- 0:00Welcome back to FSO Institute Reliability Maintenance and Maintenance
- 0:03Monday.
- 0:04This is Episode 9, and today we are going to dig into one of the biggest
- 0:08hidden drivers of performance in CPG and food plants: centerlining equipment.
- 0:08I'm
- 0:14James Couch, and I've got Michelle sitting in with me today.
- 0:17Laura's out on assignment, so Michelle has kindly agreed to fill in.
- 0:20Michelle, thanks for jumping in on short notice.
- 0:20Yeah,
- 0:24absolutely James, happy to be here.
- 0:26I love this topic because centerlining sounds super technical,
- 0:31but when you get out on the floor,
- 0:33it really comes down to habits,
- 0:35behaviors, and discipline.
- 0:35That's exactly right.
- 0:38Let's start by putting a simple definition on the table.
- 0:41When we say "centerlining," what we really mean is locking in what I
- 0:46call the Golden Run.
- 0:47That's the specific combination of settings and conditions where the
- 0:51machine runs stable, makes good quality,
- 0:54and delivers the throughput we expect,
- 0:56day in and day out.
- 0:56And that Golden Run isn't just magic or feel.
- 1:01It's things you can actually write down and measure,
- 1:05right?
- 1:05We're talking hard numbers and clear conditions.
- 1:05Exactly.
- 1:11You have to capture that technical foundation.
- 1:14That means all the key machine parameters-temperatures,
- 1:17pressures, speeds, film tensions,
- 1:20timing of seal bars, all those knobs people like to fiddle with.
- 1:23Then you add in material specs-the film gauge,
- 1:27the cup or lid type, product viscosity,
- 1:30product temperature going into the filler.
- 1:30On top of that,
- 1:32we've got environmental conditions: humidity,
- 1:35room temperature, even when and how the sanitation cycles hit the equipment.
- 1:39And then, finally, you tie it all to performance data: speed,
- 1:44scrap percentage, downtime, seal integrity,
- 1:47leak rates.
- 1:48When you put all that together around a stable,
- 1:50high‑performing run, that becomes your technical baseline for the centerline.
- 1:50So
- 1:56you're not guessing.
- 1:57You're saying, "When we run at these conditions,
- 1:57with these settings, under this environment, we see high OEE,
- 1:57low scrap, and the line just feels calm."
- 2:11That's the Golden Run.
- 2:11That's right.
- 2:14Now, here's where we get into trouble.
- 2:16A lot of companies, and frankly a lot of operators and even supervisors,
- 2:20have this long‑standing habit of changing machine settings from shift
- 2:24to shift because they believe, honestly believe,
- 2:27that the machine runs better under their version of the settings.
- 2:27I've
- 2:31walked into plants where first shift has one recipe,
- 2:33second shift has another, and third shift... well,
- 2:37they've got a secret recipe nobody else is allowed to touch.
- 2:40And everybody will swear, "My way is the only way this machine will run."
- 2:44But the data usually tells a very different story.
- 2:44Yeah,
- 2:48I've heard the classic lines: "Maintenance doesn't know this machine
- 2:48like I do"
- 2:53or "Engineering's numbers are just theoretical." And meanwhile,
- 2:58every shift is chasing different problems and nobody can figure out why
- 3:04the performance is all over the map.
- 3:04Exactly.
- 3:07That shift‑to‑shift tweaking is one of the first behaviors we've got
- 3:11to change if we're going to get serious about reliability.
- 3:14It is not that machine settings never change-they absolutely do as materials,
- 3:19equipment, and products evolve.
- 3:21But those changes should be deliberate,
- 3:23tested, documented Golden Run improvements,
- 3:26not somebody's gut feeling at two in the morning.
- 3:26So the message is: "Settings can change, but they change for a reason,
- 3:26and through a process,"
- 3:37not just because one operator thinks the machine "sounds" better with
- 3:41the pressure cranked up or the speed bumped.
- 3:41You got it.
- 3:45Now, once we've defined that Golden Run technically,
- 3:48we need the second pillar: documentation.
- 3:51A centerline only works if the people running the line can see it and
- 3:55use it.
- 3:55That means a centerline sheet that's clear,
- 3:58visual, and operator‑friendly.
- 3:58On that sheet,
- 4:01you should see the target setting,
- 4:03the upper and lower limits, exactly where the adjustment is located-with
- 4:07photos, not just words-how to measure it,
- 4:10what tool to use, and what to do if it's out of spec.
- 4:13If an operator has to stand there and study it for a minute to figure
- 4:16it out, it's probably too complicated.
- 4:18They need to be able to glance at it and know what to do in about ten
- 4:21seconds.
- 4:21I like that ten‑second rule.
- 4:24If I've got to flip through a binder and decode engineering language,
- 4:28I'm not using that sheet in the middle of a changeover.
- 4:31It's going to live in a drawer somewhere.
- 4:31That's exactly what happens.
- 4:36So pillar three is governance-turning this into standard work.
- 4:40We're talking about startup centerline checks,
- 4:42a quick verification at shift change,
- 4:45checks whenever you change materials,
- 4:47and a clear escalation path if something is out of spec.
- 4:50And I'm a huge fan of a line‑side centerline board where operators can
- 4:54see the key settings and status right there at the machine.
- 4:54That's where
- 4:58discipline starts to turn into reliability.
- 5:01People stop freelancing settings and start checking against the agreed
- 5:04standard.
- 5:05And then pillar four is continuous improvement.
- 5:08Centerlines are not carved in stone.
- 5:11They evolve as materials change,
- 5:12equipment wears, upgrades happen,
- 5:15and operators learn better ways of running the line.
- 5:15So you're reviewing
- 5:19those centerlines monthly, or at some regular cadence,
- 5:23instead of letting them get stale.
- 5:25And when you do tighten limits or update a setting,
- 5:29it's based on real performance data,
- 5:31not personal preference.
- 5:33That's how you shift from "my settings" to "the Golden Run."Alright James,
- 5:41you mentioned that one of the first behaviors to change is this habit
- 5:45of every shift having their own recipe.
- 5:47Let's talk about why that's such a sticky habit.
- 5:50People really defend "their" settings out there.
- 5:50They do.
- 5:56And a lot of it comes from pride and experience.
- 5:59You've got operators who've kept that line running for years under tough
- 6:02conditions, and they've built up what I call folklore knowledge-little
- 6:06tricks they've used to get the machine through a bad batch of film or
- 6:09a rough product.
- 6:10The problem is, those band‑aids become permanent habits,
- 6:14and nobody ever goes back to prove whether they're actually helping or
- 6:17hurting.
- 6:17On top of that, when there's no clear,
- 6:20trusted centerline, people default to "I know best" because there's nothing
- 6:25else to anchor to.
- 6:26So every shift tweaks, and the line behaves differently depending on
- 6:30who's at the controls.
- 6:30So centerlining is as much a cultural and behavioral
- 6:35change as it is a technical one.
- 6:37You're not just handing out a sheet of numbers,
- 6:41you're asking people to let go of "my way" and trust "our way."Exactly.
- 6:47And that's why ownership has to be cross‑functional.
- 6:50Let's start with the OEMs.
- 6:52They're important, but they're not the whole answer.
- 6:54OEMs can give you baseline recommended settings,
- 6:57show you where the critical adjustments are,
- 6:59tell you the tolerances and the likely failure modes,
- 7:02and explain the design intent of the machine.
- 7:02But what they can't give
- 7:07you is your true centerline, because that depends on your products,
- 7:10your materials, your environment,
- 7:12your operators, your sanitation cycles.
- 7:15OEM recommendations are the starting line,
- 7:17not the finish line.
- 7:17So from there,
- 7:20it becomes an internal team sport.
- 7:23Walk us through who needs to be at the table when you're building and
- 7:26maintaining centerlines.
- 7:26Operators are first.
- 7:30They're doing the daily centerline checks,
- 7:32they're the first responders when something drifts,
- 7:34and they're the ones who can tell you how the machine actually behaves
- 7:37at two a.
- 7:37m.
- 7:38on a Sunday.
- 7:39They should own that visual board on the line and feel accountable for
- 7:43keeping the machine within limits.
- 7:43Maintenance comes in to validate mechanical
- 7:46settings, make sure adjustment points are calibrated,
- 7:49and identify where wear is causing drift.
- 7:51If a seal jaw is worn or a tensioner is sticking,
- 7:55you can't hold a centerline until that's addressed.
- 7:57They're also key in troubleshooting when something's out of spec.
- 8:00Remember this was part of our discussion in episode 5 on have the machinic
- 8:05or technician on the production floor at shift startup.
- 8:08It's paramount.
- 8:08Then you've got process or packaging engineering.
- 8:12They lead the Golden Run work-running trials,
- 8:15setting limits, validating performance.
- 8:17They're usually the owners of the documentation,
- 8:20making sure the centerline sheets stay current and reflect reality,
- 8:23not what we wished the machine would do ten years ago.
- 8:23And quality's role
- 8:28is to make sure all of this protects the product and the consumer,
- 8:32right?
- 8:32Exactly.
- 8:35Quality validates product integrity at those settings and ensures the
- 8:38centerlines protect food safety.
- 8:40If there are Critical Control Points or Quality Control Points tied to
- 8:44temperature, time, or seal integrity,
- 8:46or vacuum, quality has to approve the limits and any changes.
- 8:50We're not just chasing speed; we're protecting the brand.
- 8:50Finally,
- 8:55leadership has to enforce the discipline.
- 8:57They remove barriers-like giving people time to run Golden Run trials-and
- 9:02they celebrate wins when centerlining improves OEE or reduces downtime.
- 9:06Just as important, they back up the message that you don't get to reinvent
- 9:10settings every shift.
- 9:11There's one documented way to run,
- 9:13and if we're going to change it,
- 9:15we do that through a team process.
- 9:15That brings us to training,
- 9:19because you don't erase years of "my settings are better" with a memo.
- 9:24How do you like to approach training on centerlining?
- 9:24Training has to
- 9:29be hands‑on, visual, and tied to real scenarios.
- 9:33I like to start with a short classroom session-keep it tight.
- 9:36We explain what centerlining is,
- 9:38why it matters, and how it ties directly to MTBF,
- 9:41OEE, and downtime.
- 9:43We show real data where constant tweaking drove performance all over
- 9:47the place.
- 9:47But the long part is line‑side.
- 9:49You walk the machine, show every adjustment point,
- 9:53show the gauges, the scales, the marks.
- 9:55You practice measuring the settings.
- 9:58Then you run a "find the deviation" exercise-intentionally take a couple
- 10:02of points out of centerline and have the team identify what's wrong and
- 10:06walk through the escalation process.
- 10:06I like that because it's not abstract.
- 10:11Operators can see, "When this tension is too high,
- 10:11look what happens to tracking,"
- 10:18or "When we change temperature to chase speed, look at what it does to seals."
- 10:24It connects the dots between numbers and real pain on the line.
- 10:24Exactly.
- 10:30And then we move to certification.
- 10:32Operators should be certified on startup centerline checks,
- 10:36shift‑change checks, material‑change checks,
- 10:39and how to document deviations.
- 10:40The certification isn't about passing a test on terminology; it's about
- 10:45demonstrating they can actually run those checks reliably.
- 10:45Then you need
- 10:49reinforcement.
- 10:50Daily huddles where you review a couple of key settings or a recent deviation.
- 10:54Regular reviews of the centerline board.
- 10:57Using topics like this right here-Maintenance Monday-to keep the idea
- 11:01fresh.
- 11:01And I'm a big believer in monthly refreshers,
- 11:04even if they're short, just to keep people from sliding back into "I'll just
- 11:04tweak it my way."So
- 11:11the behavior shift is: we don't stop thinking,
- 11:14but we stop freelancing.
- 11:16We use data, we use the Golden Run,
- 11:20and when we change, we change together and on purpose.
- 11:20Let's talk about
- 11:26how you know your centerline program is actually working.
- 11:30Because like you said earlier,
- 11:33James, it's not enough to say,
- 11:35"We filled out the sheet." We're trying to move the needle on reliability.
- 11:35That's
- 11:42right.
- 11:42Centerlining is a reliability tool first.
- 11:45So we measure success with reliability and performance metrics.
- 11:49At the top of the list is OEE-Overall Equipment Effectiveness.
- 11:53If your centerlines are solid and people are using them,
- 11:56you should see improvements in all three OEE components.
- 11:56Performance goes
- 12:00up because speed is more stable; you're not yo‑yoing the machine all day.
- 12:05Quality improves because you're not over‑cooking seals,
- 12:08under‑filling, or damaging product with bad settings.
- 12:12Availability improves because you have fewer jams and fewer unplanned
- 12:16stops from "settings drift."Next is MTBF-Mean Time Between Failures.
- 12:22If centerlines are stable, you see fewer setting‑induced failures.
- 12:26Fewer jams, fewer seal issues,
- 12:29fewer film tracking problems.
- 12:31The time between those types of failures gets longer.
- 12:33That's a clear sign the machine is living more of its life inside the
- 12:37sweet spot.
- 12:37And if you can see MTBF improving on the same line where you've
- 12:43also clamped down on shift‑to‑shift tweaking,
- 12:46that's a strong correlation that the discipline is paying off.
- 12:46Exactly.
- 12:52Then we look at MTTR-Mean Time To Repair.
- 12:55Centerlining reduces troubleshooting time because operators know what
- 12:58the correct settings are and deviations are visible.
- 13:01Mechanics aren't spending half their time guessing what somebody changed.
- 13:05So MTTR should come down because you can get to root cause faster.
- 13:05Beyond
- 13:10those primary metrics, we've got secondary ones.
- 13:12MTTF-Mean Time To Failure-is useful for individual components like bearings,
- 13:18seals, belts, and sensors.
- 13:20If your centerlines reduce mechanical stress-less over‑tension,
- 13:24less over‑heat-you should see those components lasting longer.
- 13:24You also
- 13:29want to track centerline compliance rate: what percentage of your settings
- 13:33are within limits at startup, at shift change,
- 13:36and at material change?
- 13:38Then look at the number of out‑of‑centerline events.
- 13:41That number should trend downward as the program matures.
- 13:41And there's
- 13:45that behavior‑driven metric you mentioned earlier: number of adjustments
- 13:49per shift.
- 13:50On a stable line, that should drop,
- 13:53right?
- 13:53Absolutely.
- 13:55A healthy centerline program means operators aren't constantly riding
- 13:59the controls.
- 14:00You should see fewer and fewer tweaks per shift.
- 14:03That's a sign that people trust the Golden Run and the equipment is actually
- 14:06staying there.
- 14:06Now, the question I get a lot is,
- 14:09"Should these metrics and checks live inside the PM program and the CMMS?"
- 14:13The answer is absolutely yes.
- 14:16That's how you build a closed‑loop reliability system.
- 14:16In your PM program,
- 14:21you should have tasks that include centerline verification,
- 14:24calibration checks on the critical adjustment points,
- 14:27wear‑point inspections that tie back to your MTTF targets,
- 14:30and lubrication that supports your MTBF goals.
- 14:33Those PMs should reference the actual centerline sheets,
- 14:36the limits, and even photos of the key points.
- 14:36In your CMMS,
- 14:41you should be tracking MTBF by asset,
- 14:44MTTF by component, work orders related to centerline issues,
- 14:48deviations logged by operators,
- 14:50PM compliance, and repeat failures tied to settings.
- 14:53When you start to see patterns-like one line constantly drifting out
- 14:57of centerline-you've got the data to go fix the real problem.
- 14:57So centerlining
- 15:02isn't this side project that lives in a binder on the shelf.
- 15:06It's built into the daily work,
- 15:08the PMs, and the way the CMMS is used to make decisions.
- 15:08Exactly.
- 15:14And that brings us to what I call the real test of a centerline program.
- 15:18You know it's working when operators can run the line without constant
- 15:22adjustments.
- 15:22The machine starts up fast and clean.
- 15:25Downtime from "settings drift" basically disappears.
- 15:25You see MTBF increasing,
- 15:31OEE stabilizing instead of bouncing all over the place,
- 15:34and your PMs becoming more predictive and less reactive.
- 15:37And most importantly, the line runs the same on every shift.
- 15:41It doesn't matter who's on the controls-you get consistent results
- 15:41because
- 15:45everybody's running to the same Golden Run.
- 15:45And that consistency is huge.
- 15:51It builds trust between operations,
- 15:54maintenance, engineering, and quality.
- 15:56Nobody's pointing fingers at "that shift" anymore because the data and
- 16:01the discipline are there.
- 16:01That's right.
- 16:04When you get to that point, you've built more than a binder of settings-you've
- 16:08built a reliability engine.
- 16:09And centerlining becomes part of how you run the business,
- 16:12not just a project of the month.
- 16:12Alright,
- 16:15that's going to wrap us up for Maintenance Monday Episode 9 on
- 16:15centerlining
- 16:19equipment.
- 16:20Michelle, thanks again for filling in while Laura's out on assignment.
- 16:20Thanks
- 16:25for having me, James.
- 16:26This is such a foundational topic,
- 16:29and I hope folks take it back to their plants and really look at those
- 16:33habits around machine settings.
- 16:33We appreciate you joining us here at FSO
- 16:38Institute Reliability Maintenance and Maintenance Monday.
- 16:41I'm James Couch, here with Michelle Reynolds.
- 16:43Take a look at your own centerlines this week,
- 16:46and we'll catch you on the next Maintenance Monday.
- 16:48Remember to keep your people safe and your food safe,
- 16:51take care everyone.