Latest / Civil Engineering Made Simple / Concrete Formwork Systems
Transcript
- 0:00Speaker 1: Welcome back to the deep Dive. Today, we're getting into
- 0:02Speaker 1: a topic that, well, it literally and financially holds up
- 0:06Speaker 1: the entire construction industry. We're talking about concrete formwork systems,
- 0:11Speaker 1: and our guide for this is the really authoritative text
- 0:15Speaker 1: by A. Wad S. Hannah.
- 0:16Speaker 2: It's so true. You know, most people just see formwork
- 0:19Speaker 2: as a temporary scaffolding, a wooden box maybe, but it's
- 0:24Speaker 2: so much more. It's an engineered structure in its own right,
- 0:27Speaker 2: and it's absolutely vital for safety and quality.
- 0:30Speaker 1: And here's the number that just changes the entire perspective
- 0:33Speaker 1: for anyone in construction management. Formwork can account for forty
- 0:37Speaker 1: to sixty percent of the total cost of the structural
- 0:40Speaker 1: concrete frame.
- 0:41Speaker 2: That's the one. It's a staggering figure.
- 0:43Speaker 1: Forty to sixty percent. I mean, let's just frame that
- 0:45Speaker 1: for you. If you're on a project with one hundred
- 0:47Speaker 1: million dollar concrete budget, that's potentially sixty million dollars on
- 0:51Speaker 1: temporary structure.
- 0:52Speaker 2: Exactly, And suddenly that temporary structure is your single biggest
- 0:56Speaker 2: target for cost efficiency. Find a five percent saving there,
- 0:59Speaker 2: and you've made a huge impact on the project's bottom line.
- 1:02Speaker 1: So that's our mission. Today, we're going to distill the
- 1:04Speaker 1: technical descriptions, get into the design principles from NDS APA
- 1:08Speaker 1: and ACI three four seven ninety four, and then really
- 1:12Speaker 1: compare the systems out there. The goal is for you
- 1:15Speaker 1: to walk away knowing what the optimal approach is for
- 1:18Speaker 1: any given job.
- 1:20Speaker 2: All right, let's get into it. To start, Let's be
- 1:23Speaker 2: really clear on the terminology. A form work system isn't
- 1:26Speaker 2: just the mold. It's the total support system, the whole package,
- 1:29Speaker 2: the whole thing that includes the sheathing that's the mole surface,
- 1:32Speaker 2: all the supporting members, the hardware, the bracing, yeah, everything.
- 1:36Speaker 1: And the industry has evolved so much. It used to
- 1:39Speaker 1: be you know, build it on site, use it once
- 1:41Speaker 1: and then basically destroy it to get.
- 1:43Speaker 2: It off wrecking they called it. Now it's all about prefabrication,
- 1:47Speaker 2: created these large units you can move with a crane,
- 1:49Speaker 2: and just maximizing reuse.
- 1:51Speaker 1: So the form work life cycle has to be completely
- 1:54Speaker 1: integrated with the project schedule.
- 1:56Speaker 2: Does There are three key activities. First is fabricating the
- 1:58Speaker 2: form work. You have to decide are you building it,
- 2:01Speaker 2: buying a system or renting it. Then you assemble it all.
- 2:03Speaker 1: And next is erecting the form work. This is where
- 2:06Speaker 1: you're on site positioning everything, making sure it's all perfectly aligned.
- 2:11Speaker 2: Yes, and a really crucial little step here is applying
- 2:14Speaker 2: a former lease agent.
- 2:15Speaker 1: Ah right. That's not just to make it come off cleanly,
- 2:18Speaker 1: is it. It does something else too.
- 2:20Speaker 2: It has a critical dual purpose. First, yes, it prevents
- 2:23Speaker 2: the concrete from bonding, but with wood forms, it also
- 2:26Speaker 2: stops the wood from absorbing water from the concrete.
- 2:29Speaker 1: Which would cause it to swell and warp, and you'd
- 2:31Speaker 1: see that on the finished concrete surface precisely.
- 2:34Speaker 2: And then finally you have stripping and reshoring the removal process.
- 2:38Speaker 2: And there's golden rule here you just can't break.
- 2:41Speaker 1: Let me guess it's about timing.
- 2:43Speaker 2: It's all about timing. You absolutely do not remove supporting
- 2:46Speaker 2: members until the concrete has reached at least seventy percent
- 2:50Speaker 2: of its design strength. It's a recipe for disaster.
- 2:52Speaker 1: Okay, that brings up some terminology. People often get mixed
- 2:55Speaker 1: up shores, reshores and backshores. Can you break that down
- 2:59Speaker 1: for us?
- 2:59Speaker 2: Yeah, it's a good distinction to make. So shores are
- 3:02Speaker 2: your first line of support. They're holding up that freshly
- 3:05Speaker 2: poured concrete. Simple enough, right, the originals. The originals now,
- 3:10Speaker 2: say you remove those shores from a large area on
- 3:12Speaker 2: a completed floor, the slab will deflect just a little bit.
- 3:16Speaker 2: The new supports you put in place, then those are reshorees.
- 3:19Speaker 1: Okay, so reshoring accounts for that slight expected deflection. What
- 3:23Speaker 1: about backshores?
- 3:24Speaker 2: Backchors are different. You use those when you strip a
- 3:26Speaker 2: small area, and you put them in place immediately to
- 3:29Speaker 2: prevent any deflection while that slab continues to gain strength.
- 3:33Speaker 2: So one allows a little bit of movement, the other
- 3:36Speaker 2: prevents it entirely.
- 3:38Speaker 1: A subtle but structurally critical difference, and it all comes
- 3:41Speaker 1: back to economics. To reuse. The source text says after
- 3:45Speaker 1: just five reuses, the material costs can drop to forty
- 3:48Speaker 1: percent of what it was initially, which is.
- 3:50Speaker 2: Why you design for durability and you manage the forms
- 3:53Speaker 2: with incredible care. The money is in the reuse cycle.
- 3:57Speaker 1: Now. In terms of the materials themselves, it's not all
- 3:59Speaker 1: high tech steel and a loom, m is it not
- 4:01Speaker 1: at all?
- 4:01Speaker 2: I mean we use those, but traditional wood products lumber
- 4:05Speaker 2: and plywood are still the most common form work materials
- 4:08Speaker 2: in the world.
- 4:09Speaker 1: They're just so adaptable and when you're designing with wood,
- 4:12Speaker 1: it's not just a piece of wood. You have classification
- 4:15Speaker 1: like boards, studs, structural joists. Why is that so important?
- 4:20Speaker 2: It all comes down to how wood handle stress. A
- 4:24Speaker 2: board is thin, it's for sheathing. A stud like a
- 4:27Speaker 2: two by four is for walls, But a structural joist
- 4:31Speaker 2: a two by eight or wider. That's the muscle that's
- 4:34Speaker 2: for carrying the heavy load of wet concrete.
- 4:36Speaker 1: And that's tied to that incredible property of wood where
- 4:39Speaker 1: the strength depends on the grains orientation.
- 4:42Speaker 2: It's the absolute core principle. The strength parallel to the grain,
- 4:45Speaker 2: tensile or compressive, is about ten times greater than the
- 4:49Speaker 2: strength perpendicular to the.
- 4:50Speaker 1: Grain ten times. So if you oriented Joyce the wrong way, you've.
- 4:53Speaker 2: Lost ninety percent of its strength. It's a non negotiable
- 4:56Speaker 2: part of form design. You have to load it parallel
- 4:58Speaker 2: to the grain.
- 4:59Speaker 1: And I guess that's where plywood is so clever, right,
- 5:01Speaker 1: It's engineered to overcome some of that weakness exactly.
- 5:04Speaker 2: The thin layers the veneers are glued together with the
- 5:08Speaker 2: grain at right angles. That cross lamination makes it stable,
- 5:11Speaker 2: reduces swelling, but you still have to pay attention. Even
- 5:15Speaker 2: plywood has a strong and a weak axis depending on
- 5:18Speaker 2: how the face grain is oriented relative to the sports.
- 5:22Speaker 1: So moving on to the actual systems built from these materials,
- 5:25Speaker 1: let's talk about the traditional handset systems. Why has the
- 5:28Speaker 1: industry moved away from the conventional allwood approach.
- 5:32Speaker 2: Two things, really, labor and waste. A conventional wood system
- 5:37Speaker 2: is incredibly labor intensive, sometimes thirty or forty percent of
- 5:40Speaker 2: the entire flab cost, and you get a lot of waste,
- 5:42Speaker 2: maybe five percent per use, and you're lucky to get
- 5:45Speaker 2: five or six reuses out of it before it's just
- 5:47Speaker 2: too beat up.
- 5:48Speaker 1: The economics just don't hold up over a large project.
- 5:50Speaker 1: So that's where conventional metal systems, especially aluminum.
- 5:53Speaker 2: Come in right. The big wind for aluminum is that
- 5:56Speaker 2: it's light, about fifty percent lighter than steel panels.
- 5:59Speaker 1: Which means your crew can move faster.
- 6:01Speaker 2: You see labor savings of twenty to thirty percent, and
- 6:04Speaker 2: the reuse value is fantastic. The main drawback is that
- 6:08Speaker 2: you have to watch for a chemical reaction between the
- 6:10Speaker 2: aluminum and any spilled concrete. It needs careful.
- 6:14Speaker 1: Management, which brings us to the more advanced systems where
- 6:17Speaker 1: it's less about what a person can carry and more
- 6:19Speaker 1: about what a crane can lift exactly.
- 6:22Speaker 2: We're moving into the crane set systems for horizontal work,
- 6:25Speaker 2: and the flagship here is the flying form work system.
- 6:28Speaker 1: People might have seen these. They look like giant tables.
- 6:31Speaker 2: They are essentially massive pre assembled units or tables made
- 6:35Speaker 2: of lightweight aluminum trusses. The crane flies the entire section
- 6:39Speaker 2: from one floor to.
- 6:40Speaker 1: The next, so all that complex assembly work is done
- 6:43Speaker 1: safely on the ground, not thirty stories up. The productivity
- 6:46Speaker 1: gains must be huge.
- 6:47Speaker 2: They're enormous. You can get floor cycles down to just
- 6:50Speaker 2: five days. The initial cost is high, but after about
- 6:53Speaker 2: ten reuses it becomes far more economical than handset systems.
- 6:57Speaker 1: And for even more repetitive work like hotels apartment buildings,
- 7:01Speaker 1: there's the tunnel form work system.
- 7:03Speaker 2: The tunnel form is the peak of efficiency for that
- 7:06Speaker 2: kind of structure. They're all steel forms, and the key
- 7:09Speaker 2: innovation is that you cast the walls and the slab monolithically.
- 7:14Speaker 1: Hold on, let's make sure we get that. Monolithically means
- 7:17Speaker 1: you pour the vertical walls and the horizontal floor slab.
- 7:20Speaker 2: All in one go at the same time.
- 7:22Speaker 1: Wow. So the room is essentially one solid piece of concrete.
- 7:26Speaker 2: One solid piece. It's incredibly strong, and because these are
- 7:30Speaker 2: custom steel units, you can get five hundred, maybe even
- 7:34Speaker 2: a thousand reuses out of them, a new room formed
- 7:36Speaker 2: every day.
- 7:37Speaker 1: Now, what if you don't have a crane available or
- 7:39Speaker 1: the site is just too tight. That's where crane independent
- 7:41Speaker 1: systems come in. The classic is the slip form.
- 7:44Speaker 2: Oh, the slip form is just pure engineering theater to watch.
- 7:47Speaker 2: It's like a continuous extrusion process for concrete. The form
- 7:51Speaker 2: itself is only say four to six feet high, and
- 7:53Speaker 2: it's constantly being jacked up on steel rides as the
- 7:56Speaker 2: concrete below it sets, and.
- 7:58Speaker 1: It runs NonStop right twenty four hours a day.
- 8:00Speaker 2: Twenty four to seven. You can see speeds of up
- 8:01Speaker 2: to twenty four inches an hour, but comes with a
- 8:04Speaker 2: big upfront cost.
- 8:05Speaker 1: The setup time, a huge setup time, three to five weeks.
- 8:08Speaker 2: That fixed cost means it's really not economical for buildings
- 8:12Speaker 2: under say two hundred and fifty or three indred feet tall.
- 8:14Speaker 2: You need the height to make the speed payoff.
- 8:17Speaker 1: So if you need that vertical speed but maybe want
- 8:19Speaker 1: a better finish, or the building isn't a super tall
- 8:22Speaker 1: you might look at self raising forms.
- 8:24Speaker 2: Yes, that's the next evolution. Yeah, they're also crane independent,
- 8:27Speaker 2: hydraulically lifted. They're great for buildings twenty stories or higher.
- 8:31Speaker 2: And because they use distinct panels, not a continuous slip,
- 8:34Speaker 2: they produce a much higher quality architectural concrete finish. You
- 8:38Speaker 2: can still hit a two to three day floor cycle.
- 8:40Speaker 1: Okay, so let's shift from the systems themselves to the
- 8:43Speaker 1: nitty gritty of designing them. This is real structural engineering.
- 8:46Speaker 2: It absolutely is. You're designing a structure to support immense loads,
- 8:50Speaker 2: and you have to prevent two things, collapse and excessive deflection.
- 8:55Speaker 2: And it's all governed by codes ACI three four seven
- 8:58Speaker 2: and DS or wood AP for plywood. It's not guesswork.
- 9:02Speaker 1: Let's talk about the loads. We have vertical loads, which
- 9:04Speaker 1: are dead and live. Deadload is the easy part. I
- 9:06Speaker 1: assume pretty.
- 9:07Speaker 2: Much it's the form zone weight maybe five pounds per
- 9:11Speaker 2: square foot, plus the weight of the wet concrete, which
- 9:14Speaker 2: is usually assumed to be one hundred and fifty pounds
- 9:16Speaker 2: per cubic foot.
- 9:17Speaker 1: And the live load is everything else, the unpredictables, right.
- 9:21Speaker 2: Workers, equipment, materials being stored on the form, impact from
- 9:25Speaker 2: dropping things. You have to account for all of it.
- 9:27Speaker 1: To do that, designers use these engineering concepts that can
- 9:29Speaker 1: sound a bit abstract. Moment of inertia, section modulus. Can
- 9:34Speaker 1: we make those more tangible?
- 9:36Speaker 2: Let's try. Think of a wooden joist. Its cross sectional
- 9:39Speaker 2: area helps it resist cheer. The moment of inertia or
- 9:42Speaker 2: I is all about its stiffness, its resistance to bending.
- 9:47Speaker 2: The further the material is from the center, the higher
- 9:49Speaker 2: the moment of inertia. That's why a deep two by
- 9:52Speaker 2: ten is so much stiffer than a flat four by four,
- 9:54Speaker 2: even with similar amounts of wood.
- 9:56Speaker 1: It resists bending better. And what about the section modulus.
- 9:59Speaker 2: The section modulus is what you use to calculate the
- 10:01Speaker 2: actual bending stress. You have to check every component for
- 10:04Speaker 2: three failure modes, bending, shear, and deflection.
- 10:08Speaker 1: And I noticed the book mentions engineers don't just use
- 10:11Speaker 1: the standard values for wood strength, they adjust them.
- 10:14Speaker 2: Yes, we use adjusted allowable stresses. A key one is
- 10:17Speaker 2: the load duration factor. Formwork only carries its full load
- 10:21Speaker 2: for a few days, not fifty years like a building,
- 10:24Speaker 2: so the code allows you to increase the design values,
- 10:27Speaker 2: often by twenty five percent for that short term load.
- 10:30Speaker 1: So once you have all that, there's a logical design sequence. Right.
- 10:33Speaker 1: You don't just start anywhere.
- 10:35Speaker 2: It's a cascade. You start at the top. The most
- 10:37Speaker 2: economical design comes from maximizing the span of your sheaving
- 10:41Speaker 2: the plywood. That spacing then dictates how far apart your
- 10:45Speaker 2: joists can be, and the spacing dictates the stringer spacing,
- 10:48Speaker 2: which then tells you how far apart your shores.
- 10:50Speaker 1: Need to be.
- 10:51Speaker 2: Exactly. It's a chain reaction. Maximize the span of the
- 10:54Speaker 2: top layer and you use fewer supports underneath. That saves
- 10:57Speaker 2: material and more importantly.
- 11:00Speaker 1: So let's bring it all together choosing the right system.
- 11:04Speaker 1: The design of the building itself has to be the
- 11:06Speaker 1: first consideration.
- 11:07Speaker 2: It's paramount. A simple flat plate slab uses the simplest
- 11:12Speaker 2: form work easy, fast, But if the design calls for
- 11:16Speaker 2: a waffle slab with that grid of beams, you suddenly
- 11:19Speaker 2: need all these special pans or domes.
- 11:21Speaker 1: And your system choice becomes much more limited and expensive.
- 11:24Speaker 1: The building shape is also key.
- 11:26Speaker 2: You mean how regular or repetitive it is.
- 11:28Speaker 1: Absolutely A uniform building with consistent column spacing and story
- 11:32Speaker 1: heights is perfect for specialized systems like flying forms, because
- 11:36Speaker 1: you maximize reuse and irregular building with lots of different
- 11:39Speaker 1: angles and openings forces you.
- 11:41Speaker 2: Back to the slow, labor intensive handset.
- 11:43Speaker 1: Methods almost every time. And finally, you have to think about.
- 11:46Speaker 2: Logistics, the cost of the system versus how many times you.
- 11:50Speaker 1: Can use it, that and crane availability. On a tight
- 11:53Speaker 1: urban site, the crane might be the single biggest bottleneck.
- 11:56Speaker 1: In that case, a crane independent system like a self
- 11:58Speaker 1: raising form might win out, even if it has a
- 12:01Speaker 1: higher initial cost. Access can trump everything else. This has
- 12:04Speaker 1: been fantastic. It really shows that formwork isn't just a
- 12:06Speaker 1: temporary cost. It's a highly specialized engineering field that can
- 12:11Speaker 1: drive sixty percent of your structural budget and sets the
- 12:14Speaker 1: entire pace for the project.
- 12:16Speaker 2: It really does, and the key is that the structural
- 12:19Speaker 2: system and the forming system have to be considered together
- 12:22Speaker 2: early in the design phase to kind of lock that
- 12:25Speaker 2: idea in. Let's finish with a quick review exercise for
- 12:28Speaker 2: you to think about.
- 12:28Speaker 1: Let's do it. It's a great way to synthesize all
- 12:30Speaker 1: these segments.
- 12:31Speaker 2: Okay, we know a conventional wood system is cheap to start,
- 12:35Speaker 2: but the labor is high thirty to forty percent of
- 12:38Speaker 2: the slab cost and you only get maybe five or
- 12:40Speaker 2: six reuses. We also know the flying form system cuts
- 12:44Speaker 2: stripping labor by about fifty percent, which is a huge saving.
- 12:48Speaker 2: But the book is very clear flying forms are only
- 12:51Speaker 2: considered economical after ten or more reuses.
- 12:53Speaker 1: So there's a gap there. Why do you need so
- 12:55Speaker 1: many reuses to make back those big labor savings. That's
- 12:58Speaker 1: the question for you. But single major upfront factor must
- 13:03Speaker 1: those labor savings overcome to justify using the flying form system.
- 13:07Speaker 1: The hint is in the name. It's all about the
- 13:10Speaker 1: high initial fabrication cost of building those huge specialized tables
- 13:13Speaker 1: in the first place.
- 13:14Speaker 2: That's a perfect way to frame in it. It's about
- 13:16Speaker 2: amortizing a huge capital expense. Understanding that trade off high
- 13:20Speaker 2: fixed cost versus low variable cost is really the key
- 13:23Speaker 2: to managing complex concrete work. We hope you'll take some
- 13:26Speaker 2: time to reflect on that.