- 0:00It's such a great technology, it's got so much it can offer.
- 0:03It's really sad that we've had this huge gap in confidence in
- 0:07it, but it does look like there is now a international consensus
- 0:11to revive it. The case for Sizewell, expensive
- 0:15as it is to build, the case for Sizewell is that building
- 0:18Sizewell saves £2 billion a year when it's on off consumer bills.
- 0:25Welcome to saving the world from bad ideas.
- 0:27I'm Mark Linus, and I've had a few bad ideas in my time.
- 0:30I used to go out in the night time to destroy GMO crops, and I
- 0:33also opposed nuclear power. But then when I looked at the
- 0:36science, I found I got it wrong. Boobs.
- 0:39I've learned the hard way that none of us are right all the
- 0:41time. So now I'm here to challenge the
- 0:43assumptions that we all too often take for granted because
- 0:45the future depends on us getting it right.
- 0:48My guest today is Julia Pike, who's managing director of
- 0:52Sizewell C. And the bad idea that she's
- 0:55taking on because we're all about saving the world from bad
- 0:58ideas here. The bad idea, I think, could be
- 1:01we don't need nuclear. Julie, welcome.
- 1:04And I presume you do disagree with that, right?
- 1:06Thank you very much, and yes, I've devoted quite a lot of my
- 1:09life to talking to people about why we do indeed need nuclear.
- 1:14Fabulous, fabulous, right? I actually wanted to start by
- 1:16asking you about your, your, your career actually, because I
- 1:19was just looking, looking up online and I imagined you'd be a
- 1:23trained nuclear engineer, but actually you're no more of an
- 1:25engineer than I am. You did English and then you did
- 1:27law. So how come you've ended up as
- 1:29managing director of Sizewell? And start off by saying the
- 1:32thing that has stopped nuclear being really built out as it
- 1:35should be isn't because we don't know how to build nuclear, it's
- 1:38because it's not been financed. And so my big job on Sizewell
- 1:42has been to make nuclear new build financiable and to bring
- 1:47in equity and debt and put Sizewell onto a financed footing
- 1:52with investment grade ratings for its debt.
- 1:55And to show that you can indeed take a technology as big and
- 1:59complicated as the EPR and you can finance it.
- 2:03And that if we can do this with the EPR, then that should unlock
- 2:07confidence in financing other nuclear technologies for the
- 2:10future programme. You've said EPR twice and we
- 2:13shouldn't assume people know what an EPR is or a light water
- 2:17reactor or any of those things. So can you just give us like a,
- 2:20a basic rundown of what, what, what, what the EPR is and how
- 2:23it's how it compares to other nuclear reactors?
- 2:26So the majority type of nuclear reactor around the world is a
- 2:29pressurized water reactor. And there are 400 or so
- 2:33operating very well. They're very reliable.
- 2:35They sort of operate for like 92% of the time and the EPR is
- 2:41simply a version of that. So it's a version of a
- 2:45pressurised water reactor and it has more safety systems added to
- 2:49it, which does make it more complicated to build, but the
- 2:52safety systems are obviously there for a reason.
- 2:55And it's the EPR which the Finns built at Ocaluto in Finland, so
- 3:00in Finland. Which I've been to actually
- 3:03glorious place, surrounded by nature and lovely sort of, you
- 3:05know, coastal, coastal environment.
- 3:08Yeah, they didn't let us inside, unfortunately, so I could only
- 3:11see the, you know, the big, big Dome type thing.
- 3:12But yeah, I mean, it looks just like any other reactor, right?
- 3:15With a big Dome and no sense around it, basically.
- 3:18Yeah, exactly, exactly. And so it's operating in Finland
- 3:21and it's operating in France and it's operating in China.
- 3:25And then Hinckley Point C is the UK adaptation of that, and then
- 3:29we're copying Hinckley. Right, right.
- 3:32Actually, I've been to Sizewell, been to Sizewell B and I did a
- 3:37sort of YouTube film with Joel from We Planet looking at the
- 3:41waste. Well, I don't really call it
- 3:42waste, they call it spent fuel storage, don't they?
- 3:44There. And we went and gave them all a
- 3:45hug because each of those chemists has apparently saved
- 3:481.5 million tonnes of CO2 from going in the atmosphere.
- 3:51And actually a few years earlier we did an action where we went
- 3:54in the sea, swam in the sea in brightly coloured bathing
- 3:57costumes. So if you want pictures of me
- 3:59scantily clad, they're still on the Internet.
- 4:02And we had and we had banners saying nuclear for net zero and
- 4:06build Sizewell C And you know, and here we are and it seems to
- 4:09be actually happening, right? I mean, have you take is the
- 4:12final, final, final decision been taken now on size 1, you're
- 4:15going to go ahead and go building the thing.
- 4:17It is. It is actually happening.
- 4:19So after eight years of getting consents and getting the
- 4:23financing sorted, it is actually happening.
- 4:25So we started building it about two years ago.
- 4:28We under the big planning consent, the development consent
- 4:31order, we were allowed to do what's called trigger it.
- 4:34So you meet all the conditions to be allowed to start.
- 4:36So we started on the main site about two years ago.
- 4:39So today there'll be 2000 people on site.
- 4:42We've started the main civils. We have started all the
- 4:44infrastructure around the site that we have to build a railway
- 4:48to bring materials into the site.
- 4:50We have to build link roads so that we don't have too much
- 4:53construction traffic on the roads.
- 4:55So yeah, we've been doing, we've been doing that for about two
- 4:57years now. You've built your own roads and
- 4:59your own railway too. Yeah, we have to build a rail
- 5:02spur to bring materials into the site and we have to build some
- 5:06bypasses from a couple of villages and we have to build a
- 5:09link road so that we can take our construction lorries off the
- 5:12roads so that they don't take too much delay.
- 5:16Yeah, intrusion, I guess to the local communities, but I mean,
- 5:19if you have to build your own transport infrastructure, this
- 5:21must be a pretty large scale project.
- 5:24So like I remember reading this I think for Hinkley Point C at
- 5:29some point that it was like the biggest building program in in
- 5:33the country and in Britain at the time.
- 5:34I don't you know, is sizeable, presumably if it's a carbon copy
- 5:38to coin a phrase is going to be the same.
- 5:40So give us a sense of of the scale of this.
- 5:42Well, it is going to be 1 of Europe's largest construction
- 5:45projects and it will be the same size as Hinckley in
- 5:48construction. So in construction they look
- 5:50huge because you need a lot of land to store materials, to put
- 5:55bits of equipment together etcetera.
- 5:57So you take hugely more land than you need.
- 6:00When it's built, it shrinks right down to about 33 hectares
- 6:05and it will look like 2 times size well B.
- 6:08So if people go on holiday to Oldborough and look down the
- 6:11coast, you can see size well B Size well C will be like 2 times
- 6:14size well B. Once it's built and operating,
- 6:17it will be small. But while we build it, we do
- 6:20take a lot of land temporarily. I mean and and appreciating the
- 6:23temporary for us is sort of like 10 years.
- 6:26Yeah, I, I imagine that given that one of these Eprs has
- 6:30already been, well is is already well actually tell me how far
- 6:34along are they in, in Hinckley in terms of finishing
- 6:37construction? Hinckley has finished its main
- 6:39civils and it's installing pipes, cable, etcetera.
- 6:43The version of of the EPR in Finland has been operating for a
- 6:46couple of years very well. The the Chinese version has been
- 6:49operating for quite a few years and the plant of Plummerville in
- 6:54France are connected to the grid, I think sometime last
- 6:57year. So Hinckley's far enough for
- 6:58long in construction that you've actually got lessons that you
- 7:00can learn from Hinckley because obviously there was a lot of
- 7:03talk about it, you know, cost overruns and, and, and things,
- 7:06you know, things taking a lot longer than they should have
- 7:08done. I mean, I know COVID was a
- 7:09factor as well, but like, what are the what are the main
- 7:11lessons from, from Hinkley that you'll take to size well to
- 7:15hopefully get this done on time and on budget?
- 7:18There are huge numbers of lessons.
- 7:20So I mean the the first thing to say is that when you build in
- 7:23the UK you build to our national laws and regulation.
- 7:26So take fire regs. If you import of a non-english
- 7:30design you have to change the design to comply with UK fire
- 7:34regs, you have to comply with UK construction methods, you have
- 7:38to undertake a series of changes to make it compliant with with
- 7:42UK law and regulation. And for Hinckley, that involved
- 7:46making 7000 changes and the 7000 changes resulted in a lot more
- 7:50steel, a lot more aggregates, a lot more cable, etcetera, and
- 7:55then adding time to install all of that extra stuff.
- 7:59So the first lesson we learned was don't make any changes at
- 8:03all, just copy the Hinkley changes.
- 8:06We're going to design as built. So we're building it in a
- 8:09different place obviously. So we have to make the ground
- 8:11conditions the same as the Somerset ground conditions for
- 8:14Hinkley. But apart from that, our our
- 8:16equivalent of the 7000 changes is fewer than 80.
- 8:20It's like an order of magnitude difference in, in terms of how
- 8:24many design changes do we have to make to build size well.
- 8:27So starting off with design, you save the money because you're
- 8:30not redesigning and then it means that you also know what
- 8:33quantities of materials you need.
- 8:35So you you know what quantities of steel, concrete, etcetera,
- 8:38etcetera. And that gives you much more
- 8:40confidence in your cost estimate because you're not constantly
- 8:43adjusting all the quantities and then adjusting the time taken to
- 8:46install them. And then there are sort of
- 8:49infinite, infinite numbers of lessons to learn from the way
- 8:53you go back consenting. So if you agree in your
- 8:56development consent order, things like noise restrictions
- 8:59which are too restrictive, you find yourself going back to have
- 9:02to have to renegotiate them. If you put your accommodation
- 9:06for your construction workforce too far away from the site, you
- 9:09end up spending quite a lot of what should be productive
- 9:11working time, actually paying people to travel from the
- 9:14accommodation to the site. Lots and lots of practical
- 9:16lessons, lots of things which are not very technical, but they
- 9:20they all mount up into representing quite a lot of
- 9:24money. And then we can see the effect
- 9:27of learning because it's got 2 units.
- 9:30We can see that Hinkley Unit 2 unsurprisingly goes along a lot
- 9:35more quickly with fewer problems than Hinkley Unit 1.
- 9:38And what we're trying to do is to build size well C, which has
- 9:432 units as effectively Hinkley unit 3.
- 9:45And four, yeah, I, I mean, I might be wrong about this, but I
- 9:48kind of imagine it's like putting a tent up on a camping
- 9:51trip for the first time, you know, and it takes, it takes a
- 9:53whole hour to get the tent up and figure out where everything
- 9:56goes and, you know, and all of that.
- 9:58But by the time you've done it four times, you could put the
- 10:00tent up in the dark in the middle of a raging storm, and
- 10:02you know you'll you'll be on your fourth time by the time
- 10:04you've finished well. Exactly that, that that's the
- 10:08idea. And, and when countries have
- 10:09built fleets, you know, sequentially within a reasonable
- 10:12time frame, then they have learned and they have got
- 10:16cheaper and they have got quicker.
- 10:18And if you look at the Chinese nuclear building program, you
- 10:21know they're doing really, really well because they they
- 10:23continuously build and every time they build, they get better
- 10:26at it. And there's quite often a lot of
- 10:29talk about does nuclear have like negative learning?
- 10:32But if you only ever consent one nuclear power station per decade
- 10:35or per every couple of decades, it's pretty hard to demonstrate
- 10:39that learning effect because you you need learning is obviously
- 10:42in people and you need the same people to be working on more
- 10:46than one nuclear project to establish can they learn.
- 10:49Yeah, it's called, isn't it called the first of a kind cost
- 10:51and then the kind cost and you know, economics and so forth.
- 10:55Presumably you can use mostly the same supply chain that
- 10:58you've already got for Henkley then as well.
- 11:00Yeah, yeah. No, we use the same supply
- 11:01chain. So the, the, yeah, the, the
- 11:03equipment in, in the metal work in inside the buildings is being
- 11:08made by the same suppliers. They're making the equipment for
- 11:12sizeable unit 1 just as they finish the equipment for
- 11:14Hinckley unit 2. So that means that the team who
- 11:17are making that equipment is at the height of their learning.
- 11:20They've just made two pieces now for us, they're making the third
- 11:23identical piece. And again, not only is the
- 11:27manufacturing to higher quality first time because they're doing
- 11:31third time, but also there's an awful lot of paperwork
- 11:33associated with nuclear and presume making the identical
- 11:36piece of equipment, you don't have to go through all the
- 11:38paperwork again and the paperwork's quite a high
- 11:41proportion of the cost of nuclear.
- 11:43I mean, you've been in how long you've been in the nuclear
- 11:44business for like, well, I. Spent 10 years as a lawyer doing
- 11:49the paperwork for Hinckley and then we came over to develop
- 11:52size well about 8 years ago. Right.
- 11:54So, you know, I mean, I've been a kind of nuclear advocate for,
- 11:57well, roughly the same length of time.
- 11:59And it's interesting to see how the debate has shifted actually.
- 12:02I mean, it used to be about, I don't know, waste and, and, and
- 12:05whether it would blow up back to a novel and all that kind of
- 12:07nonsense. And it's now really moved on to,
- 12:09to economics, hasn't it? And about the cost and the the
- 12:14price tag at least the construction cost for size well
- 12:18as well what is it 38 billion or something?
- 12:21Is that right? Yeah.
- 12:23And that's, that's how much it costs to, I mean, tell me how
- 12:25these because then then I saw a headline in the, in the FT which
- 12:29said that the cost for sizeable, you know, balloons to 100
- 12:32billion according to our model. Didn't say like, well, not
- 12:36according to a model that we've seen at the Financial Times, but
- 12:38didn't say whose model or any. It was a very strange piece.
- 12:40Didn't have any more details on that.
- 12:42But like, which one should I which figures right?
- 12:45Which one should I believe? I think that the way we talk
- 12:47about the cost of building bits of the electricity system, it's
- 12:52really complicated and it needs to be simplified.
- 12:56What people pay is an electricity bill, and what
- 12:58you're paying for is the entire system which enables you to
- 13:01flick on a switch in the dark. And that system is made-up of
- 13:05the way you're generating electricity.
- 13:07In our case, nuclear, could be wind, could be cellular, could
- 13:10be biomass, could be all sorts of things, could be gas.
- 13:12And then it's made-up of the system which takes the
- 13:15electricity, transmits it from the point of generation to where
- 13:18you want to distribute it locally.
- 13:20And then the cost of your distribution system.
- 13:22And critically, as you move to a system with more and more
- 13:25renewables and because they're intermittent, the cost of your
- 13:29backup system. So your backup system could be
- 13:31storage, your backup system could be making sure that you've
- 13:34got gas stations which can turn on, which means that you then
- 13:37need the infrastructure to bring on gas.
- 13:39So you need gas contracts, you need gas storage, you need
- 13:41obviously the entire physical gas network for when you need
- 13:45the gas stations. And as we see from what's
- 13:48happening to electricity bills and the the dialogue and sort of
- 13:51the breakdown of consensus about net zero, what's actually
- 13:54happening is that people's bills are not going down.
- 13:57And that is primarily in my view because although things like
- 14:01renewables are very cheap at the point of generation, it's not
- 14:05cheap to run a system which requires an awful lot more grid
- 14:09and requires backup system. And of course, over time storage
- 14:13technologies will develop over time, all these things may be
- 14:17well be smoothed out. But today if you're making
- 14:20energy policy and you want to move to clean energy system, and
- 14:25although it's counterintuitive, the right amount of nuclear
- 14:28actually brings down electricity bills.
- 14:30So the case for size well, expensive as it is to build, the
- 14:34case for size well is that building size well saves £2
- 14:38billion a year when it's on off consumer bills.
- 14:41And that is because effectively you need less grid, you need
- 14:44less storage, you need less of a backup system because you have
- 14:48something which is not weather dependent sitting alongside the
- 14:52weather dependent renewables. It's a It's very
- 14:54counterintuitive that something so expensive to build is
- 14:58nonetheless cheaper than not building it.
- 15:01It's very counterintuitive. It's so counterintuitive.
- 15:03I'm not sure I believe you, but maybe we just need to go into
- 15:08this in a bit more depth. But how can, how can.
- 15:12Yeah, so how can it make, how can it make bring down bills if
- 15:16it if it costs so much? I mean, you just said, you just
- 15:18said that's the case and you said it's to do with the system
- 15:20cost of integrating with renewables.
- 15:22Maybe explain a bit more how that works because I, I, as I
- 15:24understand it, nuclear always has to be on and does the base
- 15:27load thing. Renewables like fluctuate up and
- 15:29down according to the weather. So aren't they kind of in
- 15:32contradiction to each other? How does nuclear help support
- 15:34renewables in in the grid in that sense?
- 15:36Well, if you assume you need a certain quantity of electricity,
- 15:40you've you've got various means of creating that electricity.
- 15:43So you've got renewables, you've got interconnectors, you've got
- 15:46obviously the gas network, you've got some biomass, you've
- 15:49got some, you've got some and you've got some storage having
- 15:52made the electricity. So the question is, what does a
- 15:55system cost? What?
- 15:56What makes the least cost system?
- 15:58So if you tried to move to a system which has 100% renewables
- 16:02and no nuclear basis of the case for size, we'll see is that you
- 16:05need more grid, so spend more money on the grid.
- 16:09You need more storage, so you spend more money on storage.
- 16:12You need more of a backup system for when you've used up all your
- 16:15stored electricity and you nonetheless wish to turn on your
- 16:19lights on a cold, dark, windless day with no sun.
- 16:23And the cost of that system is reduced because you need less of
- 16:27it if you build nuclear, because the nuclear will be there.
- 16:31And somebody's presumably modeled this who's not the same
- 16:33model at the Financial Times just looking at.
- 16:35Yeah, that's right. So some reason was this, I mean,
- 16:38not so the £2 billion is a year for consumers when size 1 is on
- 16:42that, that's the number given by the Department for Energy
- 16:46Security, net zero. So that's, that's their
- 16:48modelling. The National Infrastructure
- 16:50Commission shortly before it turned into NISTA commissioned
- 16:53some modelling from Aurora which showed that if the country were
- 16:57to build out the amount of nuclear that the previous
- 16:59government had recommended, which was 24 gigawatts, then
- 17:03cost to consumers would be hugely reduced by I, I can't
- 17:07remember exactly what the number was, but it was about something
- 17:09by like £8 billion a year by 2050.
- 17:13And it is for the same reason. It's just a scale.
- 17:15If you built more of it, again, you need less grid, less
- 17:17storage, less backup system and the the other way that I mean
- 17:21there are all sorts of ways of thinking about about the cost of
- 17:24electricity generation. So another way of thinking about
- 17:28it is if you assume that the consumer is broadly
- 17:32representative of society. And of course that's not
- 17:34completely the case that there are people in society who are
- 17:36not consumers, but on the whole the consumer and society are
- 17:41pretty much pretty similar to being the same group of people.
- 17:44So we have very, very high UK content.
- 17:47We cost £38 billion, but over the lifetime of size, well, we
- 17:50pay £38 billion of tax. So I'm not claiming that's the
- 17:54same number because the tax is paid at a slower rate than the
- 17:57money spent in building it. Tax is what is that VAT on
- 18:00interest to your tax on What's the?
- 18:03It's the combination of corporation tax, it's PAYE, all
- 18:10those people employed, it's all of the tax paid by all of our UK
- 18:14supply chain. And because we have very high UK
- 18:17content, so we have 70% in construction and 90% through
- 18:20life, we give rise to an awful lot of tax.
- 18:23And then on top of the awful lot of tax, we are very socially
- 18:28responsible and we are good employers.
- 18:32So we will make positive efforts to, for example, take people
- 18:35from benefits. If we take people from benefits
- 18:38then we're saving the taxpayer I think something like £55,000 per
- 18:43year per person. So the way you look at what's
- 18:46the relative cost of generating electricity from nuclear with
- 18:50high UK content in comparison with generating electricity from
- 18:55something with much lower UK content is not straightforward.
- 18:58The impact on your consumer taxpayer is not straightforward
- 19:04to calculate at all. I could never ever claim to you
- 19:07that it wasn't expensive to build size or C itself evidently
- 19:11is. But counter intuitively,
- 19:14consumers are better off if we build it.
- 19:17Well, and I guess it's just dawned on me, these things
- 19:19aren't 0 sum, are they? I mean, that's the economics for
- 19:21you, isn't it? That you, you put money into the
- 19:23economy and people spend it and you get growth and you know, and
- 19:26the money gets spent lots and lots of times and it isn't just
- 19:29once and then it's gone and no one ever cease to benefit.
- 19:32But at the risk of borrowing our millions of listeners, many of
- 19:36whom aren't based in the UK, could you explain the regulated
- 19:40asset based model in this possible way?
- 19:43Because this is basically how you've been able to finance
- 19:46seismal C, right? And it's different from how the
- 19:49from how Hinckley was financed and how big infrastructure has
- 19:52been financed before, right? So can you?
- 19:54Can you do it in simple, simple terms?
- 19:57I'm going to I'm going to try you can you can, you can tell me
- 20:00whether or not it was too complicated and or too boring.
- 20:03So Hinckley, as you said it, Hinckley has a contract for
- 20:06difference. And what that means is that.
- 20:09Hinckley agreed a fixed price for the electricity it would put
- 20:12onto the system, that price being £92.50 in the money of
- 20:162012. And that's for as long as the IT
- 20:18generates for like decades, is it?
- 20:21No, no, no it's not. It's actually for about 30 years
- 20:24and, and these, these plants have a life of about 60,
- 20:28possibly even 100. But, but so Hinckley gets paid
- 20:31£92.50, whatever the wholesale cost of electricity, it's being
- 20:35paid £92.50. So it's, it's actually in
- 20:39comparison with a reference price formula, the reference
- 20:42price formula could go higher than £92.50, in which case
- 20:45Hinckley would have to pay back into the system for consumers or
- 20:49it could be below £92.50, in which case consumers pay, pay
- 20:52Hinckley the difference between the reference price and £92.50.
- 20:57So that that would have given the shareholders in Hinckley who
- 21:01are EDF and CGN, it would have given them profits calculated at
- 21:07the time in 2016 when the deal for Hinckley was all signed,
- 21:12which have been eroded because Hinckley has cost an awful lot
- 21:15more to build than they had forecast.
- 21:18So other nuclear developers came along and they looked at this
- 21:21model and they looked at at the level of cost uncertainty that
- 21:26there is in building not just nuclear, but in but in building
- 21:30all sorts of different forms of infrastructure.
- 21:33And it was seen that no project went ahead at Wilver in Anglesey
- 21:39and no project went ahead at Moorside in Cumbria because
- 21:42people weren't confident that this contract for difference
- 21:45model, which required the developer to take all the
- 21:48construction cost overrun risk would bring forward investment.
- 21:53So the government decided to look again to the National Audit
- 21:55Office, recommended they looked at the regulated asset based
- 21:57model and what is this? So this is the way of financing
- 22:01lots of infrastructure which was introduced in the UK roundabout
- 22:04of the privatisations. So the regulated asset based
- 22:08model is what funds the National Grid, is, what funds
- 22:10distribution companies, it's what funds water companies, it's
- 22:13what funds the airport industry. And the way it works is that
- 22:19there's an asset. So in our case, we build the
- 22:22asset over time, we build Saswell Sea over time.
- 22:25And once that asset is built, then the economic regulator, so
- 22:30for electricity, that's Ofgem, the economic regulator
- 22:33periodically sets the returns that investors, owners of that
- 22:39asset can expect. So you see these periodic price
- 22:42determinations by Ofgem, 4th National Grid and distribution
- 22:46companies. You see periodic price
- 22:48determinations in the water industry from off what?
- 22:51So that's the basic model. What's different about it for
- 22:54size, well is that we are a single asset.
- 22:57So we're not like the National Grid.
- 22:58We don't have a large existing grid and then we build some more
- 23:01grid. Additionally, we're just
- 23:03building from the start. So we don't have a big existing
- 23:06asset. We have lots of digging right
- 23:09now. So in order to bring forward
- 23:11investment, it was recognised that on the whole investors
- 23:15can't the best where they don't get any return at all for a long
- 23:19period like the construction period of a big nuclear power
- 23:21station. So it was agreed that they would
- 23:24get a return on their investment to date through the construction
- 23:28period. So if they put in a pound, they
- 23:30get a small return on their pound all the way through the
- 23:33construction period. And that is really what has
- 23:37enabled investors to come in to size well and it operates to
- 23:42reduce the costs to consumers because you don't build up a big
- 23:47sort of compounding interest debt in the way that you do.
- 23:52If you don't have any income through the construction period,
- 23:55you reduce the amount of interest which is being paid on
- 23:58the debt that we borrow in order to build size.
- 24:01Well see. So I don't know if that was
- 24:02short enough or simple. Sort of it sort of isn't it?
- 24:05It highlights the point that actually the cost big cost here
- 24:08is finance is finance is financing debt.
- 24:11You know, because you these are very big capital intensive
- 24:13projects. You have to borrow a huge amount
- 24:15of money upfront and therefore paying the interest back
- 24:17throughout the whole time that it that it takes for the project
- 24:21to be built when you don't get any revenue in is what really
- 24:23make drives the cost up. And that's presumably why
- 24:26Hinckley, you know, when they talk about over budget, I don't
- 24:29know whether it just cost more to build than they thought or
- 24:31whether it's just taken longer. And so it's cost a lot more in
- 24:34interest rates or a combination of the two really, but.
- 24:37Well, it's but it's it's both, it's both of that.
- 24:39I mean, in a big nuclear build weren't any big infrastructure
- 24:42bills of time is money. So there's a certain cost to
- 24:44just running, running the project for longer because
- 24:47you've got, you know, people doing stuff for longer.
- 24:50So you can't really separate time and money.
- 24:54Right. And it's partly like who are the
- 24:55investors in? It's partly publicly owned,
- 24:57isn't it? So the government's a
- 24:58shareholder who, who are The Who?
- 25:00Like what is the ownership structure?
- 25:02Well, that's another very good question.
- 25:05So Hingley is owned by EDF and CGN and.
- 25:10CGN meaning that China. Yeah, China general nuclear,
- 25:14right. And for for Sizewell, we hope
- 25:17that we've arrived as sort of Goldilocks mix.
- 25:19So there is plenty of press and sort of studies into what
- 25:24happens if the government wholly owns a big construction project
- 25:26like Crossrail or like HS2 and then millions.
- 25:31Of international listeners, it's the high speed rail link which
- 25:35is currently under construction and Crossrail was.
- 25:38That's not the Elizabeth line in London, isn't it?
- 25:39Yeah. So there are also studies that
- 25:41get published saying that if government is the sole owner of
- 25:45one of these big projects in construction, the bureaucracy,
- 25:49which is inherent in government decision making, which isn't a
- 25:52criticism, it's just it's inherent in making decisions
- 25:56through lots of committees that that bureaucracy is not good for
- 26:00bringing in a big undertaking to time and budget.
- 26:04So there are plenty of reports into into, you know, what's gone
- 26:07wrong, for example, on HS2, part of what's gone wrong on HS2 is
- 26:11held to be the ownership and governance model.
- 26:14So for Sizewell, we end up with the government having a big
- 26:18continuing stake, so around about 44% at the moment.
- 26:23And that I believe is going to be popular with the public
- 26:26because I think people are probably of a mind to think that
- 26:30a big piece of nationally critical infrastructure like
- 26:33Sizewell, part of the purpose of which is to increase energy
- 26:35security, should sit partly in public hands, but not wholly in
- 26:40public hands because of the issues with ownership
- 26:44governance. When something is in holy public
- 26:47hands, there is a majority of private sector shareholders.
- 26:50So adding to the government, we have Lacquess, which is a
- 26:54Canadian pension fund. It's owns a lot of
- 26:58infrastructure in the UK and indeed around the world.
- 27:01I think it's the second largest investor in infrastructure
- 27:06globally. And then we have Amber
- 27:09infrastructure which is Auk fund which invested in the very
- 27:12successful Thames Highway tunnel project.
- 27:15And we have Centrica who for old listeners are British Gas and
- 27:20who are a British household name who have a a multiplicity of of
- 27:25different investments across the UK energy mix.
- 27:28And so they're very helpful investor to us because one of
- 27:33our ongoing issues is, you know what is the role of nuclear in
- 27:37the UK's energy mix. So to have somebody who's sort
- 27:39of living that and expert is very good for us.
- 27:43Yeah, you mentioned the role of nuclear in the UK's energy mix.
- 27:45I mean, do do you think more of these are going to or should be
- 27:49built? I mean, they're only cheap,
- 27:51cheaper, cheaper to pops like 40 billion each.
- 27:53I mean, they might just want to go with a whole bunch more solar
- 27:57and offshore wind and stuff. But like what, what's, what do
- 27:59you think the actual, the ongoing role for nuclear is
- 28:02going to be in the UK energy energy sector?
- 28:06Well, this government hasn't actually set a target for
- 28:08nuclear, but as as I said the previous government set, set a
- 28:13target of roundabout 24 gigawatts and I think that is.
- 28:17And what's that as a proportion of the whole grid?
- 28:20What do gigawatts mean? Well, it would be sort of
- 28:24slightly less than 1/3. I mean, of course it depends on
- 28:26how you forecast demand. But for a sense of scale size,
- 28:30we'll see will make 7% of the nation's electricity and it is a
- 28:343.2 GW plant. So, and so that nuclear would be
- 28:38made-up of a mix of big plants, Pinkley, Sizewell B, the
- 28:43existing power station, the one that turned on in 1995 and
- 28:46Sizewell C. And then the question about
- 28:49whether or not there are any more big GW plants is obviously
- 28:52a question for government. We saw the announcement either
- 28:55either yesterday or today about the government building small
- 28:58module reactors, Rolls Royce small module reactors in North
- 29:01Wales. So they're obviously going to be
- 29:03small module reactors joining the nuclear family.
- 29:07And then I think there are lots of really exciting advanced
- 29:09modular reactor proposals, which if they did come to fruition, I
- 29:14think a real game changer because they're passively safe.
- 29:17And if it's agreed these things are passively safe, that does
- 29:21take out a whole layer of cost and it does, it does open up
- 29:25sort of citing put putting nuclear actors, for example, in
- 29:28industrial complexes to provide in particular clean heat.
- 29:32And so I think that if AMRS take off, I think the role of nuclear
- 29:36will expand and sort of be quite focused on heat production.
- 29:42And I think that if we're talking about gigawatts and SMRS
- 29:46only, then it will expand. But I think less so because I
- 29:49think they'll be primarily producing electricity.
- 29:52And as you say, Mark, there are other ways of producing
- 29:54electricity. The point of building nuclear is
- 29:56to have electricity, which is not weather dependent and is
- 30:01within our borders. So we're less reliant on
- 30:03interconnection. You know, interconnection can be
- 30:05great additionally, but it doesn't inherently give you
- 30:08energy security. So I hope there's, I hope
- 30:11there's some more GW, but I really that's just for the
- 30:15government to decide what they want.
- 30:16Yeah, I mean, it does feel like the whole momentum's shifted to
- 30:19SMRS and AMRS and, you know, basically new types of nuclear
- 30:23attacks. So it might, you know, I suspect
- 30:26that your EPI will be the last one that gets built.
- 30:28But does your supply chain help with other nuclear type projects
- 30:33or are they all just two different?
- 30:34I mean, the the SMRS, the Rolls Royce proposals, I think that's
- 30:38a will there in Anglesey, isn't it?
- 30:40I mean, those are little, little pressurized water reactors too,
- 30:43aren't they? So there is.
- 30:44It's not like it's a totally different technology.
- 30:46No, it's, it's the same technology.
- 30:49It's, it's the same, it's just smaller.
- 30:51So yes, I would, I would expect quite a lot of the supply chain
- 30:55to our pressurized water reactor to also compete to supply a
- 31:00fleet of small pressurized water reactors.
- 31:02Yeah. It's interesting actually the,
- 31:03the, the consensus on net zero is sort of fragmented, somewhat
- 31:06like the Conservatives now in the UK are, you know, have have
- 31:10well, basically gone gone back on that, even though I think I
- 31:14think they were in power when it was originally legislated,
- 31:17right. But there there isn't, there
- 31:19hasn't many sign of the consensus on new on the need for
- 31:22nuclear being being dragged out, dragged down as well.
- 31:25I mean, what's your kind of reading of the political
- 31:26situation at the moment? It's interesting, isn't it?
- 31:29So nuclear is obviously a point of commonality between the UK
- 31:33and the USI was at a energy security event where one of the
- 31:38US politicians was, you know, talking very critically about
- 31:42net zero and renewables, but praising nuclear.
- 31:45I'm not obviously personally critical of renewables.
- 31:48I believe in getting the right mix for the country.
- 31:52And in the UK we are good at offshore wind and we don't have
- 31:56that much sun. Sort of mix of, you know,
- 31:59nuclear and, and wind seems to me to be a perfectly sensible
- 32:02mix. And there's a cross party
- 32:05consensus on nuclear between Labour and Conservatives.
- 32:08I think the Reform Party is also pro nuclear.
- 32:12So there is a broad consensus but with some notable outliers.
- 32:16The Green Party is still sort of constitutionally post nuclear
- 32:19and the Liberal Democrat Party, I'm never really quite sure what
- 32:23their policy is because I think they are constitutionally not
- 32:26keen on nuclear. But on the other hand, it was a
- 32:28Davey and Liberal Democrat Secretary of State who signed
- 32:32off the contract for difference for Hinky Point C.
- 32:34So I think maybe they're sort of pragmatic but not instinctively
- 32:38favourable. I think the consensus on nuclear
- 32:41will hold. I mean, it's not just in the UK,
- 32:43it's sort of, you know, we've seen in the US nuclear coming
- 32:46back on for data centres and obviously lots of interest in
- 32:50investing in future nuclear for data centres.
- 32:52And then across Europe we're seeing a re expansion of nuclear
- 32:56in countries which had previously decided against it or
- 32:59had certainly had a long gap in their build program.
- 33:03So Sweden very active now, the Netherlands, Belgium reversing
- 33:07some of its previous decisions, the Czech Republic, it basically
- 33:11it's taking off again. And I find this sort of sad
- 33:14really that that these things do seem to be sort of a bit of a
- 33:17fashion, you know, if we just carried on building nuclear as
- 33:20we had been or as was forecast in the 1980s.
- 33:24There was a piece in the Economist a couple of years ago
- 33:27which said if nuclear had been built out as had been planned
- 33:30pre Chernobyl, then we literally wouldn't have global warming.
- 33:33You know, it's such a great technology.
- 33:35It's got so much it can offer. It's really sad that we've had
- 33:40this huge gap in confidence in it, but it does look like there
- 33:45is now a international consensus to revive it.
- 33:48Yeah, well, we need to not tell Trump that nuclear is low carbon
- 33:52in case they in case they turn against it.
- 33:54It's like it's literally the only thing that they that that,
- 33:57that there's a bipartisan consensus on the in the US still
- 34:00is nuclear. It's really quite extraordinary.
- 34:03I mean, the Biden administration was, was, was pretty strong in
- 34:06trying to promote a nuclear renaissance.
- 34:10And Trump is, if everything has been even stronger, even to the
- 34:12extent of like basically throwing away the safety
- 34:15regulator and just saying get on, get on with it.
- 34:17I mean, which I'm sure you're not, you know you're not, you're
- 34:19not a sport of right. I'm not in favour of throwing
- 34:23away the safety regulator, no. Good, good.
- 34:28Tell me a bit about how Sizewell's going down in the
- 34:31local community. Because when we came to do our
- 34:34action, there were some local aunties, accused them of climate
- 34:36change denial, but they denied it.
- 34:38And they, they didn't seem to quite understand what I was
- 34:41talking about. But there were fairly few in
- 34:43number. But you know, obviously that
- 34:45that's no, doesn't tell me really anything about what the,
- 34:47what the community overall feels.
- 34:49Do you have any sense really of how positively the project's
- 34:53being received? Yeah.
- 34:55I mean, in truth it's a mix. So the opposition to size well
- 34:59isn't really anti nuclear. It's we bring inconvenience, we
- 35:02bring, you know, noise, we bring construction lorries and we
- 35:05bring, you know, people doing construction to it into a small
- 35:09town. When we do polling, the majority
- 35:12sentiment is positive because where we're building size well
- 35:15is sort of like many of the places where Nutri is built in
- 35:17the UK, quite remote. There aren't fantastic job
- 35:20opportunities outside, outside of what we offer.
- 35:24There was a survey a few months ago which showed that I think
- 35:28only 30% of people who live in Suffolk, the county where the
- 35:32power station is being built, was actually satisfied with the
- 35:34quality of jobs on offer in Suffolk.
- 35:37So the majority of enquiries we get are positive and they're,
- 35:41they're about opportunities for people on their, their friends
- 35:45families, their kids. There are of course people who
- 35:49are not happy with the construction disruption and
- 35:54because like any big building project, we do have to cut down
- 35:58trees in order to build some of these link roads and we do have
- 36:01to cut down some or take out some hedgerows.
- 36:04We make promises to replant and one of the things which puts us
- 36:10in a better position is because it's taken us a long time to get
- 36:13size, we'll see into being. We've been able to actually
- 36:16create some very high quality landscape around the power
- 36:20station site, which is actually of such high quality that we're
- 36:24hoping it will get status as such a special scientific
- 36:27interest because it's so biodiverse.
- 36:30So I think because we've been able to demonstrate that we do
- 36:33understand how to make really high quality landscape, I think
- 36:37people accept that we are genuinely committed to the
- 36:39environment and we are building this essentially because we care
- 36:42about the environment and the people who are building this
- 36:45power station. We're not sort of, you know,
- 36:47just lovers of concrete for its own sake.
- 36:49We're building it because we think there's an environmental
- 36:52need. We're committed to leaving the
- 36:55land in a better state than we found it.
- 36:57So for example, a lot of what we cut down was low grade forestry.
- 37:02And when we restore the land which is around the all the bits
- 37:05of the site which are currently construction site, but which
- 37:07will be restored post construction off the main site
- 37:10will restore it to be Suffolk Sandling, sort of a much higher
- 37:14quality native state of the land, sort of similar to the
- 37:19heathland that you see around Wesselton, which is one of the
- 37:22villages fairly near the power station.
- 37:24So it wouldn't be true for me to say that it was universally
- 37:28popular. It would because it's disruptive
- 37:31and we, you know, cut down trees.
- 37:34But I think people do believe us that we will restore to a higher
- 37:36quality than we found. And I think people do want the
- 37:41jobs and they do want the the long term careers that we can
- 37:45offer because we're not just a construction project.
- 37:48Once it's been built, it then operates for, you know, 60 to
- 37:51100 years and employs around about 900 people, offering, you
- 37:55know, good local jobs to a community which is short on good
- 37:59local jobs. That little cafe on the beach
- 38:02side must be doing the roaring trade.
- 38:04As well tea, Yeah, as well tea. Lovely bacon butties and all
- 38:11that kind of stuff. And I remember the wildlife
- 38:13issue was, was being talked about.
- 38:15I think RSPB, which is a bird conservation charity was had a
- 38:18campaign against it. Have you, have you brought them
- 38:20around then with this, with this conservation measures you were
- 38:22talking about? Yes.
- 38:23I mean, I mean, it wouldn't be true for me to say that RSPB or
- 38:26the Wildlife Trusts were sort of, you know, keen advocates for
- 38:31Sizewell City. But we had a very positive visit
- 38:35to some some of our created landscape in the summer at the
- 38:39end of August with RSPB, with the Wildlife Trust, with Natural
- 38:42England. And Tony Juniper was, you know,
- 38:45kind enough to put something out on social media praising the
- 38:49he's. The head of he's the head of
- 38:50Natural England, isn't he? Yeah, former former Friends of
- 38:53the Earth director, actually. So he's got something positive
- 38:55to say. That's quite something.
- 38:56No, it is, it is quite something.
- 38:57So he, he, he was, you know, kind enough to praise the
- 39:01quality of the landscape that we have created.
- 39:04So, you know, taking what was quite a not an unbiodiverse
- 39:07onion farm and making very high quality landscape and, and said
- 39:12that we are a demonstration that you can have big infrastructure,
- 39:15which can be nature positive. And RSPB and the Suffolk
- 39:19Wildlife Trust, I think are, you know, similarly happy with the
- 39:23landscape we have created. That's not to say they wouldn't
- 39:27prefer that we weren't building. I wouldn't want to, you know,
- 39:29put words in their mouth, but I think relations are now good and
- 39:35I think that the more we are restoring landscape, the more we
- 39:38are creating much more high quality lands than we are using
- 39:42for the permanent footprint of the power station.
- 39:45The more people can see that you can, as Tony said, have a big
- 39:49infrastructure project which is genuinely nature positive.
- 39:53Yeah, I mean, of course they're all in favour of more 0 carbon
- 39:57power because they all believe fervently in.
- 40:00The climate crisis and the need to get to net zero.
- 40:03So you've got to have that coming from somewhere.
- 40:05And RSPB is also a campaign against offshore wind for, you
- 40:08know, because of bird collisions and so on.
- 40:10So you've got to kind of make your mind, if I remember doing
- 40:12an event once with with the late Lord May and he said the only
- 40:16kind of energy generation that satisfied everyone was magic.
- 40:19And it made me think because actually, yeah, that's pretty
- 40:22much what's going on here with a lot of the a lot of these
- 40:25objections. People do want the lights to
- 40:26come on and they want it. They want us to solve climate
- 40:28change at the same time, but they don't want any of the
- 40:30infrastructure or any of the choices that that actually
- 40:32involves. Yeah, I think that that is a
- 40:34really good point that that is what people would like.
- 40:37I think if I think if you could just like drop size, we'll see
- 40:40into place without going through the the pain of the building
- 40:44phase. I don't think there will be much
- 40:46opposition at all. I think as I said, people just
- 40:49don't like construction activity and I don't blame people.
- 40:52I'm not sort of judging people who are opposed to construction
- 40:55activity. And it's it's only human to not
- 40:59like changing your landscape. But obviously we believe it's
- 41:04very, very much needed and in a good cause and we have
- 41:08undertaken to leave things in a better state than we find them.
- 41:12Now, producer Rob, who's the beard you can see in the top
- 41:14right hand corner of your screen, asked me to ask about
- 41:18the direct air capture side of this.
- 41:21Was you, wasn't it, Rob? No, he's shaking his head.
- 41:23Well, somebody did, because I just think this is really
- 41:25fascinating. You're actually going to, well,
- 41:28capture CO2 from the atmosphere directly.
- 41:30Is that still part of the project?
- 41:31So we have a pilot project which has been actually funded by the
- 41:36government, which is aimed at demonstrating that a technology
- 41:41based on heat convection rather than electricity can capture
- 41:45carbon much more cost effectively than the current
- 41:48director capture electrically powered fans technology which.
- 41:51Uses huge amounts of energy and is really just completely
- 41:54completely bonkers actually. But you can do this with waste
- 41:56heat essentially. Right.
- 41:57The idea is to do it with waste heat.
- 41:58So the state, the status of this at the moment is that we have a
- 42:01prototype which you can go and see on the Portland at
- 42:04Lowestoft. It's sort of it's been built, it
- 42:07started doing some capturing and we are just waiting to see
- 42:11whether or not it works as planned.
- 42:14And if it does, then it will definitely be an option for
- 42:18people to develop this for use with waste heat.
- 42:21It sounds very qualified. It will be an option for people
- 42:24to decide to develop. Doesn't sound like it's
- 42:26inherently part of the project. Already.
- 42:28Well, I mean, it's not the pilot.
- 42:30The pilot project is in Lowestoft which is you know,
- 42:32some miles away. There's a decision to be taken
- 42:35about do we actually extract heat from size?
- 42:39Well, we could, we could extract 400 MW thermal of clean heat and
- 42:43we if we did that it would reduce the electrical output by
- 42:46about 3%. So it's actually very good value
- 42:50for consumers because the the plant is overall more valuable
- 42:53with that balance. But there is a decision to be
- 42:55made about whether or not we want to make the decision to put
- 43:00in all the kit to extract heat, and that decision has not yet
- 43:03been taken. But the direct air capture
- 43:05technology can take heat from any source.
- 43:08So there's no there's no necessity for the heat to be
- 43:11nuclear. It's a valuable thing in its own
- 43:13right, provided it works as planned.
- 43:16Well, producer Rob Stroking is beard appreciatively, so I think
- 43:19he he approves. Do you know, like do you end up
- 43:21with a liquid CO2 stream or does it come out as a solid?
- 43:24I mean, how do you actually go about disposing it once you've
- 43:27once you've captured the CO2 from the atmosphere?
- 43:29It's comes out as liquid. And then there's do heat based
- 43:32direct air capture. There are choices to be made
- 43:35about whether or not you, you want to, you know, sequestrate
- 43:38it in the oil and gas network of the southern North Sea, which is
- 43:42the sea next to where the power station is, or whether or not
- 43:46you want to use the CO2 for making, for example, clean
- 43:50fuels. I think it's probably worth
- 43:51doing just for the PR value I mean.
- 43:52Down the cost because it's like this should be the world's
- 43:55first. I mean, you're already 0 carbon
- 43:57in terms of electricity production, but you'd be the
- 43:59world's first carbon negative. You know it would if it if it
- 44:03all works. Out and you know it's decided to
- 44:05do it and this technology works as planned it would be fantastic
- 44:07we would be significantly carbon negative well this is a bit of
- 44:11an and finally. But I know you're a singer,
- 44:14right? And you have a you have a
- 44:16sizeable choir. Yeah.
- 44:18Come on. Tell me about that.
- 44:19Well. The reason we have the choir is
- 44:21because. You have, if you're building one
- 44:24of these big projects, you, you have groups of people who are
- 44:26sort of working insanely hard for years on end.
- 44:29If people are working at the site, they're very frequently
- 44:31living away from home. And if they're working in
- 44:34London, then it's a sort of there is no let up, there's no
- 44:38letter from when you decide, you know, you're committed to
- 44:40getting this project to happen all the way through the eight
- 44:42years to reach financial close, then all the way through the 10
- 44:45years to build it out. It's relentless.
- 44:48And one of the things that the nuclear industry hasn't been
- 44:50great at is communicating. So it's not been great at
- 44:53communicating with the outside world and to a degree it's not
- 44:57great at communicating internally either.
- 45:00So the combination of wanting to provide social activity for
- 45:03people, create points of connection for people, and also
- 45:06to communicate with with the outside world and internally,
- 45:11all of these things are sort of met by having a couple of
- 45:13choirs. So we have a choir insight in
- 45:16Suffolk and we have a choir in London.
- 45:18And because we've got the choir, we're able to do things like go
- 45:20and participate in the remembrance event put on by the
- 45:24local community. We were able to participate in
- 45:26the VE Day celebrations that that the community held on the
- 45:29beach. It's a, it's a way to engage
- 45:31with the community to show that we're nice, normal people who
- 45:34can make a sort of reasonable musical contribution to
- 45:38community events. People can see us, you know,
- 45:40kids can see us. We're there to come and chat to
- 45:43in case people want jobs. And it's a real well-being
- 45:47issue. People need things to do outside
- 45:50work. Singing gives you endorphins.
- 45:53It's and and the other thing it does is it's a real leveller.
- 45:56I don't know if you can see behind me there's a picture
- 45:58called Saints of Patron Saints of Sigh as well.
- 46:01So we have an artist in residence.
- 46:02So we don't know what that was. I've been trying to figure this
- 46:04out for the last 40 minutes. There you are.
- 46:06So we don't. We don't just.
- 46:06We don't just have. Music, we also have visual arts
- 46:10we also have sport. We do all sorts of things.
- 46:12But but in terms of creative arts, what the artist in
- 46:17residence who's a fantastic guy called Les Bicknell, he's
- 46:20created this picture of different jobs, whether it's
- 46:24cleaners, it's caterers, it's civil engineers, it's
- 46:28financiers, and everyone is shown as equal to me, that's
- 46:32very important that everybody involved in science.
- 46:35Well see which is thousands of people over the years,
- 46:38Everybody's playing their part, whether it's not your cleaning,
- 46:41catering, raising money, being the managing director, being a
- 46:44civil engineer, being an on site construction worker, Everybody
- 46:49is playing their equal part. And I think art, which
- 46:51represents that is something that I like a lot.
- 46:55And it's that is the other purpose of the choir, that if I
- 46:58go and be in the choir, I'm just another person.
- 47:01People can talk to me and relate to me socially.
- 47:04I'm far more likely to find out sort of what how are people
- 47:06really feeling, what are issues that people really want to
- 47:09raise. And it's sort of more effective
- 47:11really than having sort of lots of official information
- 47:15transmission systems is just making yourself available and
- 47:18making yourself human to other people.
- 47:21And then you find out quite a lot more about what's happening
- 47:24in the project. That's really rather lovely.
- 47:27Well, if you want a tuneless tenor to come and join the
- 47:30choir, give me. I do.
- 47:31I do. Yeah.
- 47:32Come and join. Actually, I wanted to.
- 47:35Also, just just finish up, ask about the, the kind of the
- 47:37gender question. There's not many, not often you
- 47:39see women in a leadership position in the nuclear
- 47:42industry. So I'm I'm I'm a big admirer of
- 47:45yours in in that sense. And also like you've made
- 47:48efforts in terms of getting the gender balance more effective
- 47:50in, in the whole project. Tell me a bit about that.
- 47:53Well, if we if we think back to. The question of why, why has
- 47:56there not been enough nuclear? One of the reasons is people
- 47:59haven't haven't worked out a way to finance it until as we'll
- 48:02see. And one of the other reasons is
- 48:05that essentially people haven't really wanted it.
- 48:07They just haven't really wanted it enough.
- 48:09Whether or not those people are politicians or bankers or the
- 48:11public. It's not that there's a huge
- 48:13anti nuclear movement in the UK, but nor has there been
- 48:16enthusiasm. So people haven't been pushing
- 48:18for it. So we do quite a lot of polling
- 48:22on, you know, what do people think?
- 48:23And there's a very, very marked difference between the views of
- 48:26men and the views of women. Basically, men are quite pro and
- 48:29women are much, much less pro. I think there is probably also a
- 48:33similar issue with ethnicity. I think that on the whole, white
- 48:37people are more pro and on the whole, people from ethnic
- 48:39managers are less pro. And then you look at, well, who
- 48:42works in the nuclear industry historically, and the answer is
- 48:45lots and lots of white men. No, we like white men.
- 48:48You know, I have a white man husband and two white men sons.
- 48:52White men are good, but they don't represent against white
- 48:55men either, no. No, really, Really.
- 48:57You surprised me, but they. Don't represent the whole of
- 48:59society. And so if you're if you're going
- 49:01to build something like size while C which impacts the bills
- 49:04of all consumers in the UK, you should really partly out of a
- 49:10sort of moral question of of offering opportunities in a
- 49:13shape which looks roughly like society.
- 49:15But also from a sort of protective question of we want
- 49:18society to like us. You know, we think we're doing a
- 49:20really good thing. We want people to also think
- 49:24that whether or not people are politicians or the local
- 49:27community, and if we don't look much like society, we are just
- 49:32inevitably less likely to appeal to society.
- 49:36And I've worked very hard to have a better gender balance.
- 49:41We have a majority female executive team at the moment and
- 49:44we have around I think just over 40% female employees.
- 49:48We have a lot of work to do on other issues like the ethnicity
- 49:53balance. It's improving but it it's not
- 49:56yet representative of society as a whole.
- 49:58And recognising, you know, that where the power station is
- 50:00built, recognising who works in the construction industry, none
- 50:04of this is going to be straightforward.
- 50:05We're never going to get to a position where we exactly
- 50:08represent society. But we need to get closer and
- 50:11and can people come and visit and look?
- 50:13Around and run around in front of bulldozers and things.
- 50:16I mean, what, what's the, what provisions do you make for
- 50:18people to to visit? At the moment we are, I think
- 50:22early next year we're. Opening a, a great new visitor
- 50:25centre which we will share between size as well B, the
- 50:28existing power station that opened in 95 and and ourselves.
- 50:32And we'd very much encourage visits to the visitor centre.
- 50:36I'm hoping that they'll be viewing platforms so people can
- 50:38look over the construction site. We probably don't want people
- 50:41running around among the bulldozers, but but people can
- 50:46visit Sizewell B can visit the visitor centre and we'll have, I
- 50:50hope, viewing platforms oversea. Wonderful.
- 50:52And it's right next to Sizewell T.
- 50:54The the little cafe on the beach, right it is, and it's a
- 50:58great. Beach nice white sand, bit cold
- 51:01but other than that, great beach.
- 51:03I can testify to that I might come and.
- 51:06Take another swim there sometime soon.
- 51:08But Julie, we should wrap up now.
- 51:10Just I just want to say thanks so much for for for coming in,
- 51:14joining us on saving the world from bad ideas.
- 51:16And if you find that you want to tell me more about this as the
- 51:21project carries on, we'd love to have you back on.
- 51:23Thank you. That's very kind.
- 51:24I enjoyed it. Thanks, Mark.
- 51:29Thanks so much for listening to Saving the World from Bad.
- 51:31Ideas. A Weplanet podcast Weplanet's a
- 51:34movement of citizens and scientists dedicated to
- 51:36defending the science and solutions we need to save the
- 51:38world. Please do subscribe and share a
- 51:40nice review. It helps us spread the message.
- 51:42We'd also love to hear your feedback and suggestions of our
- 51:45e-mail podcast at weplanet.org. Please also join our podcast
- 51:49mailing list and we'll let you know when a new episode drops.
- 51:52Just go to Savingtheworld from badideas.org or weplanet.org
- 51:56podcast right now. See you next time.