Latest / Space Exploration Stories / The S-6 solar array stuck by stiction that threatened station power
Transcript
- 0:03Speaker 1: A free-tailed bat clung to the side of Discovery's external
- 0:07Speaker 1: tank on the morning of March 15, 2009. Photographs taken
- 0:11Speaker 1: at the pad showed it gripping the foam insulation. Wings
- 0:15Speaker 1: folded tight against its body. A wildlife specialist examined those
- 0:19Speaker 1: photographs later and concluded the animal almost certainly had a
- 0:23Speaker 1: broken wing. It could not fly away. At 7.43 in
- 0:27Speaker 1: the evening, roughly 19 million newtons of thrust ignited beneath it.
- 0:32Speaker 1: Launch Director Michael Leinbach would later call it the most
- 0:36Speaker 1: visually beautiful launch he had ever seen. What was riding
- 0:39Speaker 1: inside that tank was the last piece of a puzzle
- 0:43Speaker 1: eight years in the making. The S-6 truss segment, the
- 0:46Speaker 1: fourth and final starboard section of the International Space Station's
- 0:50Speaker 1: integrated truss structure, had been packed in storage since before
- 0:54Speaker 1: the Columbia accident. Before two shuttle losses reshaped everything, NASA
- 0:59Speaker 1: knew about risk. Now it sat in Discovery's payload bay
- 1:03Speaker 1: its solar arrays folded and compressed for nearly a decade,
- 1:07Speaker 1: waiting to unfurl in a place where there is no
- 1:09Speaker 1: forgiving second chance, the question nobody could answer with certainty.
- 1:14Speaker 1: Would hardware that old still open? The International Space Station
- 1:18Speaker 1: runs on electricity, every life support system, every science rack,
- 1:24Speaker 1: every gyroscope that keeps the structure pointed correctly draws from
- 1:28Speaker 1: a power grid, orbiting 400 kilometers above the Earth. By
- 1:32Speaker 1: early 2009, that grid was running at roughly half its
- 1:36Speaker 1: designed capacity. Three of four starboard truss segments were installed.
- 1:41Speaker 1: The fourth slot, S6, had been waiting empty since the
- 1:44Speaker 1: station's earliest assembly flights. When S6 was finally bolted into place,
- 1:50Speaker 1: it would bring total station power to 120 kilowatts, 30
- 1:54Speaker 1: kilowatts of that available purely for science. That number had
- 1:58Speaker 1: been the destination for years. The S-6 Truss itself had
- 2:02Speaker 1: been manufactured and certified years before it could fly. When
- 2:06Speaker 1: the Columbia accident grounded the shuttle fleet in 2003, S-6
- 2:10Speaker 1: went into storage at Kennedy Space Center. It stayed there
- 2:14Speaker 1: through the return-to-flight period, through the resumption of assembly missions,
- 2:18Speaker 1: through the slow, methodical process of rebuilding the program's confidence.
- 2:23Speaker 1: Eight years passed. The Truss's solar arrays— Enormous accordion-folded panels,
- 2:29Speaker 1: each one roughly the size of a standard solar array wing,
- 2:32Speaker 1: sat compressed inside their blanket boxes the entire time. Engineers
- 2:37Speaker 1: had a name for what that compression could do to
- 2:39Speaker 1: the mechanism. They called it stiction, sticky friction. When metal
- 2:44Speaker 1: and fabric are held tightly folded for years without movement,
- 2:48Speaker 1: the materials can bond slightly at their contact surfaces. Not
- 2:52Speaker 1: enough to weld them together, but potentially enough to resist
- 2:55Speaker 1: unfolding when commanded. The longer the storage, the higher the risk.
- 3:00Speaker 1: And Array 3B had been in its box the longest
- 3:03Speaker 1: of all. The team knew this going in. Stiction was
- 3:06Speaker 1: a documented risk, noted in the mission planning. It was
- 3:09Speaker 1: not a surprise. What nobody could model precisely was the threshold.
- 3:15Speaker 1: At exactly what point does Stiction become an obstruction rather
- 3:19Speaker 1: than merely resistance? There was a second problem that almost
- 3:22Speaker 1: prevented the mission from launching at all. On the previous
- 3:25Speaker 1: shuttle flight, STS-126, which had landed in November 2008, engineers
- 3:32Speaker 1: discovered a broken hydrogen flow control valve. This was not
- 3:37Speaker 1: a minor finding. Hydrogen flowing through the wrong path at
- 3:40Speaker 1: the wrong pressure during launch could compromise the main propulsion system.
- 3:45Speaker 1: The valve failure on STS-126 triggered an immediate review of
- 3:50Speaker 1: all three orbiters in the fleet. Discovery, Atlantis, and Endeavour
- 3:56Speaker 1: were each inspected. Suspect valves, identified by flight hour count
- 4:01Speaker 1: rather than visible damage, were pulled and replaced with lower
- 4:05Speaker 1: flight time units. That process took time. STS-119 had already
- 4:11Speaker 1: been scheduled. The delay pushed the launch window into March. Then,
- 4:16Speaker 1: on March 11, 2009, the crew was already at Kennedy
- 4:20Speaker 1: Space Center when the countdown was halted. A liquid hydrogen
- 4:23Speaker 1: vent line leak had appeared at the ground umbilical carrier plate.
- 4:28Speaker 1: The interface between the pad's ground support equipment and the
- 4:31Speaker 1: external tank, the launch was scrubbed. Engineers worked through the problem.
- 4:36Speaker 1: The leak was contained enough for the attempt four days later.
- 4:40Speaker 1: Though the root cause, a misalignment at the carrier plate,
- 4:44Speaker 1: would not be fully understood until after the mission returned.
- 4:47Speaker 1: Commander Lee Archibald and his crew of seven had now
- 4:51Speaker 1: waited through valve concerns, a fleet-wide inspection, a cross-country schedule compression,
- 4:57Speaker 1: and a launch day scrub. They launched on March 15th
- 5:00Speaker 1: at 19.43 Eastern Time, with a station running at half
- 5:04Speaker 1: power and a truss full of eight-year-old hardware waiting in
- 5:08Speaker 1: the payload bay. The Bat, by then, was already gone.
- 5:12Speaker 1: Discovery docked with the International Space Station on March 17th
- 5:17Speaker 1: at 21.20 UTC. When the hatches opened at 23.09, the
- 5:22Speaker 1: crew moved between two worlds. one that had been running
- 5:26Speaker 1: on half its intended power for years, and one that
- 5:29Speaker 1: carried the hardware meant to fix that. The hardware was
- 5:32Speaker 1: in the payload bay. Four blanket boxes. Inside each one,
- 5:37Speaker 1: folded accordion style, were sections of solar array fabric that
- 5:42Speaker 1: had been compressed since 2001. Eight years of sitting still,
- 5:47Speaker 1: the arrays were made to unfurl in the vacuum of space,
- 5:51Speaker 1: but fabric... and metal under constant compression for that long
- 5:54Speaker 1: develops a resistance called stiction, sticky, friction, the tendency of
- 6:00Speaker 1: material to resist moving from the position it has held
- 6:03Speaker 1: for too long. Engineers at Kennedy knew this was coming.
- 6:07Speaker 1: They had planned for it. What they could not calculate
- 6:10Speaker 1: precisely was how much resistance eight years would produce. The
- 6:14Speaker 1: S6 truss segment itself, the fourth and final starboard section
- 6:18Speaker 1: of the station's integrated truss structure, was installed on March
- 6:22Speaker 1: 18th using a dual-arm robotic handoff. The shuttle arm handed
- 6:26Speaker 1: it to the station arm because the clearance restrictions around
- 6:30Speaker 1: the docking geometry made a direct installation impossible. It took
- 6:34Speaker 1: careful coordination between two robotic systems working across a structure
- 6:39Speaker 1: the size of a football field. By the time S6
- 6:42Speaker 1: was bolted into position, the physical question had shifted from
- 6:45Speaker 1: whether the truss could be attached to whether what was
- 6:47Speaker 1: inside it would ever open. EVA-1 launched that answer into motion.
- 6:53Speaker 1: On March 19th, Steve Swanson and Richard Arnold spent six
- 6:57Speaker 1: hours and seven minutes outside. They bolted S6 in place,
- 7:01Speaker 1: connected cables, removed the launch locks that had held the
- 7:05Speaker 1: arrays secured during ascent, and deployed the blanket boxes, pulling
- 7:09Speaker 1: the compressed accordion sections out of storage and exposing them
- 7:13Speaker 1: to space for the first time in nearly a decade.
- 7:16Speaker 1: The blanket boxes opened without incident. The arrays were now
- 7:20Speaker 1: free to be commanded open, but commanding them open and
- 7:24Speaker 1: having them actually open were two different things. The original
- 7:29Speaker 1: plan had array deployment scheduled for flight day 8. Ground
- 7:33Speaker 1: managers moved it to flight day 6 because an additional
- 7:36Speaker 1: EVA could not be slotted later in the mission timeline
- 7:39Speaker 1: given suit and prep constraints. The reason was simple arithmetic.
- 7:44Speaker 1: If an array stuck and refused to deploy fully, An
- 7:47Speaker 1: additional EVA would be required to manually assist it. EVAs
- 7:51Speaker 1: take preparation time, suit checks, airlock cycling, crew positioning. The
- 7:57Speaker 1: mission timeline had no slack for an unplanned spacewalk unless
- 8:01Speaker 1: that spacewalk was attempted early enough to fit inside the
- 8:05Speaker 1: remaining schedule. Moving deployment earlier was not optimism. It was
- 8:10Speaker 1: insurance purchased with time. Array 1B began its commanded deployment
- 8:15Speaker 1: at 15.06 UTC on March 20th. Astronaut Phillips monitored the
- 8:20Speaker 1: deployment from inside the station. The array started to move,
- 8:24Speaker 1: slat by slat, the accordion sections unfolding outward from the mast.
- 8:29Speaker 1: Then it stopped, halfway deployed. 45 meters of solar fabric
- 8:35Speaker 1: hanging open on one side, the rest still compressed. The
- 8:39Speaker 1: decision made in the next few minutes was one of
- 8:42Speaker 1: the quieter acts of engineering on the mission. Phillips held
- 8:45Speaker 1: the array in place and waited. No motor reversals, no
- 8:49Speaker 1: additional commands, no attempt to force the remaining sections. The
- 8:53Speaker 1: array was rotated to face the sun directly and left
- 8:56Speaker 1: there for 45 minutes. The logic, sunlight would warm the
- 9:00Speaker 1: metal and fabric, reducing the stiction that had built up
- 9:03Speaker 1: across eight years of compression. There was no procedure that
- 9:06Speaker 1: guaranteed this would work. The temperature differential between sunlit and
- 9:11Speaker 1: shadowed hardware in orbit can exceed 200 degrees Celsius, and
- 9:15Speaker 1: the thermal expansion that produces could either loosen the stiction
- 9:18Speaker 1: or stress already aged material in unpredictable ways. Forty-five minutes passed.
- 9:24Speaker 1: The deployment command was sent again. Array 1B finished its
- 9:28Speaker 1: extension without resistance. One down, the harder one still waited.
- 9:33Speaker 1: Array 3B had been in storage the longest of the four.
- 9:37Speaker 1: It was the one engineers had flagged as the highest
- 9:40Speaker 1: diction risk. Its deployment began at 1635, UTC on March 20th,
- 9:47Speaker 1: 89 minutes after 1B finished. The same pause procedure was
- 9:51Speaker 1: built into the plan from the start this time. Deploy
- 9:55Speaker 1: to the halfway point, stop, rotate to sun, wait. The
- 9:59Speaker 1: array moves to its pause point it stopped the station
- 10:03Speaker 1: turned toward the sun then when the deployment command came
- 10:07Speaker 1: something different happened stiction was observed the array did not
- 10:12Speaker 1: move cleanly the motor was working the mast was extending
- 10:17Speaker 1: but the slats The individual accordion sections that needed to
- 10:20Speaker 1: flatten out as the array unfurled were resisting. The team
- 10:25Speaker 1: watched the deployment data. There was no manual override available.
- 10:29Speaker 1: No astronaut could reach that section of the truss from
- 10:31Speaker 1: any EVA position. The array would open on its own,
- 10:35Speaker 1: or it would not open at all. The slats held.
- 10:38Speaker 1: Then they shifted. Then, one after another, they flattened. At
- 10:43Speaker 1: 17 UTC on March 20th, 2009, Array 3B reached full extension.
- 10:50Speaker 1: The station's power budget changed in that moment from a
- 10:52Speaker 1: system running at half capacity to one producing 120 kilowatts total,
- 10:57Speaker 1: 30 of them available for science. The fourth and final
- 11:00Speaker 1: starboard solar array had been waiting eight years for that minute.
- 11:04Speaker 1: What no one outside the mission documentation would notice for
- 11:07Speaker 1: some time was that Discovery had flown the entire deployment
- 11:12Speaker 1: sequence with one additional detail attached to its underside. A
- 11:16Speaker 1: single thermal protection tile had been deliberately raised a quarter
- 11:19Speaker 1: of an inch, 6.4 millimeters above the surrounding surface. Not
- 11:24Speaker 1: a defect, not damage. A deliberate experimental installation designed to
- 11:30Speaker 1: trigger a boundary layer transition during re-entry and generate data
- 11:34Speaker 1: about the aerothermal conditions that had destroyed Columbia six years earlier.
- 11:38Speaker 1: The shuttle carrying eight-year-old hardware into orbit was simultaneously serving
- 11:43Speaker 1: as a laboratory for understanding how shuttles die The crew
- 11:47Speaker 1: did not need to know it was there. The data
- 11:50Speaker 1: would write itself into the tile's surface on the way home.
- 11:54Speaker 1: Discovery undocked from the station on March 25th, 2009 at
- 11:59Speaker 1: 1953 Udo TC. The arrays were fully extended behind her
- 12:04Speaker 1: as she pulled away four wings of photovoltaic panels catching
- 12:08Speaker 1: light over the Pacific, generating power for a crew she
- 12:11Speaker 1: was no longer carrying. The three EVAs had logged 19
- 12:15Speaker 1: hours and 4 minutes of total spacewalk time. Swanson, Arnold,
- 12:20Speaker 1: and Acaba had bolted the S6 truss into position, connected
- 12:24Speaker 1: its cables, removed the launch locks, photographed a radiator panel,
- 12:28Speaker 1: reconfigured the Zenith 1 connector, and relocated a cargo cart.
- 12:32Speaker 1: They had also encountered a stuck pin on a piece
- 12:35Speaker 1: of hardware called the UCC CAS, the Unpressurized Cargo Carrier
- 12:40Speaker 1: Attachment System. The pin would not fully deploy. Every standard
- 12:45Speaker 1: technique failed. Mission controllers documented the problem, secured the hardware
- 12:50Speaker 1: in its current position, and closed the EVA without resolution.
- 12:55Speaker 1: Some problems do not yield to the tools on hand.
- 12:58Speaker 1: That pin would remain stuck for months. It was not
- 13:01Speaker 1: released until the next flight, STS-127, when engineers had time
- 13:06Speaker 1: to design a custom-made tool built specifically for that geometry.
- 13:11Speaker 1: The solution required knowing exactly what had failed and fabricating
- 13:15Speaker 1: something that had never existed before. The station waited. The
- 13:19Speaker 1: tool was made. The pin released. The hydrogen vent leak
- 13:23Speaker 1: that had scrubbed the March 11th launch attempt received its
- 13:27Speaker 1: own post-flight investigation. Engineers traced it to a misalignment in
- 13:31Speaker 1: the ground umbilical carrier plate, a fitting on the launch
- 13:35Speaker 1: pad itself, not on the orbiter. The leak had never
- 13:38Speaker 1: threatened discovery in flight. It had threatened the timeline, the window,
- 13:43Speaker 1: the margin. Once identified, the misalignment was corrected before STS-127 flew.
- 13:51Speaker 1: Two problems from STS-119 were thus resolved by the mission
- 13:57Speaker 1: that followed it. That is how the shuttle program worked
- 13:59Speaker 1: at its best, each flight generating the specific knowledge the
- 14:03Speaker 1: next flight needed. There is one more piece of data
- 14:06Speaker 1: from STS-119's return that belongs here. the deliberately raised tile.
- 14:12Speaker 1: The one set a quarter inch above the surrounding surface
- 14:15Speaker 1: to trigger a boundary layer transition during re-entry, performed exactly
- 14:19Speaker 1: as designed. At Mach 15, the airflow over Discovery's underside
- 14:24Speaker 1: tripped from laminar to turbulent at the location of the
- 14:27Speaker 1: raised tile that temperature data recorded. The aerothermal profile was captured.
- 14:33Speaker 1: The experiment was successful enough that engineers repeated it on STS-128,
- 14:39Speaker 1: with the tile raised further to 0.35 inches, where it
- 14:44Speaker 1: tripped the boundary layer at Mach 18. Discovery had flown
- 14:48Speaker 1: home as a laboratory for understanding how shuttles survive the
- 14:52Speaker 1: violence of re-entry. The data from that quiet quarter-inch of
- 14:55Speaker 1: raised ceramic went into the engineering record, where it remains
- 14:59Speaker 1: alongside the mission itself. Discovery touched down at Kennedy Space
- 15:03Speaker 1: Center on March 28, 2009, at 15.13.18, It was the
- 15:10Speaker 1: shuttle's 36th flight. It was the 156th crewed NASA space flight.
- 15:17Speaker 1: It was the 100th crewed mission since Challenger. Those are
- 15:21Speaker 1: the numbers in the record. They do not fully account
- 15:23Speaker 1: for what the flight had done. The station's total power
- 15:26Speaker 1: output now stood at 120 kilowatts, of which 30 kilowatts
- 15:30Speaker 1: were available for science. The final wing of the integrated
- 15:34Speaker 1: truss structure was in place. The assembly of the International
- 15:38Speaker 1: Space Station The structure that had been growing in orbit
- 15:41Speaker 1: for over a decade was functionally complete in its primary
- 15:45Speaker 1: power architecture. There is a detail from the morning of
- 15:48Speaker 1: March 15th, 2009, that the mission documentation preserves. A free-tailed
- 15:54Speaker 1: bat had attached itself to the external tank and was
- 15:57Speaker 1: still there when the main engines ignited. A specialist later
- 16:01Speaker 1: concluded it likely had a broken wing and could not
- 16:04Speaker 1: fly away. Launch Director Michael Leimbach, watching from the firing room,
- 16:09Speaker 1: described the STS-119 launch as the most visually beautiful he
- 16:14Speaker 1: had ever seen. He had witnessed a great many launches.
- 16:18Speaker 1: The bat left no record beyond the photographs. That image
- 16:22Speaker 1: sits at the beginning of this story, and it belongs
- 16:24Speaker 1: at the end of it too, though it means something
- 16:26Speaker 1: different now. At the start, the bat was a strange detail,
- 16:30Speaker 1: a small creature holding on, while 19 million newtons prepared
- 16:34Speaker 1: to ignite beneath it. It read, as fragility, as something
- 16:39Speaker 1: that should not have been there. By the end of
- 16:41Speaker 1: the mission, the image shifts. Seven people had traveled to
- 16:45Speaker 1: orbit carrying hardware that had been sitting in storage for
- 16:48Speaker 1: eight years. They had installed the final power segment of
- 16:51Speaker 1: a station that took over a decade to assemble. They
- 16:54Speaker 1: had paused an array deployment to let sunlight warm eight-year-old metal.
- 16:58Speaker 1: They had watched slats that seemed stuck release, one after another,
- 17:02Speaker 1: until the panels reached full extension. They had flown home
- 17:06Speaker 1: with a tiled, deliberately raised to collect data that might
- 17:10Speaker 1: save future crews. And somewhere in the documentation of all
- 17:13Speaker 1: of that, a bat with a broken wing held on
- 17:16Speaker 1: through the admission sequence and was not found again. A
- 17:20Speaker 1: bat with a broken wing held on through the admission
- 17:22Speaker 1: sequence and was not found again. Not everything that witnesses
- 17:27Speaker 1: a launch survives it. Not everything that clings to the
- 17:30Speaker 1: work makes it to the other side. The arrays that
- 17:33Speaker 1: waited eight years in blanket boxes did survive They unfolded.
- 17:38Speaker 1: They are still there, generating power above the atmosphere, catching
- 17:43Speaker 1: light over a station that was completed by people who
- 17:45Speaker 1: solved the problems the schedule did not leave room for.
- 17:48Speaker 1: The bat held on. The arrays opened. The arrays are
- 17:52Speaker 1: still there, generating power above the atmosphere, catching light over
- 17:56Speaker 1: a station, completed by people who solved the problems the
- 18:00Speaker 1: schedule did not leave room for. While no record of
- 18:02Speaker 1: the bat's survival was documented, The slats that seemed stuck
- 18:06Speaker 1: released one after another until the panels reached full extension
- 18:10Speaker 1: above a world that never saw them fold. This show
- 18:14Speaker 1: is made by Obo Media.