Latest / Deep End Era. Engineering with Sankalp

The Facility, Part 5: Inlet Facility and the East Riser
A liquid slug arrives at three in the morning. Follow it through multiphase flow, risers, severe slugging, slug catchers, pig receivers and inlet manifolds. Hydrates, corrosion, metering, level control and high-integrity pressure protection show how a violent pipeline stream becomes a manageable plant feed. Part 5 of 16 in The Facility. Corran Point, its characters, companies and story figures are fictional and illustrative.
Chapters
00:00:00 Cold open: the wall of liquid
00:03:40 From the reservoir to the beach
00:07:47 Risers: the vertical part of the journey
00:09:48 Severe slugging and…
The skinny
The skinny isn't ready yet — notes appear once the transcript is processed.