Latest / Financial Survival Network / Prospera Energy Finds More Oil Than Expected
Transcript
- 0:00We're getting average around eighty five dollars Canadian and our op cost has been every
- 0:05year we've been releasing. It was, like I said, it was sixty
- 0:08dollars a barrow when we took sixty plus and we got it down to thirty
- 0:12eight. Now we're getting down to thirty three. And these are additional wells
- 0:16that's contributing to the fixed costs, so it's even lowering the costs. So
- 0:21our netback is anywhere forty fifty dollars. The Financial Survival Network now more than
- 0:29ever, the Financial Survival Network, And welcome. This is Financial Survival Network.
- 0:38I'm your host, Carrie Lutz, and they've gotten a lot of requests
- 0:42from you out there. Please please please give us an update on Prospero Energy.
- 0:47Well, we're going to do better than that. We're going to talk
- 0:51to the CEO, Samuel David. We're going to give you an update on
- 0:54the drill program, the success to date five for five wells, increased production.
- 1:00It's really a story of a turnaround that's coming to fruition with increased production
- 1:06and the higher profits. Right around the corner, Saam, It's great to
- 1:11see you again. Hey, So we're doing the horizontal wells. You've drilled
- 1:15five of them, you're five for five. What are the results tangibly,
- 1:22What can we look forward to in terms of increased production. Thank you for
- 1:26reaching out for an update, and Prosperus is happy to convey what we have
- 1:32encountered. As you mentioned, we have drilled five horizontals and infield drilling based
- 1:41on geological delineation, well control and seismic delineation, and therefore the chance of
- 1:51success of geological finding the reservoir is high. You know, the only a
- 1:59risk is mechanical because this is infill low risk drilling, and that we tweaked
- 2:06it by drilling couple of pilot wells prior to embarking on this development program.
- 2:10That we have the drilled five wells. So as for all this tweaking,
- 2:16these wells encountered pay structure and oil as we expected, and also we came
- 2:29in under budget by about fifteen percent, and I think we can even tweak
- 2:36that a little bit more as we extend the drilling. I'm going to share
- 2:39a screen and show you the results that we have in the first few months
- 2:44of productions. So here's the type curve that we used before embarking on the
- 2:49development program for economics. And here are the results that we have encountered.
- 2:53The production initial ips in the first two months, we have two months of
- 2:59steady production effected was going up. And also there's a lot of room for
- 3:05optimization on these wells because they're being held back. There's still twenty five joints
- 3:09of fluid and the pump is just operating at a very low efficiency because we
- 3:15don't want to exert high high draw do on on the reservoir. On the
- 3:19heavy oil, with the heavier oil, with the higher viscosity, it is
- 3:23important that you do not exert high drawed on on the reservoir. If you
- 3:30do that, it's going to finger the water through the oil and you'll be
- 3:35getting more water and then the oil. As you can see, we're drawing
- 3:38these down at a very very low efficiency, and yet we're getting some really
- 3:44good rates, exceeding our time curve expectations right see, producing more oil than
- 3:50you expected. But obviously, from what you're saying, Sam, this is
- 3:53a very delicate operation. You don't just march in there and start drilling wells
- 3:59without knowing what you're doing. And this reservoir is very porous and permeable.
- 4:03There's a lot of well control that we have. So we have placed the
- 4:08technical team and the drilling team. They have worked together very well and placing
- 4:13the well where we set out to do and then pass, encounter pay and
- 4:15it is delivering at the initial stages, exceeding our expectations. Originally, the
- 4:21plan called for ten wells to be drilled, and now you're upping that right.
- 4:28Let me show you. Because of the results we have encountered and the
- 4:32collaboration that we have with our services that we were working with, especially Lasso
- 4:39Drilling Company, we have decided to extend our drilling program and continue drilling it
- 4:45because we have our inventory of horizontals to drill and this whole field is being
- 4:49transformed. Let me show you. Let me show you that I think a
- 4:53picture success thousand words. Okay, this is one of the pools that we're
- 4:59drilling. And when you're drilling these wells, these horizontals, we have to
- 5:02shut in a lot of the adjacent production so that we don't encounter drilling issues
- 5:09by the way of loss of mud, because if there's another well that's drying,
- 5:13we're drilling here and we're pumping mud it will fly over to. Especially
- 5:16in this premium porest Premiere reservoir. Most of the field is shut in prior
- 5:20to two or three weeks prior to we start drilling, so the current production
- 5:26is all there. We're attaining the results. As I showed you, the
- 5:29last five wells that we drilled added an average one hundred barrels a day each
- 5:33well. At initial stages. We expected decline later on, but it is
- 5:39exceeding our expectations right now. So based on this, we're commencing drilling on
- 5:44these well Actually we're going to commence drilling on this location and these wells.
- 5:47Strategically we picked it out to set up other horizontals going further. So then
- 5:54we have additional horizontals and you can see the whole reservoir is spaced and strategy
- 6:00clean placed to optimize recovery, all recovery, not just a certain spot.
- 6:05And with horizontals, you're reaching out and accessing additional pay is supposed to just
- 6:12one vertical well like this, it only recovers around here. With these horizontals,
- 6:17we're accessing the entire reservoir. It will deliver very nice, steady volumes
- 6:23over time. And then if you notice there's a color scheme in here.
- 6:27The red is the ones we're going to drill right now, and then we're
- 6:29going to follow up with other wells. The blue ones are also we're going
- 6:32to drill. The blue ones are going to be converted to injectors. You
- 6:35know, we will start out as a producer and it will be converted to
- 6:40injector so within the next year when the decline starts to come down, we
- 6:46have already started in the reservoir management of providing energy and support, and that
- 6:50will give us a better sweep efficiency and keep sweeping that oil to the producer
- 6:56and at lower the decline. That means the company will have steady stream up
- 7:00production, translate the cash flow. And you've got to feel good about this
- 7:05because this field and what you're doing now is the reason you took on the
- 7:10whole mess in the first place, right exactly. Not only when we drill
- 7:14all of these we're abandoning out of these ridical lows that is there. So
- 7:17we're reducing the environmental footprint and the associated surface lease costs, liability, and
- 7:25the books or retirement obligation. It also lowers the liability and it leads to
- 7:32a robust balance sheet r So basically there's a cleanup on Aisle seven. Here.
- 7:38You're taking what was really not positive environment there, you're cleaning it up,
- 7:45helping the environment, and you're producing energy barrels of oil which will directly
- 7:51feed the bottom line and the plan to maintain low decline or reduce the decline.
- 7:58So we have city stream up production. Right, So these wells are
- 8:01probably going to outlast you and me. Serve life index of these reservoirs is
- 8:07around forty years. It's just like I say, if I make it to
- 8:11forty, well, I don't want to think about that. You know what
- 8:13I'm saying. I did you and I have encountered a few times almost a
- 8:18few times now. Yeah, So basically you've been vindicated, your plan,
- 8:24your whole reason for doing this. You've proven it. I think it's going
- 8:28in the direction as we anticipated the team. You know, what we have
- 8:33encountered is what we anticipated, and I think your operation technique and brilling technique
- 8:39is bang on, as you can see by the results. Right. Okay,
- 8:43so now we go to the vertical wells at Brooks status update there.
- 8:48Certainly, as we speak of, finally we got some of the permits and
- 8:52licenses and you know, pipeline pipeline license, will license, and we're commencing
- 9:01construction next week to set up for drilling. We already have the drilling rig.
- 9:07We're still anticipating to meet dollar our targets for the year end. So
- 9:13you had hit two wells last year and when you were drilling, but basically
- 9:16they were just sitting there because you couldn't hook them in with the pipeline.
- 9:20So you're going to be able to do that now, right. Those are
- 9:22the pipeline permits that we have obtained, and we also have pained some leases
- 9:28to drill and these are new lease and new pipeline, so you know,
- 9:33they has to go through the whole process, and the process have become very
- 9:37rigorous with all the environmental consideration that is going on. It's been about a
- 9:43five month process that we've been encountering and finally we got some of them and
- 9:50the others are coming on the way. So the first two wells, you
- 9:54know, that's what really excited us. The first well test that one hundred
- 10:00barrels a day flowing light oil. The other one tested at three hundred barrels
- 10:05a day light oil. I mean that's an initial flush. Production will come
- 10:07down, but it is a lot higher than what we anticipated, and we
- 10:11have a fair way to run in this area. Out that we got three
- 10:16D size make. We have just like what I showed you in the other
- 10:18screen on the reservoir. We have delineated it with well controlled geology and size
- 10:24make, and we have identified over twenty locations we get We do our best
- 10:31to dull our eight eight wells or six sixty eight wells and tie including these
- 10:35two tie in wells by the year at that's excellent news. And this is
- 10:39medium uh medium medium medium light oil medium light. So now that's the equivalent
- 10:46of like twenty four kind of no, it's still some discount. It's about
- 10:52twenty four a bi okay, so pretty close, yeah, love SERTs.
- 10:56So all right, so production you're foreseeing or forecasting in the near future fifteen
- 11:03hundred and then it's going to go up fifteen hundred barrels per day equivalent,
- 11:07and it's going to go up from there. Right, our urine target was
- 11:11eighteen hundred and we still just obeit to hit that. Right in the first
- 11:18five wills, like you said, are producing and drills on site, right
- 11:22yes, we we drove them, completed them, tight them in fairly quickly.
- 11:28And these additional program that these wells that are commencing as we speak right
- 11:33now. You know, there's something release constructed and we're just moving on.
- 11:37The rig is just moving on, and we're going to commence production next week
- 11:41and we're going to do exactly what we just did. It's all going to
- 11:45be what the shake cookie cutter, same same process for each well because they're
- 11:50on the existing lease, there's already pipeline, tie it in and carry on.
- 11:56Yeah, so so the opportunities there. Hey, I should mention that
- 12:01I'm a shareholder, pretty significant shareholder from my perspective, from my finances,
- 12:07and you know, I'm been waiting with bated breath for this interview, Sam,
- 12:15because you know, the news is good, and obviously the market will
- 12:18do what the market does, but at some point when they it's a story
- 12:22of consistently increasing production from this point forward, barring weather conditions. And as
- 12:28you mentioned market condition, you know, the the reserves are there and we
- 12:35were executing them and we're going to continue doing that as arring from these conditions.
- 12:43And like you said, you're running fifteen percent under budget, which is
- 12:46like unheard of in the oil patch. Usually you're running fifteen to twenty five
- 12:50percent above budget. I'm very happy to commit that and that it's it's a
- 12:58credit to all those service providers, the technical team, you know, if
- 13:05working efficiently and effectively, right, important And that means that you're out in
- 13:11the field watching this, making sure that the money isn't flowing someplace else than
- 13:16otherwise into the wellhead, right. You know, Western Canadians are happy to
- 13:22have this kind of development happening and people are getting back to work and overall
- 13:30it's good for a family and the society. Right. Hey, what's the
- 13:33netback situation at this point? Netback of what we're getting for our oil.
- 13:39Yeah, we're getting average around eighty five dollars canadian. I always talk.
- 13:45I know you guys have a Canadian and our opp cost has been every year
- 13:50we've been releasing. It was, like I said, it was sixty dollars
- 13:52a barrow when we took sixty plus and we got it down to thirty eight.
- 13:56Now we're getting down to thirty three. And these are additional that's contributing
- 14:01to the fixed costs, so it's even lowering the cost so our netback is
- 14:05anywhere forty fifty dollars, which is remarkable. And obviously the less you spend
- 14:11developing these wells, then the higher the netback is going to be down the
- 14:15road, of course. And also we're retiring another thirty six radical locations that
- 14:20reduces our liability. And next summer we got a huge reclamation program to turn
- 14:28all of this back to farming lands, reducing an environmental footprint that'll also reduce
- 14:35tremendous amount to the bottom line to the op X. Do you anticipate picking
- 14:41up the pace of drilling even more as the cash flow starts to mount up.
- 14:46Well, sometimes you don't want to outrun the resources you have at hand.
- 14:52And also you have to look at the reservoir management as well. There's
- 14:56a lot of pre planning goes in here in order to do this. When
- 15:01you rush these things, that's when you encounter additional capital costs because you went
- 15:05a little too fast. We're maintaining a good pace, and you also have
- 15:09to let the reservoir, you know, show us what it can do as
- 15:13well. And there's also reservoir management. Perhaps we can go a little faster,
- 15:18but then, like I said, you need to hire more people,
- 15:22more teams, you know, all of complicated and then all of a sudden,
- 15:26you know the process. If the process is good, perhaps a can
- 15:28function, but a few the processes it always starts breaking down and the functionality
- 15:33and the results starts interiorating. Interesting developments, all on the positive side,
- 15:39which is great. I mean, how many companies out there can point to
- 15:43revenues going higher and costs going lower. That in itself is a very rare
- 15:48situation in this day and age, with inflation and the rapidly increasing prices on
- 15:56so many things that we need every day. So that's great to see costs
- 16:00h cost going down. And I guess we're going to have a lot more
- 16:03to talk about in the not too distant future. So you want to go
- 16:08over to cross Sperret energy dot com sign up for notifications so you'll know right
- 16:15away for every barrel of production that that gets uh, that gets added,
- 16:22which which is really what the story is about. And ticker symbols. In
- 16:26Canada it's p e I, in the US it's g x R f F
- 16:33he questions comments, you can always send me an email k l at Carrie
- 16:37LUTs dot com. Sam, thanks for taking time out from the field.
- 16:41Probably you're happy. I know it's cold there now, but I know that
- 16:44your heart is always in the field. That's where the action is. The
- 16:55financial survival network