Latest / Rockingham County NC Municipal Meetings / September 14, 2026 Rockingham County Planning Board Meeting
Transcript
- 0:04Speaker 1: Good evening. I would like to call to order the
- 0:08Speaker 1: September 14th meeting of the Rockingham County Planning Board. First
- 0:14Speaker 1: order of business is our invocation. If, of course, Scott
- 0:17Speaker 1: would lead us in that.
- 0:20Speaker 2: Let's pray. Our Father in heaven, we are grateful together
- 0:24Speaker 2: in this planning board meeting of Rockingham County. We're grateful.
- 0:29Speaker 2: for the trust that the county has in us, in
- 0:32Speaker 2: this board, to serve this community and serve this county.
- 0:37Speaker 2: And we pray that that will bless this meeting, that
- 0:42Speaker 2: we'll be kind and courteous with each other, that we'll
- 0:45Speaker 2: communicate effectively, and that we will understand the needs of
- 0:49Speaker 2: both the state, the applicants, and the citizenry of the
- 0:53Speaker 2: county and bring those together into a good solution that
- 0:57Speaker 2: benefits that benefits all people. We pray for thy spirit
- 1:02Speaker 2: to be with us and help us in all that
- 1:05Speaker 2: we do. In the name of our Savior, Jesus Christ, amen.
- 1:11Speaker 3: Next order of business is the adoption of the agenda.
- 1:13Speaker 1: Do I have a motion to adopt the agenda?
- 1:16Speaker 4: I move.
- 1:19Speaker 3: Is there a second?
- 1:20Speaker 2: Second.
- 1:21Speaker 3: All in favor, please raise your hand and signify by
- 1:23Speaker 3: saying aye.
- 1:25Speaker 5: Aye.
- 1:25Speaker 1: Any opposed, likewise saying nay. The agenda is adopted. Next
- 1:31Speaker 1: order of business is approval of the minutes from August 10th.
- 1:36Speaker 1: Is there a motion to approve the minutes?
- 1:41Speaker 6: I move.
- 1:41Speaker 1: So moved.
- 1:42Speaker 4: Second.
- 1:43Speaker 1: There is a motion and a second. All in favor,
- 1:46Speaker 1: please raise your hand and say aye.
- 1:49Speaker 7: Aye.
- 1:50Speaker 1: Any opposed? Likewise, say nay. The next order of business
- 1:56Speaker 1: is I will review the procedures for our cases tonight
- 2:03Speaker 1: so that you will have an idea. The following is
- 2:06Speaker 1: information for public use. All Rockingham County Planning Board meetings
- 2:11Speaker 1: are held in accordance with state law and adopted bylaws.
- 2:15Speaker 1: Meeting dates, agendas, and meeting minutes are posted on the
- 2:19Speaker 1: county's website, along with the bylaws and the county's land
- 2:23Speaker 1: use plan. Planning board meetings are open to the public,
- 2:27Speaker 1: live streamed, and videos of this meeting and previous meetings
- 2:30Speaker 1: are also posted on the county's website. Zoning map changes
- 2:35Speaker 1: are legislative matters. These map changes are reviewed for reasonableness
- 2:40Speaker 1: and consistency with the North Carolina General Statute 160D, the
- 2:45Speaker 1: Rockingham County Land Use Plan, and the Unified Development Ordinance,
- 2:49Speaker 1: among other adopted plans. This board considers recommendations from planning
- 2:54Speaker 1: staff and public comments. When applicable, this board reviews potential
- 2:59Speaker 1: land use requests from the applicant. The planning board decisions
- 3:03Speaker 1: are recommendations to the Rockingham County Board of Commissioners. The
- 3:07Speaker 1: Board of Commissioners will hold a public meeting before making
- 3:11Speaker 1: final decisions whether to approve or deny a zoning map change.
- 3:17Speaker 1: Zoning cases will be considered using the following procedure. Staff
- 3:21Speaker 1: will present the case to the board. After the staff presentation,
- 3:25Speaker 1: the applicant may come forward to offer information about the request.
- 3:29Speaker 1: A period of public comment will then be opened. Likewise,
- 3:33Speaker 1: text amendments are legislative matters. The procedure for text amendments
- 3:38Speaker 1: will be considered using the following procedure. Staff will present
- 3:42Speaker 1: the text amendment language, staff will answer questions, from the
- 3:46Speaker 1: planning board. Although public comment is not required by law
- 3:50Speaker 1: for text amendments, the chair will open public comment before
- 3:53Speaker 1: discussion and a vote by the board. Those who wish
- 3:59Speaker 1: to speak must register on the sign-in sheet at the door.
- 4:03Speaker 1: Comment is limited to three minutes per person. Before addressing
- 4:07Speaker 1: the board, all speakers shall state their name and address
- 4:10Speaker 1: for the record. Comments or questions must be relevant to
- 4:13Speaker 1: the case and be solely directed towards the planning board.
- 4:17Speaker 1: Speakers will address the planning board only. No speaker may
- 4:21Speaker 1: directly address applicants, staff, or members of the audience. The
- 4:26Speaker 1: board may seek answers from the applicants, staff, or members
- 4:31Speaker 1: of the audience.
- 4:32Speaker 3: Respect for this.
- 4:33Speaker 1: Board, staff, speakers, and general decorum during this proceeding will
- 4:37Speaker 1: be maintained during this time. Thank you very much. And
- 4:40Speaker 1: I would like to ask staff to present zoning map
- 4:46Speaker 1: amendment 2026-16.
- 4:48Speaker 7: So this is the Rockingham County Planning Board case 2026-16,
- 4:52Speaker 7: the Simpson rezoning. This is a request to rezone a
- 4:56Speaker 7: parcel from light industrial to residential agricultural. The tax spent
- 5:01Speaker 7: for the record is 890204930169. It's located at 310 Elgrim
- 5:08Speaker 7: Church Road in the Reidsville Township, and this is a
- 5:10Speaker 7: conventional rezoning. This is a vicinity map of the parcel.
- 5:15Speaker 7: As you can see here, it's located kind of in
- 5:17Speaker 7: between US 29 and US 29 Business in the southeastern
- 5:21Speaker 7: part of Rockingham County. This is a current zoning map
- 5:25Speaker 7: of the parcel. As you can see here, it's primarily
- 5:28Speaker 7: surrounded by residential agricultural, although it has some RP to
- 5:32Speaker 7: its north and east and RM surrounding the RA. This
- 5:36Speaker 7: is an aerial map of the parcel. It's currently just
- 5:39Speaker 7: wooded as Adam and I went and viewed. It does
- 5:42Speaker 7: have two driveways and it's just trees on the parcel.
- 5:48Speaker 7: The land use plan does suggest this parcel is located
- 5:51Speaker 7: in the O2 or the rural lands transect. This suggests
- 5:56Speaker 7: that this characterizes the county's areas for relatively undeveloped including
- 6:01Speaker 7: prime agricultural and or forestry lands and low density residential
- 6:05Speaker 7: land uses. Our land use plan also suggests that this
- 6:08Speaker 7: area is rural and should generally be zoned RA, but
- 6:11Speaker 7: a PUD may be appropriate depending on the area in general.
- 6:16Speaker 7: I'll be glad to entertain any questions from the planning board,
- 6:20Speaker 7: and we do recommend that you approve this rezoning.
- 6:24Speaker 3: Are there any questions for staff?
- 6:26Speaker 2: Is there any buildings or anything like that, or is
- 6:29Speaker 2: it just all wooded?
- 6:30Speaker 7: It's primarily all wooded. Now, there was a lumber mill
- 6:34Speaker 7: on this property. but all the structures were removed in 2018,
- 6:39Speaker 7: or by 2018.
- 6:45Speaker 2: Okay, good, thank you.
- 6:50Speaker 6: Adam, is this a down zoning issue?
- 6:54Speaker 5: It is kind of like by the lay term, a
- 6:57Speaker 5: down zoning, but as far as the statute goes, pretty
- 7:01Speaker 5: much any kind of rezoning that comes before us is
- 7:04Speaker 5: going to be.
- 7:07Speaker 5: With the applicant's consent. So that's kind of like one
- 7:09Speaker 5: of the requirements for that. So we would be completely
- 7:12Speaker 5: fine as far as that statute goes.
- 7:13Speaker 2: Okay.
- 7:15Speaker 7: Is there a request for this rezoning?
- 7:19Speaker 4: Thank you.
- 7:19Speaker 1: So it was LI4 because of the.
- 7:25Speaker 7: Well, it was zoned LI in 1988 when we did zoning,
- 7:28Speaker 7: but yes, probably for the lumber.
- 7:29Speaker 1: For the lumber, yeah, okay. And now they're not doing
- 7:32Speaker 1: that anymore, so they want it to go back.
- 7:35Speaker 8: Okay.
- 7:35Speaker 1: Okay.
- 7:38Speaker 3: Any more questions? Okay, let's open up the floor. Is
- 7:46Speaker 3: there a Mr. David Simpson here?
- 7:51Speaker 8: Mr.
- 7:51Speaker 1: Simpson, would you like to address us?
- 8:02Speaker 3: Wait, I'm sorry. Come forward and give us your address, please.
- 8:08Speaker 9: My name is David Simpson, and my address is 1928
- 8:11Speaker 9: Old Mill Forest Drive in Raleigh, North Carolina. And the
- 8:15Speaker 9: 310 Elm Grove Church Road is a property that I purchased.
- 8:20Speaker 9: I grew up at 380. It was right beside my
- 8:23Speaker 9: parents' house. I grew up with the sawmill there beside me.
- 8:27Speaker 9: And so when the sawmill went out of business, I
- 8:31Speaker 9: had an opportunity to purchase that 17 acres. So I
- 8:34Speaker 9: purchased it so that another sawmill could not come out there,
- 8:37Speaker 9: nor a salvage yard.
- 8:39Speaker 2: Or anything like that.
- 8:41Speaker 9: But I would like to thank the planning department for
- 8:45Speaker 9: its initial approval for the rezoning from light industrial to RA.
- 8:53Speaker 1: So does anybody have any questions of Mr.
- 8:55Speaker 8: Simpson? Nope. Thank you.
- 9:04Speaker 3: Is there any discussion?
- 9:08Speaker 1: If there's no discussion, do I have a motion?
- 9:12Speaker 10: Madam Chair, I motion to recommend approval of this request
- 9:16Speaker 10: based on the consistency and reasonableness of determination statements that
- 9:21Speaker 10: are included in the agenda packet as may be amended
- 9:24Speaker 10: during the zoning reprocess.
- 9:25Speaker 1: Second. I have a motion and a second. All those
- 9:31Speaker 1: in favor, please signify by raising your hand and saying aye. Aye.
- 9:35Speaker 1: Any opposed, likewise saying nay. Motion carries. This will be
- 9:41Speaker 1: reviewed at the which county commissioner's meeting?
- 9:45Speaker 11: It will be the October 19th.
- 9:47Speaker 1: Okay. This will go for final approval on October the 9th. So, Mr. Simpson,
- 9:52Speaker 1: you might wanna come back up here. Okay. All right,
- 10:00Speaker 1: our next case is zoning text amendment 2026-18, a proposal
- 10:06Speaker 1: to amend the Rockingham County Unified Development Ordinance to establish
- 10:11Speaker 1: specific development standards for the use of data processing facilities.
- 10:16Speaker 3: Yes, may we have staff presentation?
- 10:20Speaker 5: So this one might be a little bit of a
- 10:21Speaker 5: long one. Uh, there's a lot here. Uh, so, um,
- 10:25Speaker 5: strap in with me. Uh, I think I'm gonna try
- 10:27Speaker 5: to go through the whole thing really quickly. Cause I
- 10:29Speaker 5: think if you have questions at the beginning, I think
- 10:32Speaker 5: there's some pieces at the end that might kind of
- 10:34Speaker 5: answer them kind of thing. So, um, take notes if
- 10:37Speaker 5: you gotta, uh, and we can go through questions at the.
- 10:39Speaker 4: End, I think.
- 10:41Speaker 5: Um, so as we all may know, uh, data centers
- 10:44Speaker 5: have been kind of a hot topic. They've been around
- 10:47Speaker 5: for a while generally, but I think, um, Recently, there's
- 10:51Speaker 5: been an increase.
- 10:52Speaker 11: In size and scope of them for the most part.
- 10:55Speaker 5: So a lot of local jurisdictions are trying to get
- 10:59Speaker 5: ahead of the game, write some regulations to put in place.
- 11:03Speaker 5: Not a whole lot of places in North Carolina so
- 11:05Speaker 5: far have extensive regulations on them so far. So there's
- 11:09Speaker 5: kind of a lot of scrambling going on kind of
- 11:11Speaker 5: across the state, probably across the country, to be quite honest, so.
- 11:15Speaker 5: we've spent the past several months again, trying to get
- 11:18Speaker 5: ahead of the curve on it, go ahead and put
- 11:20Speaker 5: regulations in place. Um, so far we do not have
- 11:23Speaker 5: any kind of applications that have ever come before us
- 11:25Speaker 5: or anything. Uh, this is really just to get ahead
- 11:28Speaker 5: of the curve, go ahead and try to get these
- 11:30Speaker 5: in place, preferably as soon as possible. So we can
- 11:34Speaker 5: make sure we do have clear processes, clear language in
- 11:38Speaker 5: place on how to actually deal with these. Um, Otherwise,
- 11:43Speaker 5: if we were to get an application, say, relatively soon,
- 11:46Speaker 5: then they wouldn't have any kind of regulations to kind
- 11:48Speaker 5: of have to contend with.
- 11:53Speaker 11: So let's see here.
- 11:56Speaker 5: Like I said, no definition, nothing in the table currently.
- 12:01Speaker 5: And just as a kind of general thing, we're not necessarily...
- 12:05Speaker 5: We're looking at this as a land use specifically. I
- 12:09Speaker 5: know there's probably going to be kind of all kinds
- 12:11Speaker 5: of more broader philosophical political questions about the use of
- 12:17Speaker 5: them and things like that. But in this context, for
- 12:21Speaker 5: the ordinance specifically, we're looking at this in the context
- 12:24Speaker 5: of as a land use. So we're trying to look
- 12:27Speaker 5: at like comparable different land uses. How is it similar
- 12:31Speaker 5: to some? How is it different from others? And our
- 12:34Speaker 5: regulations here aren't necessarily to say, yes, we want data
- 12:38Speaker 5: centers or no, we don't necessarily want them.
- 12:40Speaker 11: Again, it's mostly just.
- 12:41Speaker 5: To have clear particular processes in place for when they
- 12:44Speaker 5: do come and to make sure that we can regulate
- 12:48Speaker 5: them to make sure that they don't have negative impacts
- 12:50Speaker 5: on property owners where they took come through. Um, this
- 12:54Speaker 5: little bit here at the very beginning is basically what
- 12:59Speaker 5: kind of process do we want this to go through?
- 13:02Speaker 11: Um, We are specifically.
- 13:05Speaker 5: Putting it in the highway industrial zoning district. Heavy industrial,
- 13:12Speaker 5: I've been doing this all day, calling it highway industrial.
- 13:15Speaker 5: Heavy industrial zoning district as a conditional use-free zoning. So,
- 13:20Speaker 5: so far we actually have not, don't have any specific
- 13:23Speaker 5: uses that outline specifically that it goes to a conditional
- 13:27Speaker 5: use-free zoning. And just as a quick reminder, it's very
- 13:29Speaker 5: similar to like the conventional use-free zoning that we kind
- 13:31Speaker 5: of just went through. However, with the conditional use rezoning,
- 13:35Speaker 5: that's where we are going to have site-specific, a site
- 13:38Speaker 5: plan involved, and that is where we can get into
- 13:42Speaker 5: the details. If we have concerns as a board, if
- 13:46Speaker 5: we hear concerns from the public, we can place, with
- 13:49Speaker 5: the consent of the property owner, particular conditions on it.
- 13:55Speaker 5: That first table is doing in some of that legwork
- 13:57Speaker 5: just to put in conditional zoning as a process in
- 14:01Speaker 5: the table. Then that bottom one is going to be
- 14:04Speaker 5: looking at data processing facilities specifically. Here is a little
- 14:11Speaker 5: bit of a preamble to it. We're just listing in
- 14:16Speaker 5: whatever purpose and intent with this ordinance generally. And it's,
- 14:20Speaker 5: for the most part, kind of our purpose and intent
- 14:21Speaker 5: with all zoning is to maintain public health safety while
- 14:26Speaker 5: at the same time encouraging responsible development. This applicability section
- 14:31Speaker 5: is more of a dot and I's, cross and T's
- 14:34Speaker 5: kind of paragraph here. We're mostly looking to just kind
- 14:39Speaker 5: of say, you know, we have these particular regulations that
- 14:43Speaker 5: But there's also other sections of the ordinance that can
- 14:45Speaker 5: potentially apply, like landscaping, lighting, things like that. We do
- 14:48Speaker 5: outline some particular things here, but those other sections are
- 14:52Speaker 5: going to apply as well. The other thing here is
- 14:55Speaker 5: also just any state federal laws. Also going to make
- 14:58Speaker 5: sure that those are definitely going to be applying as well.
- 15:05Speaker 2: Can I ask you a question on that?
- 15:07Speaker 4: Yes.
- 15:07Speaker 2: In the case of lighting, you don't necessarily have to
- 15:10Speaker 2: be specific in this component. to cover that because it's
- 15:14Speaker 2: covered somewhere else and you're going to reference that? Is
- 15:16Speaker 2: that the plan? Where the rules apply generally on heavy industrial,
- 15:27Speaker 2: you're just going to reference those same requirements?
- 15:32Speaker 5: Yeah, it's basically like unless otherwise stated explicitly here, there
- 15:37Speaker 5: are other sections of the ordinance that generally apply kind
- 15:40Speaker 5: of thing, if that makes sense. here's just stating basically
- 15:44Speaker 5: the same thing. Here we have our definitions that we've added.
- 15:48Speaker 5: Some very particular use specific definitions. That's why we're including
- 15:52Speaker 5: them here and not just kind of in our general definitions.
- 15:55Speaker 5: The main things, and we can touch on these a
- 15:57Speaker 5: little bit later, we do define different types of cooling systems.
- 16:03Speaker 5: We define air cooled. We define open loop and closed
- 16:07Speaker 5: loop as well. But the main thing here is the
- 16:11Speaker 5: the actual definition for data processing facilities. Um, so our
- 16:17Speaker 5: main definition here is kind of intended to be broad.
- 16:20Speaker 5: There can be a whole bunch of different uses for
- 16:23Speaker 5: data processing facilities.
- 16:25Speaker 11: Um, It could be used for crypto mining.
- 16:28Speaker 5: AI, just general like say bank information and data, just
- 16:33Speaker 5: general data processing. So our intention is to kind of
- 16:37Speaker 5: be broad in scope there while at the same time
- 16:39Speaker 5: we do carve out a few exceptions just to kind
- 16:42Speaker 5: of make sure that every office that has a server
- 16:45Speaker 5: in it isn't necessarily getting caught up in those particular things.
- 16:48Speaker 5: I mean, we probably have a couple of servers in
- 16:50Speaker 5: our IT department, right? So we're trying to make sure
- 16:53Speaker 5: that something like that isn't going to getting caught up
- 16:56Speaker 5: in that same definition because it's very different in scope, scale, intentions,
- 17:01Speaker 5: things like that. Next here is just going to be
- 17:06Speaker 5: our requirements along with the application. As you can see,
- 17:09Speaker 5: this is quite a bit and most of these are
- 17:11Speaker 5: kind of covered for the most part when we get
- 17:14Speaker 5: to the other sections, you'll kind of, if you, we
- 17:16Speaker 5: get to the other sections and you can go back
- 17:18Speaker 5: and look at it and be like, okay, that's, you know,
- 17:21Speaker 5: this section here is going to necessitate, this part of
- 17:25Speaker 5: the application kind of thing. But this is just a
- 17:28Speaker 5: list of everything that would be required with the application
- 17:32Speaker 5: for conditional rezoning. One thing we are adding here, and
- 17:39Speaker 5: so far we do not have this generally in our ordinance.
- 17:43Speaker 5: Some places for a host of different, like rezoning, special
- 17:48Speaker 5: use permits, things like that, require what's called a neighborhood meeting.
- 17:51Speaker 5: These are generally on the onus of the applicant themselves
- 17:55Speaker 5: to set up a meeting in the neighborhood and then
- 17:59Speaker 5: other ordinances will kind of set up how that process
- 18:02Speaker 5: should look. Generally, it's to get for the applicant to
- 18:05Speaker 5: kind of get ahead of the curve, talk to the
- 18:08Speaker 5: people in the area, have that kind of more detailed,
- 18:12Speaker 5: more nuanced conversation before it kind of gets to something
- 18:15Speaker 5: a little bit more official in front of us. just
- 18:18Speaker 5: so they can kind of answer questions about their proposals
- 18:20Speaker 5: a little more candidly. So far we're not doing this
- 18:23Speaker 5: generally across the board just for this particular use. Kind
- 18:26Speaker 5: of the main highlights here is they are going to
- 18:29Speaker 5: be required to do one and then we kind of
- 18:31Speaker 5: just detail that process a little bit. So they will
- 18:34Speaker 5: have to have the meeting no less than 30 days
- 18:39Speaker 5: before the planning board meeting. So they have to do
- 18:42Speaker 5: that kind of on the front end of the process
- 18:44Speaker 5: and And then we kind of outlined how they should
- 18:46Speaker 5: be notifying. So we've kind of so far matched kind
- 18:51Speaker 5: of our process with letters especially. So we do a 1,000-foot
- 18:55Speaker 5: buffer around the property for our notifications. So that's so
- 19:02Speaker 5: far kind of mirrored right there. And then kind of lastly,
- 19:06Speaker 5: they go, they have the meetings, they then have to
- 19:09Speaker 5: provide as part of their application, a summary of the meeting,
- 19:12Speaker 5: what was discussed, how did you go about notifying kind
- 19:16Speaker 5: of thing. Um, and that will be kind of sent,
- 19:22Speaker 5: brought to the packets, uh, for y'all to be able
- 19:25Speaker 5: to see as they go through that rezoning process.
- 19:29Speaker 4: Here.
- 19:30Speaker 11: We're looking at that.
- 19:30Speaker 2: That was a great, I thought it was a great idea.
- 19:33Speaker 4: Yeah.
- 19:34Speaker 5: Um, Here, just kind of general zoning meat and potatoes
- 19:38Speaker 5: kind of thing. We're looking at setbacks and things like that.
- 19:45Speaker 5: We did include a minimum lot size of 25 acres.
- 19:49Speaker 5: Most of these projects are going to be larger in scale,
- 19:51Speaker 5: so we did feel the need to have a fairly
- 19:54Speaker 5: substantial minimum acreage requirement. A lot of that is to
- 19:57Speaker 5: just make sure that that facility can fit on a
- 20:02Speaker 5: property comfortably and that they can then meet a lot
- 20:06Speaker 5: of the other setback landscaping requirements, things like that So
- 20:11Speaker 5: we're doing 25-acre minimum. We're doing 200 feet from any
- 20:16Speaker 5: property line, lot line, and then 500 feet from any
- 20:20Speaker 5: residential zoning district. Our building height is 50 feet. That's
- 20:25Speaker 5: pretty standard across all of our industrial zoning districts. And
- 20:30Speaker 5: just put a little bit of a pin in the
- 20:34Speaker 5: setbacks a little bit in your brain. One of the
- 20:36Speaker 5: very last things we'll talk about.
- 20:39Speaker 5: There's an aspect that can kind of change that a
- 20:43Speaker 5: little bit based on scale that we'll get to.
- 20:45Speaker 11: At the very end.
- 20:49Speaker 5: Landscaping is pretty straightforward for the most part. Here's the
- 20:53Speaker 5: language here and then here's some kind of bullet points
- 20:55Speaker 5: for it. So our typical landscaping for the most part
- 20:59Speaker 5: is going to be a 15 foot parcel perimeter buffer.
- 21:02Speaker 5: So that's all the way around the parcel, a 15
- 21:04Speaker 5: foot landscaping buffer. That's already a requirement. So we're keeping
- 21:09Speaker 5: that essentially. We're also adding in if they have any
- 21:13Speaker 5: outside mechanical equipment, so think like generators, HVAC equipment, anything
- 21:21Speaker 5: like that. If they've got those outside of the structure itself,
- 21:24Speaker 5: they then have to do an additional 15 foot around that.
- 21:29Speaker 5: We looked at a lot of different ordinance generally throughout
- 21:32Speaker 5: this whole process, but on a lot of these they
- 21:37Speaker 5: were showing much higher landscape buffers. Our thought process here
- 21:41Speaker 5: is one, we do the two, right?
- 21:44Speaker 11: To have it.
- 21:45Speaker 5: And that probably gets kind of close to like what
- 21:47Speaker 5: have a lot of ordinance are showing, but also that
- 21:49Speaker 5: if it ends up being a concern in the meeting,
- 21:54Speaker 5: this ends up being a great, you know, particular site
- 22:00Speaker 5: specific condition that we can add if we ever want
- 22:02Speaker 5: to increase those. So that's, And that's honestly anytime you
- 22:06Speaker 5: have a conditional rezoning special use permit. Always something good
- 22:10Speaker 5: to keep in mind that landscape buffers is usually a
- 22:14Speaker 5: pretty easy thing to increase. But if we make that
- 22:17Speaker 5: too substantial on the front end, maybe that ends up
- 22:19Speaker 5: being a harder ask a little bit later through the process.
- 22:26Speaker 5: Noise is one of the really big ones that's going
- 22:28Speaker 5: to be super specific to data centers. Here's the language here.
- 22:34Speaker 5: my notes here are going to be that, um, the
- 22:38Speaker 5: main thing is that noise specifically, we're putting a very
- 22:41Speaker 5: hard and fast limit at 60 decibels measured at the
- 22:45Speaker 5: property line. Um, from kind of our understanding, I'm by
- 22:50Speaker 5: no means some sort of sound engineer expert, and this
- 22:53Speaker 5: is mostly kind of accumulated from looking at a lot
- 22:55Speaker 5: of different ordinances on this kind of picking a middle-ish
- 22:58Speaker 5: ground on this. Um, One of the main additional things
- 23:04Speaker 5: is tonal frequencies has been cited as a concern with
- 23:09Speaker 5: data centers. The way I've kind of been thinking about
- 23:11Speaker 5: that is almost think of like a dog whistle, right?
- 23:14Speaker 5: Like it's registering at a much higher frequency. You can't
- 23:19Speaker 5: quite hear it. You maybe kind of can, but it's
- 23:23Speaker 5: at a weird different register. And if a dog whistle
- 23:25Speaker 5: was going on all the time, you'd probably develop potential
- 23:30Speaker 5: things like headaches or something along those. That's one of
- 23:32Speaker 5: the concerns with data centers, except instead of a high pitch,
- 23:37Speaker 5: just a lower pitch. So we do include some language there,
- 23:42Speaker 5: kind of the same thing for those tonal frequencies as well.
- 23:47Speaker 5: We are requiring at the beginning with the application that
- 23:52Speaker 5: they do an initial noise study. So Obviously, they can't
- 23:57Speaker 5: give us too much information with a noise study at
- 23:59Speaker 5: this stage because it hasn't been built yet.
- 24:02Speaker 11: So there's not too much.
- 24:02Speaker 5: To study, but it does give us a really good baseline.
- 24:06Speaker 5: What is the current noise levels? What are your projections
- 24:09Speaker 5: that you're expecting in the future? And that's going to
- 24:12Speaker 5: be mostly just kind of information for y'all to help
- 24:14Speaker 5: make a decision and for the commissioners to make a
- 24:18Speaker 5: decision as well. We're also requiring a noise study after
- 24:23Speaker 5: it has been built. So they can then come through,
- 24:30Speaker 5: get a licensed engineer to do a study once the
- 24:33Speaker 5: facility is actually operating before we issue their final permits.
- 24:38Speaker 5: And then from an enforcement end of it, we're also
- 24:42Speaker 5: saying that say it were to get approved, built, noise
- 24:48Speaker 5: studies were all fine, year or two goes down the
- 24:52Speaker 5: line and we start getting complaints about the noise. It
- 24:56Speaker 5: then gives staff the ability from an enforcement end to
- 25:03Speaker 5: verify that complaint, and then we can require additional noise studies.
- 25:07Speaker 5: And if they're not following that from third-party license engineer,
- 25:14Speaker 5: showing at a later time that they can't follow that,
- 25:17Speaker 5: that's when we can kind of get into further enforcement action,
- 25:19Speaker 5: but doing so with kind of hard.
- 25:21Speaker 11: Data in our hands.
- 25:26Speaker 5: Generators is the next thing and for the most part
- 25:29Speaker 5: when we looked at regulating generators our main kind of
- 25:32Speaker 5: concern was emissions. Generators are often used in data centers
- 25:37Speaker 5: as a emergency backup kind of situation. The other thing
- 25:42Speaker 5: that's important is just they do have to be operated
- 25:45Speaker 5: occasionally for a maintenance perspective.
- 25:47Speaker 11: So oftentimes data.
- 25:48Speaker 5: Centers will have several generators mostly for backup emergency situations.
- 25:56Speaker 5: So our main requirement here is we are requiring what's
- 25:59Speaker 5: called a tier four generator. The EPA has different sets
- 26:04Speaker 5: of standards for, and these are emission standards.
- 26:07Speaker 11: Tier four is the highest that they have.
- 26:10Speaker 5: And we also kind of have language in there that,
- 26:12Speaker 5: you know, if EPA comes out with a higher tier
- 26:14Speaker 5: or something, it does automatically revert to that. And the
- 26:18Speaker 5: other main thing is generators can't be the main source
- 26:21Speaker 5: of power. there would not be kind of an option to, hey,
- 26:26Speaker 5: we're not going to be able to have our full
- 26:28Speaker 5: normal power situation for another year. Can we operate on
- 26:32Speaker 5: generators temporarily? That's something that we'd kind of like to avoid,
- 26:37Speaker 5: just a full data center with potentially dozens or hundreds
- 26:42Speaker 5: of generators operating on a regular continual basis. The other
- 26:46Speaker 5: thing that we have in there is just kind of
- 26:48Speaker 5: the schedule for maintenance. We do include a little bit
- 26:50Speaker 5: of constraints, Mostly just Monday through Friday. But we are
- 26:55Speaker 5: encouraging them to submit what their schedule is before y'all.
- 27:00Speaker 5: And that can be kind of one of those things
- 27:01Speaker 5: that hopefully they negotiate with those neighboring property owners to
- 27:04Speaker 5: kind of come up with what best times would be.
- 27:08Speaker 5: And that can be something that y'all can kind of
- 27:10Speaker 5: verify and discuss and potentially look to change as it
- 27:13Speaker 5: comes before y'all of when those particular best times would be.
- 27:17Speaker 5: Have y'all talked to neighboring property owners about when those
- 27:20Speaker 5: best times would be because that would probably be the
- 27:22Speaker 5: best way to go about it. Vibration is another concern
- 27:31Speaker 5: that we've kind of learned in our research from data
- 27:34Speaker 5: centers specifically. And a lot of this is going to
- 27:37Speaker 5: be very similar to how we've set up noise. We
- 27:39Speaker 5: do have a hard limit of two inches per second
- 27:43Speaker 5: at the property line, and then a study submitted along
- 27:47Speaker 5: with the application, and then enforcement kind of works the
- 27:50Speaker 5: same way, that after it's built, we get complaints.
- 27:55Speaker 11: We can go out, try to verify that.
- 27:56Speaker 5: And then potentially require more studies from third-party engineers to confirm.
- 28:03Speaker 5: Lighting for the most part is going to be really
- 28:07Speaker 5: quite similar to what we already have in the ordinance.
- 28:09Speaker 5: We did just kind of add in some particulars to
- 28:15Speaker 5: the ordinance for this, just a maximum height in vehicular areas.
- 28:24Speaker 5: The general gist of our lighting ordinance generally and here
- 28:28Speaker 5: is mostly we don't want extra light flooding into neighboring
- 28:31Speaker 5: property owners. So we've already got in there that they're
- 28:34Speaker 5: going to have to have cut off light fixtures. You
- 28:36Speaker 5: can't have open light that just goes anywhere. They do
- 28:39Speaker 5: have to be cut off, pointed down. They do have
- 28:42Speaker 5: to not flood on the neighboring property owners. They will
- 28:48Speaker 5: have to submit a lighting plan, things like that. Here's
- 28:52Speaker 5: another one that's a little specific to data centers, and
- 28:56Speaker 5: that's going to be electrical usage and capacity. We have
- 29:00Speaker 5: a good bit of constraints here because Where they get
- 29:03Speaker 5: power from ultimately comes from Duke. Counties are a little
- 29:06Speaker 5: bit constrained in our authority to kind of like regulate
- 29:09Speaker 5: that a little bit. So our main approach here is
- 29:12Speaker 5: mostly to get information from them through that rezoning process.
- 29:17Speaker 5: So included in the application, they'll be providing mostly just
- 29:22Speaker 5: kind of basic information. What are their electrical demands going
- 29:24Speaker 5: to be generally? What are they expecting them to be
- 29:27Speaker 5: during peak hours, low hours, things like that? And then
- 29:33Speaker 5: Trying to get some sort of preliminary sign off from
- 29:37Speaker 5: their energy provider of do they think they're going to
- 29:41Speaker 5: have capacity for this and then oftentimes for large projects
- 29:48Speaker 5: which these likely will be my understanding with you know
- 29:52Speaker 5: companies like Duke for a project of larger sizes they
- 29:56Speaker 5: might have to go through a very lengthy process called
- 29:58Speaker 5: a large load study So that can be something that
- 30:06Speaker 5: we can just kind of ask of, you know, are
- 30:10Speaker 5: you needed to have a large-load study? Where are you
- 30:14Speaker 5: at in that process if it has been completed at
- 30:16Speaker 5: this point?
- 30:18Speaker 4: You know.
- 30:20Speaker 5: What kind of information are you able to share at
- 30:23Speaker 5: that point in regards to that large load study? So again,
- 30:27Speaker 5: mostly on the electrical demand, because it's a little weird
- 30:30Speaker 5: with the, it's all kind of a third party situation.
- 30:35Speaker 5: It's mostly going to be information basically for y'all because
- 30:38Speaker 5: we're probably inevitably going to get a lot of questions about,
- 30:42Speaker 5: you know, what is their electrical demands, things like that.
- 30:45Speaker 5: So a lot of this is to put information into
- 30:47Speaker 5: y'all's hands while y'all make a decision. So some of
- 30:52Speaker 5: water is going to be a little bit the same way.
- 30:57Speaker 5: So they're going to be showing some information, like how
- 31:02Speaker 5: is your water going to be coming through?
- 31:06Speaker 11: Can they get.
- 31:08Speaker 5: Verification preliminarily for their capacity from their water provider? Oftentimes
- 31:13Speaker 5: that's going to be us, I would imagine, since we
- 31:16Speaker 5: are a water provider ourselves. But there's also other companies
- 31:20Speaker 5: as well, like Dan River. and then also if their
- 31:23Speaker 5: usage is over 10,000 gallons a day, they're essentially required
- 31:26Speaker 5: to include a lot more information. Kind of the reason
- 31:30Speaker 5: for kind of that is we are, and this is
- 31:34Speaker 5: where we get a little bit into the cooling system
- 31:36Speaker 5: aspect of it that's kind of specific to data centers,
- 31:38Speaker 5: I mean, as well as other manufacturing and things like that.
- 31:43Speaker 5: The three main types of cooling systems, there is air-cooled,
- 31:48Speaker 5: there is the open loop, and then there.
- 31:50Speaker 11: Is the closed loop.
- 31:52Speaker 5: With air-cooled, a lot of the concern, so we are
- 31:57Speaker 5: requiring them to use just a closed-loop cooling system. With air-cooled,
- 32:03Speaker 5: a lot of the concerns there is predominantly noise. Most
- 32:09Speaker 5: of the cooling comes from large fans, so there's noise.
- 32:13Speaker 5: There's potential concern for air quality. as well as there's
- 32:18Speaker 5: some concern for the way it impacts like heat and
- 32:21Speaker 5: temperature around the fans and around adjacent property owners. The
- 32:26Speaker 5: other one, the open loop system, those are often using
- 32:29Speaker 5: like evaporative cooling techniques. So those are the ones that
- 32:32Speaker 5: are often using large amounts of water to cool the servers.
- 32:37Speaker 5: And they're often doing things like misting water onto them
- 32:41Speaker 5: and letting it evaporate. And that's what uses quite a
- 32:43Speaker 5: bit of water. Closed loop, from my understanding is, using
- 32:48Speaker 5: a solution predominantly water with some extra things in it,
- 32:54Speaker 5: in a, in a system that cools it and then
- 32:57Speaker 5: goes back outside from the server to get cooled by
- 33:01Speaker 5: the air, but not using a fan system. So these
- 33:07Speaker 5: typically there's once they put that in the system, there's
- 33:11Speaker 5: really no need to ever top it off to add more.
- 33:15Speaker 5: They're very low intensity in regards to their water usage.
- 33:19Speaker 5: So we're requiring that off the bat, and that's kind
- 33:22Speaker 5: of why hopefully the rest of the 10,000 gallons per
- 33:25Speaker 5: day aspect hopefully won't even come into effect. But if
- 33:29Speaker 5: it does, that's when we just kind of like require
- 33:31Speaker 5: some more information of what is your water usage actually
- 33:34Speaker 5: going to be? Do you have plans to mitigate that
- 33:37Speaker 5: and things like that? Here we've got discontinuation of use.
- 33:45Speaker 5: otherwise like decommissioning plans. This is something that we already
- 33:50Speaker 5: kind of have in the ordinance for other uses like
- 33:52Speaker 5: cell towers, solar farms, things of that nature, that when
- 33:56Speaker 5: the use has been discontinued, say they are not using
- 34:00Speaker 5: this as a facility anymore, but there's still equipment inside
- 34:03Speaker 5: of it. Perhaps the the applicant or property owner was
- 34:09Speaker 5: negligent in cleaning it up and things like that.
- 34:14Speaker 11: First, they're requiring.
- 34:17Speaker 5: A plan to how are they going to actually remove
- 34:21Speaker 5: all that equipment, how are they going to restore the site.
- 34:25Speaker 5: That's going to be included as part of the application.
- 34:28Speaker 5: And then before zoning permits are ever issued, they're also
- 34:33Speaker 5: putting up a financial guarantee.
- 34:35Speaker 11: And essentially....
- 34:37Speaker 5: That financial guarantee, whether that's with a bond, a letter
- 34:40Speaker 5: of credit, that's kind of given to the county, remains
- 34:44Speaker 5: open for the life of the facility. If for whatever
- 34:47Speaker 5: reason it's not, we can get into enforcement action. And
- 34:53Speaker 5: mostly the way that works is there's a multiplier of 1.25
- 34:59Speaker 5: times the estimated decommissioning cost minus basically scrap value. or $ 75, 000,
- 35:09Speaker 5: whichever one is going to be greater. No matter what,
- 35:12Speaker 5: they have to put up $ 75, 000 for decommissioning. Then if
- 35:17Speaker 5: it's a much larger facility, it's going to take quite
- 35:19Speaker 5: a bit of money to get it back to its
- 35:21Speaker 5: original state. That's when it potentially goes more based on
- 35:26Speaker 5: that 1.25 times number.
- 35:28Speaker 2: What do you mean by original state?
- 35:30Speaker 5: Mostly get the equipment specifically out. It wouldn't necessarily be
- 35:36Speaker 5: the structure itself because that would be quite common to have.
- 35:40Speaker 5: That would be something that probably would be generally valuable
- 35:43Speaker 5: as maybe another use wants to come in there and
- 35:47Speaker 5: utilize that structure. Any of the equipment, the servers in particular, generators,
- 35:57Speaker 5: the systems for cooling and things like that, potential Particularly
- 36:04Speaker 5: if they're outside, there's potential over long-term, after it's ceased operations,
- 36:16Speaker 5: that it could lead to general unsafe practices and have
- 36:24Speaker 5: negative externalities. So that's kind of mainly what that's focused on.
- 36:28Speaker 5: It's going to be more like the outside equipment and
- 36:30Speaker 5: things like that. Lastly, we have two things here. As
- 36:37Speaker 5: far as traffic and access, the more we thought about it,
- 36:40Speaker 5: the more and looked into it and researched, there really
- 36:46Speaker 5: wasn't going to be too much in regards.
- 36:48Speaker 11: To this particular use as far as traffic.
- 36:51Speaker 5: Potentially could be kind of up front in regards to construction,
- 36:55Speaker 5: but once the facility is up and operating for the
- 36:58Speaker 5: most part, They're fairly low traffic uses, especially when compared
- 37:03Speaker 5: to other industrial uses like manufacturing and things of that nature.
- 37:08Speaker 5: So we went a little light here, mostly just requiring
- 37:10Speaker 5: that they're coming off of a public street and then
- 37:13Speaker 5: if there's any kind of improvements that need to be
- 37:15Speaker 5: made for like construction management traffic and things like that,
- 37:19Speaker 5: that we kind of have open flexibility to do that.
- 37:24Speaker 5: And then lastly, we have the high impact use classification.
- 37:28Speaker 5: This is kind of what I was talking about a
- 37:30Speaker 5: little bit before in regards to setbacks. So basically if
- 37:33Speaker 5: it meets any of these three criteria, if it's over
- 37:36Speaker 5: a hundred thousand square feet and growth floor area, if
- 37:39Speaker 5: it's over a hundred megawatts or if its own substation
- 37:42Speaker 5: is needed, if it hits any one of those three
- 37:44Speaker 5: or any of them together, it triggers its classification as a,
- 37:50Speaker 5: what's called a class three in the high impact use.
- 37:53Speaker 5: This is something that's already in our ordinance. And I've
- 37:56Speaker 5: got here, just for reference, this is not part of
- 37:58Speaker 5: the text amendment. This is already part of the ordinance.
- 38:02Speaker 5: But as you can see, that first bit is kind
- 38:05Speaker 5: of going and defining what's called a protected facility. So
- 38:10Speaker 5: it has additional setbacks from protected facilities. And as you
- 38:14Speaker 5: can see, it includes a whole host of different things
- 38:17Speaker 5: from nursing homes, medical centers, places of worship, and single-family,
- 38:23Speaker 5: multifamily dwelling units. Um, so with class three, it's set
- 38:29Speaker 5: back from the property line doesn't actually change. It's 200
- 38:32Speaker 5: across the board, but with class three, it does increase.
- 38:36Speaker 5: We have a 500 setback from a residential lot. This
- 38:40Speaker 5: increases it to 1000 and it's not just from residential zoning.
- 38:46Speaker 5: It is the actual structures themselves at this point. Um,
- 38:51Speaker 5: so that's just essentially if it gets to a certain size,
- 38:53Speaker 5: to a certain scale, um, we then kind of get
- 38:57Speaker 5: triggered into increasing some of those setback requirements.
- 39:01Speaker 11: And I think that is it. So if y'all have
- 39:05Speaker 11: any questions.
- 39:08Speaker 10: Adam?
- 39:10Speaker 6: Are we constrained by statute to these figures here?
- 39:16Speaker 11: In regards to setbacks?
- 39:17Speaker 10: Yeah.
- 39:19Speaker 11: Not necessarily.
- 39:20Speaker 5: I mean, we're certainly constrained by statute in a whole
- 39:23Speaker 5: number of ways, generally and as it relates to this.
- 39:27Speaker 5: But specifically for setbacks, I mean, we could. theoretically make
- 39:31Speaker 5: them whatever we want.
- 39:33Speaker 8: Generally.
- 39:34Speaker 11: I don't.
- 39:34Speaker 6: Like that 200-foot figure at all. Just generally.
- 39:38Speaker 11: Property line?
- 39:39Speaker 8: Yeah.
- 39:40Speaker 5: I mean, that can be something that y'all maybe think
- 39:43Speaker 5: about and consider potentially increasing. we could bump it up
- 39:50Speaker 5: into a different class category as well. Bunch of different
- 39:54Speaker 5: ways that we could potentially go about that if that's
- 39:57Speaker 5: something that gives you heartburn.
- 39:58Speaker 2: Okay.
- 40:00Speaker 1: Can you note that one? Let's come back to it.
- 40:03Speaker 1: I think probably the best way to proceed is, since
- 40:09Speaker 1: this is draft language, Let us go ahead and get
- 40:13Speaker 1: our questions out, and then we'll mark them if we
- 40:17Speaker 1: need to tweak language.
- 40:23Speaker 3: Whoever wants to go first is fine.
- 40:28Speaker 8: I have a couple.
- 40:29Speaker 12: I had a little bit of time to research on
- 40:33Speaker 12: a few things, but the noise... I noticed that a
- 40:37Speaker 12: lot of the counties, because we're in a rural area,
- 40:40Speaker 12: so if we were talking about putting this in industrial
- 40:42Speaker 12: area in Greensboro, I think 60 decibels is doable because
- 40:48Speaker 12: you already have so much noise, it kind of bleeds
- 40:50Speaker 12: it out. But in the rural areas, I noticed the
- 40:52Speaker 12: counties usually put it around 40 to 45. And even then,
- 40:57Speaker 12: neighbors still kind of complain about at night being able
- 41:00Speaker 12: to Open up doors and windows at that 60 decibel.
- 41:09Speaker 12: So I noticed like Kent County and a couple others,
- 41:11Speaker 12: they're more around 40 with some larger setbacks.
- 41:20Speaker 5: In regards to noise, and again, I'm not, super like
- 41:25Speaker 5: a super good expert on explaining exactly kind of, so
- 41:28Speaker 5: I do know it's kind of a multiplier kind of effect.
- 41:31Speaker 5: So when you go from like 50 to 55, uh,
- 41:35Speaker 5: that's not just like a small increase. That's actually like
- 41:38Speaker 5: a large multiplier of what, what sound is.
- 41:42Speaker 8: Right.
- 41:42Speaker 5: Um, so those are going to be fairly significant when
- 41:48Speaker 5: we're talking about just even five increments in these. Um,
- 41:52Speaker 5: in my kind of understanding, um, of what does 60
- 41:56Speaker 5: decibels kind of sound like, it would probably be about
- 41:59Speaker 5: the level of speaking that I'm at right now. So
- 42:03Speaker 5: that was something that we thought, one, was kind of
- 42:08Speaker 5: generally appropriate at a property line, and then two, just
- 42:13Speaker 5: kind of at least in our research, there were several
- 42:16Speaker 5: that were looking at like 70. And probably on the
- 42:19Speaker 5: lower end, we were seeing more, a lot along the
- 42:22Speaker 5: lines of like 50 decibels But, I mean, that's certainly
- 42:26Speaker 5: something that, you know, y'all could decide to potentially, hey,
- 42:31Speaker 5: let's bump that down a little bit.
- 42:32Speaker 1: So I just asked AI what's a reasonable outdoor noise
- 42:37Speaker 1: level for a rural neighborhood, and it's generally 55 dB
- 42:42Speaker 1: or less during the daytime and 45 dB or less
- 42:46Speaker 1: at night. So I'm thinking if we're not real sold
- 42:52Speaker 1: on the 60 dB range, then maybe we can drop
- 42:55Speaker 1: it to, like you say, to 50, because that sort
- 43:00Speaker 1: of splits the baby a little bit.
- 43:01Speaker 4: I had two things.
- 43:04Speaker 8: Yeah, of course.
- 43:04Speaker 7: The buffer is going to absorb a lot of the
- 43:07Speaker 7: sound from, because you think about it, a very dense tree.
- 43:11Speaker 7: You ever seen those reflectors on highways? The sound will
- 43:16Speaker 7: be absorbed or bounced backwards, and it's going to be
- 43:19Speaker 7: so far from the property line, a lot of that.
- 43:21Speaker 7: It'll be 60 when it's coming out at first, but
- 43:23Speaker 7: then as it propagates outward, a lot of the trees
- 43:28Speaker 7: and buildings will absorb most of that sand.
- 43:30Speaker 1: Would 50 be.
- 43:33Speaker 2: So it's already gone through the buffer.
- 43:35Speaker 11: That is true.
- 43:35Speaker 5: So it is 60 measured at the property line specifically,
- 43:38Speaker 5: but kind of to his point, I mean, most of
- 43:41Speaker 5: the time, if you're a neighboring property owner, for example, then...
- 43:47Speaker 5: you're probably not just going to be standing exactly at
- 43:50Speaker 5: your property line attempting to see what kind of noise levels.
- 43:52Speaker 11: That you get from it.
- 43:54Speaker 5: Um, so kind of like to your point about like
- 43:56Speaker 5: 55 being normal for residential areas, uh, this is still
- 43:59Speaker 5: going to be a rezoning to industrial, right? So this
- 44:02Speaker 5: is probably going to go in places that hopefully our
- 44:05Speaker 5: land use plan is calling for industrial.
- 44:08Speaker 1: There's not a lot around it anyway.
- 44:09Speaker 5: Um, I don't, I, I lean towards thinking that the
- 44:12Speaker 5: idea of expectations for being something next to something that
- 44:16Speaker 5: is classified as industrial maybe does give it at least
- 44:19Speaker 5: a little.
- 44:20Speaker 11: Bit of a bump in decibel.
- 44:25Speaker 3: And you may not know this, but what's the difference.
- 44:29Speaker 1: To the vendor or the developer between keeping your noise
- 44:35Speaker 1: level at 50 and 60? What does it require them
- 44:39Speaker 1: to do?
- 44:40Speaker 5: I mean, ultimately, I think it will really depend on
- 44:43Speaker 5: the facility and kind of where their starting place is, right?
- 44:48Speaker 5: I would think if they are using something like a
- 44:50Speaker 5: closed loop system to begin with.
- 44:54Speaker 11: Because that's already a pretty hard, fast, straightforward.
- 44:56Speaker 5: Requirement, there really shouldn't be a lot of things on
- 45:01Speaker 5: the property that generate noise except for maybe generators, which
- 45:05Speaker 5: are That.
- 45:06Speaker 1: Would be temporary anyway.
- 45:08Speaker 4: Exactly.
- 45:09Speaker 5: That's going to hopefully be very temporary situations either for maintenance.
- 45:14Speaker 5: They do have to let them run periodically throughout the week.
- 45:18Speaker 5: I've generally heard maybe like an hour. Like each generator
- 45:23Speaker 5: gets run for like an hour or so once a
- 45:25Speaker 5: week kind of thing.
- 45:26Speaker 11: And then during emergency situations.
- 45:28Speaker 1: We can drop this to 50 so that we feel
- 45:31Speaker 1: more comfortable running.
- 45:33Speaker 3: Staying within, you know, guidelines.
- 45:38Speaker 1: And it's not going to be that much of a
- 45:40Speaker 1: burden on the manufacturer or the vendor.
- 45:43Speaker 5: And if it is high, that's kind of where we
- 45:47Speaker 5: didn't put anything outside of landscape buffering generally.
- 45:51Speaker 8: Okay.
- 45:52Speaker 5: We didn't put any specific requirements like you have to
- 45:55Speaker 5: do soundproofing and stuff like that because we didn't want
- 45:57Speaker 5: to get into those weeds. We already have the hard,
- 45:59Speaker 5: fast decibel measurement at the property line. So if they
- 46:02Speaker 5: can't meet that with their facility, that's when they on
- 46:05Speaker 5: their own will then have to look into potential soundproofing
- 46:08Speaker 5: and things like that.
- 46:09Speaker 1: I don't know about y'all, but I feel pretty comfortable
- 46:11Speaker 1: dropping it to 50. Are y'all okay with that?
- 46:15Speaker 11: Definitely.
- 46:19Speaker 8: Well, is it on decibels? or sound because I'm going
- 46:24Speaker 8: to change the subject.
- 46:25Speaker 11: No, it's kind of changing it.
- 46:28Speaker 12: I know you were saying with the decibels using the
- 46:32Speaker 12: closed unit, right?
- 46:34Speaker 4: Yes.
- 46:34Speaker 12: Yes, I know it will bring down sound a little
- 46:36Speaker 12: bit because they're not using some of the bigger stuff.
- 46:38Speaker 2: Yes.
- 46:38Speaker 12: But to loop in, I mean, most of the servers,
- 46:41Speaker 12: they're going to.
- 46:41Speaker 4: Hum, right? There's just all that going in. But it is.
- 46:47Speaker 12: Kind of changing the subject. With the closed loop and
- 46:49Speaker 12: it's not... If I'm reading this correctly, we're banning air
- 46:53Speaker 12: and the rest of it.
- 46:54Speaker 1: Correct.
- 46:56Speaker 12: I agree, but then also my concern is the tradeoff
- 47:02Speaker 12: is high energy to run those closed-loop systems. So they're
- 47:06Speaker 12: going to be pulling twice the energy to run a
- 47:08Speaker 12: closed loop than they would be like open air, the evaporation.
- 47:12Speaker 5: I mean, at least in our research of it, there
- 47:15Speaker 5: wasn't huge amounts of difference in energy consumption based on
- 47:18Speaker 5: the systems. It was mostly, particularly with closed and open,
- 47:22Speaker 5: mostly a water thing.
- 47:24Speaker 12: You were trading off water for energy because you've got
- 47:27Speaker 12: to cool the water off, which is pumping it out,
- 47:31Speaker 12: pumping it back in. That's the only thing I had
- 47:36Speaker 12: a question about. Is it worth, I guess, banning the
- 47:39Speaker 12: other two to.
- 47:42Speaker 5: And to specify, from my understanding of the closed loop,
- 47:44Speaker 5: it is still kind of air-cooled.
- 47:46Speaker 11: It's just not air-cooled in the sense that they need...
- 47:49Speaker 11: That's not their only meaning.
- 47:51Speaker 5: The air-cooling is for the solution that's doing the actual
- 47:55Speaker 5: cooling of the servers. And the air-cooled, the air is
- 47:58Speaker 5: cooling the servers itself.
- 48:00Speaker 2: Yeah.
- 48:01Speaker 11: Right?
- 48:01Speaker 4: So.
- 48:02Speaker 5: With the solution in a closed loop system, it goes
- 48:06Speaker 5: outside and is air cooled, but it can be done
- 48:09Speaker 5: over the length of time. So there's not like a
- 48:12Speaker 5: huge amount of energy consumption needed for that particular aspect
- 48:16Speaker 5: of the process in comparison to the other two per se.
- 48:21Speaker 7: Direct-to-chip system, it actually doesn't use any water. It uses
- 48:25Speaker 7: a solution that they bring in and it uses no...
- 48:31Speaker 7: Until the solution is gone and they have to fill
- 48:33Speaker 7: it back up, there's no water being utilized.
- 48:35Speaker 2: It reduces the water need for the facility.
- 48:40Speaker 12: The trade-off is we're not using the water capacity, but
- 48:42Speaker 12: we are using more energy. So your energy consumption is
- 48:46Speaker 12: going to be much higher than using the other two.
- 48:48Speaker 4: Systems topic i agree with what sean's saying is addressing
- 48:52Speaker 4: we want to not be you know frivolous with our
- 48:56Speaker 4: water resources and we're not wanting to make a lot
- 49:02Speaker 4: of noise with the systems but we have two other
- 49:06Speaker 4: issues in this ordinance to address that so i feel
- 49:09Speaker 4: like we're maybe over regulating there may be some technology
- 49:11Speaker 4: that comes out later on that's is a open loop
- 49:15Speaker 4: system that's quiet and doesn't use as much water that
- 49:18Speaker 4: we're saying you can't use. I mean, If that's the
- 49:21Speaker 4: two objectives we're trying to achieve, I think we're achieving
- 49:25Speaker 4: it by the direct noise issue and the direct water issue.
- 49:31Speaker 1: Well, and two, we're answering the question because we've seen
- 49:35Speaker 1: communities get caught out because they don't have any regulations
- 49:42Speaker 1: at all.
- 49:43Speaker 3: And therefore, they're having to.
- 49:47Speaker 1: Create their vision on the fly without a good base.
- 49:56Speaker 1: And they're catching themselves in the dilemma of having to
- 50:02Speaker 1: approve maybe systems that they didn't want to do in
- 50:06Speaker 1: the first place. So what Requiring the closed-loop system. Yeah,
- 50:11Speaker 1: it's it is it's tight regulation. It's pretty tight regulation however,
- 50:17Speaker 1: if we If we start with them with the more
- 50:22Speaker 1: robust regulation then we can always back it down if
- 50:28Speaker 1: there's another technology over time. Cuz the technology will change
- 50:32Speaker 1: over time, it absolutely will. But if we set the
- 50:36Speaker 1: precedent of we're putting in place the highest standard possible
- 50:42Speaker 1: for protection, protecting our water, our resources, all the things
- 50:51Speaker 1: that we are in this county. I think we're better
- 50:55Speaker 1: off taking that attitude and moving that way than just, okay, well,
- 51:01Speaker 1: we're gonna look at everything. If we can write this
- 51:07Speaker 1: ordinance so that every type of system is considered. And
- 51:13Speaker 1: this sort of goes back to my question, it's only
- 51:16Speaker 1: closed loop. So if somebody comes in, and usually what
- 51:19Speaker 1: we do is we try our best when an application, submitted,
- 51:24Speaker 1: we try to fit that application. You do work with
- 51:28Speaker 1: the applicant to make sure that what they're asking to do,
- 51:33Speaker 1: you just don't say no automatically. This office has always
- 51:38Speaker 1: been really good at trying to craft the application and
- 51:45Speaker 1: what the use is so that it fits the UDO.
- 51:51Speaker 1: and the land use plan. So y'all have been wonderful
- 51:54Speaker 1: about that. But what this does is it will, you know,
- 51:58Speaker 1: if somebody comes in with any other system than closed loop,
- 52:01Speaker 1: it's just going to be denied, and we'll never know it, right?
- 52:04Speaker 1: You will reject the application.
- 52:08Speaker 11: Outright.
- 52:08Speaker 5: With the conditional rezoning process specifically, and we've kind of,
- 52:12Speaker 5: in a very different context, right, seeing these with subdivisions, right,
- 52:17Speaker 5: where We have particular regulations in place for subdivisions, things
- 52:21Speaker 5: like setbacks. With the conditional rezoning process, you can lift
- 52:25Speaker 5: some of those conditions on a site-specific basis.
- 52:29Speaker 11: So say a.
- 52:34Speaker 5: Data center developer were to look at our regulations and
- 52:37Speaker 5: be like, okay, this is something we want to proceed with,
- 52:40Speaker 5: but we've got this slightly different technology. I think generally
- 52:47Speaker 5: our process on this was the negative externalities on AIR
- 52:53Speaker 5: and open loop systems seem incredibly high compared to closed.
- 52:58Speaker 5: So if they want to show, come in and put
- 53:02Speaker 5: their application and request specifically, we've got this other slightly
- 53:07Speaker 5: different technology or maybe it is kind of open loop,
- 53:10Speaker 5: but this is how we're mitigating.
- 53:12Speaker 11: They can do that.
- 53:13Speaker 5: Specifically ask one of the conditions be that and then
- 53:17Speaker 5: the onus is kind of on them To show during
- 53:20Speaker 5: that rezoning process that hey, we're trying to meet the
- 53:23Speaker 5: intention of the ordinance but for the most part that
- 53:28Speaker 5: makes the general kind of going regulation to be something
- 53:33Speaker 5: that diminishes the largest things that we can think of
- 53:36Speaker 5: that have large impacts to neighboring property owners and And
- 53:40Speaker 5: then if there is something that's kind of different, a
- 53:43Speaker 5: little specific, then the applicant can be the one to
- 53:48Speaker 5: try to show that. And then if something completely revolutionary
- 53:52Speaker 5: happens in the technology of how they do this in five,
- 53:55Speaker 5: ten years, this is a very growing field with a
- 53:57Speaker 5: lot of technological improvements. Things can change. We can certainly
- 54:03Speaker 5: just revisit that aspect of the ordinance.
- 54:06Speaker 1: We're not looking to have something here that's absolutely permanent
- 54:10Speaker 1: and long-lasting, because we do know the technology will change.
- 54:14Speaker 2: This has to be flexible. We have to have the
- 54:16Speaker 2: ability to rethink this, and if we have to do
- 54:21Speaker 2: it every two years, rethink it based on the advances
- 54:24Speaker 2: in the technology.
- 54:24Speaker 5: If anything, definitely keep that in mind, because it's kind
- 54:28Speaker 5: of staff's position generally that we would like to go
- 54:30Speaker 5: ahead and try to get this in place as soon
- 54:32Speaker 5: as possible. just to make sure that we have clear
- 54:35Speaker 5: processes and regulations in place were an application to ever
- 54:39Speaker 5: come through. We have a little bit of wiggle room
- 54:42Speaker 5: in the conditional rezoning process on a site-by-site basis, and
- 54:45Speaker 5: then if we have one come through, we get a
- 54:47Speaker 5: little bit more experience. Maybe we don't get one for
- 54:51Speaker 5: two or three years and things happen, change with the field, technology,
- 54:56Speaker 5: anything like that, we can revisit it.
- 54:58Speaker 1: And to that point, Spencer, you've got a couple. Oh,
- 55:01Speaker 1: are y'all... I have.
- 55:04Speaker 8: A few points. My first, I guess, question is kind
- 55:10Speaker 8: of just how we kind of came up with some
- 55:13Speaker 8: of the determinations. Because I've looked into a bunch of
- 55:19Speaker 8: them and it's kind of a mix between light industrial,
- 55:22Speaker 8: heavy industrial. So I kind of like the aspect that's
- 55:27Speaker 8: heavy industrial. I kind of looked at some other ordinance
- 55:30Speaker 8: just to try to get an idea of what a
- 55:32Speaker 8: proper appropriate acreage would be um for instance uh another
- 55:38Speaker 8: ordinance i looked at their class three which class three
- 55:41Speaker 8: is their most strict so it'd be like our class
- 55:42Speaker 8: five um they had 40 acres and then if you
- 55:45Speaker 8: drop down to their class two it's 10 acres so
- 55:48Speaker 8: i was kind of looking at the 25 acres is
- 55:50Speaker 8: that reasonable um so i you know for me that
- 55:55Speaker 8: seems somewhere in the the middle um.
- 56:00Speaker 5: That was kind of our approach with it, too, was
- 56:02Speaker 5: we were seeing similar figures, so we decided to kind
- 56:05Speaker 5: of go in the middle a little bit with that.
- 56:07Speaker 8: Okay. I kind of am in agreeance, though, with the 200,
- 56:12Speaker 8: you know.
- 56:12Speaker 1: The 200-foot setback.
- 56:18Speaker 4: Right.
- 56:19Speaker 8: Some other things that I was looking at is, so
- 56:22Speaker 8: what if the data center comes in and says, you know,
- 56:25Speaker 8: we have a green energy initiative, So we're going to
- 56:28Speaker 8: put in solar facilities or some sort of renewable energy.
- 56:33Speaker 8: Would that mess up the zoning at all? Because some
- 56:36Speaker 8: places have different ideas of what should be zoned heavy
- 56:40Speaker 8: industrial and then if it has its own energy infrastructure,
- 56:45Speaker 8: should that be something else? That was just a question
- 56:47Speaker 8: that I just was wondering if that had been thought about.
- 56:51Speaker 8: Another one is what if it's a multi-use area and
- 56:56Speaker 8: there's a term called edge data centers. So they take
- 57:01Speaker 8: up one spot of a multi-use area. And the other
- 57:06Speaker 8: one would be like, what if it's a micro data
- 57:08Speaker 8: center and smaller scale? Obviously that would be more municipal,
- 57:13Speaker 8: more in the city, not necessarily out in the county.
- 57:16Speaker 8: But those are just some of the questions that I
- 57:18Speaker 8: had if they had been considered.
- 57:23Speaker 5: So take like the micro scale one. for example, if
- 57:28Speaker 5: it's super small, it's probably going, there is a particular
- 57:35Speaker 5: exemption in our definition of under 5,000 square feet. So
- 57:39Speaker 5: if it's at that level of size, it probably wouldn't
- 57:43Speaker 5: get counted in this, at least as it's currently written.
- 57:47Speaker 5: But if it's hitting above that in any way, shape,
- 57:50Speaker 5: or form, then that's where that minimum acreage does come in,
- 57:55Speaker 5: and then they do have to meet all of these
- 57:57Speaker 5: particular regulations. And I feel like I'm already blanking on
- 58:01Speaker 5: all of your other questions already.
- 58:04Speaker 2: So when he's talking about if they add additional renewable
- 58:08Speaker 2: energy solutions, for example, batteries and solar, stuff like that,
- 58:14Speaker 2: does that include in the 25 acres, meaning that they
- 58:18Speaker 2: wanted to build a 25-acre facility But then they wanted
- 58:22Speaker 2: to put another 25 acres in for solar. So, you know,
- 58:27Speaker 2: is the place where they're putting the solar have different
- 58:30Speaker 2: applications because our regulations are for solar farms is already defined.
- 58:35Speaker 5: So more than likely with particularly like renewable and it
- 58:39Speaker 5: will very much depend on exactly how they want to
- 58:41Speaker 5: go about it. There's nothing in here that really. says
- 58:47Speaker 5: or regulates differently when it comes to them using some
- 58:51Speaker 5: sort of renewable energy source.
- 58:52Speaker 11: In my opinion.
- 58:54Speaker 2: Classified as a substation or something like that.
- 58:56Speaker 5: No, so I mean, there's multiple different ways I can
- 58:59Speaker 5: go about something like that. I mean, they could get
- 59:02Speaker 5: their own substation, for example. And like I said, with
- 59:09Speaker 5: electrical power a lot of that's kind of out of
- 59:12Speaker 5: our own control to regulate renewable is a little bit
- 59:16Speaker 5: differently and it depends on exactly on the modem that
- 59:19Speaker 5: they end up using take solar for example often times
- 59:22Speaker 5: that we would probably just treat that as accessory to
- 59:25Speaker 5: this So all of these regulations are still going to apply.
- 59:28Speaker 5: They're still going to have to have landscape buffers, any
- 59:30Speaker 5: kind of lighting or anything like that. If they were
- 59:32Speaker 5: to do something off-site, that's probably winter. Full regulations for
- 59:37Speaker 5: solar farms are probably going to kick in, if that
- 59:40Speaker 5: makes any sense.
- 59:42Speaker 8: When they propose their plan, will it be a complete build-out?
- 59:45Speaker 8: So they would have to come back if they want
- 59:47Speaker 8: to build out further?
- 59:49Speaker 5: Yes. And I'm probably always going to encourage... if you
- 59:56Speaker 5: think that you're, and this is for anything, not just this,
- 59:58Speaker 5: if you think that you're going to expand anything down
- 1:00:01Speaker 5: in the future, go ahead. When you apply for a
- 1:00:03Speaker 5: conditional rezoning, go ahead and show everything that you think
- 1:00:06Speaker 5: you're going to do. Uh, ask for all of it
- 1:00:08Speaker 5: up front.
- 1:00:10Speaker 11: Um, kind of thing.
- 1:00:11Speaker 5: Because if they go beyond the scope of it, um,
- 1:00:17Speaker 5: in conditional rezoning, our, our processes, we go over like
- 1:00:20Speaker 5: 10% of the square footage.
- 1:00:22Speaker 11: Of what was approved.
- 1:00:22Speaker 5: So they do, say, easy math, 100,000 square foot facility.
- 1:00:27Speaker 5: If they do anything more than 110,000 square feet, they
- 1:00:31Speaker 5: have to go back through this process for conditional rezoning.
- 1:00:36Speaker 8: Last one. So if there's additional equipment, I see, I
- 1:00:41Speaker 8: understand the landscaping buffer would be pushed out. Would that
- 1:00:46Speaker 8: also apply to the buffers or is that only the
- 1:00:48Speaker 8: building itself? Say, for instance, they had generators that were
- 1:00:55Speaker 8: offset from the building. Would the buffer then go from
- 1:00:58Speaker 8: the generators, or would it be... And same thing, say
- 1:01:01Speaker 8: if they had a cooling system that went out, would
- 1:01:04Speaker 8: the buffer be from the end of the cooling system,
- 1:01:07Speaker 8: or would it be from the building itself?
- 1:01:08Speaker 5: A secondary buffer is intended for outside storage of equipment.
- 1:01:12Speaker 5: So if they had generators, they had cooling systems that's
- 1:01:15Speaker 5: not internal to the building, but stand alone off from
- 1:01:19Speaker 5: the structure. that's when a secondary ring of a 15-foot
- 1:01:24Speaker 5: buffer would be required around that, if that makes sense.
- 1:01:28Speaker 8: A 15-foot buffer, is that just the building itself?
- 1:01:33Speaker 5: Oh, you're talking about for setbacks? For setbacks, yes. So
- 1:01:37Speaker 5: for setbacks, that would include accessory.
- 1:01:39Speaker 1: Okay.
- 1:01:40Speaker 2: Everything, generators and whatever, the structure of the building and
- 1:01:46Speaker 2: everything all around it, all have to be included in that,
- 1:01:49Speaker 2: then you have the buffers.
- 1:01:59Speaker 4: Okay, are you ready?
- 1:02:00Speaker 11: Okay, just five more to go. Get your pencil warmed up.
- 1:02:06Speaker 6: I'm going to go page by page here and just
- 1:02:12Speaker 6: I'll give you the section number on the page and
- 1:02:15Speaker 6: so you can look at the language there and pencil
- 1:02:18Speaker 6: that in minimize adverse impacts associated with noise vibration so
- 1:02:23Speaker 6: so and so so and so forth protected adjacent residential
- 1:02:27Speaker 6: neighborhoods I would would feel better with some language in
- 1:02:32Speaker 6: there that was about protecting an endangered wild endangered or
- 1:02:39Speaker 6: protected species or other natural elements in the environment that
- 1:02:44Speaker 6: may be of some particular Economic or social interest.
- 1:02:51Speaker 5: Okay There is language under B for environmentally sensitive areas
- 1:02:59Speaker 5: If that helps and to be fair at least in
- 1:03:01Speaker 5: this particular, I don't I don't see this as very
- 1:03:04Speaker 5: like hard regulations This.
- 1:03:05Speaker 6: Really knows why I'm putting it what I'm putting that
- 1:03:08Speaker 6: in there so that we don't we're saving time later
- 1:03:11Speaker 6: on arguing over protecting tree frogs and owls and stuff
- 1:03:17Speaker 6: like that.
- 1:03:19Speaker 5: Most of that is going to be handled by state
- 1:03:22Speaker 5: and federal agencies anyway, for the most part.
- 1:03:25Speaker 8: I mean, I think we can go.
- 1:03:29Speaker 5: Fairly general in regards to our language there, for the
- 1:03:32Speaker 5: most part, is what I'm trying to say.
- 1:03:33Speaker 8: All right.
- 1:03:34Speaker 2: One of the things I think we have to remember
- 1:03:35Speaker 2: is we're deciding about zoning.
- 1:03:38Speaker 1: Right.
- 1:03:38Speaker 2: And we're not establishing regulations yet. Around all the.
- 1:03:42Speaker 5: Stuff like wildlife is really kind of out of our
- 1:03:44Speaker 5: purview for the most part I mean there are other
- 1:03:47Speaker 5: agencies that handle that so if they do end up
- 1:03:49Speaker 5: disturbing some sort of Wildlife habitat or something those agencies
- 1:03:53Speaker 5: would kick in at that point.
- 1:03:54Speaker 2: The only ones that are talking about a permit There's
- 1:03:57Speaker 2: other permits that they have.
- 1:03:58Speaker 1: But could we? You know environmentally sensitive areas That doesn't
- 1:04:08Speaker 1: exactly include things that could have an impact.
- 1:04:14Speaker 3: Like if.
- 1:04:18Speaker 1: The noise and vibration are going to cause the barn
- 1:04:20Speaker 1: owls to leave, that is the environmentally sensitive area, isn't it?
- 1:04:26Speaker 11: If habitat is an environmental sensitive area. That's correct.
- 1:04:29Speaker 1: This isn't really regulation. This is really just to get a.
- 1:04:35Speaker 5: General gist of like What are we trying to do here?
- 1:04:43Speaker 5: So it helps with interpretation a little bit later on.
- 1:04:47Speaker 5: If there is, I mean, it's written by a human hand.
- 1:04:50Speaker 5: There's always going to be, and read by other humans,
- 1:04:53Speaker 5: there's always going to be possibilities of different interpretation. This
- 1:04:57Speaker 5: can hopefully help kind of.
- 1:04:58Speaker 11: Clarify interpretation a little bit.
- 1:05:01Speaker 3: But in the ordinance, we've given.
- 1:05:02Speaker 1: A nod to concerns that people may have about Whatever,
- 1:05:10Speaker 1: whatever thing.
- 1:05:11Speaker 2: But trying to get that definitively would be impossible to
- 1:05:17Speaker 2: do because, you know, well, I got a barn owl. Well,
- 1:05:22Speaker 2: I mean, the noise around my house doesn't stop the deer.
- 1:05:24Speaker 7: So, I mean, that's... That's good, then.
- 1:05:29Speaker 11: All right, thank you.
- 1:05:30Speaker 6: Page 3, Section B. Potable water is used only to
- 1:05:36Speaker 6: initiate the system or to replace incidental losses. Could we
- 1:05:41Speaker 6: have some kind of a stop-loss language on there to
- 1:05:46Speaker 6: say what's a... You know, we go back there and
- 1:05:48Speaker 6: find their water's been running 24-7. You know, we don't
- 1:05:55Speaker 6: want to do that.
- 1:05:57Speaker 11: I'm not sure. What is an incidental loss?
- 1:06:01Speaker 5: So that would be like a spill. So like in
- 1:06:03Speaker 5: a closed-loop system... like I said, they're usually doing some
- 1:06:07Speaker 5: sort of a solution, right? That's what's doing the actual
- 1:06:11Speaker 5: cooling of the servers. So it's probably predominantly water, but
- 1:06:14Speaker 5: there's maybe like other substance like propylene glycol or something
- 1:06:18Speaker 5: like that. So that's in the system. And hopefully none
- 1:06:22Speaker 5: of that ever needs to come out of the system.
- 1:06:24Speaker 5: It's like oil that runs through your car, but they
- 1:06:27Speaker 5: don't even need to change the oil on something like this.
- 1:06:30Speaker 5: So that incidental loss would be like And this is
- 1:06:33Speaker 5: something I'm sure the data center, this would be like
- 1:06:35Speaker 5: a disaster scenario for them kind of thing. If for
- 1:06:38Speaker 5: whatever reason there was a breach, there was a leak
- 1:06:41Speaker 5: kind of thing in that system, the only time you're
- 1:06:45Speaker 5: really using any type of potable water sources to potentially
- 1:06:48Speaker 5: refill that system in the case of either starting the
- 1:06:51Speaker 5: system off or in the case of instant leak or
- 1:06:54Speaker 5: something along those lines.
- 1:06:55Speaker 4: All right, thank you.
- 1:06:57Speaker 11: Page four, item C.
- 1:06:59Speaker 6: Number four, water usage and capacity verification even in severe
- 1:07:05Speaker 6: drought conditions. The word drought conditions doesn't appear there.
- 1:07:10Speaker 4: I think it should.
- 1:07:12Speaker 11: You said under C for water usage and capacity verification?
- 1:07:16Speaker 6: We're in drought conditions now.
- 1:07:19Speaker 1: Isn't that part of the report that they would need
- 1:07:22Speaker 1: to project water usage and capacity verification even during drought conditions?
- 1:07:29Speaker 4: Yeah.
- 1:07:29Speaker 5: So what, what this, this is just generally, Hey, if you,
- 1:07:34Speaker 5: if you hit the requirement to need this additional information
- 1:07:37Speaker 5: to be submitted with the application that at least in
- 1:07:39Speaker 5: this section, that's all that's saying is you need to
- 1:07:42Speaker 5: include that water usage information, either preliminary approval stuff along those,
- 1:07:46Speaker 5: whatever the requirements are. Um, so there are, if it's
- 1:07:50Speaker 5: utilizing a good amount of water back kind of in
- 1:07:53Speaker 5: the section on water usage, it is talking about, you know, um,
- 1:07:58Speaker 5: what are all your water consumption timetables going to be?
- 1:08:03Speaker 5: What are your leak protection? What are your water reuse
- 1:08:07Speaker 5: methods and things like that? So I would imagine that
- 1:08:10Speaker 5: would definitely kind of get included in an analysis of
- 1:08:14Speaker 5: what their water usage is.
- 1:08:15Speaker 11: Going to be now. What is it going to be estimated?
- 1:08:18Speaker 11: What is it going to be during different types of conditions?
- 1:08:21Speaker 2: All right, that's good.
- 1:08:23Speaker 11: Thank you.
- 1:08:23Speaker 6: I want to We've already handled the report. The meeting
- 1:08:30Speaker 6: is going to be held, and the report is going
- 1:08:33Speaker 6: to be given to you, the staff.
- 1:08:35Speaker 11: Yep, that's part of the application for you all to
- 1:08:37Speaker 11: look at.
- 1:08:38Speaker 6: So you will see that at some point.
- 1:08:41Speaker 1: Okay.
- 1:08:42Speaker 6: And I'm sorry, I'm on page five now. I'm still
- 1:08:45Speaker 6: back at 200 feet set back here. I still don't
- 1:08:48Speaker 6: like that. But you said we can deal with that, right?
- 1:08:52Speaker 11: Yeah, I mean, we can hash that out now. We can.
- 1:08:56Speaker 11: Hold off a little bit, Up to you.
- 1:09:01Speaker 1: I say we go ahead and agree on a number.
- 1:09:06Speaker 11: Okay.
- 1:09:07Speaker 2: We've already agreed on the 50, right?
- 1:09:09Speaker 1: Mm-hmm.
- 1:09:10Speaker 2: 50 decibels.
- 1:09:11Speaker 1: Yes. Yep, we did that. So if we don't like 200...
- 1:09:18Speaker 1: What are some suggestions?
- 1:09:21Speaker 11: We're getting into an auction here. Do I hear 300?
- 1:09:23Speaker 11: Do I hear 400?
- 1:09:25Speaker 1: Well, so what's the difference?
- 1:09:26Speaker 3: What would the difference say if.
- 1:09:31Speaker 1: We had a 500-foot setback?
- 1:09:38Speaker 3: What would be the difference between two and five?
- 1:09:42Speaker 11: About 300 feet.
- 1:09:45Speaker 1: I'm looking for.
- 1:09:48Speaker 3: That's not the.
- 1:09:49Speaker 11: Answer I'm looking for.
- 1:09:53Speaker 1: It's been a long day already.
- 1:09:54Speaker 5: I'm with the setbacks that there is the 500 on residential, right?
- 1:09:59Speaker 5: So if it's next to anything residential at all, that's RA,
- 1:10:03Speaker 5: that's RP, that's RN.
- 1:10:06Speaker 11: It is 500 foot on that. Okay.
- 1:10:08Speaker 5: So we're talking 200 feet from something that's zoned commercial
- 1:10:11Speaker 5: or industrial.
- 1:10:12Speaker 12: Yeah.
- 1:10:12Speaker 2: So I'm a dollar general.
- 1:10:15Speaker 8: And the verbiage to put non-residential or is any lot
- 1:10:19Speaker 8: kind of better?
- 1:10:21Speaker 1: So the poor people going to the Dollar General do
- 1:10:23Speaker 1: not get the benefit of that 300 feet.
- 1:10:24Speaker 5: The fact that we've specified for residential in that other
- 1:10:26Speaker 5: setback kind of does that work for us?
- 1:10:30Speaker 4: When we were talking about that, I maybe got the
- 1:10:32Speaker 4: impression incorrectly, but I thought it was only if it
- 1:10:34Speaker 4: was a certain size that that kicked in.
- 1:10:40Speaker 8: The 200 setback is also in the high impact.
- 1:10:43Speaker 11: Yeah, you're talking the high impact use.
- 1:10:45Speaker 4: Yes.
- 1:10:45Speaker 5: So these here on page five are the setbacks across
- 1:10:51Speaker 5: the board.
- 1:10:52Speaker 1: The general ones.
- 1:10:53Speaker 11: The general ones.
- 1:10:54Speaker 5: And then if it is a certain size, it does
- 1:10:57Speaker 5: get kicked up more from those. And this is something
- 1:11:00Speaker 5: that's already in our language or in our ordinance, but
- 1:11:04Speaker 5: it does it from protected facilities. So that's where it
- 1:11:06Speaker 5: gets into details about, like, dwellings, hospitals, churches, things like that.
- 1:11:12Speaker 4: Well, let's just say we have something that's not zoned
- 1:11:16Speaker 4: that way, but there is a house or a church
- 1:11:18Speaker 4: on it. Will it still apply? Because this is just
- 1:11:23Speaker 4: a residential zoning district.
- 1:11:25Speaker 11: Correct.
- 1:11:26Speaker 5: So if, say you had a home in an industrially
- 1:11:30Speaker 5: zoned district, one, that would be a non-conforming use. So
- 1:11:36Speaker 5: typically homes are not permitted.
- 1:11:39Speaker 11: in.
- 1:11:39Speaker 5: Industrially zoned properties. So someone has intentionally done that to
- 1:11:43Speaker 5: their property, has a home, and then at some point
- 1:11:46Speaker 5: requested their property to get rezoned, more.
- 1:11:49Speaker 11: Than likely, to get that.
- 1:11:53Speaker 5: Churches, for the most part, they are in residentially zoned properties.
- 1:11:57Speaker 5: They are permitted a little bit more across the board.
- 1:12:00Speaker 5: I'm actually not sure off the top of my head.
- 1:12:03Speaker 5: Are churches permitted... In commercial and industrial? I'm pretty sure commercial,
- 1:12:09Speaker 5: but I don't think industrial.
- 1:12:11Speaker 7: I just wanted to say one thing about y'all stone decibels.
- 1:12:15Speaker 7: This is from my college days. When you go from
- 1:12:17Speaker 7: 60 to 50, you're reducing the sound by 90%. It's
- 1:12:22Speaker 7: really like mathematically, because it's a logarithmic function, that is a,
- 1:12:28Speaker 7: it's going to be really, really, really hard mathematically for
- 1:12:31Speaker 7: them to get it, because you're reducing it 90%. That's
- 1:12:34Speaker 7: what he was talking about earlier. Like, it is very
- 1:12:37Speaker 7: hard to reduce it that much. Because you're going from, like,
- 1:12:40Speaker 7: I'm currently talking at 70 decibels to mic. Now I'm
- 1:12:44Speaker 7: at 50. If you were to, I mean, 60. If
- 1:12:47Speaker 7: you were down to 50, it's like, it's a 90%
- 1:12:50Speaker 7: reduction in the noise.
- 1:12:51Speaker 5: Yeah, that is a good point. I didn't have that
- 1:12:53Speaker 5: particular percentage off the top of my head.
- 1:12:57Speaker 12: To the lot line, correct?
- 1:12:59Speaker 4: So.
- 1:13:00Speaker 11: Yeah, it's measured at the lot line.
- 1:13:01Speaker 4: All right, so.
- 1:13:03Speaker 12: I mean, the 200 in industrial, 200 I kind of
- 1:13:07Speaker 12: agree with. But if you increase residential to 750 to 1,000,
- 1:13:13Speaker 12: I think you should state residential and agriculture. If you're
- 1:13:16Speaker 12: setting those setbacks, 750 to 100, then if they're at
- 1:13:21Speaker 12: the facility at 60 decibels, with also increasing that landscape buffer,
- 1:13:27Speaker 12: I think.
- 1:13:28Speaker 4: Then, I mean, I don't think you have a problem
- 1:13:30Speaker 4: meeting that 50 decibels.
- 1:13:34Speaker 5: That's actually one thing that we've kind of generally had
- 1:13:37Speaker 5: conversations about in regards to the high-intensity portion of it
- 1:13:41Speaker 5: is perhaps it would just kind of be cleaner to
- 1:13:45Speaker 5: just take out that high-intensity portion. Because that way you
- 1:13:48Speaker 5: have this weird kind of tiered approach of, okay, you've
- 1:13:52Speaker 5: got this normally, and then you hit this certain thing,
- 1:13:54Speaker 5: and you get hit with different setbacks, and it's slightly
- 1:13:57Speaker 5: different how it's calculated.
- 1:13:59Speaker 11: I'd rather go ahead.
- 1:14:00Speaker 3: The conversation was just.
- 1:14:01Speaker 5: To take that out, and then maybe we just look
- 1:14:03Speaker 5: at increasing setbacks generally or just reexamine them.
- 1:14:05Speaker 1: I think that's the answer to this because I'm— And
- 1:14:10Speaker 1: answer me this, so there could potentially be a care
- 1:14:14Speaker 1: facility in a heavy industrial area?
- 1:14:19Speaker 11: I don't know off the top of my head about
- 1:14:20Speaker 11: a care facility specifically. I doubt it. I don't think
- 1:14:24Speaker 11: they're permitted.
- 1:14:25Speaker 3: Or a daycare center.
- 1:14:26Speaker 1: I know that daycare centers exist in industrial.
- 1:14:28Speaker 11: I don't think that they're permitted in industrial.
- 1:14:31Speaker 5: Whether or not there are some edge cases that there
- 1:14:34Speaker 5: is one that happens to be in industrial, again, that
- 1:14:36Speaker 5: would probably be a nonconforming use.
- 1:14:38Speaker 1: Okay.
- 1:14:39Speaker 11: All right. Take that with a grain of salt. I
- 1:14:41Speaker 11: don't know that use table off the top of my head.
- 1:14:43Speaker 2: I feel comfortable with 500.
- 1:14:44Speaker 4: Okay.
- 1:14:44Speaker 2: I'm good with that.
- 1:14:48Speaker 8: Just to kind of, again, looking at other ordinances, again,
- 1:14:53Speaker 8: going back to this is Class 3. It has a
- 1:14:55Speaker 8: 500-foot setback. Class 2, it drops to 10 acres and
- 1:14:58Speaker 8: has a 150-foot setback. It's still heavy industrial, but it's
- 1:15:02Speaker 8: just different classes. And just to kind of give an
- 1:15:05Speaker 8: idea of what their idea of the classifications, the Class
- 1:15:08Speaker 8: 3 would be like your mining, quarrying, racetracks, asphalt plants.
- 1:15:13Speaker 8: Class 2 would be like automobile salvage, storage facilities, chemical manufacturing.
- 1:15:22Speaker 7: A racetrack, I mean, you're clocking 100 decibels.
- 1:15:24Speaker 8: That's class three. That would have your 500 foot setback.
- 1:15:28Speaker 8: Another option would be instead of having minimum setback any lot,
- 1:15:31Speaker 8: if we can all get to a consensus of whether
- 1:15:35Speaker 8: or not care facilities are within the heavy industrial. You
- 1:15:41Speaker 8: could do something as like minimum setback for heavy industrial
- 1:15:45Speaker 8: or likely zone or compatibly zoned industrial facilities as 200
- 1:15:51Speaker 8: foot and then all others 500 foot. That could be
- 1:15:55Speaker 8: something that.
- 1:15:57Speaker 3: That might get complicated.
- 1:15:59Speaker 2: But what you're kind of getting at is why would
- 1:16:02Speaker 2: we have a requirement for data centers that would be
- 1:16:06Speaker 2: more egregious or tighter than we would if somebody was
- 1:16:10Speaker 2: building some other kind of manufacturing facility? I mean, one
- 1:16:16Speaker 2: of the challenges with data centers, and I'm glad you
- 1:16:19Speaker 2: talked about crypto mining and banking and stuff like that,
- 1:16:23Speaker 2: because everything you see about data centers, it's always about AI.
- 1:16:29Speaker 2: And so we have to kind of divorce ourselves from
- 1:16:32Speaker 2: the political or the strong emotional feelings people have. We're
- 1:16:39Speaker 2: sitting in here and she goes into AI and looks
- 1:16:42Speaker 2: up stuff. So You know, why, you know, should we
- 1:16:46Speaker 2: be more, have much tighter requirements for a data center
- 1:16:53Speaker 2: than we would for any kind of other manufacturing plant
- 1:16:55Speaker 2: that could generate a bunch of noise and stuff like that?
- 1:16:58Speaker 6: And, Corey, that's a great point.
- 1:16:59Speaker 5: It's like just kind of in our approach and our
- 1:17:02Speaker 5: philosophy and deal, and this is for any land use, right?
- 1:17:06Speaker 5: Not just for this, but that is exactly kind of
- 1:17:08Speaker 5: a huge part of our approach for exactly that is
- 1:17:12Speaker 5: we do, different uses can have different characteristics, right?
- 1:17:17Speaker 11: And we, if they have negative.
- 1:17:19Speaker 5: Impacts on property owners that are specific to that use,
- 1:17:22Speaker 5: we want to address those. And that's where we get
- 1:17:24Speaker 5: super specific, but we don't necessarily want to single out
- 1:17:27Speaker 5: a particular use.
- 1:17:29Speaker 11: If it fits in a general kind.
- 1:17:31Speaker 5: Of like industrial category or a commercial category, we don't
- 1:17:34Speaker 5: want to just arbitrarily and capriciously, um, regulate a particular
- 1:17:40Speaker 5: thing so far outside of the bounds of how we're
- 1:17:42Speaker 5: treating other similar type uses.
- 1:17:44Speaker 11: We can address the specific things.
- 1:17:47Speaker 2: We put a 50 decibel limit on an asphalt.
- 1:17:50Speaker 3: But we do.
- 1:17:54Speaker 7: This thing.
- 1:17:54Speaker 11: That's always an important fine line to consider.
- 1:17:57Speaker 1: This thing is so new and we've seen how it
- 1:18:01Speaker 1: has caused community problems community impacts that That I would
- 1:18:08Speaker 1: rather out of the gate Give us a little bit
- 1:18:12Speaker 1: more regulation and we can always come back and if
- 1:18:16Speaker 1: you know if we get applications and people are not
- 1:18:20Speaker 1: and and the applicants are not able to fit any
- 1:18:23Speaker 1: of these then we should come back and go and
- 1:18:25Speaker 1: This ordinance does not serve our purpose.
- 1:18:29Speaker 2: Because our intent here is not to discourage people from
- 1:18:34Speaker 2: building data centers.
- 1:18:35Speaker 1: Or maybe it is.
- 1:18:37Speaker 2: I mean, if our intent is to discourage that business development,
- 1:18:42Speaker 2: then that's a very, and I don't think the planning
- 1:18:46Speaker 2: board has any authority for that kind of a decision.
- 1:18:49Speaker 2: That's a county constitution. issue. They need to define how
- 1:18:54Speaker 2: important it is for that type of business development in
- 1:18:57Speaker 2: our community.
- 1:18:59Speaker 1: But if we want to manage something that a technology
- 1:19:04Speaker 1: and an industry that is so new and so.
- 1:19:11Speaker 3: Has already had.
- 1:19:12Speaker 1: Impact in other communities. I think we want to make
- 1:19:17Speaker 1: sure that we're not being cavalier about it.
- 1:19:24Speaker 2: And I agree, but I'm wondering how many of those
- 1:19:26Speaker 2: communities are having problems because they didn't have the regulations
- 1:19:31Speaker 2: well thought out in place already, and it kind of snuck.
- 1:19:35Speaker 8: Up on them.
- 1:19:35Speaker 11: And that is the case.
- 1:19:36Speaker 2: And it snuck up on them. In this case, you know, we,
- 1:19:39Speaker 2: you know, We're being very proactive here, and I think
- 1:19:43Speaker 2: we have an opportunity to say, well, you know, so
- 1:19:46Speaker 2: let's set a standard that we'd like that we can
- 1:19:49Speaker 2: all agree on, and I think we got a pretty
- 1:19:52Speaker 2: good link here.
- 1:19:53Speaker 3: I do like the 500.
- 1:19:54Speaker 1: I personally like the 500 feet. I think that gives us.
- 1:20:00Speaker 4: Some.
- 1:20:01Speaker 1: Do we want to do 50 and 500 feet?
- 1:20:01Speaker 2: No, I'd do one or the other.
- 1:20:07Speaker 3: I mean, yeah, no, I'm sorry.
- 1:20:09Speaker 1: I would do both. Because, like, I mean, when you
- 1:20:13Speaker 1: get that far back, they're going to comply with the
- 1:20:16Speaker 1: 50 to begin with, right?
- 1:20:20Speaker 11: When you say 50, what are we talking about?
- 1:20:23Speaker 2: Okay. We're talking about 50 decibels and 500 setbacks.
- 1:20:27Speaker 1: When you get that far back, you're going to comply
- 1:20:30Speaker 1: with it. That's not going to be difficult to comply.
- 1:20:33Speaker 8: That depends.
- 1:20:33Speaker 7: I'm just going to say mathematically, it's... I wanted 50
- 1:20:38Speaker 7: just like you actually. You can ask them.
- 1:20:40Speaker 4: We were talking.
- 1:20:41Speaker 7: I wanted 40. Seriously, but, I mean, mathematically, 70 is
- 1:20:47Speaker 7: the lowest that we've seen in our research. We're actually
- 1:20:49Speaker 7: going 90% lower than a lot of ordinances are in
- 1:20:54Speaker 7: the first place. So even going even more, it's just
- 1:20:56Speaker 7: going to be really, really hard for them to do that.
- 1:20:58Speaker 7: That's the only reason I'm trying.
- 1:20:59Speaker 4: To, you know.
- 1:21:00Speaker 1: But if the starting point is the edge... If it's
- 1:21:05Speaker 1: at the edge of the property and your setback is
- 1:21:08Speaker 1: 500 feet, I mean, do we, I don't.
- 1:21:12Speaker 8: It may not. So some of the articles that I've read,
- 1:21:16Speaker 8: one of them said don't, they actually advise doing a
- 1:21:20Speaker 8: decibel limit because 500 foot doesn't, like 500 doesn't necessarily
- 1:21:25Speaker 8: mean 500 with the sound. So like for instance, like
- 1:21:29Speaker 8: think of if you're up in the northwestern part of
- 1:21:32Speaker 8: Rockingham County, And it's hitting just right in that holler.
- 1:21:37Speaker 8: You can hear a normal conversation 1,000 feet away.
- 1:21:42Speaker 1: To your point, in Stoneville, in the fall, you can
- 1:21:46Speaker 1: hear the cars running in Martinsville.
- 1:21:48Speaker 4: Yes.
- 1:21:48Speaker 8: So some of the articles definitely advise going towards the
- 1:21:53Speaker 8: decibel limit just because in every circumstance, 500 foot does
- 1:21:57Speaker 8: not necessarily mean a reduction in sound.
- 1:21:59Speaker 2: Yeah, I would agree with that.
- 1:22:01Speaker 11: Again, it's important. This is measured at the property line, right?
- 1:22:04Speaker 5: So if the thing is generating sound 500 feet away
- 1:22:07Speaker 5: from the property line, it could be louder where it's
- 1:22:10Speaker 5: generating sound, but that's on the property, right?
- 1:22:13Speaker 11: I mean, you're.
- 1:22:14Speaker 5: Expected to make noise on your own property, right? The
- 1:22:18Speaker 5: issue is when that sound goes to other properties. At 60,
- 1:22:23Speaker 5: we're looking at a conversation like this.
- 1:22:26Speaker 7: Actually, a little lower, but yeah, like a generalized, no
- 1:22:29Speaker 7: microphone conversation.
- 1:22:30Speaker 5: Again, compare it to other uses in industrial, right? Take
- 1:22:35Speaker 5: a UPS packaging plant, for example, where you have tractor
- 1:22:39Speaker 5: trailers operating on a regular basis. I have no doubt
- 1:22:42Speaker 5: in my mind that they would be operating at a
- 1:22:43Speaker 5: higher decibel level. Onto another property line. If you were
- 1:22:48Speaker 5: a neighboring property owner, you could feasibly hear a tractor
- 1:22:52Speaker 5: trailer just idling. For example, this likely wouldn't have that
- 1:22:58Speaker 5: level of noise loudness on a regular basis. I think
- 1:23:03Speaker 5: the general issue is more the continual nature of it.
- 1:23:07Speaker 1: Right, and that's the thing that it doesn't, it won't
- 1:23:10Speaker 1: necessarily go away. It's constant.
- 1:23:12Speaker 2: We use two types of sounds. One is tonal.
- 1:23:15Speaker 1: Yes.
- 1:23:16Speaker 2: So, I mean, one of the things I've heard is
- 1:23:18Speaker 2: that there's a vibration or there's a tone that is
- 1:23:23Speaker 2: lower than we can hear that creates physical discomfort to people.
- 1:23:30Speaker 2: And is that included in the decibel limit? Because you've
- 1:23:36Speaker 2: identified tonal as a separate item.
- 1:23:37Speaker 5: It's a metric that goes off the decibel.
- 1:23:42Speaker 7: Sound has two properties. It is an amplitude and a frequency.
- 1:23:44Speaker 7: And if you read here, it talks about the C-weighted
- 1:23:47Speaker 7: and the A-weighted sound. Those are your low frequencies that
- 1:23:50Speaker 7: you're referring to. The ones where, you know, the hums
- 1:23:54Speaker 7: that for, I mean, for me, it drives me nuts
- 1:23:56Speaker 7: to hear a low frequency hum. But, I mean, if
- 1:23:59Speaker 7: you're at the property line and it's a 60 decibel frequency,
- 1:24:04Speaker 7: it's going to be very, very, very quiet compared to
- 1:24:08Speaker 7: a racetrack. Like Adam said, transfer trailers. But, yes, your
- 1:24:13Speaker 7: frequency could be different because sound has two properties, like
- 1:24:17Speaker 7: I said.
- 1:24:17Speaker 2: Yeah, because if it's running at 10 hertz, you know,
- 1:24:20Speaker 2: and it's loud, and a decibel meter may not pick
- 1:24:24Speaker 2: that up, would it?
- 1:24:25Speaker 1: Okay. So are we– we're kind of going round and
- 1:24:30Speaker 1: round here.
- 1:24:30Speaker 10: Wait, let me ask a question. Can you go back
- 1:24:34Speaker 10: and reiterate a little bit why you decided on 200 feet?
- 1:24:38Speaker 10: I think if I remember, you said you looked at
- 1:24:41Speaker 10: some that were more and some that were less, and
- 1:24:42Speaker 10: you kind of fell in the middle.
- 1:24:44Speaker 11: That's pretty much the case with the 200 feet.
- 1:24:46Speaker 8: I actually have an article right here, too. Like Fairfax County,
- 1:24:49Speaker 8: there's this 200 feet. So obviously, this is definitely a
- 1:24:53Speaker 8: more populated county. But going back to the point earlier,
- 1:24:57Speaker 8: and I think this was a good point because I
- 1:24:58Speaker 8: didn't think about this earlier, these are going to go
- 1:25:01Speaker 8: in more industrial areas. So if this was up in
- 1:25:03Speaker 8: the outskirts, then yeah, maybe the 200 is not sufficient.
- 1:25:08Speaker 8: But if it's in an industrial area, it's more likely
- 1:25:11Speaker 8: going to get knocked down.
- 1:25:12Speaker 2: And we can decide that on a case-by-case basis, that
- 1:25:17Speaker 2: if it's going to go into a rural area where
- 1:25:19Speaker 2: there's nothing around, they're just going to, I've got 200 acres,
- 1:25:22Speaker 2: I'm going to go put a data center in the
- 1:25:23Speaker 2: middle of it.
- 1:25:24Speaker 12: It shows the difference between your communities and industrial. The
- 1:25:31Speaker 12: industrial is at 200, residential is at 500. 500, yeah.
- 1:25:33Speaker 8: Okay.
- 1:25:37Speaker 5: You take somewhere like along 220, for example. I mean,
- 1:25:41Speaker 5: that's an area that we've... I.
- 1:25:42Speaker 4: Can hear that.
- 1:25:44Speaker 5: Yeah, but I mean, that's a place that we've generally,
- 1:25:46Speaker 5: in accordance to our land use plan, that's where industrial
- 1:25:49Speaker 5: is going to be appropriate anyway. That's probably where I
- 1:25:52Speaker 5: would see a larger likelihood of just generally them being
- 1:25:57Speaker 5: approved because of that. Our land use plan has it...
- 1:26:01Speaker 5: Our utilities already exist off of 220. That's going to
- 1:26:05Speaker 5: be one of the main things that they're going to
- 1:26:06Speaker 5: be looking for in regards to siting. So you take
- 1:26:09Speaker 5: an area like that, there's probably a good bit of
- 1:26:11Speaker 5: commercial in the area in which that 200 is going
- 1:26:14Speaker 5: to apply, but there's still plenty of residential that still
- 1:26:17Speaker 5: just happens to be zoned residential. So, I mean, that's
- 1:26:20Speaker 5: where like a 500 can fit in there. And to
- 1:26:22Speaker 5: Corey's point, which is a very good point about like
- 1:26:26Speaker 5: if it were to come in to another area that's specific,
- 1:26:32Speaker 5: that's like, man, I don't know if 200 is going
- 1:26:34Speaker 5: to cut it right there.
- 1:26:36Speaker 11: You're going to see that on the site plan.
- 1:26:38Speaker 5: You're going to see that specifically in our reports of
- 1:26:42Speaker 5: what that surrounding zoning is going to look like, what
- 1:26:44Speaker 5: those aerials are going to look like. And that's something
- 1:26:47Speaker 5: that y'all can decide as a board that, okay, in
- 1:26:49Speaker 5: this particular scenario, this one might be a little bit
- 1:26:52Speaker 5: more egregious. Maybe we increase it to 300, whatever it
- 1:26:55Speaker 5: might be, right, in that specific scenario.
- 1:26:58Speaker 12: That's where I think it's coming, like, in those areas
- 1:27:00Speaker 12: coming off of the 220. That's exactly where I'm thinking
- 1:27:04Speaker 12: of because I do have the highway that's close, and
- 1:27:07Speaker 12: I still hear it at night. Now, it's not as
- 1:27:08Speaker 12: bad as, you know, when I lived over in Jamestown, right?
- 1:27:13Speaker 12: Way more quiet. But those are still adjoining residential. So
- 1:27:18Speaker 12: that's where I came into place earlier. I feel like
- 1:27:21Speaker 12: increasing when they are closer to those residential and you
- 1:27:24Speaker 12: do have those factories that are over there because they're
- 1:27:26Speaker 12: right out there off of the Highway 65. increasing maybe
- 1:27:29Speaker 12: setbacks to maybe 750 or 1,000, and increasing those land
- 1:27:35Speaker 12: buffers or the landscape buffers when they're closer to those
- 1:27:39Speaker 12: residential areas to help out. Because, I mean, along 220,
- 1:27:43Speaker 12: I know in a lot of areas they put those
- 1:27:46Speaker 12: walls going up.
- 1:27:47Speaker 4: Down the highway to kind of buffer that.
- 1:27:49Speaker 12: We don't have that, and the cost of putting that
- 1:27:52Speaker 12: down 220 is expensive.
- 1:27:54Speaker 4: So I think....
- 1:27:57Speaker 2: And they would have to put those up.
- 1:27:59Speaker 8: And another point, the decibel, I looked up a bunch
- 1:28:03Speaker 8: of different decibels. A car is roughly 70 decibels. So
- 1:28:08Speaker 8: I'm sure it's louder going up and down 220.
- 1:28:11Speaker 7: It is 90% louder to be.
- 1:28:14Speaker 8: So you're more likely to hear the car than the actual.
- 1:28:17Speaker 3: Have we come to a consensus? I thought the.
- 1:28:22Speaker 1: Decibel level was sort of... We had agreed on that.
- 1:28:27Speaker 4: To specify a decibel level at the lot line, we're
- 1:28:30Speaker 4: in a way dictating what the setbacks have to be
- 1:28:35Speaker 4: because they're going to have to move farther away to
- 1:28:36Speaker 4: meet those requirements.
- 1:28:38Speaker 5: Other things to mitigate it. If site-specific things... The.
- 1:28:43Speaker 7: Wall things as well to balance.
- 1:28:47Speaker 2: That 500-foot setback may not reduce the noise at all.
- 1:28:53Speaker 4: It doesn't do much dissipation of sand.
- 1:28:56Speaker 10: But also, we have the option... whether we set it
- 1:29:00Speaker 10: at 200 or 500 or 1,000 or whatever, we have
- 1:29:02Speaker 10: the option of making that a condition. That's correct.
- 1:29:08Speaker 1: So let's just leave it at 200, Dave.
- 1:29:11Speaker 10: But what I'm looking at is if you get it
- 1:29:13Speaker 10: 500 feet, I wonder specifically if that is a deterrent
- 1:29:19Speaker 10: to somebody, and we're not trying to say yes or
- 1:29:25Speaker 10: no to a data center of any kind, But why
- 1:29:29Speaker 10: would you put a higher setback if it potentially discouraged somebody.
- 1:29:39Speaker 4: From doing it?
- 1:29:39Speaker 2: Yeah, I think your point is that we come up
- 1:29:42Speaker 2: with a reasonable view of regulations around decibels and setbacks
- 1:29:50Speaker 2: and stuff like that.
- 1:29:51Speaker 10: And then.
- 1:29:52Speaker 2: We always have the opportunity to look at each individual
- 1:29:56Speaker 2: situation and say, yeah, no, it's got to be more.
- 1:29:59Speaker 2: Or maybe it's okay because there's a plant. They want
- 1:30:02Speaker 2: to put it next to a plant that's already generating
- 1:30:04Speaker 2: 80 or something like that. And then the 60 takes
- 1:30:08Speaker 2: on a different.
- 1:30:09Speaker 1: So then our conditional, we could actually, if we leave
- 1:30:11Speaker 1: it at 50 as a general guide.
- 1:30:16Speaker 1: If the application comes in and they are right beside,
- 1:30:21Speaker 1: and that could be part of their hearing, is our
- 1:30:26Speaker 1: neighbor emits 80 decibels, can we get consideration?
- 1:30:31Speaker 3: Can we go up as well as go down?
- 1:30:33Speaker 2: Yeah, so do we want to make it really tight,
- 1:30:36Speaker 2: or do we want to be somewhere in the middle
- 1:30:38Speaker 2: and then we can be tighter if we need to,
- 1:30:40Speaker 2: or we can be.
- 1:30:42Speaker 1: I'd like to leave it at 50 to make them.
- 1:30:45Speaker 1: To let applicants know that we mean business.
- 1:30:50Speaker 7: I do not mean to interrupt you. If you go
- 1:30:53Speaker 7: to 50, you are essentially saying we do not want
- 1:30:57Speaker 7: them here because it is going to be virtually, I'm
- 1:30:59Speaker 7: not going to say it's going to be impossible, but
- 1:31:01Speaker 7: it is going to be extremely stringent. I think 60
- 1:31:05Speaker 7: is a very well-balanced number based on what we've done
- 1:31:07Speaker 7: the research on. And then if you want to make
- 1:31:09Speaker 7: it a condition later at 50 when someone comes before you,
- 1:31:13Speaker 7: then you could do that.
- 1:31:14Speaker 12: Can we write it in the verbiage depending on the surrounding.
- 1:31:19Speaker 8: Zone?
- 1:31:20Speaker 1: No, I think it needs to be more generalized.
- 1:31:25Speaker 5: I do think having like one across the board is
- 1:31:27Speaker 5: kind of the.
- 1:31:28Speaker 2: Way to go for the most part.
- 1:31:30Speaker 5: Most importantly, like we can get initial sound studies and
- 1:31:35Speaker 5: kind of see what's already being produced in the area
- 1:31:39Speaker 5: as is, right, and then kind of make determinations from there.
- 1:31:43Speaker 11: Because that will be dependent too, right?
- 1:31:44Speaker 5: Like if it's a super quiet area and the decibel
- 1:31:47Speaker 5: level is already really low initially, that's maybe where you
- 1:31:52Speaker 5: put condition to go lower, right? If it's already going
- 1:31:54Speaker 5: into an area with you get that initial sound study
- 1:31:57Speaker 5: as part of the application and it's already pretty high,
- 1:32:00Speaker 5: then 60 is probably too low in that instance.
- 1:32:04Speaker 4: Are you guys able to pull this? Because I know
- 1:32:06Speaker 4: they have Microsoft.
- 1:32:08Speaker 1: We have gone down there.
- 1:32:09Speaker 11: Microsoft put in.
- 1:32:12Speaker 2: We can go for an hour. Yeah, we can go
- 1:32:14Speaker 2: for an hour.
- 1:32:16Speaker 11: This has created regulations yet.
- 1:32:18Speaker 5: I know they've had a proposal come through, but I
- 1:32:23Speaker 5: don't think they've drafted and gone through the process to
- 1:32:26Speaker 5: create regulation. They did an initial vote for moratorium. I
- 1:32:29Speaker 5: think that got turned down. So I don't think they've
- 1:32:32Speaker 5: kind of begun that process for crafting any specific regulations.
- 1:32:36Speaker 1: They have not begun it. You've got another question.
- 1:32:38Speaker 8: So this is my last question.
- 1:32:39Speaker 1: Okay.
- 1:32:40Speaker 8: Part of their proposal will have, will they do that
- 1:32:44Speaker 8: study for the decibels prior to construction?
- 1:32:48Speaker 1: They'll do the SAM study.
- 1:32:51Speaker 5: With the application. And obviously, like, they don't have the
- 1:32:54Speaker 5: equipment out. There's only so much they can measure. But
- 1:32:57Speaker 5: a lot of the logic of that one is, what
- 1:32:59Speaker 5: is the baseline level for this area?
- 1:33:01Speaker 11: And then, like, what would your projections be?
- 1:33:05Speaker 8: Proposal, that would be our guidance.
- 1:33:07Speaker 1: Yeah. So in the interest of getting something on the books,
- 1:33:13Speaker 1: I'm okay with that. Does that help?
- 1:33:22Speaker 10: Look, I trust these guys that have done all this
- 1:33:25Speaker 10: research on this, and if this is the numbers that
- 1:33:28Speaker 10: they've come up with, the 60 and the 200 feet,
- 1:33:31Speaker 10: and we have the ability to adjust both of them
- 1:33:33Speaker 10: up or down, I don't see a problem leaving like
- 1:33:37Speaker 10: it is.
- 1:33:38Speaker 1: I'm okay with that, too.
- 1:33:38Speaker 2: I agree with that.
- 1:33:41Speaker 8: Okay.
- 1:33:42Speaker 1: Because we went down a rabbit hole.
- 1:33:46Speaker 11: I love a good rabbit hole.
- 1:33:48Speaker 1: We went down.
- 1:33:49Speaker 2: I think we had an opportunity to explore the nuances
- 1:33:56Speaker 2: that we might run into. And we've thought through it
- 1:33:59Speaker 2: so that when we actually are confronted with it, I
- 1:34:01Speaker 2: think we're going to be more informed.
- 1:34:03Speaker 5: And believe me, we've had this exact conversation half a
- 1:34:06Speaker 5: dozen times.
- 1:34:07Speaker 2: I'm sure you did.
- 1:34:08Speaker 11: Not just with us.
- 1:34:10Speaker 5: Lance was involved heavily in this process. Lee in economic
- 1:34:13Speaker 5: development was heavily involved in this process. We have gone
- 1:34:16Speaker 5: round and round on exactly these exact conversations several times.
- 1:34:21Speaker 3: Did you have anything else?
- 1:34:22Speaker 11: Oh, yes. Okay.
- 1:34:25Speaker 4: On page seven.
- 1:34:27Speaker 1: Page 7, item K.
- 1:34:34Speaker 11: Is all one item.
- 1:34:36Speaker 6: It doesn't mention, it says the applicant is going to
- 1:34:39Speaker 6: provide a detailed electrical demand analysis, as you just mentioned.
- 1:34:43Speaker 11: They don't have the equipment out there.
- 1:34:46Speaker 6: They don't have the building up and running, so they're
- 1:34:48Speaker 6: not going to know what that is.
- 1:34:50Speaker 11: But they do know.
- 1:34:52Speaker 6: There are things that they do know, and that is
- 1:34:56Speaker 6: If they're gonna they're gonna have this study done by
- 1:34:59Speaker 6: Duke power probably You mean I think earlier in the
- 1:35:03Speaker 6: in the potential in the draft. It's mentions something about
- 1:35:07Speaker 6: Duke power doing something How much electric how much power
- 1:35:13Speaker 6: these systems need They got they ought to.
- 1:35:17Speaker 2: Look really well. There's already data centers in North Carolina.
- 1:35:20Speaker 2: So Duke's Yeah, you know there are other other facilities.
- 1:35:23Speaker 6: That Operating now that couldn't provide that kind of data
- 1:35:29Speaker 6: if they're allowed to do that or Duke power can
- 1:35:31Speaker 6: provide it or but anyway in the language here if
- 1:35:35Speaker 6: we can include some other language just say it should
- 1:35:39Speaker 6: come should include comparisons with other similar sites Can we
- 1:35:45Speaker 6: do that?
- 1:35:47Speaker 13: Part of the application process is them providing Electrical usage
- 1:35:53Speaker 13: and capacity When.
- 1:35:57Speaker 4: They do the design of the systems, they know what
- 1:36:03Speaker 4: usage they're probably going to incur.
- 1:36:05Speaker 2: They have to in order to get the equipment. Is
- 1:36:07Speaker 2: there anything in here that.
- 1:36:07Speaker 1: Would cover the comparison of like, or would there ever
- 1:36:10Speaker 1: be a like comparison? Or are all of them really unique?
- 1:36:30Speaker 4: A lot of them are unique. The technology's changing daily.
- 1:36:35Speaker 1: So that might not be... That might not be feasible.
- 1:36:40Speaker 2: But if you're going to have to spend the millions
- 1:36:42Speaker 2: of dollars to build one of these, you're going to
- 1:36:44Speaker 2: know exactly how much energy you're going to need.
- 1:36:46Speaker 5: Our logic that we were falling upon is that's going
- 1:36:49Speaker 5: to be needed information that they're going to have of
- 1:36:51Speaker 5: what do they need.
- 1:36:53Speaker 11: Because they wouldn't.
- 1:36:54Speaker 8: Start the process.
- 1:36:55Speaker 2: That's the decision factor. Can I afford to do this?
- 1:36:56Speaker 1: Which they ask for the conditional. That's when we can
- 1:37:02Speaker 1: ask them, have you done any comparisons? That's the point
- 1:37:06Speaker 1: at which we can catch them on that because they've
- 1:37:08Speaker 1: got to provide testimony.
- 1:37:11Speaker 4: Thank you.
- 1:37:11Speaker 11: Okay.
- 1:37:12Speaker 10: Yeah.
- 1:37:13Speaker 2: That's good.
- 1:37:14Speaker 11: I'm good on that one.
- 1:37:15Speaker 4: Okay.
- 1:37:16Speaker 6: I'm going to jump ahead to page nine.
- 1:37:19Speaker 4: Page nine.
- 1:37:20Speaker 2: Last question.
- 1:37:24Speaker 11: Page nine, item four.
- 1:37:27Speaker 4: Item four.
- 1:37:28Speaker 6: Amount of financial assurance shall be 1.2 times blah, blah, blah.
- 1:37:31Speaker 6: 50% $ 75, 000 that is the number that that jumps out
- 1:37:39Speaker 6: to me because of its minuscule size yes, I Mean
- 1:37:46Speaker 6: I can't imagine that that is the minute that $ 75, 000
- 1:37:51Speaker 6: when you start Remediating and restoring and cleaning up a
- 1:37:55Speaker 6: facility that has been probably abandoned by a company that
- 1:37:59Speaker 6: doesn't Doesn't give a squat about it anymore $ 75, 000 is
- 1:38:03Speaker 6: a pittance, so that number needs to go way, way up.
- 1:38:09Speaker 5: To clarify that, $ 75, 000 is the minimum. No matter what,
- 1:38:13Speaker 5: they've got to put $ 75, 000 up, right? But with that,
- 1:38:17Speaker 5: they have to include estimated costs of how much, by
- 1:38:22Speaker 5: an engineer, of how much it would cost to restore
- 1:38:26Speaker 5: the site.
- 1:38:27Speaker 11: And so if we go by that.
- 1:38:30Speaker 5: 1.25 times number, right, and that cost provided by an
- 1:38:36Speaker 5: engineer times 1.25 is higher.
- 1:38:40Speaker 11: Than that, that's what we go with.
- 1:38:43Speaker 5: So the 75 is the absolute floor on that. By
- 1:38:49Speaker 5: the way these are written, they will probably most assuredly,
- 1:38:53Speaker 5: if it's a decent-sized facility at all, be doing quite
- 1:38:56Speaker 5: a bit more.
- 1:38:56Speaker 3: And they'll have to submit a decommissioning plan.
- 1:38:59Speaker 8: Correct.
- 1:39:00Speaker 2: All the constant in there would be in there.
- 1:39:02Speaker 1: And that's where that calculation will come in.
- 1:39:05Speaker 2: Okay.
- 1:39:07Speaker 6: I'm done.
- 1:39:11Speaker 8: One thing.
- 1:39:13Speaker 4: So.
- 1:39:18Speaker 12: And I could be completely wrong about this, but I
- 1:39:21Speaker 12: want to be protected. I guess that's to be protected from,
- 1:39:23Speaker 12: I know we have a minimum of 5,000 square feet.
- 1:39:28Speaker 12: What's to say somebody doesn't do the bare minimum in
- 1:39:31Speaker 12: multiple locations close together? Is there any way, because you
- 1:39:38Speaker 12: said anything under 5,000, none of these regulations. So can
- 1:39:43Speaker 12: we drop this minimum square footage? but also I'd like
- 1:39:48Speaker 12: to see, and you can tell me the pros and
- 1:39:51Speaker 12: cons of this, dropping this down, but taking away the
- 1:39:54Speaker 12: band of all the other systems, but categorizing them. If
- 1:39:57Speaker 12: you're at this amount of square footage for this system,
- 1:40:01Speaker 12: then you have to go with closed loop, right? But
- 1:40:03Speaker 12: if you're at a 4,500 square foot, closed loop is
- 1:40:06Speaker 12: going to be an expensive system to install than open
- 1:40:09Speaker 12: air or something like that, right?
- 1:40:11Speaker 5: I mean, one of the biggest things that we've kind of,
- 1:40:16Speaker 5: seen in our research is that most of the facilities.
- 1:40:21Speaker 11: That are catching headlines are bigger facilities.
- 1:40:23Speaker 4: To begin with.
- 1:40:25Speaker 5: Almost all the things that the industry is driving towards
- 1:40:29Speaker 5: is larger facilities to begin with. For instance, I do
- 1:40:35Speaker 5: expect that if we ever were to get proposals, they're
- 1:40:40Speaker 5: probably hitting all those requirements that we put out for
- 1:40:42Speaker 5: the high-intensity use, for instance. So that's kind of like
- 1:40:47Speaker 5: one of our main fallback kind of like processes of
- 1:40:51Speaker 5: thinking about it in that regards. But the under 5,000
- 1:40:58Speaker 5: was mostly there to just consider something that's like just
- 1:41:04Speaker 5: so small that it's not really going to have the
- 1:41:05Speaker 5: type of impact that something that we all kind of
- 1:41:08Speaker 5: have in mind with a facility like this in it.
- 1:41:13Speaker 5: More is just kind of a catch-all for something that
- 1:41:16Speaker 5: is that small. But, yeah, I mean, if there's particular
- 1:41:21Speaker 5: issues with it, we can certainly look at that particular
- 1:41:25Speaker 5: aspect if, you know, the board wanted to strike that
- 1:41:30Speaker 5: or to change it or.
- 1:41:34Speaker 11: That was kind of our thinking there.
- 1:41:35Speaker 5: It was like the biggest one is to make sure
- 1:41:39Speaker 5: anything accessory, right?
- 1:41:40Speaker 8: Yeah.
- 1:41:42Speaker 13: It's pretty unlikely for someone to obtain the 25 acres
- 1:41:46Speaker 13: and put a facility that's less than 5,000 square feet
- 1:41:49Speaker 13: on it.
- 1:41:49Speaker 4: Yeah. Yeah. The next topic, well, what I was going
- 1:42:00Speaker 4: to mention was along those lines.
- 1:42:01Speaker 11: Yes.
- 1:42:03Speaker 4: I remember, that was like a year or so ago,
- 1:42:05Speaker 4: but reading an article of, People up in the mountains
- 1:42:08Speaker 4: of North Carolina and Tennessee complained about cryptocurrency mining facilities.
- 1:42:15Speaker 4: How would that fall into this? Because they're like modular
- 1:42:18Speaker 4: type containerized systems, but a lot of noise.
- 1:42:22Speaker 5: Completely fits into this. In our definition, crypto mining is...
- 1:42:28Speaker 5: fits into data processing generally as a definition. So all
- 1:42:33Speaker 5: of the same kind of categorizations apply. That if you're
- 1:42:36Speaker 5: building a standalone facility for something like that, right, if
- 1:42:41Speaker 5: you're doing an accessory, that's fine. Like if you've already
- 1:42:44Speaker 5: got a different use, you've got some servers doing that
- 1:42:47Speaker 5: on the, okay.
- 1:42:49Speaker 11: But if you're doing.
- 1:42:50Speaker 5: Standalone for that particular use, you've got a large amount
- 1:42:52Speaker 5: of servers, this kicks in.
- 1:42:55Speaker 4: So which aspect would kick in? Because I know a
- 1:42:57Speaker 4: lot of those that I was reading about were pretty small.
- 1:42:59Speaker 4: They're less than 5,000, like what Sean was saying.
- 1:43:02Speaker 12: Yeah.
- 1:43:03Speaker 5: Yeah, I mean, in that instance, this would not kick
- 1:43:06Speaker 5: in if it's under 5,000. But, I mean, our thought
- 1:43:10Speaker 5: process on that would be that as a small, at
- 1:43:14Speaker 5: that scale, the level of negative impacts that it's going
- 1:43:18Speaker 5: to have on neighboring property probably does not, fit to
- 1:43:23Speaker 5: the kind of regulations that we've kind of put forth here.
- 1:43:26Speaker 4: I hear what you're saying, but I remember reading this article,
- 1:43:29Speaker 4: and it was like national news that the neighbors were
- 1:43:32Speaker 4: really upset of how much they were being disturbed by
- 1:43:35Speaker 4: those facilities.
- 1:43:38Speaker 2: They would still have to come to the planning group
- 1:43:44Speaker 2: and would have to ask for, and we would end
- 1:43:46Speaker 2: up having to adjust the, because There would be nothing
- 1:43:50Speaker 2: in RA or RP that would allow that kind of
- 1:43:55Speaker 2: a facility.
- 1:43:56Speaker 1: Even HC.
- 1:43:57Speaker 2: They would have to come in and ask for a
- 1:43:59Speaker 2: light industrial or something that would fit into that, and
- 1:44:02Speaker 2: we would have those conversations, right?
- 1:44:04Speaker 11: More than likely, it would kind of... Like, we currently
- 1:44:07Speaker 11: have a.
- 1:44:10Speaker 5: The way I've gone ahead and like kind of preliminary
- 1:44:12Speaker 5: looked at our ordinance, the way our, our use table,
- 1:44:16Speaker 5: the rules of it is set up. Like obviously we
- 1:44:18Speaker 5: have a whole bunch of different uses in the table,
- 1:44:21Speaker 5: but in an instance and every ordinance is going to
- 1:44:23Speaker 5: treat the situation a little bit differently in the instance of, okay,
- 1:44:27Speaker 5: there's a use in here.
- 1:44:28Speaker 11: It doesn't quite fit any of the things that we
- 1:44:30Speaker 11: have in here.
- 1:44:32Speaker 5: Um, it gives us a staff the ability to, we
- 1:44:36Speaker 5: find the closest use of, Maybe it doesn't make sense,
- 1:44:41Speaker 5: but we find the one that's most comparable, not necessarily
- 1:44:44Speaker 5: just a name or definition, but an impact character and
- 1:44:49Speaker 5: make that determination from there. A bunch of different ways
- 1:44:52Speaker 5: ordinance can kind of address, you know, what do you
- 1:44:54Speaker 5: do with uses that aren't specifically in the table? The
- 1:44:57Speaker 5: way we've kind of been looking at these so far
- 1:45:00Speaker 5: for data processing facilities is has been kind of putting
- 1:45:05Speaker 5: it into a use that we have of other industrial,
- 1:45:09Speaker 5: and that is special use permit in light and heavy industrial.
- 1:45:14Speaker 5: So more than likely, a use like that, even at
- 1:45:16Speaker 5: a smaller scale, would probably fit in a category like that,
- 1:45:19Speaker 5: if that makes sense. That was a long preamble to
- 1:45:22Speaker 5: get there.
- 1:45:23Speaker 2: But the point is that then we can pull this
- 1:45:25Speaker 2: up and say, okay, there are pieces of this I mean, basically.
- 1:45:29Speaker 11: We would.
- 1:45:30Speaker 2: Think through in order for us to decide what would
- 1:45:32Speaker 2: be the most appropriate solution.
- 1:45:34Speaker 5: Basically, if it's under that 5,000-square-foot threshold, if it's super small,
- 1:45:39Speaker 5: it's still going to have a process to go through,
- 1:45:42Speaker 5: but it wouldn't be this process.
- 1:45:45Speaker 11: It wouldn't be this set of regulations that hit it,
- 1:45:47Speaker 11: but it would have a process to go through.
- 1:45:50Speaker 3: And to piggyback on what Dwayne asked.
- 1:45:53Speaker 1: I like that.
- 1:45:57Speaker 3: Is flock technology.
- 1:45:59Speaker 1: I'm bringing it up.
- 1:46:02Speaker 11: Don't do that.
- 1:46:04Speaker 1: Is flock technology data collection in the same way?
- 1:46:11Speaker 11: I know only a little bit about flock.
- 1:46:16Speaker 5: The main thing that I can think of of how
- 1:46:19Speaker 5: it would interrelate with this, right, is that there's probably
- 1:46:26Speaker 5: quite a.
- 1:46:26Speaker 4: Bit of data.
- 1:46:27Speaker 5: that a company like Flock would have to process. So
- 1:46:31Speaker 5: if they're doing off-site processing of that data in some
- 1:46:35Speaker 5: capacity and they're trying to look for standalone places to
- 1:46:38Speaker 5: do it, that could possibly fit into this.
- 1:46:41Speaker 1: But that's not in our jurisdiction. That wouldn't necessarily be
- 1:46:46Speaker 1: in our jurisdiction. What is collected is not in our jurisdiction.
- 1:46:51Speaker 1: What is collected and housed is in our jurisdiction.
- 1:46:54Speaker 11: We're looking at land use, right?
- 1:46:57Speaker 5: We don't, I mean, we go with the general, what
- 1:47:00Speaker 5: are you doing with the thing? But as far as
- 1:47:02Speaker 5: like what actually occurs in the building outside of the
- 1:47:04Speaker 5: general usage of the land, that's where it stops.
- 1:47:07Speaker 1: That answered my question.
- 1:47:08Speaker 11: Yeah.
- 1:47:11Speaker 4: Okay.
- 1:47:11Speaker 3: You got any more? You got any more?
- 1:47:13Speaker 4: I do. One thing on the noise verification.
- 1:47:18Speaker 11: In our.
- 1:47:20Speaker 4: Article G noise, it talks about doing a noise study
- 1:47:24Speaker 4: where Prior to getting a CO, yes. I think that
- 1:47:29Speaker 4: they're not going to be up and running at full
- 1:47:31Speaker 4: capacity at that point, not generating for sure the full
- 1:47:35Speaker 4: noise that they're going to do. I think we should
- 1:47:38Speaker 4: change that portion that somehow, someway a study is done
- 1:47:42Speaker 4: when they're at full capacity and not wait until people
- 1:47:45Speaker 4: complain down the road.
- 1:47:47Speaker 2: Well, there was two components to that. One was the preliminary...
- 1:47:51Speaker 2: And then there was the one that, in order to
- 1:47:53Speaker 2: get the final permit to go into full operation, they
- 1:47:55Speaker 2: have to have it up and running and have to
- 1:47:59Speaker 2: validate that, right?
- 1:48:00Speaker 3: Does it say that? No, it's at CO.
- 1:48:03Speaker 1: So they don't necessarily have to be at full capacity
- 1:48:06Speaker 1: when they get to CO.
- 1:48:07Speaker 7: That's great.
- 1:48:07Speaker 5: If they want to start operation and start inhabiting the building,
- 1:48:11Speaker 5: that is the point in which they would.
- 1:48:12Speaker 11: Have to do it.
- 1:48:14Speaker 5: And it would be at that time in which that
- 1:48:19Speaker 5: situation second there's the noise study at the beginning as
- 1:48:22Speaker 5: part of the application nothing's been built and then the
- 1:48:25Speaker 5: second one what's required comes in everything the rezoning has
- 1:48:32Speaker 5: been approved building permits have been approved they've gone through
- 1:48:36Speaker 5: all of their inspections they're pretty much done That's when
- 1:48:40Speaker 5: they do the second noise study, before we allow them to, hey,
- 1:48:45Speaker 5: you are completely okay to start operations. So to his point,
- 1:48:50Speaker 5: if they were to say they had plans for a
- 1:48:54Speaker 5: larger facility, 300,000 square foot facility, and they're only doing
- 1:49:01Speaker 5: it in phases, 100,000 square foot, 100,000 square foot, 100,000
- 1:49:03Speaker 5: square foot, They're only trying to get that first 100,000
- 1:49:08Speaker 5: square foot online now when they try to get their CO.
- 1:49:15Speaker 5: That is when a noise study would be required. It
- 1:49:20Speaker 5: wouldn't necessarily encompass the future 200,000 square foot down the line.
- 1:49:29Speaker 4: I think a third study really needs to be done.
- 1:49:33Speaker 4: You can make them do it before the CO, but
- 1:49:35Speaker 4: I guarantee you, They will not be operating at anywhere
- 1:49:38Speaker 4: near full capacity, not even half capacity.
- 1:49:40Speaker 2: That's a really good point.
- 1:49:42Speaker 4: And then, you know, because they can't have the people
- 1:49:44Speaker 4: in there. They don't have a CO. They can't bring
- 1:49:46Speaker 4: the people in to operate the facility. But once they're
- 1:49:49Speaker 4: up and running.
- 1:49:50Speaker 1: Is our fallback on that code enforcement?
- 1:49:53Speaker 4: Yes, number four.
- 1:49:56Speaker 7: If there's a verified noise complaint, they have to do
- 1:49:58Speaker 7: another study.
- 1:50:01Speaker 4: I'm just saying be proactive and not wait until you
- 1:50:04Speaker 4: piss off the neighbors.
- 1:50:08Speaker 5: I'm just trying to think of how would we even
- 1:50:11Speaker 5: word that.
- 1:50:15Speaker 3: That's how code enforcement works.
- 1:50:17Speaker 2: Well, they have to have all the servers running and
- 1:50:19Speaker 2: everything before they.
- 1:50:20Speaker 4: It's a chicken and egg issue we're asking them to do.
- 1:50:25Speaker 2: They do that.
- 1:50:27Speaker 8: Date when they have to be fully operational? I don't.
- 1:50:34Speaker 4: Know.
- 1:50:35Speaker 6: Do that.
- 1:50:36Speaker 11: Like in the situation of like kind of thinking of
- 1:50:39Speaker 11: like phases, right?
- 1:50:42Speaker 4: I agree with your point on that 100% as well.
- 1:50:45Speaker 5: With a phase, especially say you were to do a
- 1:50:47Speaker 5: separate structure, there would be a secondary CO issued. So
- 1:50:52Speaker 5: it would be logical of an interpretation of this current language.
- 1:50:56Speaker 4: And just not built out all the infrastructure within it
- 1:51:00Speaker 4: with the.
- 1:51:03Speaker 13: Servers.
- 1:51:04Speaker 4: They could have the shell building all built at once.
- 1:51:06Speaker 13: Yeah, if they're not meeting the requirements prior to the CO,
- 1:51:14Speaker 13: they'll know they have to add some more, some kind
- 1:51:16Speaker 13: of sound buffers or whatever they need.
- 1:51:20Speaker 4: But my point is they're not going to be generating
- 1:51:22Speaker 4: the noise prior to a CO that they will be
- 1:51:28Speaker 4: a week or two afterwards.
- 1:51:29Speaker 13: They should have some general idea at that point. with
- 1:51:33Speaker 13: both of those studies done, like I said, if they
- 1:51:35Speaker 13: don't have that first one that, I'm.
- 1:51:37Speaker 1: Sorry, the second one.
- 1:51:40Speaker 5: Most of the noise really isn't the servers. Oftentimes it's
- 1:51:44Speaker 5: like the generators, right? So if you were a developer
- 1:51:49Speaker 5: of data centers, oftentimes that is not always the case.
- 1:51:54Speaker 5: But it can generally go kind of two ways. You
- 1:51:58Speaker 5: can have a company that... builds out the infrastructure they
- 1:52:03Speaker 5: make the structure they make they put in the generators
- 1:52:06Speaker 5: they put in the cooling systems they run all the
- 1:52:08Speaker 5: infrastructure to it and then they sell out spaces to
- 1:52:13Speaker 5: different companies hey come put your servers here we've got
- 1:52:16Speaker 5: your infrastructure and they play pay rent other times you've
- 1:52:19Speaker 5: got full meta amazon they're building their whole thing they
- 1:52:24Speaker 5: own all of it they run all of it um
- 1:52:28Speaker 5: i forget where i was trying.
- 1:52:29Speaker 11: To go with that.
- 1:52:31Speaker 1: So if the fail safe is code enforcement, isn't it
- 1:52:38Speaker 1: our responsibility almost? Because if we're the ones that are
- 1:52:41Speaker 1: worried about this, and we should be because we're kind
- 1:52:46Speaker 1: of the front line here. If we're the ones that
- 1:52:50Speaker 1: are most concerned, we can activate code enforcement anytime we
- 1:52:54Speaker 1: want to.
- 1:52:54Speaker 4: True.
- 1:52:55Speaker 1: That meaning that any one of us, or any other
- 1:52:58Speaker 1: citizen for that matter, can say, I'm afraid that they're
- 1:53:03Speaker 1: too loud. Can code enforcement ask them to do.
- 1:53:08Speaker 4: And.
- 1:53:09Speaker 1: Any citizen can do that.
- 1:53:11Speaker 11: I remembered where I was going.
- 1:53:12Speaker 5: So that infrastructure is probably already going to be in
- 1:53:17Speaker 5: place kind of in either scenarios. Even if they want
- 1:53:20Speaker 5: to open and operate before they've even gotten a server
- 1:53:23Speaker 5: in there, the server's probably not going to... The servers
- 1:53:26Speaker 5: in itself is probably not going to contribute too much
- 1:53:28Speaker 5: to the noise aspect of it.
- 1:53:30Speaker 11: It's probably the other infrastructure. And that aspect is going
- 1:53:33Speaker 11: to be in place.
- 1:53:34Speaker 4: I agree that cooling and stuff is going to, but
- 1:53:36Speaker 4: they're not going to be running that cooling system if
- 1:53:38Speaker 4: they don't have a heat or demand that requires it.
- 1:53:42Speaker 11: Well, they'll have to for the noise study. I'm in construction.
- 1:53:47Speaker 4: You can't just run a system without a load to
- 1:53:50Speaker 4: apply to. You can't just.
- 1:53:53Speaker 11: I'm just trying to think of what other... What other mechanism?
- 1:53:57Speaker 5: Like, the reason that we tied it before CO, right,
- 1:54:00Speaker 5: is because we have super strong teeth.
- 1:54:04Speaker 11: If you do not comply with that noise ordinance, we
- 1:54:06Speaker 11: do not give you that CO.
- 1:54:08Speaker 4: Right.
- 1:54:08Speaker 11: I agree with you. That's a super direct. So, like,
- 1:54:10Speaker 11: I'm trying to think of, like.
- 1:54:11Speaker 1: I'm not sure.
- 1:54:12Speaker 4: What would we give ourselves a false sense of security
- 1:54:14Speaker 4: that they pass that test?
- 1:54:15Speaker 3: I'm not sure there is a mechanism other than code enforcement.
- 1:54:18Speaker 11: Yeah.
- 1:54:20Speaker 4: Make it clear that they have to pay for the
- 1:54:22Speaker 4: third-party engineer if there's a complaint. It may already say that.
- 1:54:26Speaker 11: It does, definitely.
- 1:54:29Speaker 13: We also have access to a decibel reader as well.
- 1:54:34Speaker 11: That's how we'll verify the complaint.
- 1:54:38Speaker 2: The sheriff, the deputies are going to be going around
- 1:54:41Speaker 2: with their decimeters, right?
- 1:54:42Speaker 4: On the generators, we're tying them to the Tier 4
- 1:54:46Speaker 4: emission standards. It's my understanding that Tier 4 only applies
- 1:54:50Speaker 4: to diesel generators.
- 1:54:52Speaker 7: Yes.
- 1:54:53Speaker 4: So what if they bring one and hook to a
- 1:54:55Speaker 4: natural gas system or propane system?
- 1:54:58Speaker 11: That is a very good question.
- 1:55:02Speaker 3: Why don't we just put the word any?
- 1:55:03Speaker 1: Any.
- 1:55:04Speaker 4: The other ones, Tier 4 won't apply to them is
- 1:55:08Speaker 4: my understanding.
- 1:55:08Speaker 11: I don't know if you heard that, Ben.
- 1:55:10Speaker 2: It would actually be good if they didn't actually.
- 1:55:12Speaker 5: He was saying Tier 4 applies to diesel generators.
- 1:55:19Speaker 11: What if they use a generator that is not diesel?
- 1:55:24Speaker 3: Do we catch that at the conditions?
- 1:55:28Speaker 11: We certainly can.
- 1:55:29Speaker 3: Can we ask them what kind of generators they are?
- 1:55:34Speaker 11: Certainly.
- 1:55:35Speaker 1: Okay.
- 1:55:36Speaker 4: I think we need to go ahead and tell them.
- 1:55:37Speaker 5: I don't think I'd ever seen any of looking at
- 1:55:40Speaker 5: any of them. I just don't think it ever even
- 1:55:42Speaker 5: came up.
- 1:55:43Speaker 11: They almost all use diesel generators.
- 1:55:46Speaker 1: But you're correct. There are other applications.
- 1:55:48Speaker 4: I've installed them before. That's why I'm asking.
- 1:55:50Speaker 11: Yeah, I mean, that's a really good point.
- 1:55:51Speaker 13: We do have that sentence right below it.
- 1:55:54Speaker 11: Like they still wouldn't be able to be utilized.
- 1:55:57Speaker 4: Standard that are equal. Two or more stringent.
- 1:55:59Speaker 11: Anything other than maintenance.
- 1:56:00Speaker 1: Oh, okay.
- 1:56:01Speaker 4: I'm saying that the... Tier 4, I don't think, applies
- 1:56:04Speaker 4: to those type generators.
- 1:56:06Speaker 11: To non-diesel?
- 1:56:08Speaker 5: Yeah, that tier system from the EPA specifically applies to diesel.
- 1:56:15Speaker 1: Can we take tier.
- 1:56:16Speaker 3: There's probably.
- 1:56:17Speaker 4: Some other standard we should probably reference in here for that.
- 1:56:19Speaker 3: Let's take that out and to a higher standard of.
- 1:56:22Speaker 5: No, I mean, honestly, I mean, that's a good, like,
- 1:56:25Speaker 5: we can definitely try to look into if there are other.
- 1:56:29Speaker 11: Yeah, something that can potentially catch that.
- 1:56:31Speaker 5: Because I'm trying to think, like, if the logic is
- 1:56:33Speaker 5: mostly for emissions, diesel is probably going to be your
- 1:56:37Speaker 5: most serious contributor to emissions, right? So if it's natural
- 1:56:41Speaker 5: gas generator, for example, I would think your emissions are
- 1:56:44Speaker 5: generally going to be lower in the first place.
- 1:56:47Speaker 7: This requires a diesel generator because it says it has
- 1:56:49Speaker 7: to be Tier 4. Like, if he's saying that a
- 1:56:53Speaker 7: Tier 4 generator is a diesel generator, that is requiring
- 1:56:56Speaker 7: that to be a... actual diesel, so they couldn't do
- 1:56:59Speaker 7: gas at all. Because it says that it must meet
- 1:57:02Speaker 7: a Tier 4 emission standard, so it has to be
- 1:57:05Speaker 7: a diesel generator. You see what I'm saying?
- 1:57:08Speaker 4: I see what you're saying, yes.
- 1:57:11Speaker 13: But facilities would be using anything other than a diesel generator.
- 1:57:14Speaker 1: But we are requiring them to have a diesel generator
- 1:57:17Speaker 1: instead of anything else.
- 1:57:18Speaker 7: Yes, that's what it.
- 1:57:21Speaker 4: There's a natural gas pipeline running through this whole county.
- 1:57:24Speaker 9: Mm-hmm.
- 1:57:25Speaker 4: So I could say it would be smart for me
- 1:57:27Speaker 4: to put one here because I can tap into that.
- 1:57:31Speaker 5: Honestly, I really don't have a good answer for that.
- 1:57:34Speaker 5: I mean, that's something that we can definitely look into.
- 1:57:37Speaker 2: What we can do is approve this, and then if
- 1:57:39Speaker 2: we can go back and readjust it, tweak the language
- 1:57:42Speaker 2: based on your further research.
- 1:57:45Speaker 5: This and Board of Commissioners, we can double-check if there's
- 1:57:48Speaker 5: any kind of like logical things that we could add
- 1:57:51Speaker 5: in relationship to that.
- 1:57:52Speaker 7: Well, Adam, I think it does because it says, or
- 1:57:55Speaker 7: any subsequent federal emission standards that are equal to or
- 1:57:58Speaker 7: more stringent than Tier 4. So if there's any standard
- 1:58:01Speaker 7: that would apply to a natural gas generator, it would
- 1:58:04Speaker 7: have to be equal to or more stringent.
- 1:58:06Speaker 11: It's really an apples or orange thing.
- 1:58:08Speaker 5: If Tier four applies to diesel, I mean, I just
- 1:58:11Speaker 5: don't know enough about it, right?
- 1:58:12Speaker 11: Like I don't know if like.
- 1:58:13Speaker 5: Tier, if diesel is for diesel.
- 1:58:17Speaker 11: Emissions, I don't know if it's even logical.
- 1:58:22Speaker 4: Let's just look into it. Absolutely.
- 1:58:26Speaker 11: That's a very good point.
- 1:58:28Speaker 1: As we go down the rabbit hole.
- 1:58:30Speaker 4: Anything else? We've talked about my other things. I want
- 1:58:32Speaker 4: to send you guys a few more comments, but a
- 1:58:34Speaker 4: lot of it's just clerical stuff.
- 1:58:36Speaker 2: 55 decibels.
- 1:58:42Speaker 1: 55 decibels.
- 1:58:44Speaker 3: Is that it?
- 1:58:48Speaker 2: You know, I agree with you. I think they've done
- 1:58:52Speaker 2: a good job. I think we've got a good framework.
- 1:58:56Speaker 2: We're not locking this in stone. And and I think
- 1:59:01Speaker 2: we have an opportunity to come back, you know And
- 1:59:04Speaker 2: because the technology is going to change we're gonna have
- 1:59:06Speaker 2: an opportunity We're gonna have to come back and look
- 1:59:08Speaker 2: at this probably every couple of years to say hey,
- 1:59:11Speaker 2: you know based on the changes in technology We need
- 1:59:14Speaker 2: to reword this, you know, so I think it's you know,
- 1:59:18Speaker 2: let's let's get something on the books so that we
- 1:59:21Speaker 2: don't get caught unprepared and then then Then let's go
- 1:59:28Speaker 2: from there.
- 1:59:28Speaker 11: And then we've got the flexibility to add stuff later on.
- 1:59:31Speaker 2: And we have the ability to, because it's all conditional anyway,
- 1:59:35Speaker 2: we have the opportunity to tweak those requirements based on
- 1:59:39Speaker 2: the individual.
- 1:59:39Speaker 11: Case-by-case basis, yep. Bernie, do you have anything?
- 1:59:43Speaker 4: I have one other thing.
- 1:59:44Speaker 1: Okay, go right ahead.
- 1:59:47Speaker 4: It was mentioned earlier about having different standards. I don't
- 1:59:50Speaker 4: want to make this overly complicated, but if somebody comes
- 1:59:52Speaker 4: in and wanted to do a smaller... data center. Is
- 1:59:58Speaker 4: 25 acres really applicable? You guys researched it and there
- 2:00:02Speaker 4: was a wide range of what it was. I'm wondering
- 2:00:04Speaker 4: if we should tie a megawatt size to a acreage
- 2:00:08Speaker 4: requirement versus just a blanket 25 across the board.
- 2:00:12Speaker 5: So you're thinking of a scenario of someone doing like
- 2:00:15Speaker 5: a smaller 20, 30,000 square foot and that 25 acres
- 2:00:19Speaker 5: being too much?
- 2:00:20Speaker 4: I don't know what they would do but I'm just
- 2:00:22Speaker 4: saying it's a.
- 2:00:23Speaker 1: Well is it megawatts or is it Is there a
- 2:00:26Speaker 1: measurement of, like, yes, there is a measurement of actual
- 2:00:30Speaker 1: data being stored on site?
- 2:00:34Speaker 12: Oh, God.
- 2:00:35Speaker 11: I mean, I'm sure there is, but I have... It's
- 2:00:38Speaker 11: more on a megawatt.
- 2:00:40Speaker 1: It's how much resources they're taking.
- 2:00:44Speaker 3: It's applicable. So megawatt is applicable.
- 2:00:46Speaker 5: Because that's something that's going to scale more on technology...
- 2:00:51Speaker 5: than anything, like what is the computing power of the server?
- 2:00:55Speaker 11: And that can, in 10 years, that's gonna be different, right?
- 2:00:58Speaker 11: And maybe make them make.
- 2:00:59Speaker 2: I mean, more efficient. And their usage is gonna go
- 2:01:02Speaker 2: down as time goes on.
- 2:01:04Speaker 5: To Sean's point, probably as far as like resource consumption,
- 2:01:07Speaker 5: its uses as a land use, something like the resources
- 2:01:11Speaker 5: that it's consuming is probably gonna be better.
- 2:01:14Speaker 11: Or just general size and scalability.
- 2:01:16Speaker 1: Are you good?
- 2:01:18Speaker 11: I have one.
- 2:01:21Speaker 1: I've waited a long time.
- 2:01:24Speaker 3: On the neighborhood meeting.
- 2:01:27Speaker 11: Yes.
- 2:01:28Speaker 1: You and I have discussed this. The applicant shall provide
- 2:01:33Speaker 1: notification of the neighborhood meeting via first class mail to
- 2:01:37Speaker 1: no less than 15 days prior. I think that this
- 2:01:39Speaker 1: is an antiquated definition way to get people information about
- 2:01:49Speaker 1: the neighborhood meeting only. The zoning request, we can use
- 2:01:56Speaker 1: what we can continue like the law is with postcards
- 2:02:01Speaker 1: and placards. But the neighborhood meeting, I would like to
- 2:02:06Speaker 1: see language included so that using either approved or other
- 2:02:19Speaker 1: than a newspaper because there are no newspapers in Rockingham County.
- 2:02:26Speaker 1: And we can, like, say news source. I'll leave the language,
- 2:02:34Speaker 1: the wordsmithing up to you. But I would like to
- 2:02:37Speaker 1: see that. Or either social media because, you know, the
- 2:02:40Speaker 1: county has a Facebook page. No, they wouldn't know. We
- 2:02:46Speaker 1: wouldn't use the county. If you throw that on social media, then.
- 2:02:50Speaker 11: Everybody's... I think maybe something along the lines of like.
- 2:02:55Speaker 8: We have the.
- 2:02:56Speaker 4: The whole county will know because of social media.
- 2:03:01Speaker 2: That's true.
- 2:03:01Speaker 11: At one point, the whole county will probably already know
- 2:03:04Speaker 11: because of social media.
- 2:03:06Speaker 1: But if we can include one other news outlet, i.e.
- 2:03:12Speaker 1: Rockingham update, which.
- 2:03:14Speaker 11: It's like the use of other media to get this
- 2:03:20Speaker 11: is encouraged. One other media source.
- 2:03:22Speaker 1: Just one other media source.
- 2:03:25Speaker 2: When we've had these meetings where we've talked about cell
- 2:03:29Speaker 2: towers and stuff, and they've had meetings with the neighborhood
- 2:03:32Speaker 2: and stuff like that, those processes included everybody that was
- 2:03:39Speaker 2: in the area.
- 2:03:42Speaker 5: So far, the way we have it where it's just
- 2:03:44Speaker 5: We already have us, a staff, when we do these,
- 2:03:48Speaker 5: particularly with the rezonings, we do letters out to 1,000
- 2:03:51Speaker 5: feet from the property. So we're already creating that. Like,
- 2:03:56Speaker 5: we do that from GIS. We get a spreadsheet. And
- 2:03:59Speaker 5: that can be something we just pass along. They can
- 2:04:01Speaker 5: send those letters out to the exact same people that
- 2:04:03Speaker 5: we would be notifying. And then to Julie's point, we
- 2:04:06Speaker 5: can add in some language that, you know, Other means
- 2:04:09Speaker 5: of reaching out with other media sources are going to
- 2:04:11Speaker 5: be highly encouraged, and that can be something they include
- 2:04:14Speaker 5: in that summary of that neighborhood meeting, and y'all can
- 2:04:17Speaker 5: kind of make a determined Determination from there is like,
- 2:04:20Speaker 5: do y'all think that was really adequate?
- 2:04:22Speaker 1: Yeah, and this is just the neighborhood meeting. This is not.
- 2:04:26Speaker 11: Correct, yeah.
- 2:04:26Speaker 1: Yeah, this is just... We don't control the neighborhood meeting.
- 2:04:32Speaker 1: They have to provide it. So all we're asking them
- 2:04:36Speaker 1: to do or requiring them to do is to provide
- 2:04:38Speaker 1: it through at least one media outlet. Like, yeah. Mm-hmm.
- 2:04:47Speaker 1: Not just, I mean, we're not even requiring them to
- 2:04:53Speaker 1: send out the letters to 1,000 feet, are we?
- 2:04:56Speaker 11: That's us.
- 2:04:57Speaker 1: That's our process.
- 2:04:58Speaker 5: We were requiring that as well for the neighborhood meeting.
- 2:05:01Speaker 5: So we're going to do that for our public hearings,
- 2:05:03Speaker 5: both of them. For here, but we're also for the
- 2:05:06Speaker 5: neighborhood meeting. They've got to do their own set of letters.
- 2:05:10Speaker 5: To the exact same people.
- 2:05:12Speaker 1: And one other media outlet, I think that will be
- 2:05:15Speaker 1: the easiest thing for them to do. So they'll send
- 2:05:17Speaker 1: the letters and one other media outlet. Okay, and I
- 2:05:20Speaker 1: actually have a procedural question that I need to ask.
- 2:05:23Speaker 1: So we've talked about a lot of details here. What
- 2:05:31Speaker 1: will the TRC catch for us, like water noise? And
- 2:05:37Speaker 1: will the TRC review these reports, the required reports? And
- 2:05:42Speaker 1: will we need to invite specific experts to the TRC
- 2:05:49Speaker 1: meeting who will then have the ability to deny or
- 2:05:55Speaker 1: approve the permit?
- 2:05:57Speaker 5: Well, a lot of the specific things that we're asking for,
- 2:06:01Speaker 5: like the noise studies, most of those are required by
- 2:06:05Speaker 5: a licensed engineer. So we're kind of banking a little
- 2:06:10Speaker 5: bit on that, right? Engineers are going to have very
- 2:06:13Speaker 5: strict standards to uphold their license. If that engineer is
- 2:06:18Speaker 5: willing to put that stamp on there, then there's usually
- 2:06:24Speaker 5: at least a little bit of a surety with that.
- 2:06:28Speaker 5: TRC typically process-wise would usually come after the entire rezoning process.
- 2:06:33Speaker 5: So they've gone through the process and they've taken probably
- 2:06:40Speaker 5: even more detailed levels.
- 2:06:41Speaker 11: Of their plans than what y'all have seen.
- 2:06:44Speaker 5: And they'll go kind of even more fine-grained into it.
- 2:06:47Speaker 1: That's my question, is that we are... So here we are,
- 2:06:51Speaker 1: you know, we're looking at the overall and the land use.
- 2:06:55Speaker 1: Some of the things that the... The details that we're
- 2:06:59Speaker 1: getting like bogged down, not bogged down, but that we're
- 2:07:02Speaker 1: interested in will be handled at the TRC level.
- 2:07:06Speaker 4: Yes.
- 2:07:06Speaker 5: I mean, some of it certainly, right? I mean, obviously
- 2:07:11Speaker 5: like NCDOT, huge part of it. Planning staff is going
- 2:07:16Speaker 5: to review more of the planning components to it at
- 2:07:18Speaker 5: that point.
- 2:07:21Speaker 1: And nobody's building the thing without a permit.
- 2:07:23Speaker 5: Fire marshal is definitely going to be included. Those are
- 2:07:26Speaker 5: probably going to, and the other main one will probably
- 2:07:28Speaker 5: be like Caleb with engineering and public utilities on the
- 2:07:31Speaker 5: water end of it. So like a lot of like
- 2:07:33Speaker 5: the utility component, most of that is just kind of
- 2:07:36Speaker 5: information for y'all for the most part. They're going to
- 2:07:39Speaker 5: then handle their business with Duke. They're then going to
- 2:07:41Speaker 5: handle their business with either us or.
- 2:07:44Speaker 11: Um, Dan river. Am I thinking the right?
- 2:07:49Speaker 10: Okay.
- 2:07:49Speaker 11: Dan river.
- 2:07:50Speaker 5: Um, And so that aspect of it, unless it's Caleb specific,
- 2:07:57Speaker 5: they're getting county water.
- 2:07:58Speaker 11: Caleb's going to be reviewing that after. aspect of it.
- 2:08:00Speaker 5: So there are different aspects of it that's handled by TRC.
- 2:08:04Speaker 5: Some aspects of it, this is mostly here for information
- 2:08:06Speaker 5: for y'all. Other aspects of it, they're getting state permits,
- 2:08:11Speaker 5: things like that.
- 2:08:11Speaker 8: Okay.
- 2:08:14Speaker 1: With the... with the change in from 60 to 55
- 2:08:20Speaker 1: and the one, the only thing that I'm hearing that's
- 2:08:24Speaker 1: changed that we've asked to change any of the language
- 2:08:26Speaker 1: that you presented to us tonight, it's, um.
- 2:08:30Speaker 5: So, so far it was my understanding. We're keeping it
- 2:08:32Speaker 5: at 60. Um, so, and then the only other things.
- 2:08:35Speaker 12: Is change it, do, or we're allowed to vote on
- 2:08:38Speaker 12: changing per based off of the permit and we're going
- 2:08:41Speaker 12: to keep it at 60.
- 2:08:42Speaker 8: Correct.
- 2:08:43Speaker 4: Yeah.
- 2:08:43Speaker 7: I just don't want someone going for, From 60 to 55,
- 2:08:47Speaker 7: you're not– like, don't think about it.
- 2:08:50Speaker 11: I'm thinking 5% off.
- 2:08:52Speaker 7: Like, I'm going down by 5. Well, no, you're not.
- 2:08:54Speaker 7: You're going down by 50% at that point.
- 2:08:56Speaker 11: So it's a lot.
- 2:08:57Speaker 7: Mathematically, it's a lot more than– That.
- 2:08:59Speaker 11: Was just my understanding by the end of the conversation.
- 2:09:01Speaker 7: If you want me to do it for you on
- 2:09:01Speaker 7: a calculator, when they come to office, I'll explain how
- 2:09:03Speaker 7: the logarithmic function works.
- 2:09:04Speaker 4: You're not going– it's going to be hard to go
- 2:09:06Speaker 4: down once we've got this in the plan, in the ordinance.
- 2:09:12Speaker 8: Is it?
- 2:09:14Speaker 3: Will it be difficult to go down?
- 2:09:18Speaker 11: In like a.
- 2:09:21Speaker 3: In the permitting?
- 2:09:22Speaker 5: In the conditional rezoning process or in a, like, let's
- 2:09:25Speaker 5: change the regulations like a year from now kind of process?
- 2:09:28Speaker 11: Because in either one, I think.
- 2:09:30Speaker 1: The rezoning. The conditional rezoning. We can go down in
- 2:09:34Speaker 1: conditional rezoning.
- 2:09:35Speaker 5: I mean, I've kind of taken the assumption that anything
- 2:09:39Speaker 5: that happens with this is going to be a hot issue.
- 2:09:41Speaker 5: that most of the public is probably going to generally
- 2:09:43Speaker 5: be focused on, let's regulate this more. I would be
- 2:09:49Speaker 5: inclined to think that going in a more restrictive way
- 2:09:52Speaker 5: would probably be kind of easier.
- 2:09:55Speaker 11: But I don't know. That's kind of my thought process
- 2:10:00Speaker 11: on it.
- 2:10:00Speaker 4: At least.
- 2:10:01Speaker 1: Okay, so I think tonight, because we will get bogged
- 2:10:06Speaker 1: down here. I think that we need to... Find a
- 2:10:10Speaker 1: number that we're all happy with, whether it be 60
- 2:10:13Speaker 1: or 55. I don't care which. And leave it at that.
- 2:10:20Speaker 1: And the only other change was adding one other media outlet.
- 2:10:25Speaker 11: Media outlet and then look into the generator.
- 2:10:28Speaker 10: Exactly.
- 2:10:28Speaker 11: With those three things, do we feel comfortable with.
- 2:10:29Speaker 1: A motion or have we agreed on, is it 55
- 2:10:40Speaker 1: or 60?
- 2:10:43Speaker 12: I agree with the 60 because we're allowed to base
- 2:10:46Speaker 12: it off of a case-by-case scenario, whether we restrict it
- 2:10:49Speaker 12: more or leave it at the 60 based off of whether.
- 2:10:56Speaker 1: Okay, 60 it is.
- 2:10:57Speaker 11: 60 it is. Generators in the neighborhood meeting stuff. Okay.
- 2:11:02Speaker 11: Got you.
- 2:11:03Speaker 2: I motion.
- 2:11:04Speaker 11: Okay.
- 2:11:04Speaker 2: I motion to approval on this text based on the
- 2:11:07Speaker 2: consistency determination standards. that are included in the agenda packet
- 2:11:11Speaker 2: and may be amended during the text amendment process.
- 2:11:17Speaker 11: Now I second it.
- 2:11:20Speaker 1: There is a motion and a second. All those in favor,
- 2:11:23Speaker 1: please raise your hand and signify by saying aye.
- 2:11:26Speaker 8: Aye.
- 2:11:26Speaker 3: Any opposed?
- 2:11:27Speaker 1: Likewise. Saying nay. Motion carries. And this will be presented
- 2:11:34Speaker 1: to the commissioners at their next meeting, will it?
- 2:11:37Speaker 5: I think we've kind of already talked a little bit
- 2:11:41Speaker 5: with Lance, and I think we're all kind of trying
- 2:11:44Speaker 5: to get this quick. So we were thinking if this
- 2:11:47Speaker 5: goes well, we get approved, probably going to the first
- 2:11:51Speaker 5: commissioner meeting in October.
- 2:11:52Speaker 1: Okay.
- 2:11:53Speaker 2: All right.
- 2:11:53Speaker 1: That's cool.
- 2:11:54Speaker 2: Yep.
- 2:11:55Speaker 1: All right.
- 2:11:56Speaker 3: So is there any other business?
- 2:11:59Speaker 2: Who are those people that were going to speak?
- 2:12:02Speaker 1: Nobody signed up?
- 2:12:04Speaker 8: Nope.
- 2:12:05Speaker 1: Nobody signed up?
- 2:12:06Speaker 7: Nope.
- 2:12:07Speaker 2: It should be parties because they were paying close attention.
- 2:12:10Speaker 1: They were paying close attention. They did not sign up
- 2:12:12Speaker 1: to speak.
- 2:12:14Speaker 2: See what we're going to do.
- 2:12:15Speaker 6: Yep.
- 2:12:16Speaker 10: Yep.
- 2:12:17Speaker 1: And we went too long. They can watch it on TV.
- 2:12:21Speaker 6: Right.
- 2:12:22Speaker 3: So any other business? Motion to adjourn?
- 2:12:27Speaker 10: Motion.
- 2:12:28Speaker 1: Second. All those in favor, please signify by raising your
- 2:12:32Speaker 1: hand and say aye. Aye.
- 2:12:33Speaker 3: Any opposed?
- 2:12:34Speaker 1: Likewise, saying nay.
- 2:12:36Speaker 3: Meeting adjourned.