're going to get into like estimating
- 14:47mistakes and things to watch out for later.
- 14:49So I'm not going to go through it now, but that is the three
- 14:51kind of tiered step budgeting that you can do with clients to
- 14:54save yourself a ton of time and fine tune the level of budgeting
- 14:59to the specific client budgeting, estimating
- 15:01interchangeable parts. The wording here making sense
- 15:04for everybody. All right, a little bit of a
- 15:06funny here. Estimator.
- 15:07What's a good definition? An individual who does precision
- 15:10guesswork based on unreliable data provided by those of
- 15:14questionable knowledge. So I like this.
- 15:16You also wizard and magician. It can feel like this sometimes
- 15:19the use the three-step process that drill down budgeting
- 15:22hopefully should eliminate a lot of this, but sometimes it feels
- 15:25like a lot of guesswork. Definitely.
- 15:27And just like that seems about right.
- 15:29It's not what you wanna be feeling, but sometimes it is
- 15:31Alright, so let's move on here. Top five estimating mistakes.
- 15:35So you don't want to be like this guy, you know, found out
- 15:39that you just lost a couple $1000 because you forgot
- 15:42something in the scope of work or maybe who knows right?
- 15:45There's 101 things of of ways to lose money on a construction
- 15:48project, and you've probably experienced more than your fair
- 15:51share of those if you've been in business for, you know, anything
- 15:54over over a couple months. Alright, so the, the first one,
- 15:58poor markups. I see this time and time again
- 16:01where especially when starting out, you've probably kind of set
- 16:04a markup rate and you're a little bit afraid to go beyond
- 16:07that markup rate because you want to stay busy because you,
- 16:10you think you're maybe overcharging client or what have
- 16:13you. So the proper way to find your
- 16:16specific markup and not go by just industry standards or what
- 16:19your competitors may, may or may not be doing is figuring out
- 16:22your overhead for the last 12 months.
- 16:24So if you go to your your bookkeeping, hopefully you have
- 16:26up-to-date books. If not, you can use your last
- 16:29year, although the most current numbers are better.
- 16:32You look at your trailing 12 months and what is your revenue
- 16:35or your overhead and the trailing 12 months.
- 16:38So let's say you spent $20,000 on overhead in the trailing 12
- 16:43months and you've done $1,000,000 in revenue.
- 16:46Then I don't know the exact percentages are there, but I
- 16:48believe that would be 5 or 20%. No, it'd be about 2%.
- 16:52That seems kind of low. You're, you're probably more
- 16:54like 50,000 or or even 100,000 overhead.
- 16:57But anyways, whatever your percentage is, you'll divide
- 16:59that by your, your revenue. Typically speaking, what I see
- 17:02most contractors are at least 7 to 10% overhead, if not, if, if
- 17:09not more. And that includes your, your
- 17:11salary typically as, as the owner as well as any like hard,
- 17:14hard fixed costs for the company.
- 17:16If you're not sure how to do that, just, you know, go Google
- 17:18it or ask your accountant or bookkeeper to help you out with
- 17:20that. But essentially, if you're
- 17:21running a 10% overhead, that's a margin.
- 17:24And if you have 15% markup, most people will think that's gonna
- 17:28leave me with a 5% profit. But in reality, that's not the
- 17:31case because of 15% markup, I believe is about a 12% margin or
- 17:3613% margin somewhere in there. So really you're only making
- 17:39like 2 to 3% profit above that 10% of overhead that you need to
- 17:44cover in your markup. So that's why you need to know
- 17:46the difference between markup and margin and why typically
- 17:49speaking, your markup needs to be at least 20% to, to be
- 17:52profitable. Because what you're not
- 17:54accounting for, if you don't have contingencies in your
- 17:57estimating or some sort of miscellaneous, which I would
- 17:59suggest you do have, it's very easy for a project to run over
- 18:02to 3-4 or even 5%. And that's why it kind of
- 18:06you're, you're at the end of the year, you're not making any
- 18:08profit and you don't, you're realizing you're not really
- 18:10making any money is because your markups are, are too low.
- 18:13So that's kind of the idea and the calculation behind it.
- 18:16If wherever you're at, try to just ratchet it up.
- 18:19I would like depending on what you want to do.
- 18:21But if you are at, let's say 15%, you know, jumping up to 20
- 18:24or 25% may be a big jump for you.
- 18:27Try 12 or 13 or 14% and kind of slowly ratchet it up.
- 18:31Or if you've got a lot of leads and you've got a lot of projects
- 18:34that are already running, try bumping up to 20%.
- 18:37See what happens. You may find that your closing
- 18:39ratios don't actually, you know, change that much.
- 18:42And even if they do, it's better to do a little bit less projects
- 18:46and make more profits because it's going to be easier to run
- 18:49and you've got you're just in a healthier state in the business
- 18:53financially. And it'll give you practice of
- 18:55selling jobs at a little higher margin and having to kind of
- 18:58find the right clients for you, if that makes sense.
- 19:00Alright, no project management time.
- 19:02Another mistake I used to make, especially when I started out, I
- 19:05would just put a mark up. I would, you know, have all my
- 19:07different costs in there for Subs, materials, suppliers,
- 19:10whatever. And I would, I would put down,
- 19:12you know, 1520% markup, leave it at that.
- 19:15And I was like, I make my money off the profit or the markup and
- 19:19I didn't have any management time for the project, which of
- 19:22course I was spending all my time managing projects and not
- 19:26really being paid for it. And so you wanna have specific
- 19:30project management time, number of hours.
- 19:32If you're doing like a new home build, that could be anywhere
- 19:35from, you know, 203 hundred hours of your time dealing with
- 19:38clients, suppliers, checking sites, doing quality control,
- 19:41dealing with county, city, you know, inspections, whatever it
- 19:45may be. Make sure that you've got a, an
- 19:47hourly rate and you've got amount of hours for that
- 19:49project. Because again, if you need to
- 19:51hire project manager, you've got project managers, you're paying
- 19:54them a salary or, you know, hourly rate, you want to make
- 19:57sure that you've got their expenses covered so that you can
- 20:01easily transition to that and get out of the project
- 20:04management role inside your company.
- 20:05Rushing is a common one as well. I, I like to move fast.
- 20:09I remember, you know, nailing out estimates and just running
- 20:13through numbers and kind of doing a quick review and, and
- 20:15getting them off to clients and, and rushing is a quick way to
- 20:19forget things, leave things, you know, undone.
- 20:22And I think anybody is willing to.
- 20:26Take an extra 15 minutes, 15 minutes.
- 20:28Your time is definitely worth taking in order to save, you
- 20:31know, 10s, even hundreds of thousands of dollars on a
- 20:33project by not forgetting something or having a
- 20:37altercation with the client later on because you don't have
- 20:40something in your scope of work or whatever it may be.
- 20:42Take a little bit of extra time, take a breath, maybe even just
- 20:45let the estimate be and get to it the next morning or or
- 20:48whatever. Get a fresh set of eyes on it
- 20:50and put the the amount of time you need because as mentioned
- 20:54earlier, you're profitability is set in the estimate.
- 20:57This is where like the financial security and financial
- 21:01profitability of your of your company all starts with the
- 21:04estimating. So take the time needed.
- 21:06Yes, make the process quicker. Yes, you don't get this
- 21:09delegated and make it as easy as possible exactly as possible,
- 21:12but don't over rush it. Next one is no review.
- 21:15So keep this one super simple. Get somebody else to review it.
- 21:19Ideally, if even if you've got like a Superintendent foreman on
- 21:22site, get them to quickly review your numbers for you because
- 21:25they're like hands on. They're in the frontline.
- 21:28They may be like, you know that framing amount of time.
- 21:31I feel like it's not accurate. You should bump it up or maybe
- 21:34that's a lot of time and get their feedback.
- 21:36Not that you need to change everything they say, but at
- 21:38least it gives you a second set of eyes.
- 21:40If you've got a project manager or an estimator or whoever,
- 21:44obviously you would typically be the second set of eyes for them,
- 21:47but get someone to review it before and after.
- 21:49If beyond anything else, review yourself and just go through a
- 21:53line by line. Make sure everything is correct.
- 21:55Last one you mentioned here is no mist or contingency, so you
- 21:59may not want to put a line item miscellaneous or contingency
- 22:03because your clients may be like, why am I paying for
- 22:05something that's you know, miscellaneous or contingency
- 22:09Miscellaneous. You should be able to make the
- 22:11case that with every project that comes up, there's always
- 22:14something that needs to get taken care of that's just
- 22:17slightly outside of the scope of work or is just can't be
- 22:21accounted for ahead of time. If it's something larger that's
- 22:24going to be, you know, constitute a change order.
- 22:27But little things like miss, maybe you're finished Carpenter
- 22:30forgot to install a little bit of baseboard somewhere or you
- 22:33know, maybe the wall is a little bit crooked.
- 22:35You need to call your guy back or whatever rate.
- 22:37There's always these little things that's like you could
- 22:39call someone in to to redo that or maybe it falls a little bit
- 22:43outside the lines of which trade should this be for need to get
- 22:46your own guy in there. Little things like that.
- 22:47That's what miss is for both missed for materials as well as
- 22:52as ours. Alright, so hopefully this
- 22:54making sense for everybody. If you've made a couple of these
- 22:58mistakes, then I'm sure you felt the pain of it later on.
- 23:01And this is definitely upstream thinking here of take care of it
- 23:04in the moment in the estimate so it doesn't become a problem
- 23:07during the project. Alright, so this is sort of the
- 23:10the the second part of the training here.
- 23:12We move on to the third right away and stop this from
- 23:15happening. We already mentioned kind of the
- 23:17mistakes that can cause, you know, money down the drain.
- 23:19Essentially, we've talked about how to save time, how to
- 23:22increase profitability. Now we're gonna be talking about
- 23:24saving money. So proposal protection pack,
- 23:27you've provided that you're going to provide this proposal,
- 23:30you've done your estimating, you need to protect your pricing,
- 23:32protect your company and make sure things don't go sideways as
- 23:36best you can inside the project. Obviously having a good contract
- 23:39in places is important, but there's things you can do on the
- 23:42proposal to set the stage and, and make sure that you're not,
- 23:46things aren't, aren't going, you know, sideways.
- 23:49As I mentioned with the, the the client accepting the proposal.
- 23:53So terms, inclusions and exclusions.
- 23:56I am going to share this document with everybody here
- 23:59because it is very important that you have this.
- 24:03So I'll put in the chat here. So in the chat you can go and
- 24:06click that link and you can get access to this document.
- 24:09Essentially, you may have something like this and
- 24:12hopefully this template will give you some ideas of other
- 24:14things you can add or how you can modify it.
- 24:16But on a proposal, this isn't like a final contract, but on
- 24:19the proposal, you wanna kind of sell your company a bit.
- 24:22So let them know what they're getting, what's included, you
- 24:24know, quality workmanship, warranties, any sort of awards
- 24:28you may have won, if you have portals or certain clients like
- 24:32relationship things that you do, let them know about it.
- 24:35I like to, you know, all materials, labour, supervision,
- 24:38everything's included for them. Like I imagined qualifications,
- 24:41so your licenses, your certifications, your insurance,
- 24:45if you have like a work safe or some sort of safety program,
- 24:48mention it. And and then any exclusion.
- 24:51So environmental, structural upgrade, city upgrades, you
- 24:55know, permits, typically I don't include permits at the be, you
- 24:58know, on a on a rough budget because you don't really know
- 25:01what the permit costs are going to be.
- 25:02And normally either you'd be paying for it and just
- 25:05forwarding that that cost the client or the client would be
- 25:08paying for it. So keeping that budget kind of
- 25:10low, you don't necessarily want to include certain things and in
- 25:13terms of conditions. So how long is it valid for talk
- 25:16about allowances, you know, with some materials that do you,
- 25:21what's your, you know, deposit policy?
- 25:24What can they expect? Invoicing, just all these
- 25:27little, you know, little things you don't want to overwhelm it
- 25:30with like, you know, pages because it again, you're going
- 25:34to have a contract that's going to specify these things very
- 25:37explicitly. But this is like a general kind
- 25:40of terms and conditions and things like that.
- 25:41So you want to put that on a proposal to help protect
- 25:43yourself and let the client know you know what's what
- 25:47essentially. So go download that and use it
- 25:49as you wish. Details definitely matter on a
- 25:52proposal. The more detail you can put on a
- 25:54proposal, the better. So you may be thinking that you
- 25:58just want to have like large kind of functions like
- 26:01categories, framing, demo, drywall or whatever it may be.
- 26:06Put some details, especially if you've gone to the extent where
- 26:09you've detailed line items, show everything to the client.
- 26:12Like all the details you have, show that to the client.
- 26:15You don't have to include pricing for every line item
- 26:18depending on how you want to run your business and then
- 26:20proposals. But the more detail you have in
- 26:22there, don't feel that you're overwhelming or client with
- 26:25information because even if the client is just going to skim
- 26:28over that, which they probably will and they may not understand
- 26:30it, they can at least see that you've gone to a high level of
- 26:33detail and it makes it feel more solid.
- 26:35If you, if you provided a, an estimate and your competitor has
- 26:39both like similar price, similar scope of work, but yours has a
- 26:43lot more detail on it, It seems a lot more secure and like
- 26:47you've, you've spent a lot more time on it, even though you're
- 26:50probably working from a template.
- 26:51And a lot of that stuff should just be kind of templated
- 26:53details that are standard for, for most projects.
- 26:56So detailed definitely matter. Doing a risk assessment, this
- 27:00would happen in your review of the, the estimate.
- 27:03You guys are on track. I know I'm throwing a lot at you
- 27:05here, but this is, you know, really important stuff.
- 27:09And it's the kind of stuff that you kind of do once or you set
- 27:12up the process once and, and you're good to go.
- 27:15All right. And that's, that's the beauty of
- 27:18systems. Do the work once you set it up.
- 27:20Yeah, you're always kind of improving and refining it.
- 27:22But once it's set up, once you have it in place, you can just
- 27:24continue to use it, do the work once, get paid forever.
- 27:27That's that's the anytime you can do that, you know, you're
- 27:30you're doing, you're doing good work and that you should
- 27:33prioritize. So do a risk assessment.
- 27:35What are the risks? Is this, you know, trust your
- 27:37gut. Does this client seem a little
- 27:39bit off? Is there maybe some issues here?
- 27:41Maybe they've mentioned the other three contractors that
- 27:44they worked with in the past three years that are all idiots
- 27:46and I didn't know what they were doing and had a, you know, a
- 27:49horrible time. Again, use information as
- 27:51information, but you can start to pick up kind of
- 27:54commonalities. Maybe the projects really far
- 27:56away. Maybe it's a really, you know,
- 27:58difficult approach to the property.
- 27:59Maybe super sloped. Maybe you've built in this area
- 28:02before. You know that you're there's a
- 28:03bunch of like clay and uneven terrain or, or you know, issues.
- 28:07So do a risk assessment and put that in your estimate.
- 28:12If there is some sort of risk that you've identified, again,
- 28:14details matter. Do you know risk excavation
- 28:17without geotechnical analysis, You know, excavation could be a
- 28:20risk. We don't know we're going to
- 28:21find underneath the ground is a risk factor, right risk without
- 28:25doing proper environmental testing, we can say that the
- 28:30there's a good chance or possibly the house has Festus in
- 28:33it because of the age and you know, remediation could be an
- 28:37extra 20 to 30 grand or whatever it may be, right.
- 28:40So if you can identify those risks, you don't want to scare
- 28:43them away. But if if there is some specific
- 28:46like risks that are specific that are worth kind of
- 28:51discussing, it puts you on a different level than the other
- 28:54contractor. That's like sunny skies,
- 28:56everything's fine. Let's just get this contract
- 28:58signed, move forward. Don't worry about anything.
- 29:00You want to make it easy for them, but you also want to let
- 29:03them know that you're in their court, you'll identify risks and
- 29:06that you provide them with the information and they can make
- 29:09the decisions moving forward there.
- 29:10And you know, the driver's seat, you're there.
- 29:13As you know, they're they're trusted advisor for for the
- 29:16getting the construction project done.
- 29:17Expectations super important to set the expectations as far as
- 29:22kind of each step I mentioned the three tiered process of the
- 29:25estimate. Let them know like, hey, you
- 29:26know, ballpark budget project like this is whatever $700,000.
- 29:32Our next step is to go to a rough budget.
- 29:34If you know, after they've said like, yeah, that seems about
- 29:37later. That's a little bit more, but
- 29:38it's, you know, we were expecting maybe 6 hundred 650.
- 29:41It's like, well, we're not too far off there.
- 29:43Let's move into rough bugging you kind of like always tell
- 29:45them what the next step is so they know what to expect in, in
- 29:48your process, even during the rough budget, you tell them
- 29:50we're gonna give you a rough budget to kind of get within,
- 29:52you know, 10%, five to 10% of of what the project costs are.
- 29:56From there. Our next step would be PCs a so
- 29:59that when you offer it to them, it's not like a big surprise,
- 30:01like, oh, now you want me to pay you to have to go to
- 30:04preconstruction or whatever. It's like you've sort of set the
- 30:06stage a bit already ahead of time.
- 30:08So expectations, exploratory demo, I mentioned that earlier,
- 30:11especially on remodels is super common.
- 30:13If there's like some cracks in the ceiling and the house was
- 30:16built 100 years ago and the roof is, you know, sagging or
- 30:21whatever, doing like you don't want to.
- 30:24Yeah, if you can pop your head in the attic and take a look and
- 30:27easily see that something out of place, great.
- 30:29But typically speaking, the exploratory demo would be done
- 30:32during the preconstruction stage and you would maybe remove a
- 30:35little bit drywall, maybe get a structural engineer in there to
- 30:40give like, you know, analysis of what's going on so that, you
- 30:44know, before you move into the project, what may be happening
- 30:47or what may be cause for, you know, consideration and what may
- 30:51cause change orders while during the project, more that you can
- 30:54do ahead of time. Again, just the better
- 30:56experience the clients going to have.
- 30:57Because now when you move into the project, it's like, yeah,
- 30:59you know, we thought this was a risk.
- 31:01We've opened up the wall. It's pretty obvious that this
- 31:04was framed, you know, using like some old trees and some rubbish,
- 31:092 by fours or whatever. And there's there's rod mold
- 31:12here. So we've got to RIP it out.
- 31:13And you know, at least the clients can give him the heads
- 31:15up with the exploratory demo, environmental testing and
- 31:18geotech, as I mentioned is, is what you want to do.
- 31:22And this if you've done all of this now you're very well
- 31:24protected. Everyone knows the risks,
- 31:26everyone's has the expectations going into it.
- 31:29You've provided a very detailed drill down budget.
- 31:31It should be a very natural process that you've been working
- 31:34with this client now to then move into the construction
- 31:37phase. They already know the budget.
- 31:38It's been arrive from the beginning.
- 31:40There's real there's no real reason for them to put the
- 31:42brakes on now and not move forward with you and your
- 31:45business. But you can always frame it as
- 31:47especially with the preconstruction is like we're
- 31:49gonna do all this like testing. We're going to identify risks.
- 31:52We're going to get you a schedule.
- 31:54We're going to create a very detailed drill down budget.
- 31:57If you don't want to move forward with the construction
- 31:59where you want to go with a different contractor, there's
- 32:01nothing stopping you. The CSA is, you know, non
- 32:04binding as far as like moving into the construction phase.
- 32:06So it's always low risk. You want to keep the very low
- 32:09risk. And then by the time you get to
- 32:11this final stage, it's like we just need to sign the dotted
- 32:13line. We've already kind of applied
- 32:15for permits. We can get into the
- 32:16construction. This is what's gonna cost.
- 32:18They know everything and it's it's typically is a fairly
- 32:21seamless process. Alright, making sense to
- 32:23everybody. I tried to keep this as concise
- 32:25but impactful as possible. So I hope that you've, you know,
- 32:29got a lot out of this today. Just as a quick read tech half,
- 32:32we talked about how to save time with the three tier estimating,
- 32:35how to get more profit, eliminate those mistakes and
- 32:38protect your profit with the protection pack.