- 0:05Welcome back to the Remodel Report by USA Cabinet
- 0:08Store. I am Chris, and today we are doing something
- 0:11different. We are not talking about what a bathroom
- 0:14remodel costs. We are talking about how to plan
- 0:17one. Which is the episode people actually need.
- 0:21Hi everyone, Jessica here. In our showrooms,
- 0:24the projects that go wrong were almost never
- 0:26built wrong. They were planned wrong, months
- 0:29before the first tile came off the wall. So give
- 0:32me the whole plan in one breath. How do you plan
- 0:34a bathroom remodel? Six steps in order. Consultation,
- 0:38where the goals and the budget get honest. Measurement
- 0:41and discovery. Layout and 3D design before you
- 0:44fall in love with finishes. Material selection.
- 0:48A written itemized scope and estimate with permits
- 0:50assigned. And only then, ordering and installation.
- 0:54The plan is finished when the permit is issued
- 0:56and every product is sitting in your garage.
- 0:59Not before. That last part sounds like a rule
- 1:02you enforce. It is the rule. Demolition does
- 1:05not start until everything is on site and inspected.
- 1:08A missing faucet cartridge during planning is
- 1:10a phone call. During construction, it is a bathroom
- 1:14your family cannot use for three extra weeks.
- 1:17Okay, timelines. People hear a bathroom takes
- 1:18two weeks, true? Construction on a typical hall
- 1:22bathroom takes four to seven weeks and a primary
- 1:24suite seven to ten. But door to door, from the
- 1:28first meeting to the final walkthrough, plan
- 1:30on eight to sixteen weeks. because design decisions,
- 1:33material lead times, and permits all run before
- 1:36demolition day. The vanity usually sets the clock.
- 1:40Stock arrives in days, semi -custom in about
- 1:42four to six weeks, and full custom can take up
- 1:45to 12. So the long pull is not the construction
- 1:48at all? Almost never. It is the ordering and
- 1:51the permits, which is why a well -planned project
- 1:54orders everything early and then builds fast,
- 1:57and a badly planned one demos fast and then waits.
- 2:00Let us do money briefly, because this is a planning
- 2:03episode. What should people budget? Four planning
- 2:07tiers. A budget refresh runs $5 ,000 to $10 ,000.
- 2:11Mid -range, $16 ,000 to $28 ,000. And that is
- 2:14where most full remodels land. High end, $30
- 2:18,000 to $50 ,000. Luxury custom starts around
- 2:21$60 ,000. The national average sits near $16
- 2:24,500. And whatever your number is, hold 10 %
- 2:27to 20 % on top of it outside the contract. for
- 2:30what the walls are hiding. Is $10 ,000 enough?
- 2:34For a refresh, yes, if you are disciplined. Keep
- 2:39every fixture where it is. Reuse what works.
- 2:43Choose a stock vanity. Skip the custom glass.
- 2:47It is not enough for anything that moves plumbing.
- 2:50Relocating a single fixture adds roughly $600
- 2:53to $1 ,500 and a tub -to -shower conversion runs
- 2:56$2 ,000 to $8 ,000 even without moving the plumbing.
- 2:59That leads to the layout question. You say the
- 3:01layout is where the money is saved or spent.
- 3:04The strongest cost control decision in bathroom
- 3:06planning is keeping fixtures where they are.
- 3:10Every move, toilet, or drain buys plumbing work,
- 3:12open floors, permits, and inspections. Sometimes
- 3:16the layout truly fails you, and the move is worth
- 3:18it. But make that decision at the design step
- 3:22with a floor plan in front of you, not in week
- 3:24two of construction. And when you review a layout,
- 3:27what are you actually checking? Clearances first.
- 3:30The industry guideline from the Kitchen and Bath
- 3:32Association recommends 30 inches of clear floor
- 3:35space in front of every fixture, and code minimums
- 3:38sit around 21. Then the practical stuff. Door
- 3:42and drawer swings that do not collide. Shower
- 3:45door clearance. Where the towel bars and the
- 3:48storage actually go. Outlets in the right places
- 3:50with proper protection. And where the exhaust
- 3:53duct runs, because a fan that vents into the
- 3:56attic instead of outdoors is a mold farm on a
- 3:58timer. You also push people to think about the
- 4:01future while the walls are open. Because it is
- 4:04nearly free during framing and expensive forever
- 4:06after. Solid blocking behind the drywall for
- 4:09future grab bars. A curbless shower entry. A
- 4:13comfort height vanity. And the crowd favorite
- 4:15from the remodeling forums. An outlet by the
- 4:18toilet for a bed A seat. Costs almost nothing
- 4:21at rough -in. People love it. Speaking of the
- 4:24forms, there's a Reddit thread where someone
- 4:27about to start a bathroom remodel asked for advice,
- 4:30and the top answers were brutal. Brutally accurate.
- 4:34The most upvoted warning was simply, it will
- 4:37take longer than you expect. And one commenter
- 4:40gave a formula I quote to clients, take your
- 4:43schedule and multiply by three, then add 10 %
- 4:46more time and 20 % more cost for every decade
- 4:49your home is older than 1990. The multiplier
- 4:52is dramatic, but the direction is dead right,
- 4:54and it is exactly why the contingency exists.
- 4:57There was also a confession in that thread about
- 4:59a shower bench. A homeowner built a tiled bench
- 5:02into the shower, used it three times in two years,
- 5:06and called it their biggest remodel mistake.
- 5:08That is a planning lesson. Interrogate every
- 5:11feature at the design step. What does it cost
- 5:14in space and waterproofing complexity? And would
- 5:17a $40 teak stool do the same job? All right,
- 5:20permits. You work in seven states. How different
- 5:23can bathroom permits really be? Very. The general
- 5:27rule travels everywhere. Move or add plumbing,
- 5:30wiring, or walls, and you need a permit. Paint,
- 5:34flooring, and a like -for -like fixture swap
- 5:36usually do not. But the details are local. Fairfax
- 5:41County, Virginia exempts strictly cosmetic work,
- 5:44even a vanity swap on identical plumbing, and
- 5:46runs everything else through an online portal.
- 5:49with eligible minor projects clearing review
- 5:51in a few business days. Maryland requires contractors
- 5:55to hold a state home improvement license, and
- 5:57it is enforced. Houston treats flooring, tile,
- 6:01and simple faucet or toilet swaps as exempt finish
- 6:03work. And Florida sounds permissive until plumbing
- 6:07or electrical gets involved, which in a bathroom
- 6:09is always, so most real remodels there are permitted
- 6:12and some counties flood test your shower pan
- 6:14before they let anyone tile it. Flood test. Explain
- 6:18that because it sounds dramatic. It is the best
- 6:21moment of the whole project. Before any tile
- 6:23goes on, the shower pan gets its waterproofing
- 6:26membrane, the drain is plugged, and the pan holds
- 6:29standing water to prove nothing leaks. We also
- 6:32insist the waterproofing system is named in the
- 6:34contract, a liquid membrane like RedGuard or
- 6:37a sheet system like Schluter -Kerdi. A shower
- 6:40that is merely tiled is not waterproofed, and
- 6:43water always finds the shortcut. One more permit
- 6:47thing. Who should actually pull the permit? The
- 6:49licensed contractor. Every time. The permit holder
- 6:53answers for the work. If a contractor asks you
- 6:56to pull it yourself as an owner -builder, that
- 6:58is often a sign they do not hold the license
- 7:00the trade work requires. In Virginia, you can
- 7:03look up a contractor's license class online in
- 7:06about a minute. Do it before you sign anything.
- 7:09Rapid fire. Where does someone start today if
- 7:11their bathroom drives them crazy? Write down
- 7:14what actually fails you. Storage, lighting, ventilation,
- 7:19safety. Then set your true ceiling number, measure
- 7:22the room, and take photos. Those three things
- 7:25turn your first conversation from browsing into
- 7:28planning. Biggest planning mistake you see? Choosing
- 7:31tile before the layout is settled. Finishes are
- 7:34the fun part, so people start there, and then
- 7:37the whole plan bends around a backsplash. Layout
- 7:39first, finishes last. Your future self will thank
- 7:43you. And the quote comparison trap? Never compare
- 7:47bottom lines. Compare line by line. Allowances,
- 7:51exclusions, brands and model numbers, who pulls
- 7:53the permits, payment milestones tied to progress,
- 7:56and the change order procedure. The lowest preliminary
- 8:00bid is usually just the least complete one. Three
- 8:03things to remember, Jessica. One. Plan in six
- 8:06steps, in order, and do not let demolition start
- 8:09until permits are issued and every product is
- 8:12on site. 2. Budget from the tiers? Hold 10 -20
- 8:17% for surprises and keep the plumbing where it
- 8:19is unless the layout truly fails you. 3. Permits
- 8:24are local. What is exempt in Houston needs paperwork
- 8:27and Fairfax, so ask your local office or your
- 8:29local showroom and put the answer in writing.
- 8:37is at usacabinetstore .com. The design consultation
- 8:42is free, in a showroom, at your home, or virtual.
- 8:46Bring your measurements. And your failure list.
- 8:49That is where every good plan starts. That is
- 8:52the remodel report. See you next episode.