Latest / West Michigan's Morning News / Upgrades Coming to US 131
Transcript
- 0:00Speaker 1: Hey, there was a little get-together yesterday to talk about
- 0:05Speaker 1: 131 with the Michigan Department of Transportation.
- 0:08Speaker 3: J.R.
- 0:08Speaker 2: Richard is back on the live line. Thanks for doing
- 0:10Speaker 2: this this morning. Oh, yeah.
- 0:12Speaker 3: I don't get too excited about projects anymore, like bridge
- 0:14Speaker 3: rehabs or asphalt resurfacing. Who cares? But this project is
- 0:18Speaker 3: really cool. So we're going to add another lane on 131.
- 0:23Speaker 3: just north of Grand Rapids. So this is going to
- 0:24Speaker 3: really help with everyone's daily commute.
- 0:26Speaker 1: Well, Schmitty talks about this area a lot, right? So
- 0:30Speaker 1: it gets really full of traffic. I'm trying to think
- 0:34Speaker 1: of a good traffic term. And there's $ 59 million to
- 0:38Speaker 1: play with here. What specifically is the upgrade and how
- 0:43Speaker 1: can it work?
- 0:44Speaker 3: Well, this is the flex route, and there's two of
- 0:46Speaker 3: them in the state. This will be number three. So
- 0:48Speaker 3: it's the first one in West Michigan. There's one on U.S.
- 0:50Speaker 2: 23.
- 0:50Speaker 3: There's one on 96. to the east, so they basically
- 0:54Speaker 3: upgrade the existing shoulders to federal requirements. This way we
- 0:59Speaker 3: can start building right away. So dirt's going to fly
- 1:02Speaker 3: next year in 2027. So if we added a permanent lane,
- 1:06Speaker 3: if this was not a flex route, if it was
- 1:08Speaker 3: a permanent lane, we'd have to add the additional lane
- 1:11Speaker 3: plus the shoulder, which would be a lot wider and
- 1:14Speaker 3: a lot more expensive, and you'd have to go through
- 1:16Speaker 3: the environmental process, which can take years and years. And
- 1:20Speaker 3: on top of that, when you widen it that much,
- 1:22Speaker 3: you might have to take out a few bridges that
- 1:24Speaker 3: are along the way to widen those bridges because the
- 1:26Speaker 3: piers might be in the way. But this way, we
- 1:29Speaker 3: don't have to widen any bridges. So we can get
- 1:32Speaker 3: to getting right away. So this is going to add
- 1:34Speaker 3: an additional lane from 96 all the way up to
- 1:37Speaker 3: post drive. So that's going to help. tremendously with the
- 1:41Speaker 3: morning rush and the afternoon rush hours.
- 1:43Speaker 2: I wondered about this.
- 1:45Speaker 1: I've been on that 23 thing never when the light
- 1:48Speaker 1: said that that lane was open, and I've always thought,
- 1:51Speaker 1: why can't I just go in this lane? Now you've
- 1:54Speaker 1: explained that process a little bit better, and I understand.
- 1:56Speaker 1: So it's only in how often is there a restriction
- 2:01Speaker 1: to how often you can pull the trigger, and how
- 2:03Speaker 1: does that work? Is there somebody with a camera like
- 2:05Speaker 1: the Maytag repair?
- 2:07Speaker 2: Is it you that says, turn it off?
- 2:10Speaker 3: Yeah, it's not Gordon Jump from the Maytag commercials.
- 2:14Speaker 2: Great reference.
- 2:17Speaker 3: But we do have our eyes in the sky at
- 2:19Speaker 3: the TOC, so they're going to be watching everything. They've
- 2:22Speaker 3: got their eyes on it. They can open it up
- 2:24Speaker 3: every morning for rush hour, every afternoon for the afternoon rush,
- 2:28Speaker 3: and we can also use it for crash management and
- 2:32Speaker 3: whitecaps games, too. There's another influx where the traffic volume
- 2:36Speaker 3: is really peaked, too, so we can open that lane
- 2:38Speaker 3: up for events, including the White Camp. So it's a win-win.
- 2:42Speaker 3: So we're going to do northbound first in 2027, and
- 2:45Speaker 3: then 2028 we're going to do southbound. And this includes
- 2:51Speaker 3: replacing the bridge decks at West River Drive, which you
- 2:54Speaker 3: know has been problematic this year, as well as bridge
- 2:57Speaker 3: work at Six Mile Road. So there's about $ 20 million
- 3:00Speaker 3: worth of bridge work, and then the $ 40 million goes
- 3:03Speaker 3: to the flex rail. So there's 22 signs 11 on northbound,
- 3:08Speaker 3: 11 on southbound, letting motorists know when they can use
- 3:13Speaker 3: that lane. So when the lights are dark, you can't.
- 3:15Speaker 3: When the lights are flashing, you can. It's pretty simple.
- 3:17Speaker 2: All right. Looking forward to it.
- 3:19Speaker 3: J.R.
- 3:19Speaker 2: Richard with MDOT. Always good stuff, man. Thank you.
- 3:23Speaker 3: Oh, next year is going to be pretty wild with
- 3:26Speaker 3: the East Belt line and this project and a bunch
- 3:29Speaker 3: of other stuff. So get ready.
- 3:30Speaker 2: All right. I got you on a redial, so it
- 3:33Speaker 2: should work great.
- 3:35Speaker 3: Appreciate that.