Latest / Road Maps for Texas Local Agencies / Mill & Overlay Best Practices Every Local Agency Should Know
Transcript
- 0:05SPEAKER_02: Welcome to this episode of Roadmaps.
- 0:07SPEAKER_02: Today we're going to be talking about best practices for mill and overlay projects.
- 0:11SPEAKER_01: You know, Larry, we start each uh podcast episode off with the safety chair.
- 0:16SPEAKER_01: Safety chairs are an important part of our culture at TechSappa for ourselves and our member firms.
- 0:20SPEAKER_01: So we'll do nothing different here.
- 0:23SPEAKER_01: We're going to talk about the upcoming time change and uh and all the effects that that has.
- 0:28SPEAKER_01: Want you people to remain extra vigilant regarding workplaces and work zones safety there.
- 0:33SPEAKER_01: The shift in our biological clocks uh causes fatigue, slower reaction times, and decreased alertness.
- 0:40SPEAKER_01: And that that shows up in studies that show a spike in traffic accidents, workplace injuries, uh struck by incidents, equipment collisions, and uh slips, trips, and falls that show up immediately after we have a time change.
- 0:53SPEAKER_01: So a few best practices.
- 0:55SPEAKER_01: Number one, prioritize rest, make sure you're adhering to a good sleep schedule, and that may include going to bed a little bit early so you get ready and get used to that transition.
- 1:04SPEAKER_01: Uh drive defensively, know that it's going to be darker in the morning or the evening commutes, allow extra travel time, eliminate distractions, and watch closely for pedestrians, especially in those school zones.
- 1:16SPEAKER_01: Assess high-risk tasks.
- 1:18SPEAKER_01: You know, if you have a heavily physical or high consequence task coming up a few days on the week of a time change, uh make sure that you adjust those things and uh and check people to see if they're fatigued.
- 1:29SPEAKER_01: Uh, and that includes the buddy system.
- 1:31SPEAKER_01: You want to keep an eye on your coworkers and uh speak up if you see anybody showing signs of exhaustion or a lapse in focus during this critical time.
- 1:39SPEAKER_01: Another one, maximizing maximize natural light.
- 1:42SPEAKER_01: You want to expose yourself to daylight early in the day to kind of help reset your circadian rhythm and that do that more quickly if you do that earlier in the day.
- 1:51SPEAKER_01: And especially for those of us on construction sites, make sure we're having uh good uh high visibility gear.
- 1:57SPEAKER_01: It's a good time to check to make sure that your vests, pants, hard hats, everything's clean and functional, uh, just especially when we're gonna be out there in low light conditions.
- 2:05SPEAKER_01: Uh work zone setups, another great time to check that.
- 2:08SPEAKER_01: Advanced warning signs, cones, digital message boards, just make sure that we are the all those are in the right spot.
- 2:15SPEAKER_01: You talk about this in a tailgate meeting and our daily debriefs.
- 2:18SPEAKER_01: Uh, this is a great time uh to talk about during the transition to a time change.
- 2:22SPEAKER_01: And then finally, manage our shift rotation carefully.
- 2:26SPEAKER_01: You know, we don't want to do any uh overtime or back-to-back shifts uh during this week as that may uh may impact us on the low alertness.
- 2:35SPEAKER_01: And now for today's topic.
- 2:37SPEAKER_01: Well, good morning, Dennis.
- 2:38SPEAKER_01: Morning, Larry.
- 2:39SPEAKER_01: How's the family?
- 2:40SPEAKER_01: Doing great.
- 2:40SPEAKER_01: We are picking out Halloween costumes.
- 2:42SPEAKER_01: We haven't quite figured out if we're gonna be care bearers or Star Wars, but you'll know soon.
- 2:48SPEAKER_02: Dennis has, well, I have uh twins.
- 2:52SPEAKER_02: I've got a boy-girl twins that are uh finishing college, and uh Dennis, he's so competitive, he has to have two sets of twins.
- 3:02SPEAKER_02: So uh we always check in with each other because uh you know I always think about the challenges of raising twins, and then I I stop and say, well, uh Dennis has that times too, so we don't know any better.
- 3:14SPEAKER_01: It's good good time at the Turner House.
- 3:16SPEAKER_02: Well, it's good to hear.
- 3:17SPEAKER_02: That's good to hear.
- 3:18SPEAKER_02: Give them my give them my best.
- 3:19SPEAKER_02: Our last episode we discussed surface prep, the importance of surface prep, and uh we did touch on milling and overlaying in that uh in that episode, but uh today we wanted to spend a little bit more time, maybe drilling a little bit deeper, about uh the best practices for a mill and overlay project.
- 3:38SPEAKER_02: You know, before the milling and paving begins, you know, we got to look at, you know, how would an agency uh identify and address the issues they need to be taken care of, like we talked about in surface prep, um, but uh also kind of getting ready for that operation of milling, it's important.
- 3:56SPEAKER_01: And uh so, you know, some of the some of the things that we were going over, uh we were talking about we talked a lot about patching and knowing where to patch, how big the patches should be, uh how deep they need to go, uh whether they need to go just you know partial depth or full depth, uh and how to scale those to size to uh make sure they uh that we have a good material that goes back.
- 4:18SPEAKER_01: And then just also uh you know, having a contingency in place to know that after we mill, we may find other areas.
- 4:24SPEAKER_01: But the most important thing is this is the time to fix it before this new layer of asphalt goes down.
- 4:30SPEAKER_02: And I think uh you it's really important what you talked about.
- 4:35SPEAKER_02: Um sometimes when we mill, we'll see things that we didn't know were there.
- 4:42SPEAKER_02: Um it could be some cracking, that is, you've milled down and you've found some cracking that hadn't made it through to the old surface, but now you're milling and you're milling right into that cracking, and uh and you may find some other issues, uh, whether it's uh you may find some soft spots that maybe weren't showing up through that original overlay.
- 5:04SPEAKER_02: Um and so or that original surface, and so you want to make sure that we address those things.
- 5:09SPEAKER_01: Uh you don't just say, well, we'll just go ahead and that's why it's important to have the scope and the contingency there, because this is the time to fix it.
- 5:16SPEAKER_01: It's not going to magically get better once the asphalt goes over it.
- 5:19SPEAKER_01: Uh, this is a good time for proof rolling.
- 5:21SPEAKER_01: Uh that equipment weighs a lot.
- 5:22SPEAKER_01: You can use that to check for soft areas during the milling process because those things will tell you where you have soft areas.
- 5:29SPEAKER_02: Yeah.
- 5:30SPEAKER_02: So, Dennis, you you you you hit a you hit on a few things that are all all of them are critically important about about the prep for milling.
- 5:38SPEAKER_02: Um you know, let's talk about those.
- 5:42SPEAKER_02: Maybe uh take them, take them one at a time.
- 5:45SPEAKER_02: Proper milling depth and consistency.
- 5:47SPEAKER_02: You know, we make plans to mill out a certain thickness because we're coming in with a we want that to match what we're gonna put back.
- 5:57SPEAKER_02: Yep, yeah.
- 5:57SPEAKER_02: So that's really important.
- 5:59SPEAKER_02: Profile, cross low.
- 6:00SPEAKER_01: Yeah, there's a a couple different reasons why we would mill.
- 6:03SPEAKER_01: You're trying to get out an individual layer, or you may be trying to correct some uh surface ride issues.
- 6:09SPEAKER_01: There's a couple different reasons why we would mill, uh, but you just want to make sure that that that process is set up to achieve that target.
- 6:16SPEAKER_02: Yep, yep.
- 6:17SPEAKER_02: And uh, you know, drainage, you know, we uh drainage is important no matter if we're talking about pavements, whatever the topic is, drainage is critical.
- 6:26SPEAKER_02: I mean, we've got to handle drainage, so we want to make sure that um sometimes there may be something on a project that already existed that could have some challenges with drainage.
- 6:38SPEAKER_02: Um so some going in and doing a mill and overlay might give you an opportunity to correct the highlight that correct uh correct drainage issues, uh issues when you can.
- 6:48SPEAKER_02: Another thing, many of our local agencies, when we're doing milling and overlaying, there's curb and gutter.
- 6:53SPEAKER_01: You gotta you gotta match those and you need to match your center line and make sure you have your cross slope if that needs to be whatever you're trying to pave to is kind of where you need to set that milling process up for.
- 7:04SPEAKER_02: We want to make sure that um, you know, utilities, you know, we've got uh many, many local agencies, particularly cities, municipal areas closer to the urban core, just because of right-of-way issues and terms that are.
- 7:18SPEAKER_01: There may be some utilities in the in underneath the pavement.
- 7:21SPEAKER_02: And you may find something when you do that milling operation that you you need to you need to address.
- 7:28SPEAKER_02: But you know, something you just got to keep it in mind more than anything.
- 7:31SPEAKER_01: And manholes are a big one.
- 7:32SPEAKER_01: A lot of times we'll see that, so you need to set your plan up to handle those.
- 7:36SPEAKER_01: You may have some hand work and things like that for the milling machine, but also the paving to come later.
- 7:40SPEAKER_01: Right.
- 7:41SPEAKER_02: And you know, if you're using a full-size milling machine, um if you've got a lot of manholes, which you may, um, and you're fairly close to the curb, you know, there are you know things like using a jackhammer um uh skid steer.
- 7:57SPEAKER_02: You know, they have these smaller skid steers that'll have a uh milling head um uh uh uh that you can attach, you know, attachment that can be used on there, but uh making those adjustments in um driveway transition intersection transitions.
- 8:15SPEAKER_01: You want to make sure you don't create a new drainage problem by uh trying to correct a previous and oftentimes you can uh if you've got manholes, you know, sometimes you have the ability they'll have a collar.
- 8:25SPEAKER_02: Yeah, you can recess them or raise them.
- 8:28SPEAKER_02: Cover them up, and you may be able to you may be able to pull a collar or come down lower, put a cover over that manhole, and then you can run the milling operation without having to stop and do a bunch of hand work around it if you're lucky.
- 8:43SPEAKER_02: But uh oftentimes just something to keep in mind.
- 8:45SPEAKER_02: We don't want to say, well, we're gonna mill, uh, but around this, we got a few manholes, and you know, it's just gonna get kind of sloppy around there.
- 8:53SPEAKER_02: We're not gonna we're we're just gonna we're not gonna mill there.
- 8:56SPEAKER_02: We'll we'll just uh somehow try to account for it, and you don't want to do that.
- 9:01SPEAKER_02: You want to be thinking about these things ahead of time.
- 9:03SPEAKER_01: Yeah, you want to have a quality process uh to set us up.
- 9:06SPEAKER_01: You know, it and the the the last thing we can kind of touch on is that you know, after the milling process goes through, we we may uncover some additional areas that need to be repaired and some patching.
- 9:15SPEAKER_01: So uh never never be surprised when that happens.
- 9:19SPEAKER_01: Uh always try to account for that contingency for sure.
- 9:21SPEAKER_02: Yeah, and we talked about that in in pretty good detail in a previous podcast.
- 9:26SPEAKER_02: But doing these base repairs, this is your opportunity.
- 9:29SPEAKER_01: This is the time.
- 9:30SPEAKER_02: This is the time to build it off.
- 9:31SPEAKER_02: I mean, ideally in a lot of projects, you'll do this before you mill.
- 9:34SPEAKER_02: You'll do your base, you'll have areas that you've identified that need to be worked on and fixed, and then you'll do them you know, prior and do the milling.
- 9:44SPEAKER_02: But if you expose something through the milling operation, don't, you know, you've got to have, and so I I think that it's important for an agency to have this in mind that those are things that can happen.
- 9:57SPEAKER_02: And you may see this and try to build in some contingency and try to have some allowance and you know, but lean on your local contractor, your pr your your contractor that's out there, if they come to you and say, you know, we found a few things you might want to address this, you really ought to get with them and to say, hey, let's stop here for a second, let's go look at what we're seeing out here and have an opportunity to fix that.
- 10:24SPEAKER_02: Before we go and say, okay, it's time to put the overlay we've milled.
- 10:28SPEAKER_01: No, for sure.
- 10:29SPEAKER_02: So I think that's important.
- 10:30SPEAKER_01: Yeah, you can't can't can't stress that one enough.
- 10:32SPEAKER_01: Yeah.
- 10:32SPEAKER_02: Something that's really important is having a clean milled surface.
- 10:38SPEAKER_02: And what I'm talking about there, and you can elaborate on this, is milling is creates a tremendous amount of dust in fines.
- 10:47SPEAKER_02: You've got this milling head that is grinding up that existing asphalt.
- 10:52SPEAKER_01: And it has a texture, and that's where those fines will get get caught up in.
- 10:56SPEAKER_02: Yes, exactly.
- 10:57SPEAKER_02: So you've got a lot of dust that can settle there.
- 11:00SPEAKER_02: That has got to get out of there before you put that overlay it in.
- 11:05SPEAKER_01: Yeah, before before you tack.
- 11:06SPEAKER_01: It needs to be it needs to be uh cleaned up.
- 11:09SPEAKER_01: Uh uh TextOt has an item that that goes into great detail.
- 11:13SPEAKER_01: Item 354.
- 11:14SPEAKER_01: It has some uh sweeper requirements on what's really required there.
- 11:18SPEAKER_01: Um, you know, if you're going to uh you know, water can can help keep the dust down, but then you know you then that water dries and then you have you know back back to getting the fines out of there.
- 11:27SPEAKER_01: Uh vacuum trucks are uh used in a lot of urban settings uh to uh to kind of suck up that dust.
- 11:33SPEAKER_01: I think the uh the ten dollar word is a regenerative air vacuum sweeper.
- 11:38SPEAKER_01: That's the the San Antonio area.
- 11:40SPEAKER_01: They that's kind of what their some of their practices are.
- 11:44SPEAKER_02: Kind of a a a special uh note.
- 11:46SPEAKER_01: A general note.
- 11:46SPEAKER_02: Yeah, a general note in the plans.
- 11:48SPEAKER_02: Yeah, and that that item 354 is pretty clear that you know you need a broom with water.
- 11:53SPEAKER_02: With water.
- 11:54SPEAKER_02: Uh with some pickup apparatus apparatus and uh a debris hopper.
- 11:59SPEAKER_02: And if you're doing that, um you're you're gonna do a pretty good job of it.
- 12:04SPEAKER_02: Now, on a lot of text on highway work where they have the ability because they don't have to open it up, you know, they they may have be able to switch lanes, things like that.
- 12:14SPEAKER_01: You may have enough structure there to let traffic run on it for a few days, and that does a great job.
- 12:18SPEAKER_02: Right.
- 12:19SPEAKER_02: The traffic uh will will help suck that up and blow it out, and the wheels will knock it out of the wheel pads and things like that.
- 12:26SPEAKER_02: But um, you know, in if you if you don't if you have the ability to have some kind of a vacuum truck apparatus, you know, you know you're gonna get that out of there.
- 12:39SPEAKER_02: But uh it is really, really important that you have a clean surface.
- 12:43SPEAKER_02: That milled surface has got to be cleaned off.
- 12:46SPEAKER_01: It needs to be clean and dry.
- 12:47SPEAKER_01: Yeah.
- 12:48SPEAKER_02: If if you've ever driven through an area that's been milled before it's been broomed or cleaned up, you'll be able to do that.
- 12:55SPEAKER_01: It's a dust storm.
- 12:56SPEAKER_02: Yeah, it is a dust storm.
- 12:57SPEAKER_02: I was on a highway, you know, in Austin and they had done milling overnight.
- 13:02SPEAKER_02: Um, and I think that you know maybe they were running a little late or something like that, but they opened that milled surface.
- 13:09SPEAKER_02: Uh it was like, but it's 5 30 in the morning.
- 13:11SPEAKER_02: They opened that milled surface, and I I hit that, and I mean it was like a dust storm.
- 13:16SPEAKER_02: And a lot of debris, you know, kind of tapping on the windshield and you know, making a making a lot of noise.
- 13:23SPEAKER_02: So you don't want that, and you certainly cannot pave on top of that because you are gonna have a heck of a time with getting good bonding.
- 13:32SPEAKER_02: And talk a little bit about in addition to that.
- 13:34SPEAKER_02: So say we've done that, that doesn't mean you're it doesn't mean you don't have to tack it.
- 13:38SPEAKER_01: No, that doesn't mean you have to attack.
- 13:39SPEAKER_01: No, the uh no for the for the overlay to work, it needs to be bonded to the rest of the pavement structure.
- 13:44SPEAKER_01: And that structure beneath the overlay needs to be stable and in good shape, as we talk so much about surface prep.
- 13:50SPEAKER_01: But the the the tack is is vitally important to that, and that really only is only going to work if it's clean and dry.
- 13:56SPEAKER_01: So once you once you've achieved all of that, um, you know, you don't want to you know clean it and then let it sit for two weeks.
- 14:02SPEAKER_01: You want to make sure it's clean and dry immediately before that tack goes down.
- 14:06SPEAKER_01: And uh the the tack is there to uh to to bond uh the asphalt to to the to the material beneath it, and so it's uh vitally important uh for that to happen.
- 14:16SPEAKER_02: We talked about it before, but let's uh let's re-emphasize it.
- 14:19SPEAKER_02: So you've got some exposed faces, vertical faces.
- 14:22SPEAKER_01: Tack uh when in doubt tack, tack vertical faces, uh take tack to into the adjacent lane, tack up against the curb, uh, tack up against the manhole, uh, when in doubt tack.
- 14:33SPEAKER_01: And uh it's so it's so important in our uh item 341 specification.
- 14:36SPEAKER_01: We recommend that uh that you uh pay for tack by uh by volume as a specific bet item.
- 14:42SPEAKER_01: It's that important.
- 14:43SPEAKER_02: Yep, it is that important.
- 14:44SPEAKER_02: And you know, on that topic, um milling, you know, that uh it can it can go either way.
- 14:51SPEAKER_02: I mean, sometimes if it's a mill and overlay and that's the primary function, that that that milling um is is pay item is it can be by the square yard.
- 15:01SPEAKER_01: Um but if you're if you're I've also seen it where it can be uh incidental, you know, incidental to the uh Yeah, we we've seen it uh handled a variety of different ways, you know that, and who's gonna own the wrap, where is it gonna go to, a lot of those decisions you need to uh make uh in advance as part of the the bid package process.
- 15:20SPEAKER_01: Just be very clear about whatever the plan is, yeah, where that material is gonna go, who's gonna own it, and uh where it needs to go, if the you know, if the county or the city wants to keep it, you know, where where where do they where does that need to be delivered to?
- 15:31SPEAKER_02: Exactly.
- 15:32SPEAKER_02: We've seen a lot with uh FDR projects where the FDR, you know, that pay item will include milling, and we've seen where milling is needed for um base repair.
- 15:43SPEAKER_02: If the project is a base or subgrade repair project, a large volume they may be incidental to the repair process.
- 15:51SPEAKER_02: Right, right.
- 15:52SPEAKER_02: But you know, as you said, think about these things in advance.
- 15:56SPEAKER_02: Make sure we have this lined out.
- 15:58SPEAKER_02: It's important to have all this lined out.
- 16:00SPEAKER_02: It's important that you know that the mix that's supposed to go back is the right mix.
- 16:05SPEAKER_02: Yeah, it's you know, we had a decent graded mix.
- 16:07SPEAKER_01: Yeah, we're gonna we're gonna mill out a certain thickness.
- 16:09SPEAKER_01: We need to make sure that that uh mix is appropriate for that thickness that's gonna go back.
- 16:13SPEAKER_01: This is also a good time if you had some some odd and even areas that it kind of scabbed out or and things like that.
- 16:19SPEAKER_01: It's a great time to include level up in the bid package just so you can uh come back with that surface list uh lift being uh being a nice uh uniform layer for us to drive on.
- 16:29SPEAKER_02: Absolutely.
- 16:30SPEAKER_02: You know, another thing that um we we talk about a lot because it's important is making sure we get joints, good joint practices, good joint construction, and also you know, we're milling.
- 16:45SPEAKER_02: We're sometimes we may be milling and there may be a little bit of widening, or there may be some changes in the features, and we don't see it all the time, but we do see it from time to time, and you'll go out there and realize that we're about to overlay.
- 17:01SPEAKER_02: We've just milled and we're gonna do some other work, and we may be adding some capacity, or there may be some changes in how this road's gonna look.
- 17:09SPEAKER_02: It's a little bit different than what was there before in terms of width.
- 17:14SPEAKER_02: Don't have that longitudinal joint smack in a wheel path.
- 17:19SPEAKER_01: Right, absolutely.
- 17:20SPEAKER_01: That's that's uh that's a big part about paving up your or setting up your paving plan is to definitely want to do that.
- 17:25SPEAKER_01: And then not only in a wheel path, but if you expose uh uh a layer of asphalt beneath that, you don't want your longitudinal joint to line up directly on top of a previous longitudinal joint.
- 17:36SPEAKER_01: Definitely something to take take a look at.
- 17:38SPEAKER_02: Yeah, absolutely, absolutely.
- 17:40SPEAKER_02: So let's talk about the paving process.
- 17:42SPEAKER_01: You know, we talked about the we talked about the joints and everything.
- 17:45SPEAKER_01: Uh it's just going to be in a lot of the best practices we've talked about before.
- 17:49SPEAKER_01: Uh, we want to make sure that we have the right mix uh uh selected.
- 17:52SPEAKER_01: We want to make sure that we've had a pre-pave meeting to talk about the logistics and who's going to do what, make sure everybody knows who they are and we have a good plan in place, whether that's the the traffic control, the volumes we think we're going to pave that day, um, the inspection and testing plan.
- 18:08SPEAKER_01: And then really, um, you know, as that mix gets uh being delivered, do we have the right number of trucks?
- 18:13SPEAKER_01: We paving the right time of day, weather, all of those things.
- 18:15SPEAKER_01: And we have uh, you know, that the the mix is coming in, we get to check our the the temperatures uh and really just set up that paver to uh to the paving train to for success by having consistent material delivery, uh consistent paving speeds, all of those.
- 18:30SPEAKER_02: Yep.
- 18:31SPEAKER_02: And this goes back to just good paving practices.
- 18:34SPEAKER_02: Once you've got a milled surface, you're good to go.
- 18:37SPEAKER_02: All the things we talk about about hot mixed paving now come into play.
- 18:41SPEAKER_02: Yeah, you've done all the things up front.
- 18:44SPEAKER_02: It's just important to do it up front.
- 18:45SPEAKER_02: And you mentioned the pre-paved meeting, um and even in in in pre-con in general, or you know, allow questions, you know.
- 19:00SPEAKER_02: I I think that yeah, ask questions.
- 19:02SPEAKER_01: If you're curious, uh be curious.
- 19:03SPEAKER_01: That is absolutely the time to be curious.
- 19:05SPEAKER_01: Just ask a lot of questions.
- 19:06SPEAKER_01: How are you gonna do this?
- 19:08SPEAKER_01: How are you gonna how are you gonna start off uh the each day paving?
- 19:11SPEAKER_01: How are you gonna come off or what are you doing to try to mitigate a giant bump at the transverse joint when you're starting each day?
- 19:17SPEAKER_01: Um, what do you do if um all the questions in our all-hands plan?
- 19:21SPEAKER_01: What do you do if weather happens?
- 19:23SPEAKER_01: Uh what do you do if uh the plant breaks down?
- 19:25SPEAKER_01: Where how all all of those things, those are the times to talk about it before we get out there.
- 19:30SPEAKER_02: Yeah, there's no question about it, David.
- 19:31SPEAKER_02: Having uh, you know, building you know, uh contingencies and uh scenarios for if something pops up or crops up, it's so much better to talk about these things before we're ever out there paving.
- 19:45SPEAKER_02: And it helps too with the and you know, going back to making, you know, want to discuss that how important it is to have that milled surface to be clean.
- 19:54SPEAKER_02: So talk about some of those techniques.
- 19:56SPEAKER_02: You could talk about are we hey, are we going to use a broom with water?
- 20:00SPEAKER_02: Uh do you are we going to require or does the city have vacuum trucks?
- 20:04SPEAKER_02: Uh you know, some of the bigger ones do because they do a lot of that type of work.
- 20:08SPEAKER_01: Or maybe an area where dust isn't necessarily that big of an issue, and we'll use an air compressor.
- 20:13SPEAKER_01: I mean, there's some different things you can do for that right there, that last, that last final check before before we start proceeding.
- 20:19SPEAKER_01: Well, the dust control.
- 20:19SPEAKER_02: Yeah, dust control is something we didn't we we mentioned it, but there are some urban areas where that milling operation can create a tremendous amount of dust.
- 20:29SPEAKER_02: And so having, you know, this regenerative air vac, yeah.
- 20:33SPEAKER_02: Yeah, the air vac that is not allowing that stuff to get up, that dust to fly all over the place, oncoming traffic, uh, or you know in a neighborhood close to uh uh some infrastructure that you don't want a bunch of dust, whether it's schools or playground or something.
- 20:50SPEAKER_02: Or a car lot that's got a bunch of brand new cars sitting there.
- 20:53SPEAKER_02: Yeah, more houses.
- 20:54SPEAKER_02: Nope, nobody wants that in their front yard.
- 20:56SPEAKER_01: So though, but those are all things to think about as you're scoping the job to make sure that's very clear on whatever is going to be required, whatever your expectation is, have that conversation.
- 21:05SPEAKER_01: A lot of times that's even a scoping thing before the bid even comes out.
- 21:08SPEAKER_02: It is a scoping thing, and then it's something that you highlight and say, hey, by the way, remember we need to make sure this is the control is dust.
- 21:18SPEAKER_02: We're going to this is our expectation, is that all our expectations and handle that kind of stuff in the uh in the pre-paved meeting.
- 21:25SPEAKER_02: Yeah.
- 21:26SPEAKER_02: And then we we also stress that you know you you really ought to be doing daily debriefs if possible, um, if not daily, at least at some really pretty good frequency, so that after you've gone through things, say, hey, what did we learn today?
- 21:42SPEAKER_02: What any lessons we learned?
- 21:44SPEAKER_02: Is anything we need to do differently tomorrow?
- 21:46SPEAKER_02: Uh, and keep everybody engaged, the contractor, the agency's rep.
- 21:51SPEAKER_01: Good communication will solve solve a lot of problems.
- 21:54SPEAKER_01: It's it's a lot of heartache, too.
- 21:56SPEAKER_01: It's avoided.
- 21:57SPEAKER_01: It's football season.
- 21:58SPEAKER_01: You hope your coaches are talking during time.
- 22:00SPEAKER_01: To figure out what's going on.
- 22:01SPEAKER_01: And if you need to adjust the game plan, adjust the game plan.
- 22:04SPEAKER_01: Those are good opportunities to do that if you're communicating well.
- 22:09SPEAKER_02: And we've also talked uh a number of times about inspection testing.
- 22:15SPEAKER_02: Once we're paving that, you know, once that overlay is going down, we're back to uh the the practices, the best practices for optics paving.
- 22:27SPEAKER_01: And that's we we we talked about that on on previous episodes that you know definitely want to uh make sure that we're inspecting the production of the mix, that we have that set up in the specification.
- 22:38SPEAKER_01: Yep.
- 22:38SPEAKER_01: Uh that we are we're inspecting that and we know the the in the prepave, we know who's doing that, what frequency, um, just so we know that the material is being produced that meets our specification.
- 22:49SPEAKER_01: And then as it's being delivered, you know, we're that process has been approved, and it when it gets there, we're also uh checking it uh when it shows up, and we're checking it through the paver.
- 22:59SPEAKER_01: And there are a variety of those different tests.
- 23:02SPEAKER_01: Temperature is a big one.
- 23:03SPEAKER_01: That's that's a big one.
- 23:05SPEAKER_00: Yep.
- 23:05SPEAKER_01: Um as Danny Gerhart with the Asphalt Institute would tell us, if you're worried about compaction, the three things you need to check are temperature, temperature, temperature.
- 23:14SPEAKER_02: That is a big one, you know, looking for all the things, segregation, all that type of stuff, you know, making sure that we're just getting a good mat.
- 23:22SPEAKER_02: And um I'll I'll I'll throw this plug in because I do it all I've done it probably half a dozen times over the last year, but it's so important for an agency to have representation for the owner on a project.
- 23:38SPEAKER_02: Um while and we talk about this, our 341 M specification, which mirrors in a lot of ways text.spec uh for dense graded, and again, this is a dense graded topic here uh because that's what 341M is, is we we want to make sure if you were to follow that, you know that if you're gonna accept contract results as your acceptance, and we do see that.
- 24:04SPEAKER_02: Um, their people, the people that are doing this work are certified and credentialed and credentialed.
- 24:13SPEAKER_02: Um in my mind, that doesn't take the place of an agency having some means, some mechanism, whether it's internal staff or if they go outside to a qualified testing lab, to have somebody representing you to make sure that your your interests are being represented as an agency and working in conjunction with the contractors, folks.
- 24:40SPEAKER_02: Um, you know, it's going to give you your best opportunity.
- 24:43SPEAKER_02: Yeah.
- 24:43SPEAKER_02: So I think that's really important.
- 24:45SPEAKER_01: It's good.
- 24:45SPEAKER_01: It it leads to a good quality, uh, an additional set of eyes and additional data points are always good for that, for that, for that process.
- 24:52SPEAKER_01: And and uh that really just goes into risk management for the agency, for the owner, on uh how how they're you know, this is a uh these projects are significant projects for most uh most local agencies, and you don't want to uh don't want to to miss the one thing that you could have could have done to uh to make sure you get a good product.
- 25:10SPEAKER_02: Yeah, you know, I've heard we can't afford to do our own QA, and you know, you've heard me say it, Product, you're tired of hearing me say it, but you can't.
- 25:19SPEAKER_02: You really have to have, you really should, because there are many really good testing labs here in the state of Texas that you can hire on an as-needed basis for a project and you know, spending that money.
- 25:35SPEAKER_02: I don't like paying insurance premiums.
- 25:37SPEAKER_02: Nobody does.
- 25:39SPEAKER_02: Um I pay insurance premiums so that I'm covered if something catastrophic happens.
- 25:44SPEAKER_02: And you know, having, you know, to me, having uh either doing it in-house or having an outside company being able to perform that work for you, you're paying a little bit now, but in my mind you're you're you're buying some insurance there to avoid you know having uh a lawsuit or having to go to the courthouse, as they say, uh after the fact.
- 26:09SPEAKER_02: Because you know what?
- 26:10SPEAKER_02: You're gonna pay.
- 26:11SPEAKER_02: Yeah, it's gonna be a lot more than if you would have had a pretty decent little QA program.
- 26:16SPEAKER_01: Yeah, and typically it's single-digit percents of the uh construction costs.
- 26:20SPEAKER_01: It's uh it's you know, in the you know, one, two, three percent for testing is what we see that's uh pretty common.
- 26:26SPEAKER_01: Uh so there in that we uh in 341M we we we built in some flexibility for a variety of things uh for that.
- 26:32SPEAKER_01: So it's definitely um if you can afford to pay if you can afford to get some tests.
- 26:36SPEAKER_02: Dennis, these are all important things.
- 26:38SPEAKER_02: I'm glad we I'm glad we talked about this today.
- 26:40SPEAKER_02: Um cannot emphasize in mill and overlay is such a common.
- 26:45SPEAKER_02: It's a typical project for us.
- 26:47SPEAKER_02: Typical project, very, very common.
- 26:49SPEAKER_02: So um just want to make sure we're paying attention.
- 26:52SPEAKER_02: So let's close out here.
- 26:53SPEAKER_02: You know, obviously start below the surface, identify, you know, properly uh execute uh repairs that need to be done, whether it's base failures, patching.
- 27:03SPEAKER_02: That's another thing.
- 27:04SPEAKER_02: You may find areas that need to be patched after you mill.
- 27:07SPEAKER_02: You know, so that's important.
- 27:09SPEAKER_02: Uh if there's any drainage issue issues that can be addressed when you're doing this milling process, uh, then you know, do that.
- 27:16SPEAKER_02: Um you know, just take care of underlying problems.
- 27:18SPEAKER_01: Absolutely.
- 27:18SPEAKER_01: And then once we know what we do the milling, we're gonna make sure that that process uh achieves the target that we're looking for.
- 27:24SPEAKER_01: And then uh is the the final step, make sure that uh surface is clean and dry.
- 27:30SPEAKER_01: Uh we talked quite a bit about that process, and then get a good tack coat down and pay for the tack as a bid item.
- 27:36SPEAKER_02: Yep.
- 27:37SPEAKER_02: And uh, of course, we talked about, you know, it's a little late in the game to say, oh, we don't have the right mix, but pay attention to that because you're coming back with an overlay, and that overlay, depending on what the thickness is, uh, you you should have in your design the right target in terms of the size of aggregate to make sure you're going to be able to get good compaction and good density.
- 28:02SPEAKER_02: Uh so you know, just making sure that is done, um, making sure that we have discussed the you know, these pre-paves are critical and let's handle that.
- 28:11SPEAKER_02: Uh things like the schedule of the day.
- 28:14SPEAKER_02: I mean, if you got you know one paver and you've got all these trucks, are these is the are the trucks and the delivery of that hot mix matching up with the production rate of that paving crew so that we've got good temperature control?
- 28:29SPEAKER_01: It's the good it's the good song of dance from the plant to the trucks uh to the paver and the rollers.
- 28:34SPEAKER_01: Make sure all of that is uh all that's going going in unison.
- 28:37SPEAKER_02: And just keep in mind it's a team effort, quality is a team effort, and the agency and the contractor both have a role to play in that.
- 28:45SPEAKER_02: Both have a role to play and are all on the same team, trying to get a good quality hot mix project.
- 28:52SPEAKER_02: So, Dennis, you know what time it is.
- 28:54SPEAKER_01: Top 10 list.
- 28:55SPEAKER_01: Let's do it.
- 28:56SPEAKER_01: Let's go.
- 28:57SPEAKER_01: The top 10 signs your mill and overlay project might be in trouble.
- 29:02SPEAKER_02: Reason number 10.
- 29:04SPEAKER_02: The prepaid meeting is scheduled for after the paving starts.
- 29:07SPEAKER_02: That's a good time for it.
- 29:09SPEAKER_01: Oops.
- 29:09SPEAKER_01: Number nine, the answer to how much are we milling is until it looks about right.
- 29:15SPEAKER_02: That's probably not so good.
- 29:17SPEAKER_02: Reason number eight, someone says, don't worry about that soft spot, the overlabel bridge.
- 29:23SPEAKER_01: Good luck.
- 29:24SPEAKER_01: Number seven, the surface prep plan consists of a skid steer and a leaf blower.
- 29:31SPEAKER_02: Reason number six, the tack truck gets introduced as that thing that's slowing down the paving operation.
- 29:38SPEAKER_01: It's usually me.
- 29:39SPEAKER_01: Number five, the mixed collection process was, you know, whatever did we use last time.
- 29:45SPEAKER_02: Reason number four, the paving crew asks where the full-depth repairs are, and everyone suddenly becomes very interested in their phones.
- 29:54SPEAKER_01: Number three, density is low, but somebody points out that the mat sure does look good.
- 30:00SPEAKER_02: Always looks good right off the bat.
- 30:03SPEAKER_02: Reason number two, the rain is five minutes away, but somebody says, I think we can get one more load down.
- 30:10SPEAKER_02: Heard that one before.
- 30:11SPEAKER_01: And the number one sign that your Mellon Overlay project might be in trouble.
- 30:16SPEAKER_01: The project specification says two benches of pot mex, and that's pretty much the entire spec.
- 30:23SPEAKER_01: We can't have that.
- 30:24SPEAKER_01: If any of these sound familiar, this episode's for you.
- 30:28SPEAKER_02: Larry, what do we have for the project of the month?
- 30:30SPEAKER_02: Project of the month is uh a full roadway reconstruction project done at Fort Hood, Texas.
- 30:37SPEAKER_02: The uh first award-winning project ever done at Fort Hood, Texas.
- 30:41SPEAKER_02: The Turkey Run Reconstruction Project included 2,700 tons of dense graded level-up mix and 2,100 tons of dense graded surface mix, both utilizing PG 70-22 binder.
- 30:54SPEAKER_02: From planning through construction, the Fort Hood Engineering Team and Texas Materials Group worked together with a shared commitment to deliver a ward-winning roadway project.
- 31:05SPEAKER_02: Evaluators praise the project for its nearly perfect overall appearance, exceptionally smooth transitions, and outstanding ride quality with an average IRI, the International Roughness Index, of just 43.
- 31:20SPEAKER_02: The project exemplifies excellence in asphalt pavement construction.
- 31:24SPEAKER_01: We hope you enjoyed this episode of Roadmaps and our conversation about best practices on the mill and overlay project.
- 31:30SPEAKER_01: We look forward to seeing you at a 2027 MAPS conference.
- 31:33SPEAKER_01: And remember, Larry, stay flexible.
- 31:39SPEAKER_02: Thanks for tuning in for this month's episode of Roadmaps.
- 31:43SPEAKER_02: If you enjoyed today's episode, feel free to like and subscribe and follow us on our social media channels at Texas Asphalt Payment Association.
- 31:52SPEAKER_02: Stay flexible, and we'll see you next time.