- 0:00The decision making process. An understanding of the decision making process provides the pilot
- 0:06with the foundation for developing ad M and SRM skills. While some situations such
- 0:13as engine failure, require an immediate pilot response using established procedures, there is
- 0:19usually time during a flight to analyze any changes that occur, gather information,
- 0:25and assess risk before reaching a decision. Risk management and risk intervention is much
- 0:31more than the simple definitions of the term might suggest. Risk management and risk
- 0:36intervention are decision making processes designed to systematically identify hazards, assess the degree of
- 0:43risk, and determine the best course of action. These processes involve the identification
- 0:49of hazards, followed by assessments of the risks, analysis of the controls,
- 0:54making control decisions using the controls, and monitoring the results. The steps leading
- 1:00to this decision constitute a decision making process. Three models of a structured framework
- 1:07for problem solving and decision making are the five P the three P, the
- 1:11three with Care and Team, the O O, DA and Decide models.
- 1:17They provide assistance in organizing the decision process. All these models have been identified
- 1:23as helpful to the single pilot in organizing Critical Decisions sr M and the five
- 1:30P Check. Sr M is about how to gather information, analyze it,
- 1:34and make decisions. Learning how to identify problems, analyze the information, and
- 1:41make informed and timely decisions is not as straightforward as the training involved in learning
- 1:46specific maneuvers. Learning how to judge a situation and how to think in the
- 1:52endless variety of situations encountered, while flying out in the real world, is
- 1:56more difficult. There is no one right answer in ADM. Rather, each
- 2:01pilot is expected to analyze each situation in light of experienced level, personal minimums,
- 2:07and current physical and mental readiness level and make his or her own decision.
- 2:14SRM sounds good on paper, but it requires a way for pilots to
- 2:17understand and use it in their daily flights. One practical application is called the
- 2:23five pas refer to Figure seventeen Dash seven. The five pis consists of the
- 2:31plan, the plane, the pilot, the passengers, and the programming.
- 2:38Each of these areas consists of a set of challenges and opportunities that face a
- 2:42single pilot, and each can substantially increase or decrease the risk of successfully completing
- 2:49the flight based on the pilot's ability to make informed and timely decisions. The
- 2:53five p's are used to evaluate the pilot's current situation at key decision points during
- 3:00the flight or when an emergency arises. These decision points include preflight, pre
- 3:06takeoff, hourly or at the midpoint of the flight, predescent, and just
- 3:12prior to the final approach fix or for visual Flight Rules v FR operations,
- 3:17just prior to entering the traffic pattern. The five p's are based on the
- 3:22idea that pilots have essentially five variables that impact his or her environment and that
- 3:28can cause the pilot to make a single critical decision or several less critical decisions
- 3:34that, when added together, can create a critical outcome. These variables are
- 3:38the plan, the plane, the pilot, the passengers, and the programming.
- 3:44This concept stems from the belief that current decision making models tended to be
- 3:47reactionary in nature. A change has to occur and be detected to drive a
- 3:53risk management decision by the pilot. For instance, many pilots use risk management
- 3:59sheet that are filled out by the pilot prior to take off. These form
- 4:03a catalog of risks that may be encountered that day and turn them into numerical
- 4:09values. If the total exceeds a certain level, the flight is altered or
- 4:14canceled. Informal research shows that while these are useful documents for teaching risk factors,
- 4:20they are almost never used outside of formal training programs. The five P
- 4:26concept is an attempt to take the information contained in those sheets and in other
- 4:30available models and use it. The five P concept relies on the pilot to
- 4:35adopt a scheduled review of the critical variables at points in the flight where decisions
- 4:41are most likely to be effective. For instance, the easiest point to cancel
- 4:46the flight due to bad weather is before the pilot and passengers walk out the
- 4:50door and load the aircraft. So the first decision point is preflight in the
- 4:57flight planning room, where all the information is readily ailable to make a sound
- 5:00decision, and where communication and fixed base operator FBO services are readily available to
- 5:08make alternate travel plans. The second easiest point in the flight to make a
- 5:13critical safety decision is just prior to takeoff. Few pilots have ever had to
- 5:18make an emergency takeoff. While the point of the five P check is to
- 5:23help the pilot fly, the correct application of the five p before takeoff is
- 5:29to assist in making a reason to go no go decision based on all the
- 5:33information available. That decision will usually be to go with certain restrictions and changes,
- 5:41but may also be a no go. The key point is that these
- 5:46two points in the process of flying are critical go no go points on each
- 5:49and every flight. The third place to review the five piece is at the
- 5:55midpoint of the flight. Often pilots may wait until the Automated Terminal Information Service
- 6:00ADIS is in range to check weather. Yet at this point in the flight,
- 6:06many good options have already passed behind the aircraft and pilot. Additionally,
- 6:12fatigue and low altitude hypoxia serve to rob the pilot of much of his or
- 6:16her energy by the end of a long and tiring flight day. This leads
- 6:21to a transition from a decision making mode to an acceptance mode on the part
- 6:26of the pilot. If the flight is longer than two hours, the five
- 6:30PEA checks should be conducted hourly. The last two decision points are just prior
- 6:35to descent into the terminal area and just prior to the final approach fix or
- 6:41at VFR just prior to entering the traffic pattern. As preparations for landing commence.
- 6:46Most pilots execute approaches with the expectation that they will land out of the
- 6:51approach every time. A healthier approach requires the pilot to assume that changing conditions
- 7:00the five peas again will cause the pilot to divert or execute the mist approach
- 7:04on every approach. This keeps the pile alert to all manner of conditions that
- 7:10may increase risk and threaten the safe conduct of the flight. Diverting from cruise
- 7:15altitude saves fuel, allows unhurried use of the autopilot, and is less reactive
- 7:21in nature. Diverting from the final approach fix, while more difficult, still
- 7:27allows the pilot to plan and coordinate better rather than executing a futile mist approach.
- 7:32Let's look at a detailed discussion of each of the five pas. The
- 7:39plan. The plan can also be called the mission or the task. It
- 7:45contains the basic elements of cross country planning, weather, route, fuel publications,
- 7:50currency, etc. The plan should be reviewed and updated several times during
- 7:56the course of the flight. A delayed takeoff due to maintenance, fast moving
- 8:00weather, and a short notice TFR may all radically alter the plan. The
- 8:05plan is not only about the flight plan, but also all the events that
- 8:09surround the flight and allow the pilot to accomplish the mission. The plan is
- 8:15always being updated and modified, and is especially responsive to changes in the other
- 8:20four remaining ps. If for no other reason, the five feet check reminds
- 8:24the pilot that the day's flight plan is real life and subject to change at
- 8:30any time. Obviously, weather is a huge part of any plan. The
- 8:35addition of data link weather information gives the advanced avionics pilot a real advantage in
- 8:39inclement weather, but only if the pilot is trained to retrieve and evaluate to
- 8:45weather in real time without sacrificing situational awareness. And of course, weather information
- 8:52should drive a decision, even if that decision is to continue on the current
- 8:56plan. Pilots of aircraft without data link weather should get updated, whether in
- 9:01flight through a Flight Service Station FSS and or flight watch the plane. Both
- 9:09the plan and the plane are fairly familiar to most pilots. The plane consists
- 9:15of the usual array of mechanical and cosmetic issues that every aircraft pilot, owner
- 9:20or operator can identify. With the advent of advanced avionics, the plane has
- 9:26expanded to include database currency, automation status and emergency backup systems that were unknown
- 9:31a few years ago. Much has been written about single pilot IFR flight,
- 9:37both with and without an autopilot. While this is a personal decision, it
- 9:43is just that a decision low IFR in a non autopilot equipped aircraft may depend
- 9:50on several of the other pas to be discussed. Pilot proficiency, currency,
- 9:54and fatigue are among them. The pilot flying, especially when used for business
- 10:01transportation, can expose the pilot to high altitude flying, long distance and endurance
- 10:07and more challenging weather. An advanced avionics aircraft, simply due to their advanced
- 10:13capabilities, can expose a pilot to even more of these stresses. The traditional
- 10:18i M Safe checklist see page seventeen, Dash six is a good start.
- 10:24The combination of late night pilot fatigue and the effects of sustained flight above five
- 10:31thousand feet may cause pilots to become less discerning, less critical of information,
- 10:37less decisive, and more compliant and accepting. Just as the most critical portion
- 10:43of the flight approaches, for instance a night instrument approach in the weather after
- 10:48a four hour flight, the pilot's guard is down the most the five p
- 10:52process helps a pilot recognize the physiological situation at the end of the flight before
- 10:58takeoff, and continues to update personal conditions as the flight progresses. Once risks
- 11:05are identified, the pilot is in an infinitely better place to make alternate plans
- 11:11that lessen the effect of these factors and provide a safer solution the passengers.
- 11:18One of the key differences between CRM and sr M is the way passengers interact
- 11:22with the pilot. The pilot of a highly capable single engine aircraft has entered
- 11:28into a very personal relationship with the passengers. In fact, the pilot and
- 11:33passengers sit within an arm's reach all of the time. The desire of the
- 11:37passengers to make airline connections or important business meetings easily enters into this pilot's decision
- 11:43making loop. Done in a healthy and open way, this can be a
- 11:46positive factor. Consider a flight to Dullest Airport and the passengers, both close
- 11:52friends and business partners, need to get to Washington, d C. For
- 11:56an important meeting. The weather is fr all the way to southern Virginia then
- 12:01turns to low I FR as the pilot approach is Dullest. A pilot employing
- 12:07the five P approach might consider reserving a rental car at an airport in northern
- 12:11North Carolina or southern Virginia to coincide with a refueling stop. Thus the passengers
- 12:18have a way to get to Washington, and the pilot has an out to
- 12:22avoid being pressured into continuing the flight if the conditions do not improve. Passengers
- 12:28can also be pilots. If no one is designated as pilot in command PC
- 12:33and unplanned circumstances arise, the decision making styles of several self confident pilots may
- 12:41come into conflict. Pilots also need to understand that non pilots may not understand
- 12:46the level of risk involved in the flight. There is an element of risk
- 12:50in every flight. That is why SRM calls it risk management, not risk
- 12:56elimination. While a pilot may feel comfortable with the risk present in a night
- 13:01I FR flight, the passengers may not. A pilot employing SRM should ensure
- 13:07the passengers are involved in the decision making and given tasks and duties to keep
- 13:11them busy and involved. If upon factual description of the risk present, the
- 13:18passengers decide to buy an airline ticket or rent a car, then a good
- 13:22decision has generally been made. This discussion also allows the pilot to move past
- 13:28what he or she thinks the passengers want to do and find out what they
- 13:31actually want to do. This removes self induced pressure from the pilot. The
- 13:37programming the advanced avionics aircraft adds an entirely new dimension to the way general aviation
- 13:46aircraft are flown. The electronic instrument displays GPS and autopilot reduced pilot workload in
- 13:52increased pilot situational awareness. While programming and operation of these devices are fairly simple
- 14:00and straightforward, unlike the analog instruments they replace, they tend to capture the
- 14:05pilot's attention and hold it for long periods of time. To avoid this phenomenon,
- 14:11the pilot should plan in advance when and where the programming for approaches,
- 14:16route changes, and airport information gathering should be accomplished as well as times it
- 14:20should not. Pilot familiarity with the equipment, the route, the local air
- 14:26traffic control environment, and personal capabilities vis vi the automation should drive when,
- 14:33where and how the automation is programmed and used. The pilot should also consider
- 14:39what his or her capabilities are In response, to last minute changes of the
- 14:43approach and the reprogramming required an ability to make large scale changes a reroute,
- 14:50for instance, while hand flying the aircraft. Since formats are not standardized,
- 14:56simply moving from one manufacturer's equipment to another should give the pilot pause and require
- 15:01more conservative planning and decisions. The SRM process is simple. At least five
- 15:09times before and during the flight, the pilot should review and consider the plan,
- 15:15the plane, the pilot, the passengers, and the programming and make
- 15:18the appropriate decision required by the current situation. It is often said that failure
- 15:24to make a decision is a decision under SRM and the five p's. Even
- 15:31the decision to make no changes to the current plan is made through a careful
- 15:35consideration of all the risk factors present. End of Part three of Chapter seventeen.