- 0:00This is James. He's a general contractor who is
- 0:02stuck trying to grow his business.
- 0:04He had tried organizing his company, hired better staff, was
- 0:07even working 70 hours a week, but nothing actually was helping
- 0:10to fix the overwhelm that he's feeling.
- 0:12Which is why he reached out to me in December of 2023 and we
- 0:16started coaching. Within 1 1/2 years his profit
- 0:18had doubled and he had shortly thereafter scaled up to 5
- 0:22million in revenue. So in this video, I'm going to
- 0:24breaking down the exact strategies we used to help them
- 0:27grow and how you can apply these same strategies inside your
- 0:30construction company. Now sit back and relax because
- 0:33this knowledge you're about to get is worth thousands of
- 0:36dollars. Alright, so here's James.
- 0:38He was able to scale his company up to 5 million plus.
- 0:41They're doing better now. And when we started, he was
- 0:45stuck in every part of his business.
- 0:46He was definitely, you know, the the cog in the machine that
- 0:50everything had to go through him.
- 0:51He was essentially wearing all the hats and they were in a
- 0:55really great place to scale up and and grow fairly rapidly, but
- 0:59without the systems and the right people is just becoming a
- 1:02bit of a mess. And that's why they reached out
- 1:04to me. This is one of our early
- 1:06coaching calls here with James. We often were on a call with his
- 1:09office admin, office manager, as well as later on a project
- 1:14manager when he had hired a project manager.
- 1:16So we had these group coaching calls regularly, very much
- 1:20aligned with what needs to get done, who's on track, you know,
- 1:24keeping communication very high and moving the ball forward.
- 1:28So he was a residential and commercial general contractor,
- 1:32very strong reputation in his area, lots of demand for his
- 1:36services. They typically had a lot more
- 1:38inquiries and estimates to do than they could handle.
- 1:41And that was one of the bottlenecks of of James was he
- 1:44was still doing all the estimating in the project
- 1:46management and just couldn't keep up essentially.
- 1:48So they had jobs they just had to let go because they were too
- 1:52busy. Revenue was growing, but growth
- 1:54was creating a lot of stress as as you can imagine with so many
- 1:59potential projects and things going on, but just not having
- 2:03the organization systems, the structure of the people to
- 2:06handle it. There's four big problems that
- 2:08we identified and worked on. The first one kind of the
- 2:12biggest issue was the owner bottleneck.
- 2:15As I mentioned, James was wearing all the hats in the
- 2:18business constantly. He was the one put out fires
- 2:20there. Anyone had a problem, you know,
- 2:21they called James to fix it for them.
- 2:23No real time to really think strategically or think about
- 2:28putting in systems or processes. You know, all the time was just
- 2:32going to running business as it was, you know, kind of running
- 2:35out of control, a lot of risk of burnout.
- 2:37You can maintain this for awhile, but eventually this is
- 2:40going to catch up with everybody and 70 plus hour work weeks are
- 2:44just not sustainable. And growth was capped by James.
- 2:47Essentially they they were unable to grow with James being
- 2:50the bottleneck in the company. So the solution, the things that
- 2:53we worked on was to restructure and and hire strategically.
- 2:58So the things that we we implemented here was we hired a
- 3:02project manager fairly early on. This was a huge kind of leap
- 3:06forward for James because now, yes, with any new person, you
- 3:11need to train them and there's that onboarding time, which is
- 3:14going to take time. But once they're in the role and
- 3:16they're able to operate and manage some part of the business
- 3:20without you, it just frees up like a whole new time, whole new
- 3:23world for you. And we didn't just go out and
- 3:26look for somebody and hire them right away.
- 3:27This was like a, a process that was planned as well as a system
- 3:33set in place. So we hadn't, so P we had a
- 3:35structure in place, not all of the little, you know, kinks were
- 3:38worked out necessarily, but there was something in place so
- 3:41that when a project manager was brought in, they had training,
- 3:44they had an operating procedure, they had a game plan to follow.
- 3:48Essentially. That's where a lot of people go
- 3:49wrong. They think I'll just hire
- 3:51someone with experience, take over this role, then I don't
- 3:53have to do it anymore. And that just causes a lot of
- 3:55problems because you're not providing them with enough
- 3:58support or guidance for them to actually do the things that you
- 4:02think that they should be capable of doing.
- 4:03Over the course of our coaching as well, there's two new office
- 4:07admin staff. Both of them were kind of part
- 4:10time with ability to grow and that really freed up again,
- 4:14James, as well as the office manager at the time where we
- 4:17were able to build operating procedures and help get some of
- 4:20that, you know, financials that just that everyday admin stuff
- 4:24out of the way of dealing with, you know, clients and paperwork
- 4:27and, and whatever. So huge step forward there
- 4:29clarified an org chart. I'm going to show you that in
- 4:31just a second here of what, you know, like a typical org chart
- 4:34looks like and, and how James was a big part of all of it and
- 4:39we were able to kind of free up his roles and time.
- 4:42And as I mentioned, we created systems training around those
- 4:44key roles. So like just hiring more people
- 4:47or hiring them and hoping that they'll kind of build a system
- 4:50for you is, is not going to work well.
- 4:52You'd really want to make sure you've got something in place
- 4:54before you get the, you know, bring the people into the
- 4:57business. So moving on to the the org
- 4:59chart here. This is a typical org chart for
- 5:03construction company and you're probably familiar.
- 5:06You probably are the owner of the CEO of the president at the
- 5:09top and you also fill all of the senior management roles
- 5:13depending on the size of your business.
- 5:14If, if you're in that 2 to 5 million range, you're probably
- 5:19filling all of the top seats of, you know, you're the vice
- 5:23president or you know, chief engineer or operating officer of
- 5:27like sales and marketing, production, administration and
- 5:31finance. So you are the senior management
- 5:33team essentially. And then if you're not out of
- 5:36these yet, as James was, you know, he's still doing all the
- 5:39sales, doing all the project management.
- 5:41He had an office manager, which was great.
- 5:44So that admin office manager role was filled luckily.
- 5:48And he had a bookkeeper. So the admin of finance was
- 5:52still taking his time, but he wasn't doing the the hands on
- 5:56type of work there, which is great, which is where a lot of
- 5:58you probably are if you're in that like 2 to three, 4 million
- 6:01range. And the next step is to fill
- 6:04those roles. So we filled out the project
- 6:07manager gold, which gave him a big step forward.
- 6:09And for those smaller projects, that project manager was also
- 6:13able to meet with clients as well and fill a bit of that
- 6:17sales role with the business. So as you can see with this org
- 6:20chart, the idea is you are probably filling a lot of these
- 6:24or there's people in your business who aren't really
- 6:27fitting in these or they have multiple roles that are not
- 6:30defined. And that's really where
- 6:32structure and bottlenecks will you'll find when you don't have
- 6:35a clearly defined structure and and goals with accountability,
- 6:40you know, responsibilities, clear lines of communication and
- 6:43everything that goes along with with having it a high
- 6:46functioning team. So the next big problem that
- 6:48that we tackled was the scheduling of projects.
- 6:51So when we started, there was no real scheduling.
- 6:54It was simply, yeah, we think it's gonna take this long.
- 6:57Ohe next week. We've got this coming up.
- 6:59So we better call the trades and make sure that they're they're
- 7:01gonna be there If you ask for a schedule, no one had anything to
- 7:05show, showing you essentially. So what happened with the
- 7:08negative impacts of this is, yeah, you know, trades
- 7:10overlapping. So it's, you know, that same day
- 7:13delivery kind of thing where it's like, hey, can you know we
- 7:16need you tomorrow or the next day.
- 7:18And luckily they had good trades people, but that's really
- 7:22strains the relationships you have with your subcontractors,
- 7:25your trades, because yes, they want to do good work for you.
- 7:28They want to be a Johnny on the spot.
- 7:30But when you're calling them and they've got to jump ship or come
- 7:33running, it sets you up and sets them up for rushed and stressful
- 7:38project. There was delays because of, you
- 7:40know, no scheduling and ordering and nothing was was timed
- 7:44properly. Guesstimation on timeline.
- 7:46So guesstimation for for we've talked about trades and
- 7:49subcontractors, but for clients as well.
- 7:51I'm sure you've been in that situation where you tell a
- 7:54client, yeah, this is like a six month project or 8th month
- 7:57project and you get into it and it's just like dragging on or
- 8:00it's taking forever. The clients like where are we at
- 8:03with the schedule? And there's just nothing,
- 8:06nothing clear. No one really knows besides like
- 8:08what's happening that day and maybe a few weeks in the future.
- 8:12So there's constant, you know, where are we at, what's going on
- 8:14and just a lot of stress throughout.
- 8:16So the, the solution that we put into place and what we
- 8:19implemented was we found that Microsoft project was going to
- 8:22be the best fit for them. They were not using a specific
- 8:25project management software. Usually I would suggest that
- 8:28your project management software will have scheduling as a module
- 8:31in it and to use that because it integrate with everything for
- 8:34for James, we wanted to use his existing kind of stack that he
- 8:39had, which was Google Drive and QuickBooks essentially.
- 8:42And then so we incorporated Microsoft project because they
- 8:45needed like a standalone scheduling software.
- 8:47We built out templates. So now they could just pull in a
- 8:49template for home builds, remodels, and they did a bunch
- 8:52of commercial work and government work.
- 8:55So we had those templates in place, build all the projects
- 8:58scheduled for production pipeline.
- 9:00This was huge. This was a major step forward
- 9:02for them because they had so many projects and they had
- 9:05residential, they had commercial, they had some
- 9:06government work, they had, you know, small kind of Mr. Fix it
- 9:10sort of stuff. They had up to like massive
- 9:13$1,000,000 projects. So they really didn't know when
- 9:18they could start projects or how like what their capacity was as
- 9:21far as the business. Essentially when we incorporated
- 9:24this, we had like a master dashboard that had all the
- 9:27projects schedules, as you know, large outline items so that you
- 9:30know, project 1-6 months, project 2, that's going to be
- 9:33like a three-week thing that we can plug in here.
- 9:35So now they could project and when they got a call on the
- 9:38phone, hey, can you do our project for us?
- 9:40We want to start in three months or whatever.
- 9:42They can easily see their capacity, they can see how to
- 9:45move things around or where to fit projects in, and they can
- 9:47see when they can expect a lot of projects to line U.
- 9:50This can often happen as well where you're super busy and you
- 9:53don't realize that you actually have like 2-3, four projects
- 9:57that are all going to be kind of finishing within a month or two
- 9:59of each other. And if you don't have new
- 10:01projects scheduled into the pipeline, you may have a big
- 10:04lull in work. And this is often why you can
- 10:06feel with those ups and downs in business where it's like super
- 10:09busy pushing production, pushing production and all of a sudden,
- 10:12you know, you don't have any work.
- 10:13I gotta get on the sales. And you got this like teeter
- 10:16totter seesaw effect that never feels good.
- 10:18So get a good scheduling dashboard and templates and
- 10:22schedules for every project can alleviate a lot of that.
- 10:25Coordinating with trades much better now, you know, Mr.
- 10:28Electrician, they could give them a call.
- 10:30The project manager love this so much because when the project
- 10:33manager came in, like she was the person that was the most
- 10:37experienced with the scheduling software and who I trained
- 10:40personally and set the system up with her.
- 10:43And now she could see, OK, I'm gonna need an electrician in,
- 10:46you know, six weeks or we're starting the project today.
- 10:49I need to make sure the framing package is going to show up in
- 10:51three weeks or whatever. And it just clarifies so much
- 10:55and just decreases the whole stress of the project because
- 10:57it's like it's clockwork. You just this ends, that starts.
- 11:00And yeah, the schedule is going to change a little bit.
- 11:02There's unforeseen things, but at least everyone's like running
- 11:06and managing from a game plan, from something sold and specific
- 11:10and we created along with this. So the schedule is a big step
- 11:13board and then the other component to kind of lock in
- 11:15that project management side of the business was quality control
- 11:18checklist. At the time they had great, I
- 11:21mean they still do have great carpenters, tradespeople on, you
- 11:24know, crafts people on site. And it was sort of just left up
- 11:27to them and their trays that they would do a good job.
- 11:30And the project manager if they saw something out of place, they
- 11:33would mention it. But there was no real checklist
- 11:36or specific cadence of quality control.
- 11:38So what we did is we implemented checklist for all of the
- 11:41different stages. So checklist for getting the
- 11:44project started, making sure everything's safety and
- 11:47protection and materials, everything's ordered and then
- 11:49quality control for framing for or well foundation for framing
- 11:54for Ruffins, for, you know, finishing for whatever, right?
- 11:57So having those quality kind of check stops of like we need to
- 12:01make sure the quality is at 100% before we get to the next stage.
- 12:04If you ever got to the end of a project and you've got this huge
- 12:07punch list at the end and it just seems to drag on, it's
- 12:10like, oh, we've got to like we had that scratch on the
- 12:13countertop. Now the countertops are on stock
- 12:15order, we've got to get the guy in there.
- 12:17Whatever, right? And you end up like spending an
- 12:19extra couple of weeks at the end of a project.
- 12:21It's because the quality control process was not at a good level
- 12:25and didn't have those checks and balances.
- 12:26So this is what a good schedule will look like.
- 12:29This is not Microsoft project, but it's a schedule that I built
- 12:32with a client. The Gantt chart view is similar
- 12:34to any scheduling software. You'll have your lists and
- 12:37that's usually the lists are the easiest place to make updates
- 12:39to. But the Gantt chart is most
- 12:41visual and easy to see what I want you to see on here and the
- 12:44things that really like improved with their scheduling at James
- 12:49Company there is you can now put, you know, client meetings
- 12:53so the client knows when they're meeting and you know when you
- 12:56should be scheduling client meeting.
- 12:57You've got buffers between stages.
- 12:59So as you've probably had before, especially with like
- 13:03Ruffins, you know, your electrician, plumber, HVAC, and
- 13:06if one goes over the other one doesn't want to work around them
- 13:08and you got to push them back or whatever.
- 13:10So put a little bit of buffer in there knowing that the schedule
- 13:13is going to be changing so you're not scrambling when
- 13:17inevitably something goes a little bit over schedule
- 13:20inspections as well. So if you got regular
- 13:22inspections on the project, have those.
- 13:24Another good thing that kind of next level for scheduling that I
- 13:28don't see a lot of people really doing well is put your ordering
- 13:33into the schedule So you know that you're finished.
- 13:37Carpenter is going to be showing up on a certain week or your
- 13:40cabinetry is going in on a certain week.
- 13:42That means, you know, minus whatever it is, if, if cabinetry
- 13:46takes six weeks to manufacture, that means seven weeks prior to
- 13:51installation, you need to order it or 8 weeks before
- 13:54installation, you need to order it to ensure that it gets there
- 13:56and is delivered on time. Long lead times, cabinetry,
- 13:59windows, doors, flooring, whatever those types of things
- 14:03that have any kind of lead time of a couple weeks needs to be in
- 14:07the schedule. All right, so now we're going to
- 14:09move on to #3 The 3rd place that we really kind of locked in and
- 14:14tightened up was the financial invisibility.
- 14:18So there was no job costing happening as far as knowing how
- 14:23much labour was being spent at specific sites or by a certain
- 14:27cost code. So we implemented some cost
- 14:29codes and different things like that.
- 14:30Impact of having, you know, weak financial visibility is you're
- 14:34kind of guessing at your profitability year labour costs,
- 14:38you know, are kind of like, well, I'm not too sure.
- 14:41You know, as long as we can meet payroll every two weeks or month
- 14:44and, you know, hopefully we're doing good.
- 14:45There's inefficiencies that come up when you don't know your
- 14:47numbers and you can't usually see what's going on per project.
- 14:51You're sailing your ship blind essentially is the analogy I
- 14:54like to use. You're out there, you have no
- 14:55idea if you're going into the rocks or shark infested waters
- 14:58or even heading in the right direction because you're not
- 15:01running your business by the numbers.
- 15:03It's like a a big black area that you just have no idea
- 15:06what's going on. Turn on a light, get the right
- 15:10financial controls and visibility in place and you
- 15:13probably overspending on labour materials all sorts a number of
- 15:17things and you cannot make sound business decisions without
- 15:20having good job costing and financial have visibility in
- 15:24place. So from there the, the solution
- 15:27that we integrated was we installed employee time
- 15:30tracking. So they had and a from their
- 15:34accountant where they, their guys were able to put in their
- 15:38jobs and their hours, but it wasn't tracking the actual tasks
- 15:44that they were doing on the projects.
- 15:46They weren't able to use cost codes with it or do proper job
- 15:48costing. So again, trying to stay with
- 15:50their existing stack. You know, there's lots of great
- 15:52software out there. The least amount of changes or
- 15:55software that you need to incorporate, the better.
- 15:58The more moving parts, the more complex it gets.
- 16:00So they're already using QuickBooks.
- 16:01We set up a system using QuickBooks with QuickBooks time
- 16:05to start tracking their employees tasks per project and
- 16:08the projects. We created a really clean
- 16:10workflow for invoicing, for payment processing as well as
- 16:16providing true job costing visibility.
- 16:18So we were able to utilize in QuickBooks through.
- 16:21It was not an easy thing because a lot of times like a project
- 16:24management software that's specific for construction is
- 16:26going to have this type of module in there for job costing.
- 16:29QuickBooks, there's options there.
- 16:30You can make it work. It's not really designed
- 16:33specifically for this, but we were able to get a really nice
- 16:37system in place where they had projects in QuickBooks and they
- 16:40were able to see specifically tied into payroll as well as
- 16:43expenses where every job was at and as well as labour burdens.
- 16:48So because they had a lot of different labour rates depending
- 16:51on the type of construction that it was, and they had to have
- 16:55specific rates and visibility for the government type
- 16:59projects, it was a little bit difficult to know exactly where
- 17:04the, you know, labour burden and rates and all that kind of stuff
- 17:06was. So we were able to clarify that
- 17:08and work with their accounting team to really make this all
- 17:12seamless where we were able to send, you know, export
- 17:16spreadsheet, send it specifically to the account and
- 17:19they were able to run payroll as well as a number of other
- 17:21things. So a lot of little intricate
- 17:24parts. And this is where you as the
- 17:26business owner for you to figure this out and have the time
- 17:29wherewithal knowledge, it's unreasonable with everything
- 17:33else you else you have in the business.
- 17:35And that's why if you want systems like this, you want
- 17:37someone specifically to be an integrator and put this stuff in
- 17:40place, reach out to us. You can work directly with me in
- 17:43the comments or in the description below.
- 17:45There is a link. Click the link and get on a call
- 17:48with us. We have done for you, you
- 17:50programs as well done with you programs.
- 17:52And we can help you get this whole place, get the help you
- 17:55need and you'll just make your life so much easier.
- 17:58And example, easy SOP document, standard operating procedure.
- 18:02This is an example that we have just, you know, the first page,
- 18:05but essentially every new employee that came into the
- 18:07business. If you've ever had your
- 18:09employees try to fill out hours on their phone and in some sort
- 18:13of a, you know that half of them probably don't do it properly.
- 18:16Half of them may not even do it. They wait till the the weekend
- 18:20or the day before payday to, you know, get in their hours or
- 18:24whatever. So that can all be mitigated.
- 18:26It's never going to be 100%, but when you have proper onboarding,
- 18:29you have leadership to explain why they need to do this, why
- 18:32it's so important and what the expectations are.
- 18:35Every day they're filling in their hours by task.
- 18:37That project. Here's the SOP document.
- 18:39This is what your phone looks like, This is what you press
- 18:42like making it as foolproof as possible so that you and your
- 18:46team aren't dealing with a whole bunch of people that don't know
- 18:49what's going on, essentially. So that's just an example.
- 18:51One of the, you know, QuickBooks Workforce SOP that we made that
- 18:54they could give specifically to the employees so that they knew
- 18:57how to do the time tracking properly went on to big problem
- 19:01#4 was no systemized processes. They had a number of people in
- 19:06the business. Everyone was sort of running
- 19:08their own playbook or their own show.
- 19:10I can't remember if there was any, but there's very little
- 19:13documented processes of what people were actually doing on a
- 19:16daily basis. It was more like they just
- 19:18figured it out for themselves. And I mean, they, they talked,
- 19:21they were a solid team. So I don't want you to think for
- 19:23one moment that they didn't have like good communication and a
- 19:27extremely amazing culture inside their company.
- 19:30They were just missing that structure, that integration,
- 19:33that implementation of, you know, the systems and the, and
- 19:35the, and the processes and just that the kind of outside
- 19:38knowledge of this is how like a really good organized company
- 19:43operates. And, and these are the pieces
- 19:45that we need to get in place and then have like streamlined
- 19:47guidance of like what's most priority?
- 19:50What's the steps here? So some of the negative impacts
- 19:51that they were feeling from, you know, not having these systems
- 19:54in place was inconsistent estimating.
- 19:56James was doing all of the estimating.
- 19:58They had an estimating spreadsheet essentially, but he
- 20:01was always just kind of pulling from his knowledge and, and he
- 20:03was super knowledgeable, great at what he did, but everything
- 20:07hinged on him. Everything went through him.
- 20:09And there was no real like pricing data or templates or
- 20:13specific kind of standardized markups and things like that
- 20:16depending on projects, client expectations.
- 20:20This was something that was unclear to where often projects
- 20:23were started. There was no real discussion of
- 20:28what the client can expect or again, they didn't have
- 20:30schedules. So it was just the client kind
- 20:32of expectation and and communication was unclear from
- 20:36the beginning and then admin confusion.
- 20:38So who does what and how, as I mentioned, there was a amazing
- 20:41office manager. She was kind of doing everything
- 20:43on the admin side. And then they added more people,
- 20:46but it was still a little bit unclear of like which parts did
- 20:49she do? What did James do?
- 20:51What did you know the the field crew do?
- 20:53Who was responsible and who specifically owned the separate
- 20:57processes of the company? And as you add more people, this
- 21:00becomes more and more critical. And this is also why they've
- 21:03ever hired someone and realized that you actually made more work
- 21:06for yourself, because now you have to explain everything to
- 21:09them and train them and had more people and more fires to put
- 21:13out. Essentially, This is why because
- 21:15you don't have compartmentalized processes that are owned and,
- 21:18you know, responsible, accountable to a specific person
- 21:22slash rule new hires learning by trial and error.
- 21:24So kind of same thing. No real good onboarding process
- 21:27training solution in place to to really train someone on what is
- 21:31the, you know, specific thing that they should be doing.
- 21:33The big solutions that we put into place essentially were
- 21:36standard operating procedures and then training dashboard with
- 21:39with training videos. So we got an estimating.
- 21:42So now this is how we run an estimate.
- 21:44Project management stop. This was huge.
- 21:46How do you talk to trades? How do you talk to clients?
- 21:48How do you, you know, put schedules together?
- 21:50What are the quality control checks?
- 21:52What needs to happen, you know XYZ down the stage?
- 21:55Financial management SOP How do we invoice?
- 21:57How do the employees track their hours?
- 22:00How do we do the job cost reports?
- 22:02Everything is in the financial management SOP for that client
- 22:05process SOP. So how do we set expectations
- 22:09with the client? How do we on board new clients,
- 22:12how do we communicate with them setting that up?
- 22:15And then we had a lead intake system.
- 22:16So how do we qualify all these projects?
- 22:19As I mentioned, they were overly busy.
- 22:21There was no shortage of work for them.
- 22:23It was often a matter of we've got 10 estimates to do, which
- 22:26ones do we actually have time or want to estimate for?
- 22:28And people are waiting weeks, sometimes I want to say months,
- 22:32but like over a month to just have their estimate get into the
- 22:36process. So we, we created a lead intake
- 22:38so that they had qualifying questions.
- 22:40They could then better differentiate which projects are
- 22:43better suited in a good fit for us and which ones can we, you
- 22:47know, be upfront with and just say we don't have time or it's
- 22:49not, you know, aligned with with what we do as a business.
- 22:52The employee training dashboard, I'll show you that in a moment,
- 22:54but essentially we set up an employee training dashboard.
- 22:56So now the employees could have easy access to the SOP's and the
- 23:01training videos. So you hire a new admin, they
- 23:03need to know how to do the financial management of the
- 23:05business. Go to the training dashboard,
- 23:07click on financial management. Here's the SOP, Here's a
- 23:11training video explaining exactly what to do.
- 23:13So everything was there easy for them to get trained up.
- 23:17Video based onboarding. So same thing with training and
- 23:20onboarding. A video does so much better than
- 23:23just a written black and white stop.
- 23:25When you have like a document SOP, people may read through it,
- 23:28but it's hard to really understand what is going on.
- 23:31Even if you have pictures in there or links to things.
- 23:34It's a good first step and it's really nice to have that
- 23:37resource of like this is specifically what we do.
- 23:40But when you have a video along with it, cleaning what it is or
- 23:45showing it on a computer screen, the training is, I don't know,
- 23:4810 times more effective. People prefer learning through
- 23:51video just just how it is. You, you get much more
- 23:54information on it. And then we structure their
- 23:56Google Drive. So they were using Google Drive,
- 23:57but we were able to structure their folder system.
- 23:59We set up some automations with Zapier so that they could have
- 24:03like automatic firing of new clients, setting up folder
- 24:06structures. It was much easier for people to
- 24:09find what they needed to find because before that it was just
- 24:13unorganized. These were kind of thrown in
- 24:15here there everywhere over the years.
- 24:16So we got rid of the clutter, organized it and just totally
- 24:20restructured their, their Google Drive.
- 24:22Here's an example of the training dashboard that we we
- 24:25implemented. It is a website.
- 24:26New employees are given the website.
- 24:28They essentially have access to watch a video telling them how
- 24:32the training happens. There's a knowledge base.
- 24:34So this is like all extracurricular extra, you know,
- 24:37videos or blog articles or whatever that could incorporate
- 24:41with the training. And then there's online courses.
- 24:43So along with our coaching program, we have training
- 24:47programs and courses that your project manager can take, that
- 24:50your financial manager can take and they have access to that.
- 24:53And you can control who has access to what depending on
- 24:56their role. And then you have all of the
- 24:58different parts of the business, so estimating project
- 25:00management, sales, finances, professional development,
- 25:04whatever it is. And again, you've got your SOP,
- 25:06the training video, you've got the document, and then you have
- 25:09a workflow. So workflow is like, again, that
- 25:10next level. We don't take any chances
- 25:12essentially with training people or communicating or having them
- 25:15know what's happening. I mentioned the other things,
- 25:17the video and the shop, but the workflow is what the visual
- 25:20representation of the steps look like and the decisions that need
- 25:23to be get made. And when you have all three of
- 25:26those in place, as long as the person is competent, has some
- 25:30awareness and can learn, they will know at a very high level.
- 25:35Yes, they're still being need someone to kind of walk them
- 25:37through or answer questions, but after going through those three
- 25:40resources, they should have a very clear picture of exactly
- 25:43what they need to do and how they need to do it.
- 25:45We're building solutions to those four big problems that we
- 25:49mentioned. Their results were able to scale
- 25:51up to past five million, increase the profit margins.
- 25:54That's a difficult thing to do when you're scaling a business
- 25:57as they did they their company grew 150%.
- 26:00Typically when you start to scale and grow up in business
- 26:02because you're hiring people and you're taking on more projects,
- 26:06probably, you know, purchasing more equipment and things like
- 26:08that, you'll often find as you grow your margins decrease.
- 26:11But we were able to increase margins while still massively
- 26:14growing their business. Financials became much clearer.
- 26:17Owner got out of the daily operation.
- 26:19So getting that project management role, also bringing
- 26:22in one of the field guys to start with the estimating
- 26:24process. So that was something that that
- 26:26was in the works and have a well trained team of leaders.
- 26:28As I mentioned, they had a great culture.
- 26:30They had everybody was on the same page helpful, wanting to
- 26:34like there was none of this kind of politics that you can often
- 26:37find in companies, but we were start to implement and train
- 26:41leaders. So we talked about the systems.
- 26:43The next kind of step that really enables the business
- 26:47owner to level up is when they can be a leader of leaders.
- 26:52So project managers leader everybody in the company
- 26:54essentially. But office manager, those are
- 26:56are leaders in the company that have to then be able to lead the
- 26:59next people, whether that's the field crew of the trades, the
- 27:02other office staff, whatever it may be.
- 27:04And that's where, you know, a lot of the magic really comes
- 27:07into play. And these are some of the
- 27:09amazing results that we achieve. Now you have three options.
- 27:12You can watch 100 more videos and never take any action to You
- 27:16can try to figure this all out on your own.
- 27:17Spend years learning through the mistakes, or three you can apply
- 27:21to work with us and fast track the process of systemizing and
- 27:25scaling your construction company using the first link in
- 27:29the description below. The choice is yours.