Latest / Landing the Moon / LC 42: Grading the Artemis III Briefing
Transcript
- 0:15[Max] Okay, so get this.
- 0:17[Max] Friday morning, three people stand up at Kennedy Space Center, and somewhere
- 0:20[Max] there's a leaked memo sitting on a desk just waiting to be
- 0:23[Max] compared to every word.
- 0:24[Blake] Waiting with a red pen.
- 0:26[Max] A very red pen.
- 0:28[Max] I'm Max, this is Blake, and this is Landing the Moon.
- 0:31[Blake] The briefing is Friday, October twenty-third.
- 0:33[Blake] Isaacman, Kshatriya, and the Artemis III program manager, Jeremy Parsons, are briefing
- 0:38[Blake] the press on Artemis III and the twenty twenty-eight landing plan.
- 0:41[Max] So we're not reviewing it, we're grading it.
- 0:43[Max] Two rubrics.
- 0:44[Blake] Yours first.
- 0:45[Max] Engineering, valves, thrust vector control actuators, the Orion helium leak, and the
- 0:50[Max] big one, are both test landers going to be ready?
- 0:53[Blake] Mine is the Congress pitch.
- 0:55[Blake] Does this work on a post-midterm Congress with the December 11th CR
- 0:59[Blake] deadline sitting right there?
- 1:00[Max] Oh man, that deadline.
- 1:01[Blake] It's the clock behind the whole pitch, and we'll get to it.
- 1:04[Blake] And a question for both of us, is there any plan to
- 1:07[Blake] win back the three months the memo says were lost?
- 1:10[Max] Wait for it, because I also wanna know if anyone whispers about
- 1:13[Max] a single landing attempt in late twenty twenty-eight.
- 1:16[Blake] Whispers, right.
- 1:18[Blake] Because a whisper tells you more than a slide does.
- 1:21[Max] Spoken like a banker.
- 1:22[Blake] Spoken like someone who's read the memo twice.
- 1:24[Max] Fine, show off.
- 1:25[Max] Then that's where we start.
- 1:27[Max] First, the baseline we're grading against, what the memo said.
- 1:35[Max] Okay, so get this.
- 1:37[Max] The memo lives mostly in secondary reports, and one of them, a
- 1:40[Max] post on a local site called Talk of Titusville, says it came
- 1:44[Max] from a September twenty email that NASA Watch published.
- 1:47[Blake] Which means we're grading against a copy of a copy.
- 1:50[Blake] I'd like that on the record before anyone treats the baseline as
- 1:53[Blake] gospel.
- 1:54[Max] Fair.
- 1:54[Max] Noted.
- 1:55[Max] And the headline of that post is blunt.
- 1:57[Max] Isaacman called the schedule roughly ninety days broken.
- 2:01[Blake] Broken, not slipping, not challenged.
- 2:03[Max] Administrators usually reach for softer words.
- 2:06[Max] Then the best case, according to that same post, is Artemis III
- 2:10[Max] on the pad in summer twenty twenty-seven.
- 2:13[Blake] On the pad, not launched.
- 2:15[Max] Right, and up to two landing attempts in twenty twenty-eight.
- 2:18[Blake] Up two.
- 2:19[Blake] That phrase is carrying the whole sentence.
- 2:21[Max] It is.
- 2:22[Max] Now, plot twist.
- 2:23[Max] There's a second door in the memo.
- 2:25[Max] The report says it allows flying only Artemis IV in twenty-eight if
- 2:29[Max] that gives the best chance of success.
- 2:31[Blake] Wait, skip Artemis III's landing entirely?
- 2:34[Max] The post doesn't say how.
- 2:35[Max] It says the memo allows it.
- 2:37[Max] That's all, all claim.
- 2:38[Blake] Okay.
- 2:39[Blake] Does anyone outside NASA vouch for the email being real?
- 2:42[Max] Yes.
- 2:43[Max] A syndicated copy of Mashable-sourced coverage on Yahoo says NASA confirmed the
- 2:47[Max] email's authenticity.
- 2:49[Blake] Good.
- 2:49[Blake] That moves it from rumor to something the agency owns.
- 2:52[Max] And that same coverage adds the part you've been circling.
- 2:55[Max] NASA could be looking at a single landing attempt in late twenty
- 2:58[Max] twenty-eight if Artemis III keeps slipping.
- 3:01[Blake] If it keeps slipping.
- 3:02[Blake] Conditional.
- 3:03[Blake] So the memo isn't announcing it.
- 3:05[Max] Exactly.
- 3:05[Max] It's a trip wire.
- 3:06[Blake] And the three months, is that one outlet's number?
- 3:09[Max] Fox 35 Orlando ran a piece headlined that Artemis III is three
- 3:13[Max] months behind schedule, which lines up with the memo.
- 3:15[Blake] So the figure shows up in more than one place, though it's
- 3:18[Blake] still the same leak underneath.
- 3:20[Max] Yep.
- 3:20[Max] Same leak, different mastheads, playfully.
- 3:23[Max] The news cycle loves a photocopier.
- 3:25[Blake] One caution on the number itself.
- 3:27[Blake] The memo coverage says roughly ninety days, and the headline says three
- 3:31[Blake] months.
- 3:32[Blake] Those are close, but I'd call it a round description rather than
- 3:35[Blake] a measured count.
- 3:36[Max] Fair.
- 3:37[Max] Roughly is doing a lot of work there.
- 3:39[Max] Round numbers travel well in headlines, which is partly why this one
- 3:42[Max] keeps showing up.
- 3:44[Blake] Right.
- 3:44[Blake] So when we say lost three months, we mean the reported size
- 3:48[Blake] of the slip, not an audited figure.
- 3:50[Max] Ha.
- 3:51[Max] Switching gears then.
- 3:52[Max] With the memo laid out, the first test is whether Friday's briefing
- 3:55[Max] offered any way to win back those three months.
- 3:58[Blake] Because a plan to recover them would beat any adjective Isaacman picks.
- 4:07[Max] Okay, so the memo has one concrete lever for winning time back,
- 4:11[Max] and it's not a schedule.
- 4:13[Max] It's a launch pad, Blue Origin's.
- 4:15[Blake] Hang on.
- 4:16[Blake] NASA fixing a competitor's pad?
- 4:18[Max] Per the secondary report on the memo, NASA is helping rebuild Blue
- 4:22[Max] Origin's launch pad and supporting its anomaly investigation.
- 4:25[Max] The goal is both test landers ready for mid twenty twenty-seven.
- 4:29[Blake] Both.
- 4:30[Blake] So the recovery plan is, in effect, a rescue mission.
- 4:33[Max] A very expensive favor, yeah.
- 4:35[Blake] Fine, but I wanna know what that buys.
- 4:38[Blake] A pad repair is a precondition.
- 4:40[Blake] It isn't a recovered quarter.
- 4:41[Max] Wait, that's a fair split.
- 4:43[Max] Is a pad repair a recovery plan or just the cost of
- 4:46[Max] staying in the game?
- 4:47[Blake] Right, that's my worry.
- 4:49[Blake] If Friday's briefing says the pad is being rebuilt, that restates the
- 4:52[Blake] memo.
- 4:53[Blake] A recovery plan names which days come back and from where.
- 4:56[Max] Okay, but you're being stingy.
- 4:58[Max] If they say the lander date's held, that's news.
- 5:01[Blake] Then I'd ask what changed since the memo.
- 5:03[Blake] Held against what?
- 5:04[Max] Ooh, yes.
- 5:06[Blake] And there's a piece of context from before the briefing.
- 5:08[Blake] Eastern Herald on October fourteenth reported that NASA had stacked the Artemis
- 5:12[Blake] III boosters.
- 5:13[Max] Hardware on the stand.
- 5:15[Max] Love that.
- 5:16[Blake] But the same report said nothing NASA had published indicated a lander
- 5:20[Blake] would be ready for next year's crew.
- 5:22[Max] Oh man, so the rocket's stacked and the ride to the surface
- 5:24[Max] is a question mark.
- 5:26[Blake] That's what the report says, and it's one report.
- 5:28[Blake] I won't stretch it beyond that.
- 5:30[Max] Sure, but it gives us the listening list.
- 5:32[Max] Does anyone say lander readiness out loud with a date attached?
- 5:35[Blake] Does anyone say what the Blue Origin help actually unlocks in months?
- 5:39[Max] Does anyone say whether stacking progress offsets any of those lost days
- 5:43[Max] or just looks good on camera?
- 5:44[Blake] The stacking photographs very well.
- 5:47[Max] It really does.
- 5:48[Max] A rocket is a great backdrop.
- 5:50[Blake] Here's what I'd actually reward though, a trade-off stated plainly.
- 5:54[Blake] Something like, "This is what we're giving up to get these days
- 5:57[Blake] back."
- 5:57[Blake] Recoveries cost something, and a plan that costs nothing is usually a
- 6:01[Blake] hope.
- 6:02[Max] Okay, that's a rubric I can use.
- 6:04[Max] A recovery plan has a price tag, even if it isn't in
- 6:06[Max] dollars.
- 6:07[Blake] Right.
- 6:07[Blake] It could be risk.
- 6:08[Blake] It could be a compressed test schedule.
- 6:10[Blake] It could be a handoff between teams.
- 6:12[Blake] I just wanna hear which one.
- 6:14[Max] And I'd add one more.
- 6:16[Max] Be clear about whose work is whose.
- 6:18[Max] If the speaker blurs the pad repair and the rocket schedule into
- 6:21[Max] one happy sentence, I'd mark that down.
- 6:23[Blake] So I'm not calling it a recovery plan unless it has a
- 6:26[Blake] number and an owner.
- 6:28[Max] Harsh.
- 6:28[Max] I'd give partial credit for a named milestone.
- 6:31[Blake] Partial credit for a milestone, fine.
- 6:33[Blake] A milestone isn't months back, though.
- 6:36[Max] Fair.
- 6:37[Max] Okay, switching gears, because the stuff I care about is down in
- 6:40[Max] the hardware: valves, thrust vector control actuators, and that Orion helium leak.
- 6:46[Blake] Go.
- 6:46[Blake] I'll hold the red ink for later.
- 6:53[Max] Okay, so get this.
- 6:55[Max] The memo coverage has Isaacman at NASA leaders out in the field
- 6:59[Max] leaning on suppliers and subcontractors for two things: valves and thrust vector
- 7:04[Max] control actuators.
- 7:06[Blake] Which are?
- 7:07[Max] Thrust vector control actuators are the hardware that swivels the engine nozzle,
- 7:11[Max] so the rocket steers.
- 7:13[Max] No steering, no landing, no anything.
- 7:16[Blake] Fine, but which valves?
- 7:17[Blake] Which actuators?
- 7:18[Blake] Who's late?
- 7:19[Max] Plot twist, the memo doesn't say.
- 7:21[Max] It never lists which items are the ones sitting ninety days behind.
- 7:25[Blake] Hold on.
- 7:26[Blake] I'm reading a website summary of the memo, not the memo.
- 7:29[Blake] UFO Feed is an aggregation, so I'd hold that even loosely.
- 7:33[Max] Fair.
- 7:33[Max] Treat it as a pointer.
- 7:35[Max] Still, it's the best engineering detail floating around, and it's thin.
- 7:39[Blake] Thin is generous.
- 7:41[Max] Wow.
- 7:41[Max] Okay, now the one that makes me twitch, Orion's helium leak found
- 7:46[Max] during Artemis II.
- 7:47[Blake] Remind me where?
- 7:48[Max] Technology org's April writeup says oxidizer side of the pressurization supply.
- 7:54[Max] Helium pushes propellant into the engines, so a leak there matters.
- 7:58[Blake] Matters how much?
- 7:59[Max] In-flight leak rates ran about an order of magnitude above what ground
- 8:03[Max] tests predicted, ten times worse than the models.
- 8:07[Blake] Ten times?
- 8:08[Max] And that piece is a secondary summary of flight director comments, so
- 8:11[Max] same caution.
- 8:13[Max] But it says NASA planned a redesign for future missions.
- 8:16[Blake] Future missions, plural, vague.
- 8:19[Max] Yep, and that's my grade sheet.
- 8:21[Max] Did the briefing name the actual parts?
- 8:23[Max] Did it name the fix?
- 8:25[Max] If Parsons says valves and actuators with a fix attached, that's a
- 8:28[Max] pass.
- 8:29[Blake] Naming a part isn't the same as showing it's on schedule.
- 8:32[Blake] I can name every line item on a balance sheet and still
- 8:35[Blake] be insolvent.
- 8:36[Max] Okay, but naming beats the memo, which names nothing.
- 8:39[Blake] It beats silence.
- 8:40[Blake] It doesn't beat a delivery date.
- 8:42[Blake] Did the supplier say yes, and when does the part show up?
- 8:45[Max] Ooh, I want the date too.
- 8:47[Max] Dude, I want a date on a valve.
- 8:49[Blake] A date and a sense of scale.
- 8:51[Blake] If a supplier's late on one actuator, that's one problem, but being
- 8:55[Blake] late across the board is another.
- 8:57[Blake] The memo gives us neither, so a briefing that gave either one
- 9:00[Blake] would be adding real information.
- 9:02[Max] And a fix isn't a finish line either.
- 9:04[Max] Naming the fix tells me engineering knows what's wrong.
- 9:07[Max] It doesn't tell me the part has been built, tested, or installed.
- 9:11[Blake] So there's a ladder: named, scheduled, delivered.
- 9:14[Blake] The briefing only has to reach the second rung to beat the
- 9:17[Blake] memo, and a third rung is what would actually move my grade.
- 9:21[Max] Second rung is my pass line.
- 9:23[Max] Third rung is extra credit, and I'd frame it.
- 9:26[Blake] And the redesigned valve, does it go on Artemis 3 or only
- 9:29[Blake] Artemis 4?
- 9:30[Blake] Nobody is codis.
- 9:32[Max] Right, and I'm not gonna guess.
- 9:33[Max] If the briefing answers that, it's the biggest engineering line of the
- 9:36[Max] day.
- 9:37[Blake] And if it dodges, that's information too.
- 9:40[Max] Wait for it, because the landers are where the real engineering pain
- 9:43[Max] lives.
- 9:44[Blake] The long pole.
- 9:45[Max] Next up, whether both landers will be ready.
- 9:53[Max] Okay, so get this.
- 9:54[Max] One of the secondary write-ups of the memo, the UFO Feed piece,
- 9:58[Max] calls the landers the long pole.
- 10:00[Max] That's the tent pole joke, except nobody's laughing.
- 10:03[Blake] Long pole meaning everything else waits on it.
- 10:06[Max] Exactly.
- 10:06[Max] And that same piece says SpaceX and Blue Origin were told back
- 10:10[Max] in April to plan a rendezvous and docking demo by late 2027.
- 10:15[Blake] Late 2027?
- 10:16[Blake] Hold on.
- 10:17[Blake] That's after the summer 2027 pad date we've already heard about.
- 10:21[Max] Right.
- 10:22[Max] So the landers have their own clock, and it's running on top
- 10:25[Max] of the rocket clock.
- 10:26[Blake] And it's an aggregation of the NASA Watch memo, one step removed.
- 10:30[Max] Fair.
- 10:31[Max] Treat the April details aggregator color, not gospel, but it's the only
- 10:34[Max] date we've got on the lander side.
- 10:36[Blake] Mm, fine by me.
- 10:38[Max] Th- think about what that means for the lander teams, though.
- 10:41[Max] A docking demo by late 2027 sits behind the mid-2027 readiness goal
- 10:46[Max] from the memo, so there's very little cushion between being ready and
- 10:49[Max] having to perform.
- 10:51[Blake] Little cushion is the polite phrase.
- 10:53[Blake] It means any slip in the earlier date lands directly on the
- 10:56[Blake] later one, and the memo coverage doesn't say how much room there
- 10:59[Blake] is.
- 11:00[Max] Now, we covered the dual option point in the baseline, so I'll
- 11:03[Max] be quick.
- 11:03[Max] The Talk of Titusville write-up says the best case is two landings,
- 11:07[Max] and the Artemis IV only option sat right beside it.
- 11:10[Max] Both doors were open before anybody reached a podium.
- 11:13[Blake] Mashable-sourced coverage.
- 11:15[Blake] The Yahoo syndication frames it as pressure on the two-landing plan.
- 11:19[Blake] That's context, not a new fact.
- 11:21[Max] Right.
- 11:21[Max] So the interesting part isn't that the fallback exists.
- 11:24[Max] It's what narrowing it would take.
- 11:26[Blake] And here's where I think you're being generous.
- 11:28[Blake] You want the briefing to close one.
- 11:31[Blake] I'd say a program manager who closes the two landing door in
- 11:34[Blake] October has just handed critics a headline.
- 11:38[Max] Okay, but keeping both open forever is its own headline.
- 11:41[Blake] Only if the dates slip again.
- 11:43[Max] Which, come on, this program.
- 11:46[Blake] I said only if.
- 11:47[Max] What would narrowing even sound like to you?
- 11:50[Blake] One sentence.
- 11:51[Blake] Which lander flies the docking demo and who certifies it's ready?
- 11:55[Blake] That alone tells you which door is wider.
- 11:57[Max] Mine's more hardware.
- 11:59[Max] Tell me both landers have a test article that's passed something, anything,
- 12:03[Max] a review, a fit check, a pressure test.
- 12:06[Blake] That's a lot narrower than mine.
- 12:08[Max] Narrower and checkable Yours is a sentence anyone can say.
- 12:12[Blake] Mine can be checked too.
- 12:14[Blake] Say it, and then watch whether the date moves.
- 12:16[Max] Hmm.
- 12:17[Max] Okay.
- 12:18[Max] That's fair.
- 12:18[Blake] There's also a sequencing question inside my version.
- 12:22[Blake] A rendezvous and docking demo needs vehicles that can actually fly, so
- 12:26[Blake] a stated date for it implies real progress on the hardware.
- 12:29[Blake] If the briefing gave one, I'd ask whether it covered one lander
- 12:32[Blake] or both.
- 12:33[Max] And I'd ask whether that date held through all of this, if
- 12:36[Max] they'd even say.
- 12:37[Max] A date that held through all of this is informative.
- 12:40[Max] A date that quietly became sometime next year is informative in a
- 12:44[Max] different way.
- 12:44[Blake] And notice what we can't say yet.
- 12:46[Blake] We don't know whether both landers make it.
- 12:49[Blake] We don't know whether the Artemis IV only option stays on the
- 12:51[Blake] table.
- 12:52[Max] Both open, both unresolved.
- 12:55[Max] I kind of love that professionally.
- 12:57[Max] Terrible for the schedule, great for the podcast.
- 13:00[Blake] Speaking of what an audience hears, there's a different room entirely that
- 13:03[Blake] has to buy any of this.
- 13:04[Max] Congress.
- 13:05[Blake] Congress.
- 13:06[Blake] After the midterms, with a December deadline on the calendar.
- 13:09[Blake] Whatever engineering you liked, does it survive that room?
- 13:12[Max] Go.
- 13:13[Max] Floor's yours.
- 13:19[Blake] Okay, so get this.
- 13:20[Blake] You've read it?
- 13:21[Max] I could not read the page itself, so I'm quoting you zero
- 13:24[Max] appropriations figures.
- 13:25[Max] Not one.
- 13:26[Blake] The most disciplined sentence in this episode.
- 13:29[Max] Thank you.
- 13:30[Max] Now, a Congress that comes back after the midterms is tired and
- 13:33[Max] has a deadline.
- 13:34[Max] What does it need to hear from a podium in Florida?
- 13:37[Blake] Applause, a flyover.
- 13:39[Max] Three things: a date, a cost, and a fallback.
- 13:43[Blake] Go on.
- 13:43[Max] The date has to be one somebody owns.
- 13:46[Max] Staffers have watched this program slide before, so a hopeful month won't
- 13:49[Max] register.
- 13:50[Max] They'll ask who signs their name to it.
- 13:53[Blake] Fair.
- 13:53[Blake] And the cost?
- 13:54[Max] Whether the lost three months carries a price.
- 13:57[Max] Schedule slips cost money because the workforce keeps getting paid while hardware
- 14:01[Max] sits.
- 14:01[Max] If the briefing said nothing on that, a member can't tell a
- 14:04[Max] colleague what they'd be voting for.
- 14:06[Blake] Hold on.
- 14:07[Blake] Isn't that a little unfair?
- 14:09[Blake] Nobody gives a full cost at a press briefing.
- 14:11[Max] I'm not asking for a full number.
- 14:13[Max] I'm asking for any shape of one, even a statement that cost
- 14:16[Max] is unchanged to give staff something to repeat.
- 14:19[Blake] Huh.
- 14:20[Blake] Okay.
- 14:21[Blake] And the fallback?
- 14:22[Max] That's the one I'm watching hardest.
- 14:24[Max] If a single landing attempt is the cushion, a Congress that hears
- 14:27[Max] about it first from a leaked memo will feel ambushed.
- 14:30[Max] Hearing it from Isaacman on the record reads as planning.
- 14:33[Blake] Oh, that's nasty.
- 14:35[Blake] Same fact, opposite politics.
- 14:37[Max] Exactly.
- 14:38[Max] Silence on the fallback looks like hiding it.
- 14:41[Max] Naming it looks like a manager who has a plan B.
- 14:43[Blake] Does the timing help or hurt?
- 14:45[Blake] A briefing on Friday, the midterms behind it, and then the December
- 14:49[Blake] 11th deadline waiting for whoever comes back.
- 14:52[Max] Hurt, if it's vague.
- 14:53[Max] A deadline concentrates minds, and staffers will be hunting for one paragraph
- 14:58[Max] they can carry into a negotiation.
- 15:00[Max] Whatever the briefing offered, it either hands them that paragraph or it
- 15:03[Max] doesn't, and a stacked rocket on a backdrop doesn't make a paragraph.
- 15:08[Blake] So what's the grade right now, honestly?
- 15:11[Max] Incomplete.
- 15:12[Max] I can't score a pitch I haven't heard, and I won't pretend
- 15:15[Max] a stacked rocket answers any of the three.
- 15:17[Blake] Incomplete from the banker.
- 15:20[Blake] Brutal.
- 15:21[Max] Warm but exacting, Max.
- 15:22[Blake] Fine, fine.
- 15:24[Blake] So Congress gets three boxes to check, and I get a hardware
- 15:27[Blake] list.
- 15:28[Blake] Time to write down the pass/fail lines and put our predictions on
- 15:31[Blake] the record.
- 15:32[Max] Pens out.
- 15:33[Max] Mine's the red one.
- 15:39[Max] Okay, scorecard time.
- 15:41[Max] Five lines total, pass or fail, no partial credit.
- 15:45[Max] I own three, Blake owns two.
- 15:47[Max] My first, a recovery plan for the lost three months.
- 15:51[Max] Not a mood, a mechanism.
- 15:53[Blake] And mine are the other two.
- 15:55[Blake] A stated fallback stance on the record from someone with a title
- 16:00[Blake] and a date, a cost, and a fallback for Congress, each with
- 16:03[Blake] an owner attached.
- 16:05[Max] My second, both landers ready.
- 16:07[Max] Dude, if they say on track without naming a test article, that's
- 16:11[Max] a fail.
- 16:12[Blake] Harsh.
- 16:13[Max] Fair.
- 16:14[Max] My third, engineering names tied to a calendar.
- 16:17[Max] Valve, actuator, whatever.
- 16:20[Max] A part with a date passes.
- 16:22[Max] A part with an adjective fails.
- 16:25[Blake] And I'll add a tripwire.
- 16:26[Blake] If the word aspirational shows up near 2028, I start counting.
- 16:32[Max] Keep a tally.
- 16:33[Max] Now predictions.
- 16:34[Max] Mine first.
- 16:35[Max] Within a few weeks, nobody publishes a firm date for either test
- 16:39[Max] lander being ready.
- 16:41[Max] Readiness stays a phrase, not a milestone.
- 16:44[Blake] Hmm.
- 16:45[Blake] I'm less gloomy on that.
- 16:47[Blake] I say one lander gets a named milestone, but only one.
- 16:51[Blake] The other stays vague.
- 16:53[Max] Wait, you're predicting a split?
- 16:55[Blake] Splits are how organizations hedge without admitting it.
- 16:59[Blake] Second prediction, the December 11th deadline doesn't move.
- 17:03[Blake] No new funding language appears before then, and the conversation shifts to
- 17:08[Blake] what a short-term extension does to the program.
- 17:10[Max] Oh, that's a bold one, and I kind of hate that I
- 17:13[Max] agree.
- 17:14[Max] Politicians love a deadline they can't dodge.
- 17:17[Blake] Third, and this one's cheap, nobody on the record says single landing
- 17:22[Blake] out loud.
- 17:23[Blake] The fallback stays implied.
- 17:25[Max] Cheap, but is it also the easiest one to lose?
- 17:28[Max] One reporter asks the question straight, someone answers it plainly, and your
- 17:32[Max] prediction is gone.
- 17:34[Blake] Then I lose, happily.
- 17:36[Blake] A direct answer is exactly the kind of narrowing we asked for.
- 17:40[Blake] I'd take a lost prediction over a vague briefing any day, and
- 17:43[Blake] I'd say so in ink.
- 17:44[Max] Plot twist for the future us, we check all three, and I'm
- 17:48[Max] wrong about two.
- 17:49[Blake] Then I get to be insufferable.
- 17:51[Blake] We revisit these in a future episode, scorecard in hand, and we
- 17:55[Blake] don't edit them afterwards.
- 17:56[Max] No sneaky rewrites.
- 17:58[Max] Hands on the table.
- 17:59[Blake] And we haven't graded anything yet.
- 18:01[Blake] These are only the tests.
- 18:03[Max] Right.
- 18:03[Max] Criteria locked, predictions on the record.
- 18:06[Blake] Then that's the list.
- 18:07[Blake] Let's close it out.
- 18:14[Max] Okay, so the scorecard goes in the notebook.
- 18:16[Max] Five lines, three mine and two Blake's, all blank until Friday's briefing
- 18:20[Max] gives us something to write in them.
- 18:21[Blake] Blank is the honest answer.
- 18:23[Blake] Nothing's graded until someone attaches an owner to a date.
- 18:26[Max] And if anybody says single landing out loud, I'm buying you lunch.
- 18:31[Blake] Noted.
- 18:31[Blake] I'll order the expensive thing.
- 18:33[Max] Of course you will.
- 18:34[Blake] What to watch.
- 18:35[Blake] Whether the briefing narrows the two landing and Artemis IV only options.
- 18:39[Blake] Next episode, we check our predictions in ink.
- 18:42[Max] Wait, one more thing.
- 18:43[Max] If a friend of yours still asks why we're going back to
- 18:45[Max] the Moon, send them this episode.
- 18:47[Blake] Please do.
- 18:48[Blake] And subscribe wherever you listen so the next one finds you.
- 18:51[Max] Dude, I am genuinely curious which of us the briefing embarrasses first.
- 18:55[Blake] Me.
- 18:56[Blake] Obviously me.
- 18:58[Max] See you next time.