Latest / Project Podcast / Fixing Our Broken Planet: Natural History Museum’s inspiring call to action
Transcript
- 0:08Welcome to the APM podcast. APM is the chartered body for
- 0:12the project profession. My name is Emma Devita and I'm
- 0:15the editor of Project APM's course free journal and your
- 0:18host. In this podcast, I go behind the
- 0:21scenes at London's Natural History Museum, which is an APM
- 0:25corporate partner. The museum celebrates its 150th
- 0:29anniversary in 2031 and has kicked off a celebratory project
- 0:33programme that includes the creation of 6 new permanent
- 0:36galleries within the iconic building in South Kensington.
- 0:39The first gallery has already opened and that's where I
- 0:42headed. It's called Fixing Our Broken
- 0:44Planet and focuses on the planetary emergency and the
- 0:47solutions that scientists, including those at the Natural
- 0:50History Museum, are working on. It started life as a temporary
- 0:54exhibition that opened in 2021, but it was so successful it was
- 0:59decided a permanent home should be made for it.
- 1:02It subsequently became the kick off project for the Natural
- 1:05History Museum 150 Years Programme.
- 1:08As you might imagine, being a programme or project manager at
- 1:11the Natural History Museum, surrounded by dinosaurs,
- 1:14precious gems and taxidermied animals draws not only on strong
- 1:18project management skills but the ability to speak to all
- 1:21kinds of different stakeholders to get them on board, engaged
- 1:25and committed to a vision of what can be.
- 1:27Come with me to visit the gallery mid morning during the
- 1:30school summer holidays to get a sense of what's there.
- 1:38Samantha Bannister, who project managed the design of the
- 1:41exhibition, shows me around the rooms that shows off the
- 1:44architecture of the original building, which was completed
- 1:47back in 1881. The exhibition opened at the
- 1:50beginning of April and they're expecting to reach 1,000,000
- 1:53visitors by August. Yes, one of the whole sort of
- 1:58principles of this gallery, we've got a public span
- 2:02principle of showing off the architecture of of the building
- 2:06and bringing more daylight into our galleries.
- 2:08But the gallery itself was designed to be quite reductive
- 2:12because the whole sort of the premise of the galleries around
- 2:16highlighting the climate crisis. And so we didn't want to build
- 2:20anything unnecessarily. So.
- 2:23The design is quite reduced. We've just got showcases, we've
- 2:26just got the flints and the necessary graphics to explain
- 2:29what's going on. So yeah, there is a sort of an
- 2:32open, open plan feel to the gallery to reduce that use of
- 2:37unnecessary material. The NHM declared a planetary
- 2:41emergency and this is our sort of first physical exhibition at
- 2:46the South Kensington site, which sort of brings that to the fore.
- 2:50It displays scientists behind the scenes the work that they
- 2:54are doing to help to find solutions for the climate
- 2:58emergency. So we're looking at Specimen
- 3:01Solution Scientists Society as a sort of encompassing directive
- 3:08for the the exhibition. So it's meant to show you what
- 3:11the issues are, but bring you hope that solutions can be found
- 3:16and help you to take some actions away yourself to help to
- 3:20counter the planet. Treatment.
- 3:22The first exhibit I face is a huge Marlin.
- 3:26So this is a Marlin. So this is showing how
- 3:30overfishing of our seas can deplete our apex predators in
- 3:34our seas and that can affect the, the ecosystem of our our
- 3:38seas. So they're looking at the the
- 3:40DNA of this of this Marlin to understand how chemical makeup
- 3:46and specimen can help us to develop the solution for a
- 3:50healthier planet. I asked Samantha what her
- 3:53involvement in the project was. So I was the project manager for
- 3:58the, the sort of the exhibition development.
- 4:01So from deciding the scope of the project, developing the
- 4:05design, the 3D, the 2D design, the lighting design, the
- 4:09specimen selection, the narrative of of the exhibition,
- 4:13and then ultimately the installation of everything
- 4:16that's. In here alongside Sherry Louise
- 4:20with the the installation. So it was a two year programme
- 4:22from start to finish. And I think walking around it
- 4:27looks exactly how we envisioned it.
- 4:30Like there it it completely looks like the design that we
- 4:33were working through. We had a fly through created
- 4:37that sort of showed the space as it is and it is it's literally
- 4:40as it was on paper. So that's very nice to, to see
- 4:44that sort of the to be realised, especially with all sort of the,
- 4:49the sustainability of the sort of materials being at the fore
- 4:54and actually seeing that realised is and it's nice to see
- 4:58people walking around it. We were in here maybe 30 people
- 5:04at a time installing it and it felt very, very sparse.
- 5:08And then within the 1st 15 minutes of it opening, we had
- 5:10200 people come through the door and it's it's just not stopped.
- 5:14It's just great to see people engaging with these stories.
- 5:19What was one of the biggest challenges of putting the
- 5:21exhibition together? I guess the the really large
- 5:26specimens here. So we got the Marlin and and the
- 5:28bison over in the corner there. And in order to get the cases
- 5:34in, for example, they had to be manufactured in a way that
- 5:38they're sort of demountable. So we could bring everything in
- 5:42in pieces and assemble them here and ensuring that we could sort
- 5:46of get the specimens into those cases.
- 5:49Everything in the gallery has had conservation work done to it
- 5:53before it goes on display. So we have an in house
- 5:56conservation team who do any remedial works to the specimens
- 6:01before they go on display. So everything to make them
- 6:04display. Were they?
- 6:06Why have we? Got.
- 6:08Bison. This is about the rewilding of
- 6:11bison into. I think it's into the to the UK
- 6:15basically they help with by grazing, they help to to lock in
- 6:20carbon and so yeah, so they're sort of a natural carbon thing.
- 6:25The exhibition doesn't intend only to educate, but to provoke
- 6:29conversation. These in screens in the centre
- 6:33here by the seating are our conversation starters where
- 6:36people are asked questions and then we sort of like a poll.
- 6:40Do you think, for example, that we should continue to deep sea
- 6:46mine in order to find the necessary minerals for batteries
- 6:49or should we not be allowed to to do that?
- 6:52And then we can gather that data and use that to sort of
- 6:56understand how what society is thinking about these these
- 7:01issues. And that will be used by
- 7:04different departments across the museum.
- 7:06So we've got our learning teams, our digital teams, our policy
- 7:11makers. Yeah, so it's stated that all
- 7:14help. Drive all of that.
- 7:17These are our film booths, and this one is specifically by a
- 7:24Nook winner, a Natural Environmental Research Council
- 7:28winner, and they give awards for scientific research that looks
- 7:33into environmental issues. And so we've got three around
- 7:38the gallery. So they're sort of scientists in
- 7:42conversation with everyday people that are doing things to
- 7:47to help the environment. I asked Samantha how she got to
- 7:52where she has. So I've been here for 10 years,
- 7:56always been in the project office that started in a sort of
- 7:59support role in the first instance.
- 8:01So I've been a project manager for delivering this level of
- 8:05exhibition for about two years now.
- 8:09I think at the museum we're we're looking to have more sort
- 8:14of engagement with the science that we do behind the scenes.
- 8:18So galleries now are sort of trying to showcase that a lot, a
- 8:23lot more, make people understand that the things that they're
- 8:26seeing on display are things that scientists that at this
- 8:29institution are working on. Be that in the dinosaurs
- 8:33gallery, be that in this sort of climate action kind of space,
- 8:40people are working everyday with these collections.
- 8:43They're doing scientific research with them.
- 8:47Yeah. So it's a lot less passive in
- 8:50terms of you just sort of see, see a dinosaur in the gallery.
- 8:55You can understand who the people behind the research
- 9:00that's been done with. That is why it's in our
- 9:03collection versus somewhere else less sort of stuffy and more
- 9:07sort of this is a living breathing organisation that does
- 9:11a lot of cutting edge research into into things you meant to
- 9:16leave with, with hope as you as you leave that there are things
- 9:21that you as an individual can do in your everyday life to help
- 9:25with the the climate emergency. You don't have to be a scientist
- 9:29that's researching you as a as a person can do small things
- 9:34within within your life, within your everyday life that will
- 9:38help with the climate emergency. I leave the gallery, walk
- 9:44through the earthquake section of the museum and then through a
- 9:46discreet door into the project office, where I sit down with
- 9:50Meg McDonald, programme manager for Fixing Our Broken Planet.
- 9:53It gives me the bigger picture, but first I ask her how
- 9:56seriously the museum takes project management.
- 10:00More and more seriously as time goes on.
- 10:02So when I first started, we were a relatively small group.
- 10:06There was a push to sort of form a project management office that
- 10:11lasted for about 5 years. And then we sort of changed TAP.
- 10:15There are now sort of 30 project managers and project support
- 10:19staff and admin, whereas we were a much smaller team back in the
- 10:23day. And when with the projects that
- 10:25we do, we're really one of three strands, 3 core teams.
- 10:33So it is at the heart of so much of what we do in terms of
- 10:36exhibitions, building works and everything else.
- 10:39So it is, it has grown, it's sort of the stature and
- 10:43importance, but it's always kind of been at the heart driving
- 10:47these exhibitions and galleries forward previously and in other
- 10:51museums still you might find that there are more curator LED
- 10:55exhibitions and galleries and it's more LED sort of by the
- 10:59content side. But there is obviously an
- 11:03increasing, it always was. But now particularly with giant
- 11:07master plans and refurbishments, there's a lot of construction
- 11:10work. And around that construction
- 11:13work comes a lot of coordination, a lot of
- 11:15stakeholder management and a lot of kind of regulatory aspects
- 11:22that need to be considered and adhered to.
- 11:24So having someone sort of be at the centre of that, you know, I
- 11:29always kind of like in PMS to a conductor, we're not playing any
- 11:33of the instruments, but we're at the core to make sure we're
- 11:36bringing in everything at the right time.
- 11:38We're giving everybody their cues.
- 11:41And I think that having that role in place and making it at
- 11:45the heart of the project really increases chances of sort of
- 11:49delivering on time and delivering to sort of the scope
- 11:53that you'd set out to. It also helps you along the way
- 11:56make sure that you're talking to the right people.
- 11:58This is a huge partially visitor facing, partially scientific
- 12:03institution. And in any number of the
- 12:06projects, whether you're looking at something that Sophie does,
- 12:08which has to do with the building itself or any of the
- 12:11building's project managers, or whether you're looking at
- 12:13galleries and exhibitions, there's a certain amount of
- 12:17stakeholders that will always be involved.
- 12:19And when we tell people about all the people who we talk to
- 12:22and sort of list them off endlessly, people are often
- 12:25shocked. You know, they, they have their
- 12:27own sort of little view of what they're doing.
- 12:29And when they see the whole picture, they realise how
- 12:31important it is to have someone, essentially how important it is
- 12:34for someone to have the big picture in their mind so that
- 12:37the people who are delivering work packages can just focus on
- 12:40their specialties. As I previously mentioned, the
- 12:44Fixing Our Broken Planet or FOBP gallery started as a temporary
- 12:48exhibition led by Meg during the COVID lockdowns.
- 12:52It was open for about 10 months I think and we phased the build
- 12:56of it, which was a a real testament to how quickly we
- 12:59moved. So we opened one section.
- 13:01The first section was food and then we moved on to materials
- 13:05and then energy. It only had three sections.
- 13:07Then we've added the the 4th for the permanent gallery.
- 13:11But it was really hugely successful in ways that I think
- 13:13that we didn't necessarily foresee.
- 13:16It had about a million people through it and it's a free
- 13:19exhibition and it was on for a certain length of time.
- 13:22So that in and of itself isn't too surprising.
- 13:24But we found that there was a lot of interest from
- 13:29policymakers and change makers and we had sort of Greta
- 13:33Thunberg was in there being interviewed.
- 13:35And you know, we found there was this whole other audience in
- 13:39terms of policy makers and change makers that we always had
- 13:42links with, but who were interested in that and who
- 13:46wanted to come to that and wanted to see it.
- 13:49There's also another part of it where it was the first time
- 13:51where we'd really spotlit our scientists work.
- 13:57You know, it's the the permanent gallery is following the same
- 14:00formula in some ways as that temporary exhibition where you
- 14:03have the specimen, the science, that the scientist that's doing
- 14:08the science, a picture of that scientist in a quote.
- 14:12And we found that people really reacted to that.
- 14:14And it's like we found our voice when it came to the planetary
- 14:17emergency and that we found that people really trusted the
- 14:22scientists more than they trust this institution as a whole.
- 14:26It was the person to person dialogue that seemed to be the
- 14:31thing that really got people interested, engage and sort of
- 14:34trusted the information that they were getting.
- 14:37We named it Our Broken Planet, how we got here and ways to fix
- 14:40it because we wanted to make sure, you know, the temporary
- 14:44exhibition, you have the name and sort of the tag, you know, a
- 14:46subtitle. We wanted to make sure that we
- 14:49were selling that idea of of that there's hope.
- 14:53Like here's the work that's happening.
- 14:55People are trying to fix this and here's ways you can fix it.
- 14:59And it's really important to us that people left with a sense of
- 15:02hope because there's some really hard hitting, really hard to
- 15:07take facts that we give and in order to not make everybody
- 15:13despondent, walk out there being like, well, that's it.
- 15:16As you say, we're screwed. We can't do anything about it.
- 15:19It would that would be a failure on our part.
- 15:21What we want to do is make people understand that they can
- 15:24do things to help. And that's how the name sort of
- 15:28changed into fixing our broken planet.
- 15:31We needed something that was shorter but still kept still
- 15:35kept conveyed. The the seriousness of the
- 15:38situation is that we do have a broken relationship with nature.
- 15:41We didn't want to shy away from that.
- 15:44But putting the fixing in, it's like there is ways to do this.
- 15:47We can do this. All hope is not thought so our
- 15:50out of the kind of temporary exhibition and out of the
- 15:53everything that we've learned. It was decided that this because
- 15:58the museum has a strategy to 2031 to make advocates from for
- 16:02the planet, you know, to make a place where both people and
- 16:06nature thrive. It was decided that we would
- 16:09create this into a longer term offer.
- 16:14Doing the work to the gallery had been on the table for a lot
- 16:17longer before that decision had been made.
- 16:20They talked about different things that could go in that
- 16:22gallery, different types of of exhibitions.
- 16:27And then when they landed on sort of that as a, as a lovely
- 16:29space for fixing our broken planet.
- 16:32But also there was sort of side stuff that was happening, side
- 16:38programming that was happening while we were in lockdown,
- 16:40mainly online because that's the only way that you could do it.
- 16:43We had some audience engagement events that were online.
- 16:47And then this meant that we weren't just keeping it to South
- 16:50Kensington either. It wasn't South Kensington
- 16:52centric, it wasn't London centric.
- 16:54We could invite the nation and indeed people from around the
- 16:57globe to take part in these discussions or watch people who
- 17:02were activists or climate influencers speak on various
- 17:09related topics. You know, they had, we had one
- 17:13that had Jane Fonda speaking to a young activist and those
- 17:17proved to be incredibly effective at sort of maximising
- 17:22the reach of everything, getting that messaging out really far.
- 17:26I think the NHM 150 programme was sort of developed while we
- 17:31were already putting Fixing Our Broken Planet in, but Fixing Our
- 17:36Broken Planet being the 1st permanent gallery that we'd put
- 17:40in since 2016 when we opened the main hall, it seems like the
- 17:45perfect place to launch that front.
- 17:48Make that the first of those. Originally we started with an
- 17:52idea that the Fixing Our Broken Planet gallery in that space
- 17:56would only be sort of three to five years.
- 17:58But given the importance of the topic, we and our ongoing sort
- 18:04of strategy, that was when it was the decision was taken to
- 18:07make it the 10 year and then position it as the first of the
- 18:10NHM 150. And the NHM 150 has grown out of
- 18:13the fact that a, we have, we're going to be 150 years old in
- 18:172031, which is we obviously want to celebrate that, but also
- 18:21because we have an ever increasing number of visitors
- 18:24that come here. And we have lovely gallery
- 18:28spaces that have for decades now bin back of house bin collection
- 18:34stores. And we have an opportunity to
- 18:37refurbish them and open to the public and and bring the museum
- 18:41back to the original Waterhouse galleries, the original
- 18:44galleries that it was always meant to be.
- 18:46I ask Meg about what she has learnt from this project that
- 18:49will feed into the creation of the further 5 galleries as part
- 18:52of the 2031 programme. Lots.
- 18:58I think the broader programme is going to benefit hugely from us
- 19:04having on through this one at a time where they were all these
- 19:07emerging things, where the Tennis Valley Science Park was
- 19:11was beginning to take shape, where the idea of NHM 150 came
- 19:15in, where the idea of making fixing our broken planet a
- 19:18permanent gallery and with the surrounding programme all sort
- 19:22of came together, but not necessarily in the right order.
- 19:26So there was a lot of sort of going down a certain way and
- 19:30then having to catch up. I think having gone through that
- 19:33process, will it help us better plan forward plan for the rest
- 19:39of the galleries, which is something that we're absolutely
- 19:41doing. The fact that it's a programme
- 19:43of a number of galleries means that it's, you know, it's baked
- 19:47in that we will be looking across the entirety of it to be
- 19:51able to work more efficiently, to be able to plan things now so
- 19:56that it works across all of the galleries to minimise clashes.
- 20:01We don't have a great deal of room here for parking stuff
- 20:05temporarily and we're going to have elephants and dinosaurs to
- 20:10move as well as innumerable smaller specimens.
- 20:13So it's, it's really good to have I think, I think having
- 20:17gone through this in more of a bits and pieces way is going to
- 20:21really have us well equipped. To look at it all holistically,
- 20:27take those lessons about spaces to, to, to work spaces to store
- 20:32temporarily, you know, the things that might happen with
- 20:36the fabric of the building. Things that we should expect to
- 20:40be surprises, you know, because it is an old building.
- 20:44All of those things are going to massively feed into it and make
- 20:46our lives a lot easier in the long run, I think.
- 20:50I asked about the budget for the gallery and, as part of that,
- 20:53the use of innovative, sustainable materials.
- 20:56It wasn't a ginormous budget, it was healthy and part of the the
- 21:03design was obviously to be as sustainable as possible.
- 21:06So not you'll have noticed that it's not very heavy onset works,
- 21:10it's not a lot of built walls and you know, structures.
- 21:14So that's sort of reflected in the budget.
- 21:18But also we brought on a sustainability consultant, which
- 21:20was something that we've never done before for this.
- 21:22So there are some new things for which we invested some of that
- 21:25money in, but it was a challenge too because it was using
- 21:30sustainable materials, which a means you can't, if there's a
- 21:34problem with the delivery, you can't go down to sort of B&Q to
- 21:37go get more timber or something. But also because they aren't
- 21:42widely available on the market, they have that sort of specialty
- 21:46materials costs associated with them as well.
- 21:49So I think the team did a really great job in coming in at, I
- 21:53think they came in slightly under budgeting.
- 21:56What's her advice to other project professionals who want
- 21:58to experiment with more sustainable materials and
- 22:01practises? Well, I, I think there's, you
- 22:05shouldn't underestimate the amount of time it takes that
- 22:08you'll have that you necessarily need to commit to, to sort of
- 22:12research of these new materials. They're not known to people in
- 22:17the construction industry. They're often made by smaller
- 22:20companies outside of the country.
- 22:24You know, there's it, it took our design team a fair amount of
- 22:28time, probably more than we had expected to do the research.
- 22:32And also it's because there is so many claims that on that
- 22:35could look good on the surface. But when you start to dig down,
- 22:38you can find many reasons why they become unsustainable or not
- 22:42as green as they they claim. There's then materials that
- 22:45aren't robust enough. You know, we have 6.2 million
- 22:49people come through the gap the the museum last year.
- 22:52We need stuff that's going to stand up to the sort of wear and
- 22:55tear of that. So I would, I wouldn't
- 22:57underestimate the amount of time for research and development of
- 23:00these materials and also don't as don't underestimate the the
- 23:05level of risk. And as long as you are capturing
- 23:07that, spending time figuring out how to mitigate that, then
- 23:11you're managing that as best you can.
- 23:14I asked Meg about how successful the project has been and how
- 23:17they measure that. Well, we generally have a number
- 23:21of KPIs and benefits, obviously, that tie back to the strategic
- 23:25aims of the museum. That's the very simple answer
- 23:29when it comes to fixing our broken planet.
- 23:31It's it, it has a layer of complexity because it, it comes
- 23:35down to how do you measure creating advocates for the
- 23:39planet? How do you know when you've done
- 23:42that and the museum has actually developed sort of an advocate
- 23:47advocacy engagement model that they are using, which is
- 23:51basically to it to inform, to inspire and to empower.
- 23:57And this is all gone through our wonderful sort of audience
- 24:00research and evaluation team, because that's the tricky part
- 24:03to capture. You can say, you know, we've had
- 24:06a million people through in the first six months.
- 24:08You can say, you know, we've had a number of pieces in the media,
- 24:13we've had this coverage, we've had these policy makers come to
- 24:16visit, but how do you actually measure what happens when
- 24:20someone leaves and whether they take those actions?
- 24:23And that's a much more that's, that's almost an impossible
- 24:26thing to do. So what we can do is, is try to
- 24:29quantify the sort of positive interactions and the onward
- 24:32journey that someone might take through our channels and then
- 24:35make sure that we're providing links and tools to other
- 24:39organisations and wherever we can send them.
- 24:42What's about the delivery of the project?
- 24:45It was a very hard deadline. This is one of the things about
- 24:49the projects, particularly the, the, the public facing ones have
- 24:54less leeway. I mean, some of the stuff that
- 24:56the buildings team do absolutely have a hard deadline and they're
- 25:00they, they face it innumerable challenges on that.
- 25:03But when you're opening a gallery or temporary exhibition,
- 25:05there's definitely, definitely a movable deadlines for
- 25:08completion. And it can be really
- 25:09challenging. And this team managed to pull it
- 25:13off. So they they opened it on time,
- 25:15despite some some small delays that are are small in and of
- 25:21themselves. But when they start getting more
- 25:24new, even more in number, it does have sort of have a, a
- 25:27compacting consequence or outcome.
- 25:32But they, they did, they did deliver it on time and they did
- 25:35deliver it to budget. So for, and, and they delivered
- 25:38it to the quality that they asked for.
- 25:39And that's often where the stressor is when you have a, a
- 25:43very, very, very firm timeline that in which you can't go past
- 25:47you often something has to give. But they really worked very hard
- 25:50at a number of teams across the museum to get that open in time.
- 25:54Does the museum take a particular approach to managing
- 25:57projects? We used to be, we used to try to
- 26:02follow Prince 2 for a really long time because obviously that
- 26:05was sort of the government way approach to project management.
- 26:10But recently we have been looking more at APM and their
- 26:14approach to it through the project management qualification
- 26:17PMQ on which we've just loads of our PMS have just been sort of
- 26:22trained on it. They've just written the exam
- 26:25and we have our membership and that seems to be a better fit
- 26:31for us as an organisation because it's very grounded in
- 26:35practical approaches. Of course, every project is, you
- 26:42know, we get a project that very massively.
- 26:45So you know, I talk about ME programme managing FOBP
- 26:49programme which involves learning international
- 26:52partnerships and all of these teams.
- 26:56But then I also just recently put a singular dinosaur in a
- 27:00display case. So you have these varying
- 27:02projects with varying amounts of money, varying amounts of teams,
- 27:06but really when we're, we're quite strict on making sure that
- 27:12we have that project management framework and it is the sort of
- 27:15the APMPMQ that so that we have our documentation is, is the
- 27:20same across all of the projects. And the way that we approach
- 27:24stakeholder management, you know, lessons, all of that sort
- 27:29of stuff is, is generally tends to be more APM these days.
- 27:35Now let's turn to the detail of delivering the construction of
- 27:38refurbishment side of the project, which was the
- 27:41responsibility of senior project manager Sophie Dolan, who has
- 27:44worked at the Natural History Museum for three years and in
- 27:47construction project management for eight years, most recently
- 27:50at the National Gallery Victoria in Melbourne, where she was
- 27:54involved in the building of a new gallery.
- 27:56So I'm actually sort of one of the few people in our team who's
- 28:00from what I call more of a traditional background.
- 28:02Our team are really diverse and have really interesting sort of
- 28:05past careers and all sorts of different things.
- 28:08I'm one of the few who sort of come from a traditional point of
- 28:09view. So I did a construction
- 28:11management degree at university in Australia and then I've
- 28:15worked in project management since.
- 28:18And then I did my 8:00 PM qualification earlier this year.
- 28:21So I feel like I kind of was a qualified PM anyway, but it's
- 28:25nice to have the extra stuff and I did actually get a lot out of
- 28:28it and learned a lot out of that as well.
- 28:31What's about dealing with people who might not be familiar with
- 28:33the world of project management? Stakeholder management is such a
- 28:37big part of what we do because whilst people might have a
- 28:42general idea that the building needs upkeep or we need new
- 28:45exhibitions and new galleries, it's if it's not kind of in
- 28:48their, their team's line of sight and priorities and, and
- 28:51staff resource and whatnot, it can be quite hard to sort of
- 28:56balance that. So it's all about like early
- 28:58communication, running some workshops with them, explaining
- 29:00what we're doing and why is a big one.
- 29:02And like, you know, if we're talking APM benefits really
- 29:04comes into this because we have to explain to people like, you
- 29:08know, there may be some disruptions, some noise and so
- 29:11on for this amount of time. But why we're doing that is to
- 29:13give you this new gallery and then you can display some of
- 29:16your amazing specimens or give you a nicer workspace or, you
- 29:19know, like everything we do is to benefit the museum and it's
- 29:24staff and it's visitors and it's collections.
- 29:26So which is no sort of small task, but I'd say it kind of
- 29:32depends on your audience. Like we have some teams who
- 29:35actually we have a lot of in house technical trades.
- 29:39So like carpenters and joiners and AV specialists and people
- 29:43who build robots and like do all that kind of stuff.
- 29:46Most people have now outsourced that or get freelancers in.
- 29:48Whereas we have an in house team again, some of whom have been
- 29:51here for nearly 40 years, which is some of them built their
- 29:54creepy crawlies exhibition, which is our next project to to
- 29:57change that one up. So really useful talking to them
- 29:59because they remember what's around.
- 30:01Whereas some so they they tend to need that less kind of not
- 30:06dumbing down, but sort of simple terms and whatnot.
- 30:08They kind of get it. Whereas some of the teams who a
- 30:12really specific science focus or or a curatorial focus, but you
- 30:18know, we just work around our audience.
- 30:20So we we love visuals. You know, we do big maps showing
- 30:22this area is going to be impacted for this long.
- 30:25Here's the route you can go And you know, we just we kind of
- 30:28tailor as we go yeah early comms, really early comms and
- 30:32keep and not just once like it's the repeated because people
- 30:36forget people are busy. They have, you know, really busy
- 30:38other jobs. We're saving the planet right.
- 30:40You know, we've got a respect people's time and their main
- 30:45work focus. We can't expect everyone to just
- 30:47work around us all the time and our works.
- 30:50So yeah, I'd say early and regular communication for sure.
- 30:55You know, we do all the stakeholder mapping.
- 30:56We work out, you know, the, the folks who need a lot more kind
- 31:02of regular cons or like Taylor cons, whereas the ones who just
- 31:05sort of need to know every month or So what you're doing.
- 31:07We we map all that type of stuff out.
- 31:09What's been really good that our team do is not just on a
- 31:12specific project level. Do we do those columns and
- 31:15information, but we do like, you know, coffee mornings and whole
- 31:19company presentations where we explain what our team do and who
- 31:22we are and why we're doing what we're doing.
- 31:23Because I think sometimes and every team do it.
- 31:25You know, sometimes, like I'm really not from a science
- 31:29background. I can't stress that enough.
- 31:31So sometimes I feel quite lost here with not lost here, but
- 31:33sort of a bit out of my depth when they, when we get a
- 31:36presentation about someone who's just discovered a new type of,
- 31:40or, you know, something, I found it really interesting and I
- 31:43think it's fantastic. But I'm kind of they sometimes
- 31:45they're using words and I'm like, what does that mean?
- 31:47So I think, you know, they do it for us, we do it for them.
- 31:50And I think it's a really nice culture we have here in the
- 31:53museum where we, we are encouraged to learn about what
- 31:55all the other departments do. And I think that goes a long way
- 31:58to then understanding when the difficult things come in doesn't
- 32:02make it perfect. And then, you know, we
- 32:03definitely have difficult conversations.
- 32:05And I think the, the where it gets tricky sometimes too is the
- 32:09priorities. So, you know, a lot of
- 32:13organisations have this where, where it has to go to the
- 32:15director level to say, do we lose commercial revenue by
- 32:19stopping events to allow works to happen or do we keep the
- 32:22events going and then the works are pushed back.
- 32:23But that means we have a lot of money in, in, you know, delayed
- 32:27construction time and we have to those decisions sit well, well
- 32:31beyond us. But we again, we have a team of
- 32:34excellent directors who have the best interests of the museum and
- 32:38its staffing, collections and visitors at heart.
- 32:40And they kind of they make those decisions.
- 32:42But we we prepare little effectively, little business
- 32:47cases to sort of explain. We're working with other teams
- 32:49to say, look, here are your options.
- 32:51How do you want to tackle this? Because when we're such a busy
- 32:53live environment, we can't just stop all events.
- 32:55We can't just stop having visitors from for a day, you
- 32:59know, we, you know, but then we can't stop our works either.
- 33:02So it's a really tricky juggle at times, but very luckily we
- 33:05are supported by our our managers in that, which is
- 33:07great. Let's rewind and allow Sophie to
- 33:11tell us what her role covers. So yeah, so I'm a senior PM,
- 33:15senior project manager here. Currently I'm working on the
- 33:21similar type of thing of what I did for the last gallery.
- 33:23So the, the gallery shell refurbishment of the what we
- 33:28call Gallery 33. So that's the one that's
- 33:29currently the creepy crawlies, which is a lot of people's
- 33:32favourite from when they were a kid built back in the 80s.
- 33:35So that one is due to now be removed.
- 33:38So we're gonna strip that out. We, we, we sometimes call it the
- 33:42children's gallery. Every gallery is the children's
- 33:44gallery at this place. But that one in particular is
- 33:46like really interactive and fun and yeah, it's bugs.
- 33:50So kids like bugs and things like that.
- 33:52So yeah. So that one is due to be
- 33:54stripped out after for just about 40 years.
- 33:57And we will, you know, recycle, donate, you know, as much of it
- 34:01as we feasibly can. And then my role is very much
- 34:05the restoration of the gallery. So it's a little bit different
- 34:07to the FABP ones. That one, that gallery was in
- 34:10much worse condition just for various reasons over the years
- 34:13of, you know, water damage. And so we had to do a full roof
- 34:16replacement. We replaced all the glazing we
- 34:19did, replaced about 1/3 of flooring where it had rotted
- 34:21away. It was all covered under vinyl.
- 34:24Yeah. Basically it was a 1970s
- 34:27exhibition called the Whole of Human Biology.
- 34:28So it was all about the human body and how does it work.
- 34:32And it was, for its time, it was extremely sort of trailblazing.
- 34:38And it was a really new type of exhibition that was had come to
- 34:42the UK. However, as Meg was talking
- 34:46about before, they had no respect for the Victorian
- 34:49architecture. So they built what we call a
- 34:51space frame. So it's basically a white box on
- 34:53the inside of the gallery. And then this big metal almost
- 34:58looks like a climbing frame that ran across the ceiling.
- 35:01So you could, if you look it up through it, you could sort of
- 35:03see bits of the ceiling and so on.
- 35:04But there was no celebration of the architecture.
- 35:06They covered all the original oak floors with vinyl.
- 35:09A real shame to be honest with you.
- 35:10But it look, it was there for nearly 50 years.
- 35:13So it, you know, it had a good life.
- 35:15A lot of people fondly remember it from their own childhoods and
- 35:17things. So, yeah.
- 35:18So that one was again, big sort of decommissioning and strip out
- 35:22process. So we had to take out all the
- 35:24that one didn't have any actual specimens in it, but yeah, took
- 35:27out all the models and the graphics and things like that.
- 35:29Again, we donate, we recycle, we do as much as we can on that
- 35:32front, and then you're left with this empty shell.
- 35:35So then it's a huge process of because we were doing the roof
- 35:39as well, we had to set up a big internal sort of structure,
- 35:42scaffold structure, and then remove all the old slate tiles
- 35:46and pull out all the old legs. And we had so many discoveries
- 35:50on because what's tricky is because it's Grade 1 heritage
- 35:52listed, you can't just go roofing it open to do surveys
- 35:55when you feel like it. You have to a lot of it.
- 35:57You're not given permission to actually have a look until
- 36:00you're actually doing the works, which makes it really tricky
- 36:03because you just find so many things.
- 36:05And the roof filled up was not what we expected.
- 36:08It wasn't even the depth we expected.
- 36:09There was all sorts of things that meant we have to do a lot
- 36:12of redesign. So this, it was a really
- 36:14challenging project for that team.
- 36:17I mean, I came in halfway and I found it challenging, let alone
- 36:19the folks at the start. So it was just lots of surprises
- 36:21because we did have some of the original drawings from the
- 36:25original architect after Waterhouse, but not all of them.
- 36:28So and like I mentioned being heritageist and we can't just go
- 36:31like pulling things apart and having a look to see how they
- 36:34work. So that to then inform the
- 36:35design and the cost plans on. So we yeah, a lot of things were
- 36:39not quite how we thought the yeah, building fabric surprises.
- 36:44I will say on the flip side of that though is challenging as it
- 36:47was and it did resulted a lot of difficulties for that project.
- 36:51We now have a much better idea of what our buildings are
- 36:54made-up of. And we've tested, you know,
- 36:57concrete samples, we've tested paint samples.
- 36:58We've through this project, we've discovered a lot of stuff
- 37:01about not just the current sort of build, but how it has looked
- 37:05over the last 150 years. So we've done the paint
- 37:08analysis, we've done the analysis of the slate we had on
- 37:11the roof and worked out the exact quarry it came from, like
- 37:13all this kind of stuff. So we now know that the, you
- 37:17know, next couple of gallery projects to come in
- 37:21restorations, we're much better prepared and we have a lot of
- 37:23lessons learned and a lot of information we can bring
- 37:26forward, which I think is, you know, really useful.
- 37:30And you could look at it in the negative way of, you know, it
- 37:33was a really hard project and all these things kind of came up
- 37:35and there were a lot of surprises.
- 37:37But we're trying to think of it in the positive of thinking of
- 37:39all that information we can apply to the next ones.
- 37:43What did she learn from this project that she will use on the
- 37:46next? Within reason, because it's not
- 37:50always possible, is allowing for more contingency for things not
- 37:55being where you think they will be in the build up of the the
- 37:57building fabric or or the structure.
- 37:59So time and. Resource time, resource budget
- 38:04people, resource to I know, and this is something that the
- 38:07exhibition team can speak about as well, is that.
- 38:11I. Think initially because the
- 38:13exhibition, it started a bit smaller than it ended up being.
- 38:16It was just meant to be a temporary one.
- 38:18It was resourced accordingly and then it grew with the, you know,
- 38:24it was, you know, decision. It should, you know, be bigger
- 38:27than it is. It wasn't just like scope creep.
- 38:29It did, you know, we did say, look, let's actually make this a
- 38:31bigger thing. It probably should have had some
- 38:35more resources allocated. We did do a fair few things
- 38:38quite well of, you know, bringing people back to the
- 38:40benefits on why, why are we here?
- 38:41Why are we doing what we're doing?
- 38:42Stakeholder management was done quite well and change control
- 38:47and so on, things like that. I think programme was one of our
- 38:50trickiest ones and we were really unfortunately bound by
- 38:56what our contractors were saying in their programme because that
- 38:59was sort of the dates we would have to take to stakeholders and
- 39:01take to put in our reporting and our governance and things like
- 39:04that. And I think as the project got a
- 39:07little unwieldy because it was just growing and having all
- 39:10these issues, the programme became a really difficult one to
- 39:14match because we didn't necessarily feel we had control
- 39:16over it. And I was sort of sitting more
- 39:18with the, the contractor. So possibly changing the way we
- 39:24ran that and like seeing if there was a way we could not
- 39:27necessarily have more influence over it because it, the builder
- 39:29was telling us the truth. You know, this is this is what
- 39:32it is and this is how long it will take.
- 39:33But I think finding that balance between saying, yes, you, you
- 39:38know, show us your programme, here's what you think we can do,
- 39:40and then us having more influence over that and so on.
- 39:45Because yeah, the the programme did grow a fair bit throughout
- 39:49the throughout the job. Sherry Louise Rowe is a senior
- 39:54projects and programme manager who helped bring the projects
- 39:57over the line. She has worked at the Natural
- 39:59History Museum for 21 years, working her way up from duty
- 40:03manager to her current position. She explains that she now works
- 40:07on the more strategically important projects and temporary
- 40:09exhibitions, of which there are typically 3 running every year,
- 40:13which take around 2 years to develop.
- 40:15She normally runs a project team of around 4 professionals and
- 40:18then a broader team of 12. Some of the projects have
- 40:22included a tour of Dippy the dinosaur around the UK, an
- 40:25exhibition on animal sex and moving the museum's statues of
- 40:29Charles Darwin, scientist Thomas Huxley and the museum's founder
- 40:33Sir Richard Owen around the building.
- 40:35So I'm overseeing some of the temporary exhibitions, so the
- 40:39one that Sam's doing on Jurassic Oceans and another one called
- 40:42Great Ocean Forests, these are open in the next couple of
- 40:44years. I oversee the art programme, the
- 40:47project manager works on the art programme.
- 40:49So we've got a gallery called the German Gallery, which is
- 40:53sponsored partly by the German Foundation and it has to be an
- 40:56art science type exhibition that goes in there.
- 41:00Yeah. So in the past we've done things
- 41:02like Gregor Sailor exhibition. We've had various artists that
- 41:07we've commissioned done stuff. We had the Moon Museum of the
- 41:09Moon here. That was really good.
- 41:11I did that one actually. That's that was a really good
- 41:13project. Yeah.
- 41:14I asked her what's unique about working at the museum.
- 41:18I think it is just the one for a better word.
- 41:21The randomness of it really. Every day is, is different.
- 41:26You know, it's not, you're not at the job where you're doing
- 41:28the same, I know data input or seeing the same people.
- 41:31It's very, you know. Different.
- 41:35What skills do you need to thrive somewhere like this?
- 41:39I think you have to be a good communicator and knowing how to
- 41:42deal with the various, and it's only probably something you can
- 41:45learn while you're here, because I knew nothing about science or
- 41:49curators and conservation and how they feel about their
- 41:52specimens and their objects. And if there is an issue
- 41:55regarding them, you know you're going to treat it quite
- 41:58sensitively and carefully, just can't bulldoze in and whatever.
- 42:04So I think you've got to learn how to communicate effectively
- 42:08to the right people in the right way.
- 42:11How do you learn to deal effectively with specialists as
- 42:13a project manager? I sort of put it on them, like
- 42:17give them ownership of it, make them understand that I think I
- 42:21understand that they're the, they're the expert.
- 42:24So I'm relying on them to give me the right information to take
- 42:28some ownership and responsibility for it.
- 42:30And don't, I don't go in saying, right, I'm the project manager.
- 42:33I'm going to be in charge of you or I need you.
- 42:35We work as a team. I need you and your expertise
- 42:39because I don't know, I think what best conditions are for a
- 42:42specimen or I don't know, the best way for AV hardware to be
- 42:46installed into the floor. You know, I'm relying on you as
- 42:49my fellow project team members, but you know, we make this
- 42:52project, we deliver this project together.
- 42:54I just the conductor, the, you know, the band leader that
- 42:58brings it all together and, you know, might be the head of the
- 43:02face and the name of the document, but it's all the
- 43:05others that really do all the work.
- 43:07I ask her, how do you make a project a success at the museum?
- 43:11Once you know, you know how the museum works and the the various
- 43:16bureaucracies and the hierarchies and that that go on.
- 43:20But you're still an important cog in the massive wheel.
- 43:25But I think you can only do what you've got given in front of
- 43:28you. If you haven't got a set amount
- 43:29of time, ain't got a set amount of money.
- 43:31We, I think that I think we very rarely fail.
- 43:35You know, we always deliver on time within budget.
- 43:38And as I think you just got to be, you could be quite calm as
- 43:42well. You can't be too hot headed.
- 43:44And yeah, you're going to have a level head about you and take
- 43:48all the different personalities on and everyone's arguments,
- 43:52whatever and just sometimes be a peacemaker, be a mediator.
- 43:55You know you have different lots of hats to wear.
- 43:59What are the hardest parts of delivering a project?
- 44:02There are certain things that we're just giving a hard no on
- 44:05and just like, you know, it's not even worth arguing it.
- 44:08It's a no, it's not going to happen.
- 44:09We need to find an alternative way.
- 44:12You know, it might not be that we've got enough budget for
- 44:13something or we just don't have enough time.
- 44:15We haven't got enough time, right?
- 44:17What do we prioritise and what can we say?
- 44:19It's an exhibition. So we opened this gallery on the
- 44:223rd of April. It did get to a point where
- 44:24we're like, right, what are going to be priorities that can
- 44:26happen after we open? What can we not open without and
- 44:31say, you know, there was a hard, that date of opening could not
- 44:33change. There was press, there was
- 44:35everything else set around it. It was out there in the public.
- 44:38So we're like, OK, that wasn't have to wait till after.
- 44:40No, wouldn't people wouldn't know, but for us we'd know that
- 44:45was about priority and that sort of thing.
- 44:46If it comes to money and it's which often unfortunately is an
- 44:50issue, just say, OK, we might not be able to do the higher
- 44:55spec or something. What's an alternative?
- 44:57What else could we produce? Or, you know, does someone else
- 45:00have to give? Or something else?
- 45:04What was her involvement in the Fixing Our Broken Planet
- 45:07project? So actually I didn't come on
- 45:10till last May I think. So more Reba stage 5.
- 45:16It just came obvious that it was almost too big for one person
- 45:21and Sam had done a great job up until then, but it was going to,
- 45:24you know, principals contractor was about to come on.
- 45:26It was only going to get bigger and bigger.
- 45:28So I came on to sort of just help Sam out really.
- 45:31I took on a relationship with the principal contractor.
- 45:34She took on some of the other smaller work packages and we
- 45:39sort of then managed it together.
- 45:41And I, and I say I oversaw all the install stuff while she did
- 45:45all the other, but you know, the work practise that she'd been
- 45:47managing up until that time. It's easier if she to carry on
- 45:50doing that and I did the new things.
- 45:52So the principal contractor, the installation schedule, all the
- 45:56logistics about coming on site, all that sort of thing.
- 45:59At the time didn't think that it was something that hadn't been
- 46:02done before. I just thought it was like we've
- 46:04been given a lovely brand new open space.
- 46:07We need to fill it with someone that's going to look amazing,
- 46:09which obviously colleagues were in charge of designing and
- 46:13producing and whatever it was just it was more, I guess for me
- 46:18and Sam, we knew we had a deadline.
- 46:19It had to happen and it was getting everything ready for
- 46:24that day again. It wasn't until afterwards, I
- 46:27think you look back and think, Oh my God, this is the first one
- 46:29we've done since whatever the date is more Hincy Hall, I
- 46:32guess. So, yeah, I didn't typically
- 46:35feel pressure at the time that it was something new.
- 46:37It was more just like, Oh my God, we're running out of time.
- 46:40We've got a lot to do in a short amount of time.
- 46:42And it was a lot of very much all hands on deck.
- 46:45And we built in like the contingency time.
- 46:47We could do evening work, do weekend work.
- 46:49I mean, luckily we didn't have to rely on weekend work.
- 46:52I think we did a couple of evenings just to get, you know,
- 46:55be also conscious. Don't want people to burn out
- 46:58and, you know, because then that has a negative effect as well or
- 47:01people going off sick or whatever.
- 47:05So yeah, you just have to find the time and or bring an extra
- 47:09resource if you're able to and just make it work.
- 47:14I asked if she was there for the opening of the gallery.
- 47:17We sort of stood outside because we hadn't, because the doors
- 47:20that you went in this morning, everyone thought they were just,
- 47:23that was hoarding because they haven't.
- 47:24That's just how it was designed. It's going to look like that.
- 47:27So those doors were shut the whole time.
- 47:29So the first time we'd seen it open was the morning of the
- 47:32third. And then we sort of stood on the
- 47:34other side of the corridor, we got back to dinosaurs and just
- 47:37watched everyone go with an hour really.
- 47:39It was quite weird. And just watching how people
- 47:42were reacting and acting in the gallery and around the showcases
- 47:48and stuff. And it's always so busy.
- 47:51You are relieved. And it hasn't really ended.
- 47:54There's still lots of snagging and bits to continue with and
- 47:59reporting and stuff. But yeah, it was a bit like, oh
- 48:03God, I've done that. And it fell just in time for
- 48:05Easter whole day. So I think nearly all of us took
- 48:07breaks at different point and just like just forget about it
- 48:10for a few days. What approach does she take to
- 48:13projects? If you ask everyone in the
- 48:15office, they'll all just say how laid back I am.
- 48:18I don't get particularly panicked or stressed, and I
- 48:23guess I'm quite methodical in that way.
- 48:27And let's say it's all about priorities and listing what
- 48:31needs to be done when, what can wait?
- 48:33We can do that later. So rush for that and set in the
- 48:36right deadlines at the right time.
- 48:38And I just think, you know, I think we do is, is obviously for
- 48:43people to come and enjoy. And they don't see what I think
- 48:47that goes on behind the scenes, like whether, you know, blood,
- 48:50sweat and tears or whatever. And there's just no point
- 48:53getting what I'm trying to. They won't know if we've done
- 48:56something wrong. The visitors won't know if
- 48:58something you know that showcases that look quite right
- 49:01or whatever. So I don't feel all those.
- 49:04We always try. We always strive to get things
- 49:06absolutely right. It's not the end of the world if
- 49:09we don't. I guess you, you can't come in
- 49:12with two fixed like say I have this style of project management
- 49:17and that's that's it. Because it's not, it won't work
- 49:19here and you have to have a flexible approach, be good at
- 49:24communicating and be aware of all the different needs and
- 49:28expectations from all the different stakeholders and
- 49:31departments across the museum because No2 are the same.
- 49:36What is the new galleries in the programme now?
- 49:39Some are existing ones like we've done and need to be
- 49:42stripped out and started again. Or I think at least one of them
- 49:46is. Used to be a gallery, public
- 49:49gallery years and years ago, but has since been taken by
- 49:54collections and office space and whatever.
- 49:57So yeah, it's like we said earlier, it's about bringing
- 50:00back the fabric of the building to the visitors.
- 50:05Samantha Bannister, who project managed the design of the
- 50:08exhibition and who took me on the tour earlier, sat down with
- 50:11me and gave me a bit more background on her role and the
- 50:13work she's engaged in. I'm a project manager in the
- 50:19Estates projects master planning department, and really I manage
- 50:24public engagement projects. So these are things like ranging
- 50:28from permanent gallery spaces to temporary exhibitions and
- 50:32sometimes even commercial activities like the ice rink
- 50:37that we used to do before the Urban Nature project.
- 50:40And so, yeah, I'm really sort of on the the public engagement
- 50:44side of things versus we've got our buildings PM that they look
- 50:47into the infrastructure of of the building.
- 50:51What's her role on the project? So I came in as sort of the the
- 50:55start up stage just before we sort of kicked off concept
- 51:00design. So yeah, responsible for sort of
- 51:03setting the scope and the the parameters of the project,
- 51:07getting in any of the design team members that we needed.
- 51:12It was delivered in house by our NHM design studios.
- 51:16So 3D design was was covered, but we needed to get in our 2D
- 51:22designer QS PD. Three of the zones, the material
- 51:29zone, the energy zone and the food zone were zones that were
- 51:35represented in the original temporary exhibition.
- 51:38Some of the specimens that were in the temporary exhibition have
- 51:43been removed because they we have to consider how long
- 51:47they've been on gallery from the conservation conditioning
- 51:51perspective that we had to replace some of those stories in
- 51:55order that we weren't damaging our specimens.
- 51:59The longer a specimen will be on display, the more sort of
- 52:05detrimental that can be to a specimen.
- 52:08So your conditions have to be very set with temporary
- 52:14exhibition. A lot of those spaces are kind
- 52:17of like black box spaces, so there's there's no daylight in
- 52:20those galleries. So in order for us to be able to
- 52:23maximise what we can put on on display, but they're often on a
- 52:28run for seven months. So you can put things on that
- 52:32are considered more fragile because of the shorter time
- 52:35frame. Whereas for this gallery, it's
- 52:38meant to be in the space for a minimum of 10 years.
- 52:40You have to understand what specimens.
- 52:45Will be able to. Withstand that some of those
- 52:47specimens will need to be rotated out, some of the stories
- 52:52will need to be swapped later down the line in order that
- 52:55we're yeah, we're we're managing the risk to those specimens.
- 53:00The whole concept of the gallery is to enable us to update it as
- 53:04science changes. It's meant to be a much more
- 53:09sort of dynamic space, so we can swap stories in and out as the
- 53:14science around something changes, as something is more
- 53:19perhaps to the fore in the news, for example, like wildfires have
- 53:22been quite in the news at at the moment, but there may be
- 53:26something else that is more relevant to at the time that we
- 53:31want to represent on the gallery.
- 53:32It's ongoing. So, so the project team that we
- 53:35had to deliver this this exhibition has it's sort of
- 53:40disbanded and really the the the update side of things will be
- 53:46led by our interpretation team, who are the people that do the
- 53:49research into what stories we can tell and what specimens we
- 53:54can put on gallery when we come to do those swaps.
- 53:58Project management team will get involved again in order to
- 54:01coordinate that. But yeah, that's sort of
- 54:04specific looking at what stories we want to put on since outside
- 54:09project. Yeah, we designed it.
- 54:11And then in that time we're establishing the the content,
- 54:16the narrative, what specimens we can use.
- 54:20And then once all the design is finished and you've established
- 54:23what stories you're using, you go into the construction phase.
- 54:29So procuring principal contractors, procuring showcase
- 54:32manufacturers and then we had to procure with the 3D ceramic
- 54:40plinths as part of that subcontracted to our PC.
- 54:45Yeah. So there's a sort of an off site
- 54:47construction period where all of those things are being made,
- 54:52manufactured and then we bring them to start and install them
- 54:57in gallery. It started in the beginning of
- 55:01November and we opened the 3rd of April.
- 55:06I ask her what was the biggest challenge she faced.
- 55:10Our biggest change I think was around the the prints that are
- 55:14in the gallery. Those were developed, they're a
- 55:193D printed ceramic. It's quite an innovative
- 55:24material to use. The reason reviews that is for
- 55:26sustainability reasons. It's made out of natural
- 55:31materials. It's all held together without
- 55:34the need for screws and the car footprint of things like screws
- 55:39we've sort of taken into account and stuff.
- 55:41But because it's an innovative product, we had to go through
- 55:45quite a bit of prototyping with that.
- 55:47And we had some issues with things not drying correctly and
- 55:52therefore not firing correctly. So it was quite a process to
- 55:56sort of get that right. And that was quite sort of a
- 55:59linchpin moment in our programme in terms of we can, we got the
- 56:05showcases in and then we wrapped the showcases with those clips.
- 56:09And that was sort of the major bit of work that was really
- 56:12happening in that gallery. So we had a long lead time of
- 56:15like enabling works waiting for these ceramic clips to come in.
- 56:20What lessons will she take from it?
- 56:23So the whole sort of the point of of this as well was it wasn't
- 56:28necessarily for us to create the most sustainable gallery
- 56:33possible though, because as I said, there were constraints
- 56:37around that. But for really for us to attempt
- 56:41to reduce our sort of cup footprint around our gallery
- 56:45production. But really so that we can sort
- 56:48of create an initial assessment of how this gallery has
- 56:53performed so that future galleries can look back at what
- 56:57we've done and understand where they could improve on the
- 57:01process. So it's really to yeah, to
- 57:03create this is an assessment from a sort of carbon
- 57:07perspective of delivering this gallery so that yeah, future
- 57:11galleries can try to improve in terms of the next galleries.
- 57:18We've taken a lesson around the working in parallel on the base
- 57:24field side of things as well as the exhibition development side
- 57:27of things. Whereas for this, for this
- 57:30exhibition of this gallery, the base build was very much in
- 57:38front of the exhibition development.
- 57:40And that was some around the decision about what was going to
- 57:44be put in there. And we didn't know that FOBP was
- 57:48going to be the gallery that we were going with at that stage,
- 57:52but it just meant that the interface between the two
- 57:55projects were there was some some things that had been sort
- 58:00of developed as part of the exhibition.
- 58:03The base build that had we known the exhibition was going into
- 58:08it, we probably would have looked to do slightly
- 58:11differently. So going forward across all of
- 58:15our new galleries, we are working more in parallel with
- 58:19that base build and that exhibition development of the
- 58:22base build can more easily achieve what the exhibition
- 58:26design requires. I leave the project office and
- 58:31I'm emerging to a throng of museum visitors.
- 58:34It's been a privilege to go behind the scenes at the museum
- 58:37and understand what it takes to put together a new gallery like
- 58:39this and how's this fits into the institution's globally
- 58:43important role in combating climate change.
- 58:46No matter which sector you work in, I hope you found something
- 58:48in our conversations that might inspire you or help you in your
- 58:51project work. Anyway, thanks again to Meg,
- 58:55Sophie, Sherry, Louise and Samantha for joining me and to
- 58:58you for listening to the APM Podcast.
- 59:01Just to mention, you can find out more about my Natural
- 59:03History Museum visit in the Autumn 2025 issue of Project
- 59:07Journal. Don't miss it.
- 59:09And don't forget to look out for more episodes or to rate and
- 59:12review us. Wherever you get your podcasts.
- 59:15We'd welcome you to get in touch with your comments, feedback and
- 59:17suggestions by emailing us at APM Podcast at
- 59:22thinkpublishing.co.uk. This podcast has been brought to
- 59:25you by APM, the chartered body for the project profession.
- 59:29For more information on APM, visit apm.org.uk.