Latest / AV SuperFriends / AV SuperFriends: On Topic - Some of this sounds like a spreadsheet problem
Transcript
- 0:05AV Super Friends On Topic is an
- 0:07independent production wholly owned and
- 0:08operated by AV Super Friends, LLC.
- 0:11For the highest quality recording of all
- 0:12of our shows, visit avsuperfriends.com.
- 0:15Before we begin another thoughtful,
- 0:17focused episode of AV Super Friends On
- 0:20Topic, we need to address some of you.
- 0:23And you know who you are.
- 0:26You listen to On Topic because it has
- 0:27a clear subject, a manageable runtime,
- 0:30and the comforting illusion that we are
- 0:32serious professionals.
- 0:34But while you've been hiding here in the
- 0:35safe, respectable part of the feed,
- 0:38you've missed Off the Rails,
- 0:39where we discuss the following topics.
- 0:42At Infocomm,
- 0:43we discovered every product now has an
- 0:45API,
- 0:46everything has been lightly seasoned with
- 0:48AI,
- 0:49and the more mystery boxes Justin adds to
- 0:51a system,
- 0:52the cheaper it apparently becomes.
- 0:55Then we investigated classroom ownership
- 0:57and learned that universities have general
- 0:59purpose rooms, departmental rooms,
- 1:02shared rooms, covered rooms,
- 1:04rooms nobody will pay for,
- 1:06and rooms assigned through what appears to
- 1:07be a poorly regulated pyramid scheme.
- 1:11We also accidentally developed an
- 1:13unauthorized CTS study guide based on
- 1:15ignoring the math,
- 1:16leaving work before five,
- 1:18and determining sound levels from the
- 1:20hallway.
- 1:21Also somehow, document cameras are back,
- 1:24emerging from storage closets like beige
- 1:26plastic cryptids demanding VGA adapters.
- 1:30You missed all of that because you only
- 1:32listened to on-topic.
- 1:34That's not being selective.
- 1:36That's neglect.
- 1:37So after today's episode,
- 1:39go back and listen to off the rails.
- 1:41All of it.
- 1:42You clearly have some catching up to do.
- 1:50This is AV Superfriends On Topic,
- 1:52a thirty-minute monthly roundtable focused
- 1:54on a single topic.
- 1:55This discussion will be opinionated,
- 1:56to the point,
- 1:57and saturated with our well-known blend of
- 1:59painfully won expertise and deeply
- 2:01ingrained immaturity.
- 2:10For July, July, July, July, July, July,
- 2:11July, July, July, July, July, July, July,
- 2:26Confuse the heck out of me.
- 2:28Broadcasting live from the loading dock to
- 2:30the lectern,
- 2:30from the cable spool to the control room,
- 2:32pulling wire, mounting displays,
- 2:33terminating connectors, tuning DSPs,
- 2:35and commissioning classrooms without
- 2:37submitting a change order.
- 2:38We're rack builders, button pushers,
- 2:40signal switchers,
- 2:40and occasional institutional
- 2:41troublemakers.
- 2:42I'm Chris Decker.
- 2:43You're tuning in for another Friday
- 2:44afternoon podcast adventure with the ABC
- 2:45for Friends.
- 2:46And let's say hello to that panel,
- 2:47a slightly expanded panel today.
- 2:49Get that in a moment with this one.
- 2:51Oh, man.
- 2:52All right.
- 2:54Our first panelist builds internal AV
- 2:56capability, one crooked rack shelf,
- 2:58mislabeled patch panel,
- 2:59and increasingly nervous dean at a time.
- 3:02He's a director of in-house rack stacking
- 3:04and institutional confidence from Kansas
- 3:06City.
- 3:06Say hello to Mr. Jamie Reinhart.
- 3:08Hi there.
- 3:09It's all a house of cards,
- 3:10but if you're a cheerleader, it works.
- 3:15Cheerleader?
- 3:15A house of cards?
- 3:16A what?
- 3:16Okay.
- 3:17I didn't get that.
- 3:18No one got that.
- 3:18You want to try again?
- 3:19You want to go back to one?
- 3:22Well, I was trying to build confidence.
- 3:25Our next panelist intercepts one tiny
- 3:30change request before they evolve into
- 3:32full auditorium renovations with no added
- 3:34budget.
- 3:35He's a senior manager of scope, creep,
- 3:36capture, and containment from Corvallis,
- 3:38Oregon.
- 3:38Say hello to Mr. Mark Kolosinski.
- 3:40We can catastrophize anything into a
- 3:42project if we try hard enough.
- 3:45If it's not a project,
- 3:45I'm not doing work on it.
- 3:46That's right.
- 3:46It's into the world, though.
- 3:49Our next panelist transforms three student
- 3:50workers, a borrowed crimp tool,
- 3:52and half an online training course into a
- 3:53campus integration department.
- 3:55He's an assistant dean of student labor,
- 3:56signal flow,
- 3:57and questionable certifications from
- 3:59Greensboro, North Carolina, Salem, Mr.
- 4:00Larry Darling.
- 4:01Yeah, that's not even a joke.
- 4:03That's exactly what I did at Butler.
- 4:06Three students, and we took it over.
- 4:08Did you ever give back that crimp tool?
- 4:10No, I took it with me.
- 4:14Our next panelist oversees the
- 4:16university's strategic transition from
- 4:18call the integrator to let's give Steve a
- 4:20ladder and see what happens.
- 4:21He's a vice president of vertical
- 4:23integration and horizontal cable
- 4:24management from Bowling Green, Kentucky.
- 4:26Say hello to Mr. Justin Rexing.
- 4:28This is the actual real job.
- 4:29And I don't know who Steve is,
- 4:31but we're going to have him put it
- 4:32on the table.
- 4:32Let's give Steve a laugh and see what
- 4:34happens.
- 4:35It's a real job.
- 4:36It's super important.
- 4:38And joined by a special guest panelist,
- 4:40he personally assembles classroom systems
- 4:41while insisting that the smoke you see is
- 4:43normal, the firmware is up-to-date,
- 4:46and facilities approved all these new
- 4:47holes in the furniture.
- 4:49He's a lead fabricator of lecterns and
- 4:51liability waivers from Clemson,
- 4:52South Carolina.
- 4:53Say hello to Mr. Tim Dixon.
- 4:59Glad to be here.
- 5:00Thanks.
- 5:00So on today's show,
- 5:03we're going to discuss building up your
- 5:05own internal AV integration team at your
- 5:07college university.
- 5:08But first, and everyone hates this,
- 5:10a little bit of housekeeping.
- 5:11That's why we get it out of the
- 5:12way at the beginning.
- 5:12So if you're listening to this as a
- 5:13recorded MP three, congratulations.
- 5:15The system has been commissioned.
- 5:16The firmware has stopped updating and
- 5:18someone finally found the correct USB
- 5:20audio device driver on the room PC.
- 5:21we stream live on friday is that about
- 5:23three fifteen eastern or twelve fifteen
- 5:24pacific or whenever the heck i get my
- 5:26act together today because i'm obviously
- 5:27on a different setup and i mess with
- 5:28all my settings and all that crap i
- 5:30can barely tell chris yes it's amazing you
- 5:32can join us for that live on twitter
- 5:34linkedin and youtube uh if you can't join
- 5:35us live we still want you to connect
- 5:36with us on the socials you can follow
- 5:38us on av super friends on twitter blue
- 5:39sky linkedin youtube all those fun places
- 5:42please don't forget to spread the word if
- 5:43you could share this podcast with your
- 5:44co-workers campus partners consultants
- 5:46integrators electricians networking teams
- 5:48facility staff and the associate dean who
- 5:49just discovered
- 5:51that classrooms now contain technology.
- 5:53Recommend it to anyone who's thinking
- 5:54about building an internal AV integration
- 5:56team or someone who's currently paying an
- 5:57outside integrator two hundred dollars an
- 5:59hour to come in and troubleshoot something
- 6:00to discover the display was unplugged.
- 6:03If you really want to help,
- 6:04you can grab a hard hat,
- 6:05a label maker, a fiberglass ladder,
- 6:06and then wander around campus telling
- 6:08everyone you're part of the new internal
- 6:09AV integration team.
- 6:10Start pulling cable, updating drawings,
- 6:12correcting racked elevations,
- 6:13and quietly replacing every undocumented
- 6:15HDMI extender you find.
- 6:17By the time anyone asks who authorized
- 6:19this project,
- 6:19you'll already have a full standards
- 6:20document and three rooms undergoing
- 6:22commissioning.
- 6:23If you want to support our show,
- 6:24please consider donating.
- 6:25Your contributions help us to keep
- 6:26bringing you the honest content that you
- 6:27love or that you love to hate and
- 6:29allow us to maintain our own internal
- 6:30podcast integration team consisting of
- 6:32several opinionated professionals,
- 6:34one functioning network switch,
- 6:35and a growing pile of USB audio adapters
- 6:37that no one's really willing to throw
- 6:39away.
- 6:40You can find the donation link for that
- 6:41in our show notes or at the website.
- 6:44So thank you for listening.
- 6:45Please build your team,
- 6:46document your systems,
- 6:47label both ends of the cable,
- 6:48not just one, but both.
- 6:49What?
- 6:50Preferably with the same label.
- 6:52Oh, come on.
- 6:53And remember,
- 6:53it's only an internal integration AV
- 6:55department after somebody gives you a
- 6:56storage room full of old discontinued
- 6:58equipment and calls it a budget.
- 6:59So thanks for your support.
- 7:00We could not do this without you.
- 7:02We bought this back then.
- 7:03We could probably still use it, right?
- 7:05I still have a bunch of brand new,
- 7:06like, new in-box gear that has, like,
- 7:09you know, ship dates on it,
- 7:09and the ship dates are, like, so thanks.
- 7:11That's still good.
- 7:13There's life in that.
- 7:15I don't know who's life.
- 7:16I can't bring myself to get rid of
- 7:17it, but, you know, there it is.
- 7:18They aren't open.
- 7:19so uh yes yeah i'll make sure the
- 7:21smoke gets out of it right now don't
- 7:23let the magic smoke out so uh tim
- 7:25today is your fault um yes apparently this
- 7:29was a topic that uh you came up
- 7:30and i'm justin i'm going to turn it
- 7:32over to you tim came up to was
- 7:33bending your ear about this and you're
- 7:35like we're going to get you on the
- 7:36show and we're going to talk about all
- 7:37this stuff and see how's it going and
- 7:39what we're doing and all that fun stuff
- 7:40so justin said shut up i'm going to
- 7:42think that tim was so inspired by this
- 7:45life-changing course that i taught at
- 7:47avixa
- 7:48What four years ago,
- 7:50with Justin and Justin was like the most
- 7:53phenomenal class he's ever had.
- 7:56He decided to create his own team.
- 7:57And this class is how to develop staff
- 7:59and, and, you know,
- 8:01standard operating procedures and training
- 8:04and all that good stuff.
- 8:06What was the name of it?
- 8:09Managing staff.
- 8:11Clever.
- 8:12Managing staff and... I think it's just...
- 8:16That's it now.
- 8:17Oh,
- 8:17you guys got rid of the last half?
- 8:19Yeah.
- 8:21Managing.
- 8:22Managing.
- 8:22Now it's just going to be managing.
- 8:24It's just going to be staff.
- 8:25We'll see.
- 8:27But he was so inspired.
- 8:29that long ago that he decided to build
- 8:31his team.
- 8:31And I think Tim reached out to me
- 8:33on LinkedIn and was like, Hey,
- 8:35got some questions.
- 8:37This thing's in a hurry.
- 8:39We're building it right now.
- 8:41And so Tim, I guess,
- 8:43just tell us about when you started this
- 8:46process and what challenges you went
- 8:49through and where you are today,
- 8:51because I'm assuming you just dealt with
- 8:53integrators.
- 8:54And now you're trying to build up your
- 8:55internal team to take on some of that.
- 8:57What is it you had the nerve to
- 9:00ask Justin to help you figure out?
- 9:02That's really what we're trying to figure
- 9:03out here.
- 9:05I see that's my downfall right now.
- 9:07He's starting to see his air.
- 9:08He's like, wait, what have I done?
- 9:13So I started Clemson about thirteen years
- 9:15ago and there was already an internal
- 9:17team.
- 9:17It was class tech, tier one support.
- 9:19We go out and we fix all the
- 9:22broken projectors and push the buttons for
- 9:25all the people and make that stuff work.
- 9:27And as my role has continued,
- 9:30I've done a lot more design to be
- 9:33involved with capital projects.
- 9:35Well,
- 9:36trying to manage the team of four techs
- 9:38and also design my classroom,
- 9:40do programming and capital projects is
- 9:43really tax it.
- 9:44We've got about three hundred classrooms
- 9:46and we've bringing on two actually one new
- 9:49campus seven buildings and then another
- 9:52campus or another main building on campus
- 9:54so eight buildings that have to be
- 9:56commissioned before the end of August and
- 9:59I am running into so many headaches about
- 10:01so many
- 10:02Missed opportunities, wrong floor boxes,
- 10:05the parts were ordered late,
- 10:07they get changed, missed drawings.
- 10:09Who's going to commission the systems?
- 10:12Because it started out as an external AV
- 10:14consultant, handed over to an architect.
- 10:17The architect says, yeah, we got it.
- 10:18Let's put some of this stuff in the...
- 10:20I'm getting there.
- 10:24Let's put some of this stuff on the
- 10:26EC,
- 10:27put some of this stuff on the GC,
- 10:30and just ignore the rest.
- 10:31A complete nightmare.
- 10:35So I'm talking with my facilities folks,
- 10:37and they're like, yeah,
- 10:37this is a great idea.
- 10:39And then I talk to my supervisor.
- 10:40What's a great idea?
- 10:41Yeah, we need to do that.
- 10:43I'm sorry, to expand my team.
- 10:45So I want to be able to hire
- 10:48on essentially a field supervisor with two
- 10:51dedicated project technicians that could
- 10:54float in the classroom whenever they're
- 10:56not busy.
- 10:57Can I pause you real quick?
- 10:58Why did you have to talk with facilities
- 11:00to do this?
- 11:01Yeah, I was curious about that too.
- 11:03The ever important dollar.
- 11:06I don't have it.
- 11:07You work for IT though.
- 11:09I do work for IT,
- 11:10but facilities is the one that's paying
- 11:12the outside AV consultant and the outside
- 11:15AV contractor and the AE and the architect
- 11:19and all of that.
- 11:20So they've got the money.
- 11:21You want to divert those funds from going
- 11:23external to move them internal.
- 11:24That's interesting.
- 11:25You got it.
- 11:26You got it.
- 11:27So trying to get them on board as
- 11:29an option, the buy-in.
- 11:32Got some buy-in from that.
- 11:34And then, yeah,
- 11:35I know that's your keyword, Justin.
- 11:36That's the keyword in our class.
- 11:37We say that every hour, buy in,
- 11:38get the buy-in.
- 11:40So, I approached my supervisor,
- 11:42who's the VP of customer success,
- 11:44and I'm like,
- 11:45here's what I want to try to do.
- 11:47He's taken it to my CIO,
- 11:49and everybody's like, yeah,
- 11:50this sounds great, this sounds great.
- 11:52I still don't have the money for it,
- 11:54but before I finalize with my CIO...
- 11:59Before I get things really finalized with
- 12:01my CIO,
- 12:02I just want to bounce some ideas off
- 12:04of what do I actually need?
- 12:06So my idea is with my CTSD,
- 12:10I'll do all the design.
- 12:11Let me interface with the architect,
- 12:13get that stuff out there.
- 12:15I can do CAD,
- 12:17but it's not a strength.
- 12:19So maybe I can share that with the
- 12:21facilities folks.
- 12:22They should have a CAD person.
- 12:22Yeah, you can figure that part out.
- 12:23Yeah, but I do want to...
- 12:28a design apprentice, so to speak,
- 12:30that I can train up and help me
- 12:33out, visit some sites whenever I can,
- 12:35check me to make sure I did all
- 12:36of my coverages right and my distances
- 12:39right,
- 12:39that kind of stuff to bounce off of.
- 12:42I've got a good programmer in place now.
- 12:46I know I'm hitting all Justin's keys.
- 12:48Nobody agrees with everything you're
- 12:50saying, Tim.
- 12:50We agree with you.
- 12:51Don't bring up your dirty math shit again.
- 12:53That's not real.
- 12:56So, yeah,
- 12:57I just wanted to make sure I was
- 12:58just hitting kind of the here's what I
- 13:01really want this to be.
- 13:04What's the minimum I need to be asking
- 13:06for now versus later?
- 13:08So are you I'm trying to set the
- 13:10stage here, so to speak.
- 13:12Are you trying to build out an integration
- 13:16team or are you also going to be
- 13:18having these people involved in the
- 13:21support mechanism of the department as
- 13:23well?
- 13:24That was my question,
- 13:25like your support staff,
- 13:28can they supplement the install staff or
- 13:32are they completely separate groups?
- 13:35Yeah,
- 13:35so the phase one ask was give me
- 13:39a field engineer or a field supervisor and
- 13:42at least one other person and I can
- 13:45run all of the documentation and we'll
- 13:48hire an external AV contractor to actually
- 13:50do the installation.
- 13:51We'll come back and commission.
- 13:54The other ask is to bring on the
- 13:57extra technicians, and, yes,
- 13:58they would be floating.
- 14:00They would be shadowing.
- 14:00Whenever classroom support's needed,
- 14:03the project guys get in the classroom.
- 14:04Whenever there's project support needed
- 14:06because there's just too many displays to
- 14:08hang in a day and the classroom's
- 14:10available,
- 14:11they would cross over and see that aspect
- 14:13as well.
- 14:14So, yeah,
- 14:14there would be a lot of crossing over,
- 14:16but there would be some primary duties of
- 14:19you're needed here,
- 14:20you got to take care of this,
- 14:21then you can go help with the other.
- 14:23so it sounds like you're trying to keep
- 14:25the knowledge labor in-house and you're
- 14:27not so worried about outsourcing the
- 14:29installation labor that's a nice cool fire
- 14:33alarm thing what was that yeah kind of
- 14:36sorry so um i mean i'm not against
- 14:44the the outside contractor we've got some
- 14:46good folks in this area that i don't
- 14:47mind using um
- 14:49as long as I get them the right
- 14:50documentation.
- 14:51I've done a couple of these kind of
- 14:53like trial small-scale type runs,
- 14:56just a room here close to us on
- 14:59campus and then a room down on the
- 15:01coast, put all the documentation together,
- 15:04put the specifications together,
- 15:05here's the requirements,
- 15:06here's how the system's going to work.
- 15:08And I had one little hiccup with some
- 15:10programming.
- 15:11The user kind of changed how they wanted
- 15:13that,
- 15:13but
- 15:14Ultimately,
- 15:14it went in very easy and without any
- 15:17difficulty.
- 15:18The right cables got put in the right
- 15:19place, the right parts,
- 15:21and those were really easy.
- 15:25I've got another large project I'm working
- 15:27on now, larger, several rooms,
- 15:30and it's from the ground up, essentially.
- 15:33They gutted some basement stuff,
- 15:35and they're putting new stuff back in.
- 15:36So I've been heavily involved with that.
- 15:38They told me, oh,
- 15:39you've got low ceiling heights.
- 15:40I was like, wait a minute.
- 15:42a six foot tall projection screen here.
- 15:44And you're telling me the room's only
- 15:46seven and a half foot tall.
- 15:47We got to figure out something else.
- 15:49Perfect.
- 15:49So, yeah.
- 15:50So I'm well aware of that.
- 15:52And I'm trying to get that, again, buy-in.
- 15:54I've got a lot of project managers for
- 15:57Clemson on my team.
- 15:58I just get the buy-in and then what
- 16:03do I actually need to be asking for?
- 16:04I'm asking for too little or too much.
- 16:06So how broad...
- 16:10are you involved with the overall kind of
- 16:12campus plan?
- 16:14How much insight do you have?
- 16:15Do you know what's going on five years
- 16:17from now, ten years from now?
- 16:20I don't get involved that far in advance.
- 16:23They are including me more with
- 16:24feasibility studies.
- 16:26Hey,
- 16:26we're going to take this building down,
- 16:28probably put this building up.
- 16:29What's the AV cost if we've got
- 16:32this many classrooms, flip rooms,
- 16:34auditoriums, that kind of stuff.
- 16:35So they are bringing me into feasibility
- 16:37studies to get some rough numbers.
- 16:38Because I think when you start talking
- 16:40about building FTE, like bringing in,
- 16:42hiring people full-time in your
- 16:43organization,
- 16:45I think that forecast becomes really
- 16:47important, right?
- 16:48And so where are your needs going to
- 16:52have this requirement over the next five
- 16:55to ten years?
- 16:56Do you have enough stuff in the pipeline
- 16:58that says I can warrant bringing in all
- 17:00these people in the name of this capital
- 17:02construction and all these projects and
- 17:03all that stuff moving forward,
- 17:05or is the play support plus?
- 17:09In my mind, I'm trying to figure out,
- 17:10am I scaling to meet construction and
- 17:12capital expansion,
- 17:13or do I have growth that I need
- 17:15in the support side that I can get
- 17:17those people to assist with and get to
- 17:19cover both these pieces?
- 17:20Because everything you build new,
- 17:22you also have to support, right?
- 17:24And so there's going to be some expansion
- 17:26piece all the way around the board.
- 17:27And so I know that FTE don't come
- 17:30easy in these places.
- 17:31That's why I look to like,
- 17:32what does that forecast look like?
- 17:34Do you see more construction?
- 17:36Do you see more growth opportunity?
- 17:38Or is this like a onesie, twosie,
- 17:40maybe a refresh here or something like
- 17:42that?
- 17:42So that density of ask becomes important,
- 17:45at least how I would go about staging
- 17:48the ask to get that buy-in.
- 17:50And another way to go about that,
- 17:53you've mentioned a lot of capital projects
- 17:55and new things like that.
- 17:58The way I did it at Butler was
- 18:01I was able to show a significant savings
- 18:06in the yearly refresh cycle of classrooms.
- 18:10Like when I showed them that I could
- 18:12save them a hundred thousand dollars every
- 18:14year by building an internal staff,
- 18:17that's where the funds started to open up
- 18:20for it.
- 18:22We're kind of similar.
- 18:24We started just not allowing integrations
- 18:27to do the everyday monotony of the
- 18:30refresh.
- 18:32And by doing that, now I can,
- 18:33like Larry said,
- 18:34I can justify having a staff of six
- 18:36or seven, right?
- 18:37And the knowledge workers, too.
- 18:40So now you have your tech crew and
- 18:43your designer, your programmer,
- 18:45your management, whatever you need.
- 18:47Because just doing that,
- 18:50if your cost to overturn a class,
- 18:53turn over a classroom is thirty five
- 18:55grand,
- 18:56but the integrators cost a sixty grand and
- 18:58then multiply that by three hundred.
- 19:00Now,
- 19:00all of a sudden you showed and that's
- 19:02just the everyday monotony of university
- 19:04life.
- 19:05That's not capital.
- 19:06And then on top of that,
- 19:07we are able to say, oh,
- 19:08and by the way,
- 19:11because I'm sure you guys ebb and flow
- 19:13with your capital projects, too.
- 19:14It seems like we get four or five.
- 19:16Then all of a sudden there's this kind
- 19:17of like this.
- 19:17this little trough and that's where you
- 19:19squeeze in some of these.
- 19:21So now you can admin flow with that
- 19:22too,
- 19:23but that's how we built our reputation.
- 19:26And I was able to justify our staff
- 19:28because at the end of the day,
- 19:29they're willing to shell out money for the
- 19:31everyday experience for the teachers and
- 19:33faculty.
- 19:34where the capital project is one-time
- 19:36monies here and there,
- 19:37and they can just hire a guy.
- 19:39We'll just hire a guy.
- 19:40And Jamie, most important,
- 19:40the capital funds are often it's,
- 19:42it's donor funding.
- 19:43It's some sort of campaign.
- 19:44It's magic money that comes from somewhere
- 19:46else.
- 19:47So people don't care how it might affect
- 19:49that.
- 19:49That's a twelve million dollar project
- 19:50already.
- 19:51I don't care if you're going to save
- 19:52me three hundred grand.
- 19:53But and and if you can say that,
- 19:54I say, well, hey, we have the expertize.
- 19:56We've been doing this for years or we
- 19:59take care of the rest of the campus.
- 20:01I can easily take on this building when
- 20:03it comes up.
- 20:03We have to support it anyway.
- 20:05Year over year for the next three years,
- 20:07we're going to save you two hundred fifty
- 20:09thousand dollars on this project.
- 20:11plus the ongoing support.
- 20:13That's how I was able to build my
- 20:15staff up.
- 20:16That's how right now I'm even doing some
- 20:18modifications and saying, Look,
- 20:19I might need a junior designer.
- 20:22Like I have a design person,
- 20:24I like I like Tim's phrase,
- 20:25a design apprentice, a design apprentice,
- 20:28I'm going to be able to start that
- 20:29up when I was able to,
- 20:32I can now do like a programming and
- 20:34a program or two,
- 20:36because I can justify using them for
- 20:38everything else.
- 20:41And even cleaning up some of the BS
- 20:43that I've inherited from other places,
- 20:45right?
- 20:45Because every so often you get one of
- 20:47those.
- 20:48Like,
- 20:48what do you mean the conservatory bought
- 20:50their own system from whiz-bang down the
- 20:53street?
- 20:54That thing sucks.
- 20:55I'll fix it when their warranty runs out.
- 20:58Boom, done.
- 20:58I fixed it in a couple of days.
- 21:01Now I can justify that cost, right?
- 21:03So that's how we kind of started building
- 21:05that staff.
- 21:07and justifying that staff with ongoing
- 21:09money because it was directly tied to
- 21:11everyday operations within the university
- 21:13where capitals just aren't.
- 21:15They're not tied to everyday operation.
- 21:18It's daddy.
- 21:18We're less sustainable that way.
- 21:20Right.
- 21:20And so I think that's you're trying to
- 21:22build security for the staff that you're
- 21:23going to to advocate to get.
- 21:25And I think if if money is kind
- 21:27of figured out and you understand what
- 21:28that trajectory looks like, you know,
- 21:30the capital projects, you know,
- 21:31your support is you have the foundations.
- 21:33OK, here's how I can sustain these people.
- 21:36But then let's pretend like, OK,
- 21:37we have that.
- 21:38So what types of people make sense if
- 21:42that is the take?
- 21:43And I think mileage may vary on,
- 21:46at least from where I'm at and my
- 21:47vantage point,
- 21:49taking stock of what you do have.
- 21:50Do you have people that can be tooled
- 21:52into additional roles?
- 21:53Do you have a really strong student
- 21:55pipeline?
- 21:56Do you have kind of what subject matter
- 21:59expertise do you currently have
- 22:01Because I think if you're going to go
- 22:02out and buy high end skill,
- 22:04it's going to cost you a whole lot
- 22:06more than kind of building the utility
- 22:08skill and kind of manufacturing those
- 22:10positions as you grow and those needs kind
- 22:12of proliferate.
- 22:14I also,
- 22:15I'm going to tag on to marks and
- 22:18then change.
- 22:18But I also like the internal growth as
- 22:21well.
- 22:23Because as you identify some of your
- 22:26technicians,
- 22:26they're going to start gravitating.
- 22:28They're going to self-gravitate to
- 22:30experiences.
- 22:31You're going to have these,
- 22:32just your everyday techs,
- 22:33and some of them are going to say,
- 22:34I really want a program.
- 22:36Awesome.
- 22:36Let's get you there.
- 22:37I really like project management.
- 22:39Nobody does.
- 22:39Nobody does.
- 22:40Let's pretend.
- 22:42I want to design.
- 22:43Tell me more about design.
- 22:44Tell me more about physics.
- 22:46And then you say, that doesn't exist.
- 22:49It's a unicorn.
- 22:50Do not listen to Justin.
- 22:51But I think they help.
- 22:55I've also found it's a lot easier to
- 22:57get a pay rate
- 22:59by growing your,
- 23:01like a pay rate increase by growing your
- 23:03internal staff.
- 23:04So sometimes our staffs at universities
- 23:06are undercompensated for the work they do.
- 23:09Sometimes.
- 23:10Sometimes.
- 23:11Many times, often.
- 23:13But it's easier for me to justify a
- 23:15significant pay raise if they become a
- 23:17knowledge worker.
- 23:19So it's almost choose your own adventure
- 23:21so that I can take care of you
- 23:23and you can take care of me.
- 23:27But I do like that building from the
- 23:28inside.
- 23:28I'm currently doing that now.
- 23:30I also like my other pivot was I
- 23:33like that you've already got a
- 23:34relationship with facilities.
- 23:36Because if you have a positive
- 23:38relationship with facilities,
- 23:39maybe it's not just the capital projects,
- 23:41but maybe they're doing floors.
- 23:44We're going to redo floors over here in
- 23:46this other classroom building.
- 23:48Awesome.
- 23:49Well,
- 23:49we're going to come in and we're going
- 23:50to remove our podium, our lectern.
- 23:53And then we're going to kind of refresh
- 23:55that and put it back in at the
- 23:57same time because we already have to do
- 24:00the work.
- 24:01And while we're doing that during your
- 24:03project,
- 24:03now they might throw in a couple of
- 24:04pennies to help you with electricity,
- 24:06to help you with conduits,
- 24:08to help you with this other thing.
- 24:10Now you can go back to your administration
- 24:11and say,
- 24:12because I have this relationship with
- 24:13facilities,
- 24:14because we have these room overhauls and
- 24:17that relationship,
- 24:18we're also saving money on every one of
- 24:20those because we're part of their
- 24:21business.
- 24:22painting project,
- 24:23we're part of their tiling project,
- 24:24we're part of their carpet,
- 24:25they're part of the ceiling replacements.
- 24:27Cause you're gonna get called in anyway,
- 24:29man.
- 24:29They're gonna call you,
- 24:30come in and take all those speakers out.
- 24:32Awesome.
- 24:33So how can you pick me up?
- 24:34I'm already giving that away for free.
- 24:36Yeah, we've been doing that.
- 24:38We go through and this auditorium is gonna
- 24:40get a seating refresh and carpet and this
- 24:42and that.
- 24:43All right,
- 24:44what year are you gonna do that?
- 24:45I'll work that into my LCR.
- 24:47So we already do that part.
- 24:49So at least you have that relationship
- 24:52that you can say, oh,
- 24:53and by the – my extra staff is
- 24:56going to allow me to do that quicker,
- 24:58easier,
- 24:59more nimble because they don't always tell
- 25:01you, right?
- 25:02We've all been there.
- 25:03Hey, can you come move this?
- 25:04We're going to start tomorrow.
- 25:05This morning that actually happened.
- 25:07I had one of those one day this
- 25:08week.
- 25:08Yeah.
- 25:09Yeah.
- 25:13Tim, I had a quick question.
- 25:15You mentioned that you have about three
- 25:19hundred classrooms.
- 25:21Are those all general inventory or those
- 25:23departmental spaces?
- 25:25Oh, God, here we go.
- 25:26I'm just saying that does impact the
- 25:28funding model of support.
- 25:30Right.
- 25:30Does it?
- 25:32It does on most schools.
- 25:33It does for me, yeah.
- 25:35I've heard of every university.
- 25:37You have?
- 25:39The provost back in twenty nineteen did a
- 25:41reclamation of about seventy rooms and got
- 25:43me up to a total of three hundred
- 25:44general inventory rooms.
- 25:46I still have conference rooms and labs and
- 25:49special labs, wet labs,
- 25:50all that stuff for chemistry, bio,
- 25:52that kind of stuff.
- 25:53They maintain those.
- 25:55They call me in for them.
- 25:57I treat it like I'm an outside integrator
- 25:59and I design it, I price it,
- 26:01I purchase it, I install it, program it,
- 26:03commission it.
- 26:04And then we give them a first year
- 26:06support for free.
- 26:08After that,
- 26:08if you want to be on the same
- 26:10level as the general inventory,
- 26:13and a priority,
- 26:14then here's an SLA that you pay and
- 26:16he makes an extended warranty stuff out of
- 26:19it.
- 26:19Have you considered kind of commandeering
- 26:22that person?
- 26:23Like if they have their own departmental
- 26:25biology AV person and saying, huh,
- 26:28you know,
- 26:29if you'll help me pay for their salary,
- 26:31I'll take them under my wing,
- 26:32get them traded up.
- 26:33And now if there's no SLA and you
- 26:37just kind of pirate their person.
- 26:40Yeah, there's not a department AV person.
- 26:42We have college consultants that are
- 26:44basically desktop help that go around and
- 26:47make the desktops work.
- 26:51I pitch that to some of our more
- 26:53hands-on crews,
- 26:55like the business schools or the student
- 26:58where they're always having,
- 26:59they always want some extra support from
- 27:01us.
- 27:01Can you do after hours?
- 27:02Can you do white glove service?
- 27:06Well, I can't, but I'll tell you,
- 27:08it's going to be a per hour charge
- 27:10or whatever your model is.
- 27:12But if you would hire a person and
- 27:15then give them to me to manage,
- 27:17now you have an extra person.
- 27:20Sure.
- 27:21I usually dump that off.
- 27:23Sure.
- 27:23They ask me for after-hours support.
- 27:25I ask my student workers, hey,
- 27:27you want to make a couple extra bucks
- 27:28this weekend?
- 27:29Go contact them.
- 27:31It's paid outside the whole system.
- 27:32Oh, paid outside.
- 27:33They pay directly into their – yep,
- 27:35cut them a check,
- 27:35and I don't have to worry about managing
- 27:37any of those hours or anything.
- 27:39Oh, well, that's – okay.
- 27:40That's another way to handle it.
- 27:41Because we're not allowed to do that,
- 27:43so I just try to rewind it.
- 27:46I'm going to go back to the process
- 27:48a little bit.
- 27:48You said you're going to hire a design
- 27:50apprentice.
- 27:51Maybe not.
- 27:52They do the documentation.
- 27:53Kind of thinking about capital projects
- 27:55here.
- 27:55I'm in the middle of one where I'm
- 27:58acting as the principal design consultant
- 28:02on it.
- 28:02So how do you see that playing out
- 28:04with capital projects?
- 28:05Maybe you've already done one where...
- 28:07So the documents are getting submitted
- 28:10into the entire bid set and you're bidding
- 28:12it out to another integrator and then the
- 28:14integrator is doing the intensive labor
- 28:17part.
- 28:18Are you all coming in after that and
- 28:21punching it out and then wiping their
- 28:23program and putting yours on?
- 28:24What does that look like as far as
- 28:27you supporting the system when it's done
- 28:29and are you the one signing off that
- 28:31they are done?
- 28:34That would be where I want to be.
- 28:36It's not where we're at now.
- 28:38My programmer does have a framework that
- 28:40we are skeleton for the programs we give
- 28:42out.
- 28:43We give them the actual GUI file so
- 28:45they can copy and paste the buttons and
- 28:48the scheme and everything.
- 28:49The program skeleton has all of our Fusion
- 28:53and XIO connection stuff in it.
- 28:55We've got some self-help stuff already
- 28:57built into it as a model.
- 28:59So they take all of that and expand
- 29:01that to make the room work according to
- 29:04what's needed in the system.
- 29:06And then we go back in
- 29:08And I walked one of the projects last
- 29:11week and I said, yeah, this looks good.
- 29:13This looks good.
- 29:14No,
- 29:14this isn't going to work this way and
- 29:16gave them that feedback.
- 29:17So whenever the actual AV consultant comes
- 29:20through, they're not going to say, yeah,
- 29:22that's not going to work because they
- 29:24don't know.
- 29:25The AV consultant doesn't know how we do
- 29:27it on campus.
- 29:28But I'm easily able to tell them this
- 29:31is how we need it done.
- 29:32That's why I gave you this information.
- 29:35So I'm holding them to a pre-commissioning
- 29:39versus the AV consultant saying, oh yeah,
- 29:41all the boxes are in,
- 29:42all the cables are connected.
- 29:44They're somewhat labeled in a very cryptic
- 29:48manner.
- 29:49If they show up again.
- 29:51Yeah.
- 29:52They may not just show up after it's
- 29:54done.
- 29:55And so you don't have a consultant on
- 29:57that job.
- 29:58So it's you all being the consultant,
- 30:01but leveraging other resources there.
- 30:04So you're supporting their code for,
- 30:10do they have a one year,
- 30:12like they're not,
- 30:13the client's not calling the integrator,
- 30:15they're calling you all.
- 30:17Right.
- 30:18Yeah, we tell them, go through us first.
- 30:21And we'll go out and give ten to
- 30:22fifteen minutes just to see if it is
- 30:25a power button, power brick,
- 30:26something like that we can fix real quick.
- 30:28But if it's a parts replacement kind of
- 30:30thing,
- 30:31I probably have it on my shelf because
- 30:33I've already sat through all the
- 30:34documentation and say, no,
- 30:36I'm not using that part.
- 30:37You're going to use that part.
- 30:39So I keep my inventory low there,
- 30:40throw that part in.
- 30:42take the other one and say, all right,
- 30:44integrator ABC, this one died,
- 30:45go get an RMA and get me the
- 30:47new one.
- 30:48Yeah.
- 30:48So what I'm trying to do is figure
- 30:51out,
- 30:51and I've got it in my documentation and
- 30:53we put it in the bid to essentially
- 30:55lower labor costs because from an
- 30:57integrator standpoint,
- 30:58if you're having to support a system for
- 31:00a year,
- 31:00you got to kind of build that into
- 31:01your base price or you're going to lose
- 31:03your ass.
- 31:04So we put in there like, hey,
- 31:06once I sign off,
- 31:07there's no obligations for you to come
- 31:09back.
- 31:10And so that helped us keep costs lower
- 31:13too.
- 31:14But it's really interesting when you know
- 31:16you've got it yourself into the system is
- 31:20when you're the one approving and reading
- 31:23RFIs coming from the electricians and
- 31:25coming from the integrator that bid on it,
- 31:28which is kind of where I am.
- 31:29I'm in Procore.
- 31:30Y'all may or may not know what that
- 31:32is.
- 31:32It's construction software.
- 31:35You're,
- 31:35you're getting notifications and you have
- 31:37timelines and you know,
- 31:40you're thinking about, well,
- 31:41we're university and we have all these
- 31:43holidays.
- 31:45shit doesn't matter when you have
- 31:46construction project,
- 31:47you're the principal designer.
- 31:48So you're finding that you're working
- 31:50quite a bit to just hit that construction
- 31:53schedule.
- 31:54So do you all see any kind of
- 31:57challenges by meeting a construction
- 32:01timeline with your resources,
- 32:04the way things are going?
- 32:05Because I know that's a different timeline
- 32:07than the university upgrade and kind of
- 32:11the day in and day out tasks that
- 32:13you all have.
- 32:15Yeah,
- 32:16that's some approvals I can get
- 32:18beforehand.
- 32:18We've got a university holiday coming up,
- 32:22but there's not a construction holiday.
- 32:24Then I can work with my technicians to
- 32:26say, all right,
- 32:27let's flex time or you've got this day
- 32:29off and you're reporting that day.
- 32:32I have the authority and the ability to
- 32:34do that.
- 32:35So I don't think that would be an
- 32:36issue in the long run.
- 32:37And it sounds like your staff has buy-in
- 32:41to do that as well.
- 32:43I know I have one.
- 32:45major buy-in.
- 32:47I would put him in as the field
- 32:48supervisor and he would be over all the
- 32:50technicians essentially.
- 32:52He's great with looking at infrastructure
- 32:54saying, yeah, that's going to work.
- 32:56No, that's going to work.
- 32:57Wait a minute.
- 32:57We got to rethink about this one.
- 33:02He would be a very valuable asset on
- 33:05especially these two projects I've got
- 33:06going right now where two floor boxes were
- 33:10completely missed on a building that's
- 33:11supposed to open.
- 33:12Actually, the users moved in last week.
- 33:15So he's the one who's going to go
- 33:17by every week during a weekly walkthrough
- 33:19and check to make sure four boxes are
- 33:21appropriate,
- 33:22rough ends and walls are appropriate
- 33:24before drywall goes up.
- 33:25So you're spot checking everything just
- 33:26like a consultant would.
- 33:28Right.
- 33:29Excuse me.
- 33:30A consultant is supposed to do.
- 33:31Right.
- 33:34How,
- 33:35when you're talking about kind of feeling
- 33:38out how to grow your staff,
- 33:40how to get more funding from your
- 33:41administration, and they all say, sure,
- 33:44sounds great.
- 33:46do they give you a,
- 33:47what do you need to provide?
- 33:49Like, have you just asked them outright?
- 33:51So like, I want three people.
- 33:52I need a hundred and fifty thousand
- 33:53dollars a year in salary.
- 33:55Okay, that's a little low,
- 33:57but let's pretend.
- 34:01It's a lot of low.
- 34:03Well, it depends.
- 34:04Do you work for my place?
- 34:04Yeah, do you work for my place?
- 34:07But you said, look,
- 34:08this is what I need.
- 34:09What do I need to tell you?
- 34:11What would make me successful?
- 34:12Because I had to go through and I
- 34:14talked to my HR rep and I talked
- 34:16to my fiscal officer and I talked to
- 34:18my CIO.
- 34:19What do you all need to see so
- 34:20that this is a rubber stamp request?
- 34:23And it's no longer we're just talking
- 34:25about an idea.
- 34:25It's real.
- 34:27Have you had that conversation?
- 34:29And what was their answer if you did?
- 34:31Yeah, it hasn't gone that far.
- 34:33The farthest it's gone is we don't have
- 34:36any available FTE slots.
- 34:40It's a resourcing conversation.
- 34:42So yeah, that's why I'm like,
- 34:43because that's where I had to like,
- 34:45go to my my HR folks and my
- 34:47fiscal folks.
- 34:48And it finds out that, oh, well,
- 34:49there are these,
- 34:50these stalled ones over here,
- 34:52maybe we could write and I didn't know
- 34:54if you'd gone to them and just said,
- 34:55Look, I need people,
- 34:56how do I get them?
- 34:57What do I have to have for you?
- 34:58Yeah.
- 35:03To touch on what Mark mentioned earlier,
- 35:04yeah, the FTE stuff is really difficult.
- 35:07And we've kind of floated around doing
- 35:10just TLP.
- 35:12If we've got these projects coming and
- 35:14facilities is paying my group for this
- 35:19service,
- 35:20there's a bucket of money there that I
- 35:23can pay people out of.
- 35:25And if I can get the service level
- 35:27agreements for the department rooms and
- 35:29that goes in that bucket,
- 35:31then I can start kind of growing that,
- 35:34praying that eventually when an FTE opens,
- 35:37they're like, yeah,
- 35:37we need to move this person into this
- 35:40slot.
- 35:40Are you a service center?
- 35:43What do you mean?
- 35:43Do you bill for your services?
- 35:45I do.
- 35:47Can you retain that money year over year
- 35:49or does the university take it from you?
- 35:51The answer is the money stays within my
- 35:55team, essentially my supervisor,
- 35:58the VP customer service.
- 36:01He divvies some of that up to pay
- 36:03for other licenses, Epiphan boxes,
- 36:07VizX players, that kind of stuff.
- 36:09Sorry, I mentioned names.
- 36:14It's fine.
- 36:16Are you subsidizing those other technology
- 36:19purchases through labor?
- 36:21Yes.
- 36:22You are.
- 36:23So to me, when you start looking at,
- 36:27if you were going to create a new
- 36:29position,
- 36:30are you going to have to let go
- 36:31of something else to do that?
- 36:34Or can you expand duties with your current
- 36:38position and not have to invent somebody
- 36:41new?
- 36:43Because you say you had this field
- 36:44supervisor.
- 36:44Let's just jump off of that.
- 36:45You have a field supervisor opportunity.
- 36:47You have this corpus of work that you
- 36:49want to have this person do.
- 36:51Is that different than what they're doing
- 36:52now?
- 36:54Yes.
- 36:55It is.
- 36:56And could they do that work plus what
- 36:58they're doing now?
- 37:00If compensated, they would be glad to.
- 37:02So is it a new position or an
- 37:04expansion of the current?
- 37:07that would be an expansion of the current
- 37:09but i am losing that one of those
- 37:11tier one spots doing that so i have
- 37:17less availability for somebody to run
- 37:19across campus to push the power button on
- 37:21the monitor because sometimes i find that
- 37:23if it's easier to expand somebody's role
- 37:27and like take on something and maybe get
- 37:29something
- 37:30versus I have to spin up a whole
- 37:32new, and then if I move somebody now,
- 37:34I'm backfilling.
- 37:35And so that's creating an FTE,
- 37:37which is like,
- 37:39It's getting away.
- 37:40And another way I've done that in the
- 37:42past is I don't know how much you
- 37:44use student labor,
- 37:46but I have shifted tier one to students
- 37:50so they can run across campus.
- 37:52And the FTE that used to do that
- 37:54is now available to do other things.
- 37:58It's hard to just get the blessing from
- 38:00the resource committee and say, yes,
- 38:01I grant the one FTE versus a slot
- 38:04and some pay to come along with that.
- 38:06But having your story in line with a
- 38:08service center,
- 38:09we're seeing this amount of work.
- 38:10We're building this amount on capital
- 38:11project where it's coming in here.
- 38:13We're going to offset some of that cost
- 38:16to say some of that tier one may
- 38:17be student focused.
- 38:18Maybe we can bring that in at lower
- 38:20cost so you can kind of shore up
- 38:21and create that full position worth of pay
- 38:24and opportunity and say this is the scope
- 38:26of this work.
- 38:27I think it's always hard to kind of
- 38:29dream up a new position because leadership
- 38:30can say we are operating fine right now.
- 38:32Why do you need another one?
- 38:34Yeah,
- 38:35and that's definitely what they're saying.
- 38:37As what we're doing right now,
- 38:38supporting our classrooms,
- 38:39even though we've grown,
- 38:41whenever this other campus comes online
- 38:44and this new building comes online,
- 38:46it's going to add like another twenty
- 38:47rooms to the inventory.
- 38:50But I'm still only at four people.
- 38:53We opened up a building last spring that
- 38:55had fifteen rooms in it,
- 38:57but I'm still at four people.
- 38:59And they see these buildings opening,
- 39:02You have over three hundred classrooms?
- 39:04They never add anybody else to it.
- 39:07You have over three hundred classrooms for
- 39:09four people?
- 39:13I'm not I'm not shocked by that.
- 39:16Larry, that's the way I until last week.
- 39:20Yeah,
- 39:21hundred and fifty supported spaces with
- 39:22three full time staff.
- 39:23So it is possible.
- 39:25And so I think that's a normal like
- 39:26story.
- 39:27You see this exponential expansion of
- 39:29space,
- 39:29a literal phalanx of students running
- 39:31around.
- 39:33So I make it up.
- 39:33So I have.
- 39:36And that's where I've leveraged my SLA to
- 39:38create new positions.
- 39:43I have linked positions to the SLA
- 39:45agreements in order to create new
- 39:48positions.
- 39:48So you have to have that monetary trail
- 39:50to say,
- 39:50I've justified this amount of labor,
- 39:52and so therefore I can make a person
- 39:54out of that labor request.
- 39:56Right.
- 39:56And my university would look at that as
- 39:59a time-limited position.
- 40:01Your time here is limited to the funding
- 40:03keep coming in.
- 40:04If it comes in, your job goes out.
- 40:06Yep.
- 40:08So where do you stand today?
- 40:10Are you done hiring in the short term?
- 40:12Are you done building?
- 40:13You're obviously going to probably try to
- 40:15expand long term.
- 40:17What does that look like for this year
- 40:20and then, I guess,
- 40:21five years out from now?
- 40:23Again,
- 40:23that's kind of what I was asking you
- 40:25about.
- 40:25Right now, myself as a designer,
- 40:28we got the programmer, we got four techs.
- 40:30They're not letting me hire anybody.
- 40:34I'm in a small office right now.
- 40:35They're trying to expand that.
- 40:36So I don't have a lot of room
- 40:38for even students.
- 40:39I barely have enough room for two students
- 40:40to sit down.
- 40:41So I'm running three students right now
- 40:43during the summer.
- 40:45Trying to get them working in the rooms
- 40:48this summer so whenever the fall comes,
- 40:50they're not just walking in all sheepish
- 40:53in front of a room saying,
- 40:54I have no idea what this AV system
- 40:55does.
- 40:55Well, you put one together,
- 40:57so you really should know what's going on.
- 40:58So that's what I try to do during
- 41:00the summer.
- 41:01They stay on with me.
- 41:02most of the time through the fall spring
- 41:03and hopefully through the next summer.
- 41:05I try to bring in sophomores so they
- 41:07stay for a couple of years.
- 41:09Do you think your staff not necessarily
- 41:14has the capabilities but has the want or
- 41:17the desire to take on more for more
- 41:19money so you can expand that without new
- 41:21positions kind of like what we were
- 41:22talking about earlier?
- 41:23Is that your next approach maybe?
- 41:26I just don't think there's enough
- 41:26bandwidth to do that.
- 41:29If I put a field supervisor in there,
- 41:31that's great.
- 41:33But now he's got more duties to go
- 41:35look at projects and he can't support.
- 41:38The four techs are just absolutely
- 41:39bleeding through the classroom upgrades
- 41:41this summer.
- 41:42I'm out there turning the screwdriver.
- 41:44So are you saying that you're limited by
- 41:48the actual physical space of offices plus
- 41:52the whole hurdle of creating a new FTE?
- 41:55Is that the two biggest variables?
- 41:59Well,
- 41:59the three variables is one is the space,
- 42:01second is the money,
- 42:03and then the third is the money.
- 42:05You got Clemson money.
- 42:09Well, okay,
- 42:09maybe it's not the money side of it.
- 42:11You might be right.
- 42:12It's just the FTE.
- 42:13Yeah, it's the process.
- 42:15There's a slot there.
- 42:18And just for clarifications,
- 42:19I don't see any of that athletic money,
- 42:20and I don't support any of that athletic
- 42:22money.
- 42:22I am not going to.
- 42:23How weird.
- 42:25I mean, all the rest of us,
- 42:27we get director's cuts.
- 42:30Stupid athletics.
- 42:31There's part of me that I'm hearing that's
- 42:32like screaming the student story here.
- 42:36I think that's definitely the first step.
- 42:38Yeah.
- 42:40When you say my technicians are bleeding
- 42:42and they're swamped, they need assistance.
- 42:46They need assistance so you can scale that
- 42:49portion of the process.
- 42:50Have you thought about doing just a labor
- 42:53contract where you're hiring in labor and
- 42:55you've got people working beside your
- 42:56team?
- 42:57Or hire students.
- 42:58Or hire students, right?
- 42:59But I know the word to put them
- 43:01is a different thing.
- 43:01That's a different story altogether.
- 43:03I mean,
- 43:04you can't just hire students and leave
- 43:05them on the grass to roll around.
- 43:07Because I feel like a lot of people
- 43:09get this thing confused a lot.
- 43:12I've seen it with different staffing at
- 43:13different places is that
- 43:16Seldom does it ever work that you're not
- 43:18going to be asked to do the job
- 43:20until the title comes.
- 43:22If you do want to move into something
- 43:24else,
- 43:24you are going to have to show that
- 43:26you're going to take that initiative and
- 43:27do it now.
- 43:29So I did that.
- 43:31I had a tier one technician and he
- 43:33said, hey,
- 43:33I'm really interested in this DSP stuff,
- 43:35this audio stuff.
- 43:36I was like, cool,
- 43:37here's access to the training.
- 43:39Here's access to the software.
- 43:41Go play with it.
- 43:42You got a box on your desk.
- 43:43Go play with it.
- 43:45You can look at some of the live
- 43:46stuff we've got.
- 43:47You know, there's a room going.
- 43:49That was a trust thing.
- 43:50I really trusted this guy.
- 43:52And he learned that.
- 43:54And I was like, cool.
- 43:55I see that you can do this.
- 43:57Let me go to bat for you.
- 43:58I went to bat for him.
- 43:59I was like, all right,
- 44:00this guy really knows his audio
- 44:01programming.
- 44:02I need that off of my plate.
- 44:03He needs a pay raise.
- 44:05It went through.
- 44:06He was like, cool,
- 44:06I got audio programming.
- 44:07Well,
- 44:08now let me go do some control programming.
- 44:10And he worked with another guy,
- 44:11got kind of introduced with that.
- 44:13And he's doing all my control programming
- 44:15now.
- 44:16He's done a lot of self-help that has
- 44:18really reduced our, hey, this, the image,
- 44:21our projector is not working.
- 44:22Well, you've got the image mute on,
- 44:23but there's a self-help button there that
- 44:25says,
- 44:25go turn all this stuff this way and
- 44:27that way.
- 44:28So he put all that together and that's
- 44:29taken a lot off my plate.
- 44:30And I got him a pay raise for
- 44:31that.
- 44:32So yeah, that avenue is there,
- 44:35but I only need one programmer right now.
- 44:38So I can't promote anybody else up that
- 44:40way.
- 44:41I do need a field engineer.
- 44:43So that is one of my next steps.
- 44:47I need this guy to be in this
- 44:48position at this rate,
- 44:50and he's going to be over all these
- 44:52other technicians that come in when they
- 44:53come in.
- 44:54Do you have to conform to union guidance
- 44:56on your positions?
- 44:58No.
- 44:58Depends if they're a union shop or not.
- 45:00That's what I'm saying.
- 45:01We are not a union shop.
- 45:02That's a whole different animal for folks
- 45:03that are having to deal with that.
- 45:05It's much harder for folks.
- 45:06I've worked in both environments,
- 45:09and yeah,
- 45:10there's a lot of things to be mindful
- 45:12of.