Latest / Speaking of Supply Chain / The Art of Tendering
Transcript
- 0:06You're listening to Speaking of Supply Chain, a meboch podcast. This is a
- 0:10show for logistics professionals looking to learn more about the latest innovations in supply chain.
- 0:16Each episode will feature a conversation on topics such as mitigating supply chain disruption
- 0:20and reducing risk, current automation trends, sustainability initiatives, and more. Let's
- 0:26dive right in. Hello, and welcome to Speaking of Supply Chain, where
- 0:32we explore trends, current events, and innovations impacting the logistics and supply chain
- 0:37industries. I'm your host, Ellen Wood, and I am joined today by
- 0:42Richard and Caesar from our UK office in Mebok, and we are going to
- 0:48be talking about what happens in the tendering process and what difficulties companies tend to
- 0:54face when they are going out to tender and trying to do it alone with
- 1:00their internal teams. Welcome Richard, and saysar Hi Lan, thank you.
- 1:06So this is such an interesting topic and I know that this is something that
- 1:11we do very often within our company, and I know that clients out there
- 1:15they often go out to tender, it's just part of their buying process.
- 1:19And so I can't wait to talk about this onto our actual conversation today about
- 1:26Yes, the tendering process. So, especially when operations and logistics teams are
- 1:34well established within a company, it's assumed that when they're going to be making
- 1:37a purchasing decision that these people are the internal experts. They should know what
- 1:42to be able to do. But we know from our side, from the
- 1:47me box side, that that is not always the case. That they don't
- 1:51always have the acumen to make that purchasing process go smoothly for their company,
- 1:57and it's incredibly difficult. It's it's not necessarily hard in terms of the tasks
- 2:05that need done, but it is complex. So I've been part of a
- 2:09number of RFPs, RFQs, RFIs. There's lots of different acronyms for this
- 2:15request for information question RFQ, request for quote and proposal. Yeah, quotation
- 2:24or proposal. So whether it's just information, whether they need a full solution,
- 2:30or whether they know what they need and they just need a price for
- 2:31it, depending on what's being purchased, they can be super simple or really
- 2:39complex. And you guys have written a white paper recently about why companies should
- 2:46seek external advice before they go live with this process. So tell me a
- 2:50little bit about what you what you detailed in this white paper. Yeah,
- 2:57we we normally here in the UK office in Oxford, where we normally work
- 3:06with or tender is UM what we call the four wings of tendering, which
- 3:14is software which includes WMS WCS for example UM warehousing, which is a kind
- 3:23of project that is on the rise because of Brexit. A lot of companies
- 3:29are trying to open new operations in the UK and very related also to the
- 3:38warehousing topic is transportation. For example, if if if you have a new
- 3:45warehouse, you need new transportation. Of course, sometimes we manage tender projects
- 3:51which are like a bundle of these of these two wings, and the last
- 3:59one is MH and automation, which is also quite related to Brexit. But
- 4:08also COVID companies have realized how sensible the house sensitive. Sorry, there are
- 4:16supply chains and they're short staffing the issues that can bring them so they are
- 4:25trying to use their resources more efficiently, so are using more automation. So
- 4:30those are the four wings of tendering that we use and that we took into
- 4:35account when we wrote this article or white paper. However, we consider that
- 4:43no matter how complex tender project is. These ten tips are applicable to every
- 4:53yeah yeah, yeah, no matter if it's a new warehouse or stationary supplies.
- 4:59Right, you can apply to ten of them, ten of these tips
- 5:02to every kind of tender definitely. So like like the idea behind of like
- 5:08the white paper is to identify Okay, what are like the ten made pillars
- 5:12or of tips, like all of the companies should follow up in order like
- 5:15to to reach an a successful a result in the elevendering processes. Because we
- 5:21as an amiva So sorry, Ellen, No, I was just going to
- 5:25say, so a successful tender would be what that they purchase They ultimately make
- 5:30a decision and purchase and are happy with that purchase. Yes, yes,
- 5:34like that is like that is like the main goals like hearing me, But
- 5:38we have like these expertise like working with different level of company size, We
- 5:42have like the expertise in designing where hooses again right now, most of like
- 5:46the questions that the customer ask to us is hey, like we want way
- 5:50to implement like an automation solution. We think about like what is the solution
- 5:55or the technology that we want, but we are not sure about if like
- 5:59these player is like the best for us. We don't want to pay like
- 6:03an over rate because they approach to us first, so they wanted to have
- 6:09like an objective an objective party who helped them like to take that level of
- 6:15decision. And in that point it's like yes, like an advisor, not
- 6:19yeah. And and and it's not only about making the purchase itself, because
- 6:27basically anybody could do it. But a successful tender for us is that in
- 6:32the long run, the client is still happy with that decision that we or
- 6:39any other externals or help them to do to take that decision. So that's
- 6:46a successful tender indeed. So like for me, it's like when you wanted
- 6:50to get married, because you're going to have an a partner for a long
- 6:54time, for a long term. So we really to think carefully, okay,
- 6:58because if if you're going to to say, hey, I am going
- 7:00to implement like a new highway technology, Okay, it's not only like that
- 7:05implementation, because there is coming like the maintenance. Then there is coming like
- 7:11a train in So probably is not an a relationship for one of the years.
- 7:15We're talking about like five ten years of relationship lay the same happen if
- 7:17we are looking for an a new trepl or like an a new double MS.
- 7:23Okay, So like there is always like these things, like it keeps
- 7:26to you attached to the supplier or to your partner for a long time,
- 7:30so it's important like you have a good relationship with him or so what we're
- 7:36what we're doing essentially is going after the risk mitigation here that this risk is
- 7:45a potential bad relationship and we are trying to avoid this client having buyer's remorse.
- 7:50M indeed, so it's not just about finding the right product for what
- 7:58they need, although we you can help with that, or the tendering process
- 8:01can be part of that. We're trying to find which solution is going to
- 8:05fit best. I mean that's that's also part of maybe a concept design or
- 8:11but even in the tendering process figuring out who is going to participate in this
- 8:16tender, who's going to bid. But there's also the aspect that says,
- 8:20are you touched on it, that this external set of eyes is going to
- 8:24be able to share some of that cross functional or cross industry best practices.
- 8:30So you know, a customer coming in and saying, you know, I'm
- 8:33in this industry, and I'm I'm in this role in my company and we
- 8:37know that we need something, but is this the best is are we going
- 8:43after the right thing in the first place? So is that a situation where
- 8:48you've come into a tendering project and told the customer, um, actually,
- 8:54no, this is not what you should be looking for. We need to
- 8:58back up a step and make sure that you're actually shopping for the right thing
- 9:01to meet your needs rather than just okay, you're you're looking to buy X,
- 9:07y Z pre you know, piece of material handling equipment. I can
- 9:09help you with that. It's stepping back a little bit further, and is
- 9:13this going to meet your business need? Okay? I am mutually if I
- 9:18understand properly la the question, but I think so like so, sorry,
- 9:22no, you're fine. I can I can rephrase that. So, you
- 9:26know, when we're when you're going and talking with a client about a tendering
- 9:31project that they have, do you ever advise them to say you're not you're
- 9:35not asking the right questions, You're not looking for the right thing. You
- 9:39think you need this, But based on what I know about your company,
- 9:43based on what you're you're explaining to me about what you're trying to do.
- 9:46Actually you need to look at something differently, yes, like yeah, this
- 9:50is happening. Okay, yeah, no, no, you understand your point.
- 9:54Yes it's happening. Normally, what we do, it's like to receive
- 9:58like the needs of the customer, but not only like in terms of words,
- 10:01okay, like we we we really like like to receive l the data
- 10:05as me back, like we always analyzed data. We are in a company
- 10:09who focus a lot of under data use totila these numbers, like to transfer
- 10:13or convert them in requirements or physical requirements. So in some cases, yeah,
- 10:18like the customer scale, what we're looking for is like an like an
- 10:22amounal solution, like to reach atilate this rootput. And they always think they
- 10:26think about a v and as for example, like very narrow idle solution,
- 10:31but like considering that level of flows, that level of stock and try late
- 10:33to use it like a maximum potential height. It's more convenience like to think
- 10:37about like an automated solution. So in these cases, like we challenge that
- 10:41original idea okay and try late to orientate it like to the customer. Why
- 10:48because when we go late to the next phase with that with the corresponding suppliers.
- 10:54If we only think about like an a manual solution, we are only
- 10:56going to to look for suppliers who acking. But like that is not going
- 11:01to be an a proper solution, Unlike the idea is like to have an
- 11:05a solution to be sustainable in the long term, because like this Monel solution
- 11:09has like an a limited time of life considering that the flows that he has
- 11:13expected like to have of it. So like, depending on like what is
- 11:18like the situation. Okay, what is like the data or what is the
- 11:20horizon that the customer is looking for? Like, like, the solution could
- 11:24be vary, and normally what we do is check it it like with a
- 11:28customer, what is the requirements in terms of data? But this is not
- 11:31only apply like for for all of these four winds that Creature explain. For
- 11:37example, for an a double GMAS, we need like to look for processes.
- 11:41So what are your current requirements in terms of processes? Okay, like
- 11:45this is what you have now, but this is what you're going to plan
- 11:48like to have in the future, gay or like based on that, Okay,
- 11:52Like we can started to think about, Hey, like the double gmas
- 11:54should have some additional capabilities that you are not mapping at the beginning, and
- 12:00that it could change completely, like the level of information like the customer required
- 12:05at the end. But it is depending on like models of the situation of
- 12:11a customer exactly, everyone's going to be different. Also, when when we
- 12:15manage a standard project, we it's not only about keeping the client in line
- 12:22and helping them to understand actually their needs, but also the bidders. Sometimes
- 12:28the bidders trying to be you know, to come with a solution that is
- 12:33very innovative, they come with the ideas that are not always the best,
- 12:39and it's like, okay, yeah, we appreciate that, but it's not
- 12:43actually what the client needs. So we need to try to keep on the
- 12:48on the right lane. Both parties right, and we are in the middle
- 12:52helping them to actually achieve the successful results. Yeah, you read my mind
- 13:01richer because I like you mentioned it. Like. The only point that I'd
- 13:05like to add is that if we have like an like an I, if
- 13:09we are in this phase like okay, le, they weider send their proposals
- 13:16personally. I prefer like to be open, okay, like to listen what
- 13:18other experts try let to suggests like to us. So it's fine for me
- 13:22if somebody say, hey, like this is like the original idea that MIVA
- 13:26has, Okay, this concept designed, this level of detail, notal demas
- 13:30okay for transportation, et cetera. But like we come like with this additional
- 13:33solution, Hey, I implement like a new type of racking like an sorter,
- 13:37like an AGVs. Whatever. Like the most important one here is like
- 13:41how do you what is like the reasons or le motivation that you have behind
- 13:46that like to justify this new solution Because Meva, we normally we evaluate like
- 13:52the technologies before like to recommend. So normally like we say, hey,
- 13:56this is like the right solution because we have like these reasons from behind.
- 14:01If like that if like to be there one light to post lie something definite
- 14:05is an important to say why you know, we always need like to be
- 14:07opened to think outside the box exactly. So Yeah, from the perspective of
- 14:15yes, it's a great idea to have external support in this tender for the
- 14:18client because make sure that what the client is asking for is actually going to
- 14:22meet the business need, that buyer's remorse is going to be there if it
- 14:26doesn't solve their problem. But if they have this, if they have this
- 14:30very narrow idea of what can solve their problem without listening to other options or
- 14:37someone playing devil's advocate saying no, I think this would actually be a better
- 14:41solution for you, and it will avoid that buyer's remorse. So that risk
- 14:46of getting boxed into an idea because you don't have all the information. So
- 14:52that's one risk. But then Richard, you brought up an excellent point that
- 14:56when you have to go out to these potential suppliers of whatever it is,
- 15:00whether it's a facility or whether it's material handling, equipment or software, um,
- 15:05that when those buyers come or those suppliers come back and try and offer
- 15:11a solution with within that framework of the tendering request. UM. If there's
- 15:18if there's any friction and a client is doing this on their own, then
- 15:22that's a potential partnership that they're you know, getting into. That's this marriage
- 15:28and it could start off rocky if there's an argument at the beginning. So
- 15:31by having that third party there to kind of manage that process and be that
- 15:35you know, to stick with the marriage. Analogy you know, this is
- 15:41their their counselor to help or a mediator to help with that process and make
- 15:46sure that everybody is speaking the same language, everybody is coming with you to
- 15:50the table with the best intentions and really making sure that whoever they walk away
- 15:54from even if that even if that supplier is not chosen for this particular tender,
- 16:00that they're on the table still for future potential engagements. Yeah, definitely,
- 16:04As as Assessa said, we try to keep an an open mind,
- 16:10always receive all proposals, try to keep a good relationship with every bidder,
- 16:17even if probably their solution was not was not the best for a particular project.
- 16:22But we try to keep a good relationship with them because we know that
- 16:26there will be more projects and we need to go to them and ask them
- 16:32for a proposal. And so yeah, it's it's really important to keep that
- 16:37relationship with them and with the client. Definitely. Normally what we do as
- 16:41me where he's like providing a fitback to the bidder and explain later reasons why
- 16:45they are not continued later the base kay to the final negotiations, to the
- 16:49final round, or why we're not selected. This is an important way to
- 16:53say hey, like for example, to put like an real case like in
- 16:59a pre experience, and one supplier was really keen on in one specific technology
- 17:04okay and said like this is a technology, like you should follow up this
- 17:10this and this isn't like the customer didn't want the technology and that was like
- 17:15one of the reasons, like the customers like, hey, I will not
- 17:18one like to have something that I don't like an I don't want or I
- 17:22don't need, and like this is like a feedback for like tabiter okay,
- 17:26like you push like to hard, like to this technology probably is because you
- 17:30have like your reasons okay, like probably is like this these warehouses like the
- 17:33this that you have available, et cetera. But like this is norqual like
- 17:37the customer want or need and that is like the reason. So it's like
- 17:41to explain yes, yes, yes it is here is very important like like
- 17:45to in this kind of business because like we are have a lot of relationship
- 17:51with many people. It's an important like how we approach like to them and
- 17:53how we explain like the reason behind it. So we needed like to to
- 17:57have time, like to explain to one gage why not. So when confronted
- 18:03with the term outsourcing, which is essentially what this is. You know,
- 18:07if a company it has internal resources that are capable of doing something, there's
- 18:14there's a hesitation when it comes to hiring an external firm to do it or
- 18:18overcoming that objection that we should be able to do this in house, we
- 18:22should be able to handle this ourselves. How often is that the case where
- 18:27you're coming into a tender and there's a little bit of hesitation or pushback that
- 18:34they should have been able to do this themselves, or they have internal resources,
- 18:40but someone at the at the decision making table has said, no,
- 18:42we really need an external third party to help us manage this process, or
- 18:48we just don't have the internal resources. They don't have the time or availability
- 18:53to manage this tendering process. They're busy doing their job and we need something
- 19:00else, so we need to bring someone else in. Is it more likely
- 19:03to have you know, a cost savings in the long run when it comes
- 19:07to utilizing a third party for this tendering process. Yeah, it is very
- 19:15common that situation, Like it's basically always and actually every time we every time
- 19:22we send an offer for a tender project, our main competitor is not another
- 19:30company is the client itself who is internally debating whether we should seek for external
- 19:37support or run this internally. And yes, it is true, it's very
- 19:42tempting to run it, to run that project internally, because in the short
- 19:48term, yeah, it might seem like a cheaper option. However, as
- 19:52we have said, this is the result of a tender project is like marriage,
- 20:00which will last at least three or five years, as as minimum is
- 20:07a contract that will run for several years. So and here is where looking
- 20:15for external support becomes a cost effective actually, and it is where you can
- 20:22actually see the savings because for example, and these are a couple of the
- 20:26reasons that we mentioned in the white paper. And is it, for example,
- 20:33the professional or the consultant, whatever you want to call that person through
- 20:40his experience on knowledge notes, for example, what are the right suppliers that
- 20:45should be part of the long list and not lose any time with candidates that
- 20:52from the start we're not a suitable option. Also because again experience and know
- 21:00the consultant knows what are the risks that the client might encounter in the long
- 21:06term that they not necessarily are aware of. So in the long term,
- 21:12yeah, it is more cost effective for the client to seek for external support
- 21:19among other reasons, right, like sustainability for example, etc. That is
- 21:26the ritory of completely right, like there is there is always this kind of
- 21:30challenge like because later costomers also is part of the competitors. Okay, every
- 21:34one, but like here, like the main one of the main reasons like
- 21:40to motivate the customers later go with MEVA and not continue like doing with the
- 21:45purchasing area is because these kind of technologies or situations is not something like a
- 21:52purchasing area face every day. This is something very specific okay, and not
- 21:57having ladies level of knowledge could complicate like the time late like the customer has.
- 22:03So for example, like right now, like some months ago, okay,
- 22:08we were almost finished that project, but like a customer asked to us
- 22:12to prepare like an a proposal, We prepared like the proposal. They decided
- 22:15to do it it internally, but a couple of months ago they decided to
- 22:21call again us because yeah, there is an a delay of three months.
- 22:25Okay, so we need like someone going to help us, like to finish
- 22:27the evaluation. Okay, yeah, and it's it's a lot of work.
- 22:33It's a lot of work because like they invite like they invite like more than
- 22:37to any potential bidders, like for you or this long lists, so like
- 22:42they go like for to any late to five, like to ten. It's
- 22:45quite difficult. It's quite challenging, okay, because like, okay, how
- 22:48are you going like to evaluate like these guys I don't know like this knowledge.
- 22:52It's like the first time that we're going to evaluate. How is it
- 22:55going to be like a template? How is like the process that they should
- 22:59fall blow up? Or what are like the right questions I should include in
- 23:03the R five for a que? So all of these information it gets complicated
- 23:07an at that moment is like when Meiba as an expert, we enter and
- 23:11help them like to take that resolution or the right decisions. Yeah. Also,
- 23:15also one of the things is that we some bidders have sellers that are
- 23:23very good actually, and it's easy to feel some kind of bias towards that
- 23:32company. It's like, oh, yeah, I like this person, I
- 23:34like talking to this person is very is very good at this, and probably
- 23:40their solution is not actually the best, but they have a very good seller.
- 23:45So we have encountered, yeah, a lot of times that situation.
- 23:49But we as consultants, we don't have any personal gain or personal interest there,
- 23:56so we can provide an objective valuation to the client and not fall under
- 24:04that charming of seller yeah of the sellers so yeah, or be dazzled by
- 24:12the technology yeah yeah as well yeah yeah. And also it's like challenging also
- 24:18like some performance they have, like there are they put like some numbers and
- 24:23could be realistic. We ask, hey, like these numbers are impossible like
- 24:27reach Okay, so like okay, it sounds good, but like in the
- 24:33reality probably is going to be late to difficult to reach. Probably that is
- 24:37like a maximum performance that you could have, but not like a realistic one
- 24:41that you're going to have every day. So like we we need like to
- 24:45check it in or try light to be objective or be objective like when we
- 24:48do late these kind of analysis in order to not create a these bias that
- 24:52Richer mentioned. Because again, like there are many sellers that are very good.
- 24:56Okay, they competence LA to you very quick, lay lay when you
- 25:00as selled to see lay your solution, it lay them lay the part we
- 25:06need led to evaluate. So what I hear is that there's there's two areas
- 25:10where utilizing this external partner for this tendering process is really a helpful mediator.
- 25:15So the first one is in the decision the internal decision team, so between
- 25:21purchasing, between operations, and between executive management. So making sure that all
- 25:26three of those those work streams, those those organizations you know, business units,
- 25:32understand the need and the result of whatever this purchase is going to be.
- 25:37So everyone's on the same page. Everyone agrees that moving forward is the
- 25:42right process. You don't have to worry about getting buy in or you know,
- 25:45going through this process and then going to the financing department or the purchasing
- 25:49department getting told no because it's too expensive. There really needs to be that
- 25:53that buy in and that internal communication with the company first and so we help
- 25:57mediate that process or help me eat that process, I don't do it.
- 26:02And then also between the suppliers to make sure that they're they're honest and they're
- 26:07well, we want to believe that they're all honest and they're just trying to
- 26:11you know, earn their living, but that they are truthful and upfront about
- 26:15the limitations of what it is that they're able to deliver, and that all
- 26:22the expectations are managed on both sides of the table. Am I hearing that
- 26:26right? Yes, yes, yes of course, and like as you mentioned,
- 26:30well, I'm telling very quick like one previous expedience for example, like
- 26:36we change like the technology with a customer like you want to like to have
- 26:40originally like an a pop up sorter, and like the end we say like,
- 26:44hey, shoe sort is the best, but we this has happened like
- 26:48after liscending, like the ARFI, they're fu so have to start all over.
- 26:52Not necessarily. Well, I communicate like to the leaders, hey,
- 26:56like we have decided like to change is increasingly the performance okay, like do
- 27:00you have it like this capacity like the suppliers with this new technology, and
- 27:04some of them were very honest and say, hey, like no, unfortunately
- 27:08we don't have it like that capabilities Okay, but we still have like a
- 27:14good relationship because at any moment or it's going like to appear like other opportunity,
- 27:19we can contact late to you because you have like that specific technology for
- 27:23that specific scenario. And this is like like a part like we try to
- 27:27do when we when we develop like a white paper with richer, we highlight
- 27:32it first our capacity identify, Hey, of all of these potential supplier or
- 27:37supplasion suppliers or beaters that you could have which could adapt according to your needs.
- 27:44Okay, is like not all of the technologies it's going to like to
- 27:47fit for you, but we needed to reduce it it like the universe and
- 27:52focus only in the vitas that could fulfill your requirement for your specific require a
- 27:59any last, any last thoughts before we share to our listeners where they can
- 28:03find this white paper, these ten tips we trobably wanted to start. Yeah,
- 28:07I mean, we understand that it might feel very tempting right to run
- 28:14tenders. Internally, it seems like an easy thing to do, it would
- 28:18be a cheaper option. However, in the long term and actually in the
- 28:23meat term as well, looking for external support can actually provide advantages to your
- 28:32business. It will help you grow in a healthier way and avoid certain mistakes
- 28:41that the consultants know about and and can help you avoid those yeah, those
- 28:48issues that you find Yeah, exactly, those pitfalls. So yeah, it's
- 28:56a good thing to think about that option, and I think it's always a
- 29:02positive option to consider when looking for a service or a product to tender,
- 29:10especially some of the sizes of these purchases. I mean we're talking, you
- 29:12know, hundreds of thousands, if not millions of dollars. Why would why
- 29:15would you risk that if you could ensure that this process is going to go
- 29:19smoothly and the result is going to be exactly what you need, yeah,
- 29:23exactly. Even even a cheap option is normally not cheap. So you want
- 29:30to make sure that you made the right decision and not after a couple of
- 29:36years say, you know this was not the right solution, but I liked
- 29:40that person that sella was very charming. You want to avoid that situation and
- 29:45make sure that you made the right choice from the start. So from a
- 29:51perspective, what this lay. The first thing to do any later thing is
- 29:53asking late a question, what is our experience in with these products, with
- 29:59distant this process did we do before? If you is it something that you
- 30:03do frequently, you don't need let to have an external advice it at all.
- 30:07But if this is something that you do very weird, you don't know,
- 30:11okay what exactly you're going to purchase, it's much better if you go
- 30:15like an external advisor and ask like to hin, hey, like you have
- 30:19an experience on this one. Okay, we have like this timeline, is
- 30:22it feasible? It's not feasible? How we can adapt at it? Okay?
- 30:26Like for me, like that is like the first question, Like the
- 30:30second one is think about okay, how long it's going to be my relationship
- 30:36with this new partner that I'm planning to do. Is it going to be
- 30:38only once? Okay? Is it only like to buy like like a bunch
- 30:42of papers, or is something that I am going to need and a continuous
- 30:45maintenance I need like to have like a good relationship with him? So is
- 30:51it fulfill like this to think like it be something that is very unique or
- 30:55new for us and it's going to be like an a long term relationship and
- 31:00make it like a trade off is more convenience, like to go to an
- 31:03external advice and ask like advice and say, hey, like you have an
- 31:08experience in this, help me l with this, help me late to identify
- 31:11what is like the right partner, the right solution and the right price that
- 31:17fulfill my requirement. And after I having that, we can start like to
- 31:22have like on a good tendering process, we can advice light to you like
- 31:26to reduce it it like these universe of potential leaders help like with you,
- 31:30like with our expertise, like to confirm that that solution is the right one
- 31:34for you, okay, and then think about in the future, in the
- 31:38long term, and say, hey, this supplier offer LA to you twenty
- 31:42four seven hours of maintenance. This supplier offer LA to you like in a
- 31:47continuous improvement, adapting to according to your own needs and requirements. So only
- 31:53like to finish it, like to give to you on a little bit of
- 31:56an experience that we have like with richer Less. Here we finished an attendering
- 32:01process with with a a supplier like who wants like to start a new operation
- 32:06hitting hitting the UK. They want at the beginning, like to continue the
- 32:10relationship with your current partner because they have like an a long history in Germany.
- 32:15I think so they wanted Yeah, so Lea's like to keep it it.
- 32:21But like then, when we started to evaluate what they offered in Hitting
- 32:23the UK probably was not the most convenience. And with him we found like
- 32:29an an old potential Bida he liked like the offer, like the offer that
- 32:32they did, like the technology. Okay, the relationship was very well like
- 32:37during like the conversations and the solution fulfill what the customer wants. And it
- 32:43was like the technology and the solution that they wanted. So I like the
- 32:45end of the day, it was very smooth to move from from one position
- 32:51to another one because we found okay, like the right partner that they needed
- 32:57for here for this market, like this kind of is happening okay, like
- 33:01when you have a delay the right information in gay like you understand it did
- 33:07lay what is your business? You understand it did like lay the boos strains
- 33:09that you have and helped la to you to take lay the bus decision or
- 33:14right decision. Excellent. Well that brings us to the end of this episode.
- 33:19Thank you so much, Caesar and Richard for sharing your insights on the
- 33:22complexities of the tendering process and what resources are available to support companies who use
- 33:29this uh, this tendering process for their purchasing decisions, because I know there
- 33:32are a ton of them out there. I've worked, like I said,
- 33:36I've even worked on URFPS with with me Bach and and helping to make sure
- 33:40that everything goes smoothly for our clients. I'm sure our listeners can benefit from
- 33:45reading this. This white paper this ten tipsum and that can be found.
- 33:50I'll put a link to it in our episode description. You'll find it down
- 33:52there. How can they reach you on LinkedIn? Is that the best way
- 33:57to to find you guys? Yes, of course, like please like feel
- 34:00freely to reach reach it or night if they have any questions related like do
- 34:05this topic or all of the topiece of people. We are more than more
- 34:08than happy like to receive your ust bnding which is just our names or yeah,
- 34:15our me back emails which is our surname at meback dot com. All
- 34:21right, I will make sure I have those links in the episode description as
- 34:24well. If our listeners, if any of you out there have a suggestion
- 34:29for a topic or would like to be a guest on our show, please
- 34:31let me know, drop me a line. We'd love to hear from you.
- 34:35You can reach me at podcast at meback dot com. As always,
- 34:37thank you for listening to Speaking of supply chain. If you've enjoyed our show,
- 34:42please rate us in whatever podcast platform you prefer. We're on Apple Podcasts,
- 34:47Google and Spotify, and be sure and tune in next time. Me
- 34:54Back Consulting is one of the largest and most globally recognized supply chain con halting,
- 35:00engineering and advisory firms. For nearly fifty years, we've helped clients achieved
- 35:05supply chain excellence and sustainable competitive advantage across the entire spectrum of the supply chain
- 35:10by delivering improvements and innovation strategically, tactically, and digitally. To learn more,
- 35:16visit mebach dot com. You've been listening to Speaking of Supply Chain,
- 35:22a meboch podcast. Keep connected with us by subscribing to the show in your
- 35:25favorite podcast player. If you like what you've heard, please rate the show
- 35:30that helps us to keep delivering the latest in supply chain information. Thanks for
- 35:34listening. Until next time,