Lightning Mitigation Case Study: StrikeTape Installation on US Wind Farm
Weather Guard Lightning Tech
Lightning Mitigation Case Study: StrikeTape Installation on US Wind Farm
A west Texas Wind Farm installed StrikeTape as a retrofit lightning protection solution. During the 16-month period following the installation there was zero lightning damage to the wind farm’s 37 GE turbines.
This report outlines the installation process, environmental conditions, and performance results, demonstrating the technology’s effectiveness in mitigating lightning-related downtime and reducing maintenance costs.
Project Overview
Location: West Texas (Central U.S.) wind…