- 0:05SPEAKER_01: You know, Dennis, uh on projects, an often overlooked uh aspect is surface preparation.
- 0:12SPEAKER_00: Absolutely, but it's very critical the pavement cannot perform without a proper surface.
- 0:16SPEAKER_01: Yep, we're gonna get into that in a minute, uh, but we always start off our podcast with a safety share, and today's safety share is on trailer safety.
- 0:26SPEAKER_01: So, tips for safely towing a trailer, this is important.
- 0:29SPEAKER_01: Stay within your limits.
- 0:30SPEAKER_01: Review your vehicle's towing capacity and understand what your vehicle's gross vehicle weight rating is and tongue weight.
- 0:38SPEAKER_01: Those things can differ widely depending on what kind of vehicle you're towing with and what kind of trailer it is that you're towing.
- 0:45SPEAKER_01: Check your tire pressure.
- 0:46SPEAKER_01: You know, that is critically important.
- 0:48SPEAKER_01: Maintaining optimal tire pressure on both your vehicle and on your trailer is important.
- 0:53SPEAKER_01: And a lot of times on trailers we don't use them very often, particularly if it's a trailer you're using for personal uses.
- 0:59SPEAKER_01: So you really need to make sure your trailers, your trailer's tires are in great shape.
- 1:04SPEAKER_01: Um select the correct uh hitchball and uh make sure that uh your your uh receiver, your receiver and your trailer match up properly.
- 1:17SPEAKER_01: Um chains, you've got to have safety chains that connect the trailer the right length.
- 1:22SPEAKER_01: Make sure they're the right length.
- 1:24SPEAKER_01: You don't want those things dragging on the pavement, sparking, and causing uh potentially a fire on the side of the roadway.
- 1:30SPEAKER_01: Um always check twice, do a walkthrough, walk around and look at things.
- 1:36SPEAKER_01: And you know, you might even, after you've gone a little ways, it might not be a bad idea to pull over, go back out and look sure, and make sure before you get on this longer trip that everything uh the first few miles had all worked out.
- 1:50SPEAKER_00: Especially if you got a rope or a tarp tying something down, like that.
- 1:53SPEAKER_01: Yeah, yeah, great point.
- 1:54SPEAKER_01: Uh the weight distribution is really key.
- 1:57SPEAKER_01: Um, you want to make sure that you've got that weight distributed on that trailer pretty uniformly.
- 2:03SPEAKER_01: You don't want it all up in the front of the trailer, you don't, and you particularly don't want it all in the back of the trailer.
- 2:08SPEAKER_01: Um, so let's make sure we do that.
- 2:10SPEAKER_01: You know, we say slow and steady.
- 2:12SPEAKER_01: Let's not drive as fast as we would without a trailer, and also that trailer can affect your stopping distance.
- 2:19SPEAKER_01: You know, you've got this weight behind you, you hit your brakes, you've got this weight that's pushing that vehicle.
- 2:24SPEAKER_01: So maintain a good uh stopping distance between you and the vehicles in front of you, and uh monitor your mirrors.
- 2:31SPEAKER_01: Make sure that you're able to see from the sides and behind you that trailer that you're towing.
- 2:39SPEAKER_01: Um, and these things are all really important.
- 2:42SPEAKER_01: And you know, like everything else, we go over these safety shares, these things are available.
- 2:47SPEAKER_01: You can find these safety shares on our website.
- 2:49SPEAKER_01: We encourage you to look, and if you're looking for other topics of safety, you'll be able to find them.
- 2:55SPEAKER_01: We've got dozens and dozens on our website.
- 2:58SPEAKER_01: Uh feel free to download them, share them in meetings, or if you're about to do something uh yourself, make one for us.
- 3:06SPEAKER_01: Make one for us.
- 3:07SPEAKER_01: Dennis, today we're going to talk about a topic that um is not talked about enough, in my opinion.
- 3:14SPEAKER_01: I think you and I have discussed this.
- 3:17SPEAKER_01: Uh, I know we I think we share that opinion, and that is uh surface preparation and getting ready for either a maintenance uh function or an overlay, but uh you know getting the surface of that roadway ready for whatever it is you're gonna do to it, um, and it's it's important, and and why is surface prep so important?
- 3:39SPEAKER_00: Well, we we know that the uh performance of an asphalt pavement is directly connected to uh the condition of what it's being paved on.
- 3:46SPEAKER_00: And so that's gonna be whether with the layers are bonded together so it can behave as an engineered system the way we designed it, uh little impact ride quality, uh how uh resistant and durable that pavement will be to rain and moisture, uh, whether you know rutting and cracking, and uh really that uh do we address all the problems that needed to be addressed before we started paving?
- 4:09SPEAKER_00: And we're talking about subgrade and based.
- 4:11SPEAKER_01: Yep.
- 4:11SPEAKER_01: And so I mean things like patching is something that I I think is is overlooked.
- 4:17SPEAKER_01: You know, we we think about potholes, and you know, when I think I think the the you know people that are not in the business of uh of fixing roads, uh they you know, see a pothole and they're like, well just put some put some patching material in it, which I think, you know, after a major rain event when you get these potholes that pop up, you know, I get taking this patching, you know, they sell it in the bags, and you, you know, city or county will go out and fill those potholes because you got to do that right away, but you're not done when you do that.
- 4:48SPEAKER_01: That is a very temporary thing.
- 4:50SPEAKER_00: That's a temporary thing just to buy you time, you can get back out there.
- 4:53SPEAKER_00: Uh the the the typical rules for uh for patching and kind of base repairs in general is you want to make them square.
- 4:59SPEAKER_00: You don't want round or anything like that.
- 5:01SPEAKER_00: Um, and you want to cut back into good material, and whether that's six inches or a foot or or more, uh that's just gonna depend upon your pavement section and how deep you need to go.
- 5:11SPEAKER_00: Um, another thing to remember is we try not to have a um a joint in a patch or a base repair that's gonna end up in a wheel path.
- 5:19SPEAKER_00: The kind of the same rules apply for a longitudinal paving joint.
- 5:22SPEAKER_00: Uh that's just not a good place to have that transition.
- 5:25SPEAKER_00: Um another couple things to think about is your lift thicknesses whatever, whatever the patching material is, you still want to adhere to the lift thicknesses you would have for uh for any asphalt.
- 5:36SPEAKER_00: Um, you want to make sure that you can have equipment to uh to compact that material.
- 5:41SPEAKER_00: If you got to go deeper, the patch is gonna have to get bigger just so you can get the right equipment in there to uh to make the the compact the material.
- 5:49SPEAKER_00: And uh generally um when in doubt, if you're gonna have a patch a couple feet away from another patch, just make one bigger patch.
- 5:56SPEAKER_00: And you can make these things half lane widths or full lane widths uh to match what you're what you're trying to fix.
- 6:02SPEAKER_01: Kind of when in doubt, let's err on the conservative side and make that patch a little bit bigger.
- 6:07SPEAKER_00: Yeah, and the last thing I'll say you know, uh proof rolling is good insurance.
- 6:11SPEAKER_00: Um, if you have some trucks there, you're making a patch, you can use that truck to uh test the stability of while you're patching.
- 6:17SPEAKER_01: Yep, yeah, and uh so so on that topic, like can maybe start at the bottom.
- 6:22SPEAKER_01: Um, and and we see this quite a bit that we don't really address sometimes the problem underneath we'll do a patch because there's an area that's very distressed.
- 6:36SPEAKER_01: Uh but if you don't if if you you need to look at what what is happening there.
- 6:41SPEAKER_01: If you've got all this cracking, what we call alligator cracking, fatigue cracking in a wheel path, for instance, um you can't always assume that it was the asphalt just didn't work out and it was bad.
- 6:55SPEAKER_01: The asphalt was basically following the problem down below.
- 7:00SPEAKER_01: And so when we're talking about preparing the surface, sometimes we need to say, okay, what's not sometimes, it really should be all the time, right?
- 7:10SPEAKER_01: Is the problem down below?
- 7:11SPEAKER_01: Is it a subgrade issue?
- 7:12SPEAKER_01: Is it a base issue?
- 7:14SPEAKER_01: And if it is, you've got to address that because otherwise you're gonna come back in with a treatment and it's not gonna last, and it really never had a chance to last.
- 7:25SPEAKER_00: No, and we we're we're really good and efficient at uh solving surface problems.
- 7:30SPEAKER_00: We can solve a lot of surface problems overnight with uh some automated equipment and things, uh, you know, milling and other things, uh, but you know, deeper problems, whether it's structural or a drainage issue, is not gonna be solved by an overlay.
- 7:42SPEAKER_00: Those are the those are the places we need to do uh do uh address, whether that's a local base repair or some reclamation or some base reconstruction.
- 7:50SPEAKER_01: And you know, when we're when we're looking at uh I know we had a podcast uh a while back on uh on project development and scoping and and uh you know we live in this low bid system and you bid what is in the plans.
- 8:06SPEAKER_00: And there's gonna be a percent or a uh a volume of of these things in the project, and it's always good to know you need to design for the projects you're gonna have, not the project as it existed when you did the plans.
- 8:18SPEAKER_00: There's gonna be a lag there.
- 8:20SPEAKER_00: You need to make sure you uh uh account for for for that when you set those quantities.
- 8:24SPEAKER_01: You want to have quantities for these base and subgrade repairs agencies.
- 8:29SPEAKER_01: And if you have um if if 10% of that project length when you're doing a design, uh you've gone out and looked at it, and 10% had base repair, or you know, we're gonna dig out and bring in some good base material or deal with a subgrade issue.
- 8:43SPEAKER_01: You know, if it's a year later, um, there's a high likelihood that it's not 10% anymore because that road has been deteriorating, and if you've got base or subgrade failures, you know, you may find that when it comes time to construct this roadway and this project is let that you wow, you had 20 you got 20% of this area of this project that needs base or subgrade repair, but the plans only had 10%.
- 9:08SPEAKER_00: So I think maybe advice to a local agency is hey, have some contingency built in and know your system and know your environment on um on kind of when those cycles are.
- 9:20SPEAKER_00: Um, you don't want to design uh a mill and over like a maintenance type project two years in advance because those those conditions will have changed.
- 9:27SPEAKER_01: Yeah, and I think this is an area where you know the the the contractors and the agency really ought to be in conversation because a a contractor is gonna go out and he's gonna run that project and go check it out.
- 9:40SPEAKER_01: And if they come back and say, you know, you got quantities in this bid package for base repair or subgrade repair, but they're they're not adequate.
- 9:50SPEAKER_01: I don't think an agency should look at that.
- 9:52SPEAKER_01: Well, the contractor's just trying to get more work.
- 9:54SPEAKER_00: Um there are some other tools that can uh that can add some efficiencies if you have a larger volume of places that need base repair.
- 10:03SPEAKER_00: Um you you can you can reconstruct or reclaim larger sections with more efficiency to re-establish uh your grades before paving than just a whole bunch of local areas.
- 10:13SPEAKER_00: And um that we're we're um each market will be different, but that may be you know 25, 30, 40 percent uh base repair may just be uh equal a different technique or a different approach and still get you what you want.
- 10:26SPEAKER_01: You know, uh I think we hear about surface prep or surface treatment.
- 10:31SPEAKER_01: Um, you know, there's uh a lot of times it's like let's just, you know, why don't you just seal the cracks?
- 10:37SPEAKER_01: We you know crack sealing's not overly expensive, so why don't we just do a bunch of crack sealing?
- 10:41SPEAKER_00: Well you can you can do that.
- 10:42SPEAKER_00: Um then you could look at like my parents' neighborhood and you got uh crack seal everywhere.
- 10:47SPEAKER_00: Um yeah, so but uh one of the rules there for crack sealing, it's a great technique.
- 10:51SPEAKER_00: We have some some great members that have some good products and some great expertise there.
- 10:55SPEAKER_00: Um but uh typically we would prefer not to crack seal and then pave immediately.
- 11:01SPEAKER_00: Uh typically you'll want uh that those crack seals to to age a little bit, uh maybe a season before, but definitely a couple months before you try to go back in and overlay.
- 11:12SPEAKER_00: Um another thing with crack sealing is you want to make you want to use the appropriate amount of the material.
- 11:17SPEAKER_00: Those materials are really good, they're getting better at them all the time.
- 11:20SPEAKER_00: Uh but you want to make sure that you get it in flush with the surface, manufacturer recommendation and things like that.
- 11:26SPEAKER_00: The the the ten dollar word is overbanding.
- 11:28SPEAKER_00: You don't want to just scoop material up everywhere uh because you'll that you'll pay for that later.
- 11:33SPEAKER_01: Yep.
- 11:34SPEAKER_00: And I guess the last thing is uh, you know, crack seal has its place, but it's not a uh structural solution for uh for fail uh other failures.
- 11:43SPEAKER_00: So it's not gonna it's not gonna solve everything, but it is a uh very good maintenance technique when done right.
- 11:49SPEAKER_01: Yeah, and I think you'll probably talk a little bit more about this as as we're going on, but uh you know uh I always think about uh um an old an older contractor in Houston, who we know, uh Jeff Green, uh I have to credit him with this, and he would he always used to say, you know, if you're gonna paint your house, you're not just gonna if you go out there and just say, okay, I'm gonna paint this house, um, you don't just start painting the house, right?
- 12:14SPEAKER_01: I mean, because yeah, it's gonna look good, but it's not gonna look good a year from now.
- 12:19SPEAKER_01: You've got to go in and identify what types of things need to happen before I put this final layer of paint on this house.
- 12:27SPEAKER_01: And roadways are very similar in that we can.
- 12:30SPEAKER_00: You may need to replace a window seal before you paint it or some trim board and things like that.
- 12:36SPEAKER_00: You do need to uh uh to take a look at that before you get going.
- 12:40SPEAKER_01: So, you know, um some of this goes back to uh you know assessing the the project beforehand, and I know we've talked in the past about uh um on this project development, you know, you may want to you know utilize some techniques to determine what what's going on underneath that so so you know is this a crack seal problem or is it a base repair problem?
- 13:02SPEAKER_01: Yeah.
- 13:03SPEAKER_01: So you know, we uh we we have things like prime seals and we have tack coats and those types of things.
- 13:11SPEAKER_01: Um you know, let's you know tell us a little bit about that.
- 13:14SPEAKER_01: What are what are the functions of these things and why are they important?
- 13:17SPEAKER_00: Oh they're they're they're very important.
- 13:19SPEAKER_00: Um a prime coat is uh a little bit of a thicker type product, um, and it's an oil-based material that'll go down, and typically we'd put that on a uh uh a flex-based surface or or some uh more of a rougher surface, and its intent is to get in there to seal it off for moisture, uh, to stabilize the surface and promote bonding to the new asphalt that will come on top of it.
- 13:43SPEAKER_00: So when you hear prime code, think uh think on top of a uh a non-asphalt surface like a base course.
- 13:50SPEAKER_00: Uh tac is a little bit different.
- 13:52SPEAKER_00: Uh that's going to be more like the glue that we would uh you think of between two asphalt surfaces.
- 13:57SPEAKER_00: And there are lots of options for prime and tac.
- 14:00SPEAKER_00: Um, we always recommend to use approved text.
- 14:04SPEAKER_00: A lot of our members have those out there.
- 14:06SPEAKER_00: The material producer list uh that's referenced in 341, uh point shoot item 300 that has all of those.
- 14:12SPEAKER_00: Um, and uh what you do need to know is that there are application rates for for all of these in the surface that you're putting it on and the texture you have is really going to dictate the right one for that.
- 14:24SPEAKER_00: Um, is like we can go back to the paint analogy.
- 14:26SPEAKER_00: You want to have a clean and dry surface for all of these things before you apply those just to make sure they go in.
- 14:34SPEAKER_00: Um another rule uh for for tack is uh you want to don't forget vertical surfaces if you're where you got longitudinal joints or especially for patching, you want to and some overspray is okay.
- 14:46SPEAKER_00: Uh we want to um you know you want to make sure that uh that you cover the material and a little bit around the excess is better than not enough.
- 14:54SPEAKER_00: Um yeah, if you're doing um, you know, if you're doing the hand pumps uh uh uh type applications, that's a different thing.
- 15:01SPEAKER_00: Uh but uh for your distributors when you're running these things out of a truck, you want to make sure you have the right nozzle for what you're running.
- 15:08SPEAKER_00: Uh and the nozzle uh setup for a prime versus attack or even the different types of materials you would get will be different.
- 15:15SPEAKER_00: So you want to make sure that you're set up to uh to get those things down.
- 15:19SPEAKER_01: Um you're talking about emulsions too.
- 15:21SPEAKER_01: You've got uh, you know, you you you've got to keep in mind how much it is that you're that are that are in there because you know when these things break, you know, the residual amount, you know, are you are we measuring residual or are we measuring the quantity before?
- 15:34SPEAKER_00: Right, and that that's why so an emulsion is uh is a water and an asphalt material um uh mixture.
- 15:42SPEAKER_00: N 6040 uh is about the about the split for most of them, they'll all be different.
- 15:47SPEAKER_00: So check the check exactly what you're buying.
- 15:49SPEAKER_00: But yeah, when we talk about it breaking, when you spray this down, um it'll it'll be brown.
- 15:54SPEAKER_00: And so when we talk about it, when we talk about it breaking, that's kind of we don't want to we don't want to pave until that happens.
- 16:00SPEAKER_00: So it'll turn black and shiny at some point, and that's really gonna be dictated on the weather that you have that day and the particular material you're using.
- 16:08SPEAKER_00: So it's not a a one size fits all that this is gonna be 15 minutes or an hour.
- 16:12SPEAKER_00: It's gonna be uh it's gonna depend upon what you have that day.
- 16:17SPEAKER_00: Um and uh you know, really uh you know uh when in doubt tack or uh patches everything is is uh is kind of the rule of thumb there.
- 16:26SPEAKER_01: You know, I think that you mentioned the uh you know, text dot again, you know, we're I know we're talking to our local agency partners, but this material producer list, and we talk about this in an pretty much every time we bring it.
- 16:39SPEAKER_01: We go back to this on in almost every one of our podcasts because um text dot does a good job of vetting suppliers that are making a certain kind of product, and they have a material producer list and tax emulsions, these things, if they they if you're a local agency, you really need to make sure go to that materials producer list.
- 17:05SPEAKER_01: You're gonna have some folks that have you know the latest, greatest uh material, and it's gonna solve all your problems and it's gonna be the best thing you've ever heard of.
- 17:17SPEAKER_01: The question that should be asked, is it on the materials producer list?
- 17:20SPEAKER_01: If the answer is no, if I'm a local agency, we don't have the time to go evaluate.
- 17:26SPEAKER_01: Okay, well, let us take a sample of this and we're gonna run a bunch of tests.
- 17:29SPEAKER_01: That's not gonna happen.
- 17:30SPEAKER_00: No, Text Dot spends um uh a lot of effort and resources and maintaining that list.
- 17:36SPEAKER_01: And maintaining it's important and you gotta stay on that list.
- 17:38SPEAKER_00: You've got to stay on the list.
- 17:39SPEAKER_00: And you can check and they archive it and everything, but uh I can't think of a place in Texas where uh one of these materials is not readily available uh from multiple sources uh that that you can uh that you you could get uh to find attack material.
- 17:53SPEAKER_00: It's um it that information is readily available and uh definitely would be uh I wouldn't ever think about using something that could meet that criteria.
- 18:02SPEAKER_01: Right.
- 18:03SPEAKER_01: You know, and we we it's the materials producer list, we call it the MPL.
- 18:06SPEAKER_01: And again, this is this all this information is so readily available.
- 18:12SPEAKER_01: Uh TextDot does a great job on their website.
- 18:16SPEAKER_01: You can link, you can go through our website and we'll point you the right direction.
- 18:20SPEAKER_01: We link it in 341 in 341M.
- 18:24SPEAKER_01: We've got those hyperlinks in that uh in that document, in that specification.
- 18:29SPEAKER_01: And um, you know, if it's not on an approved list for Text Dot, I wouldn't use it.
- 18:37SPEAKER_00: No, absolutely.
- 18:38SPEAKER_00: It's um it's uh there's a there's a lot of these uh there's a lot of volume that goes through those materials, and uh you want to make something uh for your street, it's that important uh to get one that you know have some confidence.
- 18:49SPEAKER_01: And on that tack coat, uh when we're talking about tack, for instance, you you you want to make sure that that entire surface that you're going to bring another layer on top of is covered with tack.
- 19:00SPEAKER_01: You know, so we have these these these trucks that are spraying this tack, right?
- 19:04SPEAKER_00: And they've got you know 10 or 15 nozzles, how many ever it is across, and you just want to make sure it fans out and and does a uniform coating.
- 19:13SPEAKER_00: Uh you want to make sure that you do not uh uh you do not see uh any of the pavement underneath when it's done.
- 19:19SPEAKER_00: And it's uh there's a there's a there's a little bit of uh observation you need to do.
- 19:23SPEAKER_00: I definitely recommend that that you go out and watch that process.
- 19:26SPEAKER_00: If you don't get enough tack, um you the surface will not bond to there and the pavement will not perform as intended.
- 19:33SPEAKER_00: Uh if you get too much, um then you can introduce other issues, um uh bleeding and and other things that may be uh may be an issue.
- 19:41SPEAKER_01: Yeah, and talk a little bit about trackless tack because there are uh different uh producers of what this trackless tack material in some areas, like in a local agency, you've got a lot of driveways.
- 19:53SPEAKER_01: You've got so you know, you're you've got vehicles coming in and out of a or if you know coming in and out across a project in certain spots because you just simply have to allow access.
- 20:05SPEAKER_01: And in tighter areas, you've got the construction track uh uh vehicles that are doing a lot of in and out.
- 20:12SPEAKER_01: And so when you've got tack out there laid out there and you cannot avoid driving on it and going out into lanes, you know, this trackless tack um will help keep that stuff in the construction budget.
- 20:27SPEAKER_01: You see all these tire tracks up and down the other lane.
- 20:30SPEAKER_00: That was the other thing is that you figure out where the asphalt plant is by following the track trails on the trucks back over there.
- 20:36SPEAKER_00: That is an old thing.
- 20:36SPEAKER_00: Chuck says that all the time.
- 20:38SPEAKER_00: He does.
- 20:38SPEAKER_00: Uh no, uh the the term that there's a MPL specifically for that material is called trail.
- 20:43SPEAKER_00: Uh this uh track resistant asphalt enderlayer.
- 20:46SPEAKER_00: Here we go.
- 20:47SPEAKER_00: It has a whole set of materials, so you can pick one off of that off of that catalog as well.
- 20:53SPEAKER_01: I was on a uh a project last night uh where they were using uh trackless tack, and I mean it was pretty impressive because this was a uh a city area with a bunch of traffic on it uh near Hearn, Texas, and it's a darn good thing they had that trackless tack.
- 21:09SPEAKER_01: And and I was watching the uh, you know, you go out there and step on it and walk back off, and it there was almost nothing on the bottom of my boots, you know.
- 21:18SPEAKER_01: And that's pretty good.
- 21:20SPEAKER_01: Yeah, it is good, and so there's a lot of times where that's really something you ought to be uh requesting or requiring your uh plan set.
- 21:31SPEAKER_00: And it's available, it's it's a proven technology at this point.
- 21:34SPEAKER_00: And I guess the last thing to talk about uh about TAC is um we always recommend that you pay for it by the gallon, you call it out as this as it's individual bid item.
- 21:44SPEAKER_00: Uh you know, if we don't measure it, it may not get done, uh but it's it's that important that we pay for it individually.
- 21:51SPEAKER_01: Yeah, you don't really want that to be incidental to the mix where it's just part of the part of the mix.
- 21:56SPEAKER_01: You want to uh be able to quantify that you you wanted this.
- 22:00SPEAKER_01: Many gallons on this project based on the project limits and scope.
- 22:06SPEAKER_01: And then you want to be able to match that up and make sure that you got that much.
- 22:14SPEAKER_01: Yep.
- 22:14SPEAKER_01: You know, another item that I think is worth discussing in this, you know, we talked about milling when we were talking about recycled asphalt pavement and wrap in a previous uh podcast.
- 22:25SPEAKER_01: Uh but you know, I think when we're talking about surface prep milling is a uh and doing that properly is is important.
- 22:34SPEAKER_01: Uh things like level up, uh, you know, where we're trying to get that that roadway uh to where the that layer that's going to come on top of it is gonna have a good base and a good you know uniform uh surface to put it on.
- 22:50SPEAKER_01: Can you talk a little bit about milling and level up?
- 22:52SPEAKER_00: Yeah, so milling is the kind of the automated process where we'll have a cutting head and it will uh cut through the uh the asphalt surface and really produce that wrap.
- 23:00SPEAKER_00: It's uh very efficient machines.
- 23:02SPEAKER_00: They got them in all shapes and sizes.
- 23:04SPEAKER_00: You don't want to make sure what uh what equipment's kind of available in your area to figure out how deep they can go, how what their typical widths are, and things like that.
- 23:14SPEAKER_00: Um, you know, you want to make sure that they are um that they have the right setup for there.
- 23:19SPEAKER_00: If we're trying to cut a crown or a cross slope, those those are all automated settings that they can have.
- 23:25SPEAKER_00: Uh so you want to make sure that you have that.
- 23:27SPEAKER_00: Uh, if you're milling, you know, manholes and everything like that, um, uh any type of curves and inlets, those are all things that you'll need to uh to you talk about project scoping, make sure those things are called out so uh that milling, you're not calling for milling and you got you know right through like a row of manhole covers and things like that.
- 23:44SPEAKER_01: Which is really important for like local agencies or you're getting in city streets, you know, if you're out in a rural highway, there's not any manholes.
- 23:51SPEAKER_01: No, but uh, there could be uh dozens, if not more, on a on a city project.
- 23:56SPEAKER_00: Well, yeah, or you've got some places where you just don't have the right of way to put things um outside the road bed.
- 24:01SPEAKER_00: Right.
- 24:01SPEAKER_00: Um so uh yeah, you want to look at those types of things.
- 24:03SPEAKER_00: You want to make sure that you have a good drainage pattern because it may rain while the this milled surface is exposed.
- 24:09SPEAKER_00: Um and um you know one thing you can also run into is that they get the milling machine out there and they uh expose the entire project for three months and then they come back and pave.
- 24:19SPEAKER_00: That may not be a good thing.
- 24:20SPEAKER_00: So you want to check to make sure your your paving train is kind of keeping up with the with the milling process, and you have a conversation about that, uh, that's a really good thing for your pre-paved meetings.
- 24:31SPEAKER_01: Yeah, and then on level up, I mean that's that's a little bit of a different uh a different animal there.
- 24:36SPEAKER_01: Um a lot of times there's a specification for a certain level of ride quality, and you uh you're trying to get that smoothest surface, the final surface you can get.
- 24:48SPEAKER_01: And so oftentimes there will be quantities in this set of plans for level up in order to give you the best opportunity for a smooth ride.
- 24:59SPEAKER_00: And yeah, so there, yeah, if you have a in a lot of our local agencies, we'll have streets, then you'll won't have as a consistent a surface and and things like that.
- 25:08SPEAKER_00: You may have what we call scabs where you kind of have to some some layers don't get fully removed and you want to get all the all of those out there.
- 25:15SPEAKER_00: And so you may not have a perfectly uh uh smooth, uniform uh uh layer to pave on.
- 25:21SPEAKER_00: And level up will really help us uh solve a lot of those deficiencies.
- 25:25SPEAKER_00: So when you come back to do your surface, you have a uniform uh uh cross section that you can you can pave.
- 25:31SPEAKER_00: And that really, you know, you mentioned smoothness, that's that's a big performance criteria for us.
- 25:35SPEAKER_00: And a lot of our uh a lot of our members that are chasing uh Tech Sappa quality awards, this is one of the ways that they get that is by uh by the proper use of level up uh so they can get that surface uh smooth.
- 25:47SPEAKER_00: Um, you know, um there's a couple rules of thumb that you can uh improve your ride quality as you come up with uh successive lifts.
- 25:55SPEAKER_00: You know, you can like double the the the ride quality uh metrics uh as you go.
- 26:00SPEAKER_00: Um and this is a way to really uh get the impact of uh of each layer as you come up.
- 26:05SPEAKER_01: Yep, and and you know, the mix type of course is going to have an impact on smoothness.
- 26:09SPEAKER_01: And so this is a topic that may be a lot more important in a residential area that needs to be smooth.
- 26:17SPEAKER_01: You know, you got your kids on bicycles and all that kind of stuff and the skateboards uh uh as opposed to if you're in a industrial area, maybe on the outskirts, but it's still a city-controlled streets uh where you've got uh heavy, slow-moving traffic where the smoothness is not as critical.
- 26:38SPEAKER_01: You want it to be smooth as possible, but you know, there it there's varying degrees of when is it really important to have smoothness, and you definitely want to focus on that when you're talking about um areas where you're gonna have a finer uh graded mixture that's gonna be much smoother, and you really want to make sure that you're went, you know, that you're giving yourself the best opportunity and sometimes level up in those types of things and really focusing on good quality milling and getting that profile.
- 27:06SPEAKER_01: You know, the the sat final surface is following what's underneath it.
- 27:10SPEAKER_01: Exactly.
- 27:10SPEAKER_01: And you know, of course, they as they're painting it, they can have variability, slight variability in thickness, you know, they'll account for you know imperfections in that underlying surface, but you don't want to lean on that, you want to lean on having that layer good and level before you come on with that final surface.
- 27:30SPEAKER_00: Yeah, there's only so much you can do with each successive lift to improve our ride quality.
- 27:35SPEAKER_00: So you definitely want to get uh get those opportunities to improve it where you can.
- 27:39SPEAKER_00: And typically when we have a smooth ride, that means that other things are going well as well on the quality front.
- 27:44SPEAKER_01: That's true.
- 27:45SPEAKER_01: That's true.
- 27:46SPEAKER_01: Well, Dennis, guess what time it is?
- 27:48SPEAKER_00: It's time for the top 10 list.
- 27:50SPEAKER_00: Top 10 reasons to prepare the surface before paving.
- 27:54SPEAKER_00: Number 10, asphalt is good, but it's not magic.
- 27:57SPEAKER_00: You can pave over cracks, potholes, and failures, but they'll eventually reintroduce themselves like uh unwanted guests at the family reunion.
- 28:06SPEAKER_01: Reason number nine, tack coat isn't super glue for bad decisions.
- 28:10SPEAKER_01: You gotta have a proper taccoat to ensure you got bond between those layers.
- 28:14SPEAKER_00: Reason number eight, because we'll fix it in the next lift, is not an engineering principle, and neither is it'll probably be fine.
- 28:22SPEAKER_01: Reason number seven, unfortunately, potholes have excellent memories.
- 28:26SPEAKER_01: If you haven't taken care of the problem where that pothole is, it's gonna come back in a very short amount of time, usually exactly where the pothole was before.
- 28:35SPEAKER_00: Absolutely.
- 28:36SPEAKER_00: Reason number six, dust is not a bonding agent.
- 28:40SPEAKER_00: Tac coats bond asphalt layers together.
- 28:42SPEAKER_00: Layers of dust only bond asphalt to disappointment.
- 28:46SPEAKER_01: Reason number five, prime coats deserve more respect.
- 28:50SPEAKER_01: Prime coats are like an offensive lineman, Dennis.
- 28:53SPEAKER_01: You were an offensive lineman.
- 28:54SPEAKER_01: Uh I'm not saying you're, you know, I'm not you're a big guy.
- 28:58SPEAKER_00: I know you were a 50 number.
- 29:02SPEAKER_01: You know, when a lineman is doing his job, nobody notices him.
- 29:06SPEAKER_01: But when it's not do when you're not doing your job, everyone knows.
- 29:10SPEAKER_00: Everybody knows.
- 29:11SPEAKER_00: Everyone, you don't want those guys to know your name.
- 29:13SPEAKER_00: Yeah.
- 29:13SPEAKER_00: Reason number four, the paving crew hates surprises.
- 29:17SPEAKER_00: Nothing gets a paving superintendent's attention faster than discovering a soft spot or a failed base or a utility cut while they already have their paving train there.
- 29:27SPEAKER_01: Number three, asphalt has trust issues.
- 29:30SPEAKER_01: If the pavement is cracked, loose, or unstable, new asphalt is going to start questioning the relationship almost immediately.
- 29:37SPEAKER_00: Absolutely.
- 29:38SPEAKER_00: Don't want those questions.
- 29:39SPEAKER_00: Reason number two, because paving over it is not a rehabilitation strategy.
- 29:44SPEAKER_00: That's not rehab, that's just a fresh coat of paint over what body.
- 29:48SPEAKER_01: No, that's a great point.
- 29:49SPEAKER_01: And uh reason number one that you need to prepare the surface before paving is gravity always wins.
- 29:57SPEAKER_01: Water is going to get into that pavement if it's not prepared properly.
- 30:01SPEAKER_01: Uh, saturated bases will fail, and surface depression is chance to solve these issues before you pave.
- 30:08SPEAKER_00: This episode's project of the month is from Houston Metro.
- 30:11SPEAKER_00: It's the Jensen Project.
- 30:13SPEAKER_00: They had 22 lane miles of asphalt pavement, and uh very appropriate for this uh this episode's topic.
- 30:20SPEAKER_00: They hit all the uh surface preparation techniques.
- 30:23SPEAKER_00: They uh encountered old bricks uh beneath the pavement.
- 30:26SPEAKER_00: Uh they had very deep voids and bases that had to be repaired, um, utilities, patches, uh, and they also included level up and then the final surface.
- 30:35SPEAKER_00: So uh great job down there in Houston, a great looking project.
- 30:38SPEAKER_01: Yeah, a big shout out to Houston Metro as well.
- 30:41SPEAKER_01: Uh they've been very engaged, and uh it's really evident that they like to build a really good project and they're looking at long-term performance, and there seems like they're investing the effort in making sure that that's what they're gonna get.
- 30:54SPEAKER_00: Yeah, there's a great partnership on this project between the agency, the uh consultants managing the project and inspecting, as well as the contractor uh producing and placing the mix.
- 31:03SPEAKER_01: Absolutely.
- 31:04SPEAKER_00: Thank you for tuning in to this episode of Roadmaps, and remember, stay flexible.
- 31:13SPEAKER_01: Thanks for tuning in for this month's episode of Roadmaps.
- 31:17SPEAKER_01: If you enjoyed today's episode, feel free to like and subscribe, and follow us on our social media channels at Texas Asphalt Payment Association.
- 31:26SPEAKER_01: Stay flexible, and we'll see you next time.