- 0:01SPEAKER_00: Welcome to Roadmaps, the podcast for Texas local agencies and the firms that support them to plan, design, build, and maintain local roads.
- 0:11SPEAKER_00: On Roadmaps, we break down design, mix types, construction and maintenance, sharing plain-spoken, practical insights you can put to work right away.
- 0:20SPEAKER_00: Asphalt is a flexible pavement engineered for optimum performance so your community gets a stronger, safer, longer lasting road.
- 0:28SPEAKER_00: The roadmap's philosophy is simple.
- 0:30SPEAKER_00: Stay flexible.
- 0:31SPEAKER_00: Enjoy today's episode.
- 0:33SPEAKER_00: Welcome to this episode of Roadmaps.
- 0:35SPEAKER_00: Our topic is quality control and quality assurance.
- 0:39SPEAKER_00: But let's go ahead and start with our safety share.
- 0:41SPEAKER_01: This episode's safety share is about summer road trips, and we all the things we need to do is we get the family in the car and go out and see America.
- 0:50SPEAKER_01: First thing you want to do is make sure the air conditioner works.
- 0:53SPEAKER_01: If you've been across the south, you want to know how important that is.
- 0:56SPEAKER_01: You want to make sure all your belts and hoses and all the fluids have been checked, make sure your tires and brakes are in good condition, make sure you got a battery.
- 1:04SPEAKER_01: We ran out of that and had that problem last year in Louisiana.
- 1:07SPEAKER_01: And the last thing we want to make sure is that you have a plan of where you're going, where you're staying, and where you're going to eat and where you're going to have fun.
- 1:13SPEAKER_01: Thank you.
- 1:14SPEAKER_01: And now let's get into this episode's topic.
- 1:17SPEAKER_00: So, Dennis, today we're talking about quality control, quality assurance.
- 1:20SPEAKER_00: I mean, that's our our title, uh, but quality control, quality assurance, quality acceptance.
- 1:25SPEAKER_00: Uh, you know, there's I think a lot of times people might think, well, that's all one and the same.
- 1:32SPEAKER_00: And while there's similarities uh and there's some things that fit in quality control and quality assurance, there's definitely some defined roles, responsibilities.
- 1:42SPEAKER_00: You've got producers and contractors that are building roads, you've got your local agencies that we call the owners.
- 1:51SPEAKER_00: I mean, they own the road, they're the customer that the road's being built for.
- 1:55SPEAKER_00: But each one of those has uh has different roles in terms of how are we making sure that this project is sticking to the specifications, the plans, how it was put together, how it was bid, how it was constructed, and how it was accepted.
- 2:11SPEAKER_00: So, like for instance, why don't we start with quality control?
- 2:15SPEAKER_00: QC, by the way, QC QA, right?
- 2:17SPEAKER_00: Yeah.
- 2:18SPEAKER_00: So why don't we talk about uh kind of kick it off with quality control?
- 2:22SPEAKER_01: Yeah, quality control is very important.
- 2:24SPEAKER_01: You know, quality is uh uh very important to us at TechSappa.
- 2:28SPEAKER_01: You know, we have a robust uh quality uh pavement awards program we're very proud of, and so it really starts with quality control.
- 2:34SPEAKER_01: And um, you know, typically it's uh we always like to say it's everyone's responsibility, but uh from a contractual standpoint, it usually falls directly onto the producer and the placer's responsibility on what they're supposed to do uh to make sure we are getting um the road that we want built out there.
- 2:51SPEAKER_01: How do they do that?
- 2:52SPEAKER_01: Well, it it all starts with the quality control plan.
- 2:55SPEAKER_01: Um we do uh we uh advocate that this needs to be in writing and it needs to be robust, it needs to name names on who's going to do what part of the functions for QC, and um and it needs to be done beforehand.
- 3:07SPEAKER_01: We do not want to uh to try to invent this uh while we have material and men and equipment in the field.
- 3:13SPEAKER_01: That's definitely we need to do that beforehand.
- 3:16SPEAKER_01: Um it also includes a lot of a variety of other things, um the material submittals, mixed designs, uh things like that.
- 3:23SPEAKER_01: Another big component, uh prepaved meetings, make sure that we talk about everything that's in that quality control plan.
- 3:29SPEAKER_01: Uh when are we going to run certain tests, who's gonna run those tests, who's gonna be responsible for reporting the data and to whom, and uh just to make sure that we also, you know, we run a test, we want it to be repeatable, and then make sure we have the right forms and checklists and um and all those things there so we can do it in an organized manner as well.
- 3:47SPEAKER_00: Yeah, you know, and you you mentioned prepaid meetings and uh how really important those things are, and again, I think when we're talking, you know, we we we're doing all this stuff for we're really our emphasis on local agencies, and a lot of times we look at what TechSot does, and it's kind of a different process, and it's a very, very thorough process, and but then there's a lot of variability between local agencies about how they go about uh you know prosecuting this work.
- 4:19SPEAKER_00: And um the prepaid meetings, I mean, to me, uh it gives you a chance before you're out there, you know, kind of on the battlefield, so to speak, of developing scenarios about okay, if this happened, as you said, who is going to do what and what is that process, but also if something happens that uh you either don't want or didn't expect, it gives you an opportunity in advance to say this is what we're going to do if this was to come up, rather than being out there in the field and you didn't discuss it and then it's a surprise to everybody.
- 4:57SPEAKER_00: It's a surprise to everybody, and it's a lot easier to talk about things.
- 5:02SPEAKER_00: Um if you and I are having a conversation, hey, we're gonna go do this thing, and we here's how it's gonna go when we do it, as opposed to you and I go out there, we might be putting a tent up to go camping, and uh, we didn't talk about putting the tent up week out there.
- 5:17SPEAKER_00: We end up and it's going, it's not going well.
- 5:20SPEAKER_00: We're gonna get mad at each other.
- 5:21SPEAKER_00: We are, yeah.
- 5:22SPEAKER_01: And as a dad of a Cub Scout, we've we've had those fights.
- 5:25SPEAKER_01: Exactly.
- 5:26SPEAKER_01: Me too.
- 5:27SPEAKER_01: I was too.
- 5:27SPEAKER_01: You want you want you want to make it look like we've done this before.
- 5:30SPEAKER_01: And and a lot of that starts with the quality control, clear communication, everything like that.
- 5:35SPEAKER_01: You want to know um, you know, do we uh do we um do we have a tent?
- 5:39SPEAKER_01: Do we uh does the paper, does it work, is it maintained, and who's who's gonna run it?
- 5:43SPEAKER_01: All all those things we need to talk about beforehand.
- 5:46SPEAKER_00: Yeah, I think that's uh that's important.
- 5:49SPEAKER_00: And you know, we we talk about this a lot and and we we have these local agency conferences we do, maps program, it's called, um, and we have we have an entire section and presentation that talks about the importance of these types of things.
- 6:03SPEAKER_00: So I guess as a plug that we we would urge uh all local agencies that are watching this, uh if you're an owner or working for an agency uh and you're representing that owner, you might be a uh a lab that's uh or a uh a consulting firm that is uh that is has a a contract with the with a city or a county, um, you know, make sure that you have a pre-paid meeting as part of the program before you can.
- 6:32SPEAKER_01: And a written quality control plan.
- 6:33SPEAKER_00: And a written quality control plan, absolutely.
- 6:36SPEAKER_00: And so quality control though, what are those, what are the aspects from for asphalt paving on quality control?
- 6:44SPEAKER_01: So we're gonna do a lot of things.
- 6:46SPEAKER_01: We're gonna look at the um the the material production.
- 6:49SPEAKER_01: Um and there's if we go back to the text dot uh uh side of the world, there's a suite of tests that we run to uh to make sure that we are producing the material of the quality that we want to build with.
- 7:00SPEAKER_01: And uh then that will be uh you know transported over.
- 7:02SPEAKER_01: You know, the qual the uh quality control plan should also include some trucking mechanism because we have to move that mix from the uh plant to the field.
- 7:10SPEAKER_01: And then we'll also have that uh that process outlined um at the field when we get the material delivered.
- 7:16SPEAKER_01: How are we going to get it in front of the paver, how are we gonna get it paved, and all those things that we're gonna have to do, checking temperature, checking compaction, all those things uh that make sure the contractor is following the process they need to have.
- 7:28SPEAKER_00: Yep, because a lot of that quality control is on the contractor, but let's just make sure that it's understood.
- 7:34SPEAKER_01: Absolutely.
- 7:34SPEAKER_01: Who's doing what?
- 7:35SPEAKER_01: Yeah, exactly.
- 7:36SPEAKER_01: And and when and how frequently we're going to test, all those things will be built into that plan.
- 7:41SPEAKER_00: That's a that's really important.
- 7:43SPEAKER_00: And then um so then we have quality assurance, you know, or the acceptance side of things.
- 7:49SPEAKER_00: Um, and uh that's a little bit different.
- 7:53SPEAKER_00: Uh now there are some testing, particularly at OES.
- 7:57SPEAKER_01: Yes, so a lot of the a lot of the tests are going to be the same tests, uh, but the reason why we rung them on on different side of the QCQA fence has a completely different uh objective.
- 8:07SPEAKER_01: You know, one we're looking at process control, and the other one we're looking at, you know, some some uh some some other type thing is can we accept this work?
- 8:15SPEAKER_00: What we have seen, and this is kind of uh you know, I I you know it's it's an issue.
- 8:20SPEAKER_00: I think that uh a lot of times we will see a local agency, and I we hear this all the time, and I know you do too, and you were you know operating in this world where the agency, the owner, their form of quality acceptance, quality assurance, is that they're going to take contractor results as, you know, contractor test results.
- 8:44SPEAKER_00: Um I'm not saying that there's that that that I mean it's better than doing nothing at all.
- 8:50SPEAKER_00: However, you know, you still want if you're going to be accepting contractor test results, producer test results, as your form of quality assurance, quality acceptance, you need to have some things in there to make sure that you are getting it, getting what it is you're buying, so to speak.
- 9:09SPEAKER_01: Yeah, absolutely.
- 9:09SPEAKER_01: One of our things is making sure that uh the the the uh the technician running the tests on the quality control side, if they are going to be used for acceptance, or regardless what they're gonna be used for acceptance or not, to make sure they're qualified and and certified.
- 9:22SPEAKER_01: Now, you know, there's a uh a pretty detailed uh certification process for the 1A uh specialists at the plant and the one B roadway specialists uh to uh to make sure that they uh they are capable and they have the right equipment to run those tests.
- 9:36SPEAKER_00: You know, there's a a lot of old sayings, right?
- 9:38SPEAKER_00: We hear about when one you know, one you hear quite a bit is uh, you know, we we don't do what's expected, we do what's inspect inspected, right?
- 9:47SPEAKER_00: You know, I mean and uh and and I always say this because I and uh because it's true and I really mean it.
- 9:54SPEAKER_00: Most contractors, producers, contractors, certainly the ones that are members of TechSappa, they want to do a good job.
- 10:02SPEAKER_00: They want to build a good project.
- 10:03SPEAKER_00: You know, they take pride in their work, and uh and so uh they don't have a problem with the fact that you're going to test uh their material.
- 10:13SPEAKER_00: And you know, a lot of times that testing is not on it might be on a slightly different scale from what the quality control function is, right?
- 10:21SPEAKER_00: I mean the quality acceptance could be, you know, uh different frequency.
- 10:26SPEAKER_01: Right, different.
- 10:27SPEAKER_01: No, but you're you're right, though.
- 10:28SPEAKER_01: I mean, these guys they're they're gonna have their name on a sign leading up to the job, and you know, that's that's some something they want to stand behind.
- 10:35SPEAKER_00: And testing, you know, another old saying, what is it?
- 10:38SPEAKER_01: Yeah, one one test is worth a thousand expert opinions.
- 10:41SPEAKER_01: That's where used to remind us of that.
- 10:44SPEAKER_01: You know, we don't want to guess, just run it, run a test and figure out.
- 10:47SPEAKER_01: You know, we want to look at can we accept this road?
- 10:49SPEAKER_01: Well, let's let's let's find out, run some tests and see see what we have.
- 10:52SPEAKER_00: Yeah, and I mean we call it owner verification for a reason you know, trust but verify.
- 10:57SPEAKER_00: And I think that's just uh just like a lot of other processes when you're building a pavement, you know, you you want to have all these things built into it uh so that you know you're you know everybody is getting what they wanted.
- 11:11SPEAKER_00: The contractor is getting the opportunity to build a really good project.
- 11:16SPEAKER_00: The owner has some things in there in place in terms of testing and reporting that they can hang their hat on.
- 11:23SPEAKER_00: Everybody sleeps better at night.
- 11:25SPEAKER_01: Yeah, you know, it's all starts with you know a clear specification to outline what level we're going to do and who's gonna do it and what's uh which um you know how how we're gonna lay that that that that piece of it out.
- 11:36SPEAKER_01: Uh but definitely uh want to make sure that we uh we we have that discussed beforehand.
- 11:40SPEAKER_00: Yep.
- 11:41SPEAKER_00: You know, the uh uh so we have inspection, right, and we have testing.
- 11:46SPEAKER_00: That's a whole nother thing.
- 11:48SPEAKER_00: You know, a lot of times those get lumped in together.
- 11:50SPEAKER_00: Well, well, and sometimes it may be the same guy doing it.
- 11:52SPEAKER_00: It might be the same person doing it.
- 11:54SPEAKER_01: Yeah.
- 11:54SPEAKER_01: But the yeah, but part of you know, a testing technician wouldn't know that's someone that's actually going to run a test, a standardized test using uh a series of equipment, whether that's a um uh a density gauge or a straight edge or a thermometer to measure certain things.
- 12:10SPEAKER_01: And you know, inspection, uh we look at that as uh someone that's observing and documenting a process.
- 12:15SPEAKER_01: Was the process followed?
- 12:17SPEAKER_01: And there uh there's a nuanced difference there.
- 12:20SPEAKER_01: So uh uh just having an inspector on the job that uh doesn't have the credentials to run tests is not necessarily the best way to do it.
- 12:27SPEAKER_00: Right.
- 12:28SPEAKER_00: And you know, conversely, uh there are some of these test functions that technically that certified technician that is running that test is not really necessarily an inspector.
- 12:40SPEAKER_00: Now they may have been around a long time and they may know what they're looking at, and they may be able to see through empirical data and years of experience or watching something going on, and they can say, that when I run the test after they're done, that test is going to fail because they have the knowledge to be an inspector, but there's also folks that may be a little greener, they're certified, they can run the test perfectly, which is what you want.
- 13:04SPEAKER_00: You want that test and you want the results from running that test to be accurate and repeatable, but there is a bit of a difference between an inspector sometimes and a tester.
- 13:16SPEAKER_00: And we see a lot of times, I think in again with local agencies where the contractor has folks that know what they're doing, but a lot of times the owner doesn't have a good rep out there on their behalf, whether it's internal staff for that agency, or um if they don't have that person, then they ought to have some kind of outside help.
- 13:40SPEAKER_00: There's a lot of good what we call testing labs out there.
- 13:42SPEAKER_00: That's what they do.
- 13:43SPEAKER_00: They go out, they collect samples, they run tests, and they are representing the owner on the owner's behalf, doing the similar tests that are being done by the contractor.
- 13:54SPEAKER_00: But, you know, it's important that uh I mean, I think that any agency should make sure that somebody who is representing them, whether they're in-house or an outside consultant, have experience as an inspector, an inspector, that they're watching what's going on, right?
- 14:11SPEAKER_00: They're uh they're observing the process, I guess.
- 14:15SPEAKER_01: Yeah, you know, did did we did we pave in the right location, the right widths, the right and all all those things that uh may not necessarily show up on a random test.
- 14:23SPEAKER_01: For sure.
- 14:24SPEAKER_00: So, you know, we've been talking about the difference between inspection and testing, but Dennis, we didn't talk about some of the uh key tests that are done.
- 14:31SPEAKER_00: Uh why don't you uh tell us a little bit about that?
- 14:34SPEAKER_00: What what are the tests?
- 14:36SPEAKER_01: Yeah, so so at the plant we want to know or the material producing, uh what what what we're what we expect, what was in the submittals.
- 14:42SPEAKER_01: And uh so the one of the things we're gonna look at is uh is the gradation, uh what we're what we're looking for.
- 14:48SPEAKER_01: Uh so we'll test that.
- 14:49SPEAKER_01: Um and then we also want to make sure that we have the asphalt volumes that are in there.
- 14:54SPEAKER_01: Uh we'll also look at the uh uh can you compact it to get the the the density that we're looking for in a lab environment under ideal conditions, um using a superpaved girlatory press.
- 15:04SPEAKER_01: And so those are some of the big ones that we'll that we'll do during production.
- 15:08SPEAKER_01: And then while we're placing the material, we're gonna look at uh temperatures all along the way.
- 15:13SPEAKER_01: Um when it when it shows up, the temperature directly leads to compaction.
- 15:17SPEAKER_01: Um and then you know our densities where we're at, we're gonna establish or someone on the QC side should establish a rolling pattern uh for us so we can kind of figure out uh to make sure that process is working.
- 15:27SPEAKER_01: And really, we're looking uh for density and uh thermal segregation and uh you know some making sure that we have our joints, uh, the density along the longitudinal joint in the right spot.
- 15:37SPEAKER_01: And a lot of those are no density-related tests and temperature are very important in the field.
- 15:41SPEAKER_00: Yep, and and the the temperature is critically important.
- 15:45SPEAKER_00: And you know, if you are a lot of agencies will refer to a text dot spec, they say they want text dot mix.
- 15:50SPEAKER_00: And so if you have uh you should have a the latest text.spec, say it's a dense graded mix, you know.
- 15:56SPEAKER_00: I mean, that's item 341 now.
- 15:58SPEAKER_00: We've developed a local agency specification we talked about in the previous podcast called 3.41M.
- 16:04SPEAKER_00: But in there it gives things about ranges of temperatures, what's the maximum it can be produced at, what's the minimum it needs to be when it's being placed.
- 16:12SPEAKER_00: Uh, should we even pave today?
- 16:14SPEAKER_00: Yeah, should we even pave today?
- 16:15SPEAKER_00: What are the ambient conditions, what's going on in terms of that temperature?
- 16:19SPEAKER_00: Uh what is the temperature when we allow traffic to get on it?
- 16:24SPEAKER_00: You know, it it has to cool to a certain level before we're allowed to let traffic on it, and all those things are incorporated into a good thorough specification.
- 16:34SPEAKER_01: So and at the end of all that process, we'll pull a core.
- 16:37SPEAKER_00: Yeah, talk about coring.
- 16:38SPEAKER_00: Yeah, so tell somebody what a core is.
- 16:40SPEAKER_01: So we'll actually go out there and actually uh you want to you want to make sure the right temperature, you don't want to you do not want to core a hot pavement.
- 16:46SPEAKER_01: Um, but uh you will we'll pull an actual core um that will uh tell us a lot of things about the pavement.
- 16:52SPEAKER_01: We'll we can run a density check on it, the uh a thickness check on it to see uh did did we um in effect meet this finished product uh requirements that we're looking for.
- 17:02SPEAKER_01: Yes.
- 17:03SPEAKER_00: Yeah, and then uh that that core should have the properties that relate back to that initial mix design that was approved and the kind of asphalt that was being put down on that, so that you talked about gradation, that's the distribution of the different size of the rocks that are in there, the percent of asphalt binder, the glue that holds it together is put in at a certain percentage and approved in a mixed design.
- 17:30SPEAKER_00: And that roadway core can rep can be you know you can take that and go back and check is what's out there, what was produced, and what was supposed to have been produced.
- 17:43SPEAKER_01: Yeah, and so that that core will help us also correlate a lot of you know more frequent uh density gauge tests that will run, and that's you know a small handheld device that uh we don't need to pull a core for.
- 17:54SPEAKER_01: We can collect obviously a lot more of those tests, and a core will help us tile that together.
- 17:59SPEAKER_00: Yep, and we look for all those things you mentioned, you know, segregation and those types of things.
- 18:04SPEAKER_00: And you know, we can't pave an entire, you know, if you've got uh if you've got two lanes and it's 24 feet, there's you know, not one paver is gonna pave 24 feet wide, so we create these things that are called joints, right?
- 18:17SPEAKER_00: And uh and joint density and proper joint construction, and we can't we could spend the next two hours talking about that, Dennis.
- 18:25SPEAKER_00: But that's really important that that we get proper density and all that, and that is part of not just the QC function, but it's a big part of that quality acceptance, quality assurance.
- 18:36SPEAKER_01: Absolutely.
- 18:37SPEAKER_00: Well, great.
- 18:37SPEAKER_00: Well, thanks for thanks for uh pointing out some of the tests.
- 18:41SPEAKER_00: Thank you, Larry.
- 18:42SPEAKER_00: All right, Dennis, it's time for our top ten list.
- 18:45SPEAKER_00: Top ten reasons why you want to have a quality control and quality assurance program.
- 18:50SPEAKER_01: Number 10, because one test is worth 1,000 expert opinions.
- 18:55SPEAKER_00: Reason number nine, you want to sleep at night knowing you got what you paid for.
- 19:00SPEAKER_00: Absolutely.
- 19:01SPEAKER_00: Number eight, we want to know what they did and what they built.
- 19:06SPEAKER_00: Number seven, we want to know if you made some mistakes that they got fixed.
- 19:12SPEAKER_01: Absolutely.
- 19:13SPEAKER_01: Reason number six, we want to know that they know what they're doing.
- 19:18SPEAKER_00: Reason number five, we have to make sure that we use the best quality materials.
- 19:24SPEAKER_00: Number four, so we can vouch for the quality of the work.
- 19:29SPEAKER_00: Number three, you need confidence in long-term quality so that you know the road relaxed.
- 19:36SPEAKER_01: And number two, it's always good to have built-in accountability with testing and some documentation.
- 19:42SPEAKER_00: And the number one reason you want to have a good quality control and quality assurance program is so we can win the Texas Quality Payment Award.
- 19:54SPEAKER_01: Absolutely.
- 19:55SPEAKER_01: And now for our project of the month.
- 19:57SPEAKER_01: This month we're going to highlight Brazit's Bend State Park, Park Road 72.
- 20:01SPEAKER_01: It's down in the Houston area.
- 20:02SPEAKER_01: I hope you get out there to visit it this summer, see some alligators.
- 20:06SPEAKER_01: It is a four and a half mile project, mill overlay and base repair.
- 20:09SPEAKER_01: It's a great looking job.
- 20:11SPEAKER_01: Thank you.
- 20:11SPEAKER_01: If you like more information and resources, please go to our local agency hub on texasasphalt.org.
- 20:18SPEAKER_01: Thank you for joining us on this episode of Roadmaps.
- 20:21SPEAKER_01: And remember, stay flexible.
- 20:27SPEAKER_00: Thanks for tuning in to this episode of Roadmaps.
- 20:30SPEAKER_00: If you enjoyed the episode, feel free to like and subscribe.
- 20:34SPEAKER_00: And follow us on our social media channels, the Texas Asphalt Payment Association.
- 20:39SPEAKER_01: Stay flexible, and we'll see you next time.