- 0:00Here's a hard truth. Most construction profit leaks
- 0:03happen before you even start the job.
- 0:05If you want to protect your bottom line, you need to master
- 0:08these five areas of estimating. Let's break them down step by
- 0:11step so you never have to work for free again.
- 0:14And so the first area that we're going to talk about is terms,
- 0:17inclusions and exclusions. So this is something
- 0:20specifically that's going to go on your proposal, your estimate,
- 0:22it's going to include, you know, what's the terms of this this
- 0:25estimate, what's included, what's excluded.
- 0:28I'm either you sneak peek behind the scenes of an actual template
- 0:31that we use and line items that you can plug and play right into
- 0:35your proposals. Let's go all right, so I can be
- 0:38walking you through some specific terms, inclusions,
- 0:41exclusions, things like that you can put in your proposals.
- 0:44So I like to have a little, you know, verbiage at the top,
- 0:47ongoing trust and thuggery, professionalism very important
- 0:50to us. You know, just some nice verbage
- 0:52there. You always want to say what what
- 0:55it includes. So if you have any warranties
- 0:57manufactured for dual materials, pretty calm weekly project
- 1:01updates, emails, if you've got a client portal, anything you can
- 1:05kind of use to differentiate yourself or things you already
- 1:08doing, but you want to highlight to the client, make sure that
- 1:11that's included. Because the more stuff again,
- 1:13details matter, the more more details and things that they see
- 1:17that they get as far as service or whatever in the in the
- 1:21proposal, the better. All materials labour supervision
- 1:24is typical. Any qualifications if you got if
- 1:27you have certain licenses, if you want awards, if your
- 1:30certifications, your, you know, liability insurance, if you have
- 1:34a work safe, you know, if you're registered to work safe or
- 1:37workers comp or whatever, put it in there exclusions.
- 1:42So some common ones are any environmental issues, so
- 1:45asbestos, mold Rd. etcetera, etcetera, structural issues
- 1:50from, you know, original build or previous renovations.
- 1:53If there's, you know, their foundation is crap.
- 1:56You know, it's not your not your issue, right?
- 1:59I mean, you'll, you'll fix it, but it's going to cost like some
- 2:02money. Any city service upgrade.
- 2:04So if they need to upgrade their sewer or water or whatever for,
- 2:08you know, the city because you've triggered some sort of
- 2:10threshold with, you know, model or if you're, you know, building
- 2:14new home or something like that. And those aren't included, then
- 2:18you want to specify that specifically as well as building
- 2:21permits. Typically speaking, I don't
- 2:23include building permits on a proposal.
- 2:26That's just an expense that would get either get paid by the
- 2:28client or forward it to the client.
- 2:30And you don't want your estimate, you don't want to
- 2:34include a whole bunch of stuff, your estimate that's not really
- 2:36tied to it where it's going to make the budget look larger than
- 2:42it needs to be. So have your exclusions in there
- 2:45terms and conditions, you know 30 days is typical for it being
- 2:49valid. If it's beyond that, obviously
- 2:52you may have to adjust the pricing allowances include
- 2:56taxes, cost over allowances will be additional.
- 2:59So with a rough budget you're just kind of working off a lot
- 3:02of allowances because you don't want to go through the whole
- 3:04selection process if the project is not feasible.
- 3:08Later when you go into a drill down and more detailed type
- 3:11budget that's when you will have less allowances and and have
- 3:15specific you know supplier costs for selections.
- 3:18Any changes or alterations change the scope of work, things
- 3:23like that. Materials purchase.
- 3:25So if you've ever had this with a client where you bought a
- 3:29bunch of materials and of course there's always extra because
- 3:31you're going to count for waste and things like that.
- 3:34And the clients asking like, can I keep those two by fours?
- 3:36Can I, can I keep those, you know, five extra boxes of
- 3:39flooring or what have you, like maybe leave one extra box of
- 3:42flooring on site so they can match your later, but material
- 3:46gets returned and it's not, you know, the clients material, it
- 3:50is the your, your you as the contractors, your material and
- 3:56same as subcontractors. So just specifying that deposit,
- 3:59what to expect as far as you know, what's how much deposit
- 4:03are you going to need before the project get started, final
- 4:07invoice, how that works over to accounts.
- 4:09Unless of course, when you actually have like your
- 4:11construction contract and you move into the construction
- 4:13stage, you're going to have like a lot more details and
- 4:18stipulations and all those things.
- 4:19But it's good to have at least the basics on a proposal so that
- 4:24the client knows what the terms, what the conditions are,
- 4:28include, exclude, all that kind of stuff, right.
- 4:29And then just a little thank you at the end.
- 4:31So that's about all there is to it for this.
- 4:33Of course, you can have a lot more.
- 4:34And what you want to do is if if you ever had an issue on a
- 4:38project that's come up and it's been a really big discrepancy,
- 4:42maybe that that shouldn't set off light bulbs, that maybe I
- 4:44should put something stipulated in my either the contract or
- 4:49the, you know, terms and conditions on the proposal so
- 4:52that it's more clear from the beginning.
- 4:54And that's how you can kind of build really robust and, and I
- 4:58really good proposal that's going to protect you in the long
- 5:00run. And just be really clear with
- 5:01the client as far as you know, what's all included, what's not
- 5:04included and the terms. Alright #2 here is details
- 5:08matter. If you've got two different
- 5:10proposals, yours and your competitors, and you have more
- 5:13details, even if the line items are the same, the pricing is the
- 5:16same, the client is going to be more inclined to go with you
- 5:18because details help provide trust.
- 5:21It makes you look professional and it also outlines and
- 5:24protects you of more stuff because there's less ambiguity
- 5:28as well as just less variance and it gives you a much more
- 5:32professional manner. So if you want a high level
- 5:35template for estimating that has, you know, a lot of detail
- 5:38on what what I'm talking about, check out the links in the
- 5:41description below. We've got free estimating
- 5:43template stack that you can go and download for yourself.
- 5:46Use, copy and modify whatever you like.
- 5:49So go click the links below and go get that for yourself now.
- 5:52So #3 to protecting your profits in an estimate is risks.
- 5:56You need to be very clear what are the risks and account for
- 6:00them. And you also want to be I put
- 6:02risks specifically on actual estimates or proposals so the
- 6:06client can see them. If you know, excavation is going
- 6:09to be tricky because of the area or it's a very old house, maybe
- 6:13there's a challenging approach to the property, whatever it
- 6:17could be, if, if it's something specific to their project,
- 6:20outline it as like risk item, you know, whatever.
- 6:24And this way, at least you're setting that expectation, you're
- 6:27letting them know it makes you look professional because you're
- 6:30telling them again about, you know, the risks and letting them
- 6:34know more details and more information than than maybe a
- 6:36competitor who's just trying to make everything sound like, oh,
- 6:39it's easy projects going to go smoothly and everything.
- 6:42You don't want to scare the client, but any good client is
- 6:46going to understand that by the by you being the professional
- 6:49and identifying risks for them, you are helping them and just
- 6:53creating a more realistic picture of what it's going to
- 6:55take to complete their project. Are there risks that you don't
- 6:58want to put on the estimate that you want to take into account is
- 7:01like, is this a picky client? Is this maybe a very, you know,
- 7:04is, is transportation to the property, like traffic gonna be
- 7:08an issue? Or maybe it's on, you know, the
- 7:09top story of a high rise building or whatever it may be,
- 7:12right? So always make sure that you're
- 7:14identifying those risks and accordingly putting that into
- 7:18your proposals to protect yourself, right?
- 7:21Area #4 is expectation. So you want to set expectations
- 7:25with the client early on. This is not expectations as far
- 7:29as necessarily like the building part of that that you'll get to
- 7:32more later in the preconstruction, you know, area
- 7:35or even as you know before you start the project.
- 7:38These expectations are expectations on you know,
- 7:41accuracy of the bid. If you're providing just a rough
- 7:43budget, let them know this is you know within 5 to 10%.
- 7:47If they are starting the project or your reconstruction, you can
- 7:50let them know. Hey, this is you know, going to
- 7:53be the cost. We suggest that you have
- 7:55financing available or money available for maybe an
- 7:57additional 5% as contingency because with any build there's
- 8:01things that may come up. Not that we plan to, you know,
- 8:04go over budget obviously, but just knowing construction,
- 8:07there's, there's things that can come up that's good to have, you
- 8:10know, some extra money for anything from, you know, the pre
- 8:13destruction service agreement. So if you have that in your
- 8:17process, let the client know this is a rough budget.
- 8:20The next step is to have a, a construction through pre
- 8:23construction service agreement signed before we move into the
- 8:26drill down budgeting or whatever.
- 8:28So just always be setting expectations and letting the
- 8:30client know what's coming next. And this will help protect you.
- 8:34All right #5 before you get started on a project, you want
- 8:37to verify. Verifying is very important.
- 8:40So things you want to verify with exploratory demo.
- 8:44So this could be opening up a wall, you know, just doing a
- 8:47small patch or whatever afterwards.
- 8:48But if there's some structural issues or cracks or maybe
- 8:52there's potential that there's been water damage and there's
- 8:55mold, things like that. You definitely want to do a
- 8:57little exploratory demo if you need to before you start the
- 9:00project so that you can identify those additional issues with the
- 9:04job and let the client know that to expect that they may have to
- 9:08do some remediation for mold or get some asbestos testing.
- 9:11You know, if, if they have, if you have to do asbestos
- 9:14remediation, that could be 10s of thousands of dollars
- 9:18additional for their project. And you want to know that before
- 9:21you're going in so that you can account for it before you know,
- 9:24it becomes an issue and you got to stop production and, and you
- 9:27know, get all this stuff done in the, in the in the meantime,
- 9:31other things could be geotechnical.
- 9:33So getting some geotechnical testing for maybe a, a property
- 9:39or if you're doing some foundation work on a remodel, a
- 9:42new home build, whatever it may be, but you want to verify ahead
- 9:45of time. So now that you know how to
- 9:46protect yourself on a proposal and going into a project, you're
- 9:49going to want to check out this next video on how to create high
- 9:53value, high converting proposals, What to have on your
- 9:56proposals so that it's easier to sell.
- 9:58It sets you above the competition.
- 10:00So go check out this next video on proposals.