Latest / Project Podcast / EastEnders at Elstree Studios: behind the scenes of a project to redevelop the site
Transcript
- 0:00It's been all right, really. Hasn't it?
- 0:01It's. Had its moments, but it's.
- 0:04Kind of ended. Up in the right place.
- 0:06It's EastEnders. It's going to have its moment.
- 0:07Well, of course. More.
- 0:08Drama off. Screening.
- 0:24I'm here at Elstree Studios on a sunny summer's day where it's
- 0:27been home to EastEnders since 1985. 2020 5 was an important
- 0:31year for the BBC soap which filmed a live episode on 20th of
- 0:35February to celebrate EastEnders 40th anniversary.
- 0:39And I have to admit I'm a long term fan so it's pretty amazing
- 0:42to be here. I'm just north of London to go
- 0:45behind the scenes of a project to create new production and
- 0:48post production suites from a derelict building and give
- 0:51actors the new dressing rooms and make up rooms they needed.
- 0:54So come with me through the gates to get a flavour of what
- 0:57it's like on a construction project in a creative
- 0:59environment like this, with cast and crew filming around you as
- 1:03the project takes shape. Let's go and meet the lead
- 1:06project actors and get a tour behind the scenes.
- 1:13Doctor John Foley, director of J4 Projects is the first to meet
- 1:16me at the gates of L Street. Built off a residential Rd in
- 1:19Hertfordshire in 1925. It's where Alfred Hitchcock
- 1:22filmed the first British talking film and Stanley Kubrick filmed
- 1:26The Shining. As the main contractor for the
- 1:28project, John has been responsible for delivering the
- 1:31two phase project for the BBC. The brief was to complete a sale
- 1:35and leaseback of the 16 acre site where EastEnders is filmed
- 1:39and where Holbrook City was filmed until 20/21.
- 1:42The site was sold to AXA and Oxygen Studios as a joint
- 1:46venture in March this year with the BBC and leaseback agreement
- 1:49that covered around half the site.
- 1:52In January 2024 work began for the building fit out of offices
- 1:55and post production suites for EastEnders and in September 2024
- 1:59work began on creating 54 new dressing rooms, a crew and cast
- 2:03Cafe and costume stores. In February this year the BBC
- 2:07successfully vacated the non leaseback area and all of this
- 2:11project work took place during EastEnders 40th anniversary
- 2:14celebrations, including the filming of a live episode in
- 2:17February. So this is the story about
- 2:20working on a complex project in a live environment and the
- 2:23lessons that can be learnt from it.
- 2:25Let's cut to me interviewing Simon Alston, Strategic
- 2:27Transformation Director at BBC Studios, which is the commercial
- 2:31arm of the broadcaster. Simon was the programme manager
- 2:34for the project, responsible for keeping it within cost and
- 2:37budget and to make the key milestone of vacant possession
- 2:40in February this year, when the new landlord took full control
- 2:43of the site, I began by asking him why the project was
- 2:47necessary. On this project you've got
- 2:50EastEnders. Obviously there's a brand that
- 2:52goes out onto BBC One, so hugely important for the public
- 2:56service, but then equally it's, it's made and produced by BBC
- 3:00Studios. It's one of the few projects
- 3:03that sort of spans across the two parts of the BBC.
- 3:07So the need with doing this project is also to do with the
- 3:10BB CS overall property strategy. We owned and have owned the
- 3:15Elstree site for many, many years, so probably 60-70 years
- 3:20now. The reality is that on the site
- 3:24there was a lot of ageing buildings and that that part of
- 3:27that is to do sort of the legacy.
- 3:29There's been, you know, shows shot here for many decades.
- 3:34But some of the buildings were sort of reaching end of life and
- 3:37some of the infrastructure was reaching the end of life.
- 3:39And to both update the buildings and to change a lot of the
- 3:46infrastructure, it was an extremely would have been an
- 3:50extremely costly exercise for the BBC to do.
- 3:52So we looked at two options. One is to keep the site in its
- 3:57entirety and update the physical infrastructure on the site.
- 4:02And we put that alongside the other option which was to sell
- 4:06the site, lease back half of it to continue to make BB CS
- 4:10EastEnders programme on that site.
- 4:12And then we sort of weighed up the two and by a relatively
- 4:17small margin, the approach to sell the site and lease back was
- 4:22considered by the BBC board to be the best option.
- 4:25OK, for commercial reasons? It's commercial, it's risk and
- 4:29it's also for what I would call transformation risk.
- 4:34So if you are, if I suppose if you are knocking down buildings,
- 4:39old buildings and you're, you're trying to sort of repair them
- 4:43and build them up again, that carries both capital risk
- 4:47because you need to find the money to do it immediately.
- 4:49And also there's a, there's sort of a, a, a risk of disruption if
- 4:54you put that on the, when you think about a leaseback option,
- 4:57you've obviously got to go to market, you've got to get a good
- 4:59commercial return for selling the site.
- 5:02But then equally, you've got to make sure that there are
- 5:05effective provisions within the agreement with your new landlord
- 5:08to protect what we're trying to do on the site, which is making
- 5:12standards for 48 for 9 weeks of the year.
- 5:16I asked Simon to tell me what his priorities were for the
- 5:18project. On on this project there was
- 5:21two, there was two things, two big macro things.
- 5:23One is to make sure that the agreement that we agree with the
- 5:28new landlord, which is AXA, that's what that sort of
- 5:33maximise the commercial return for the BBC, but then also put
- 5:36in where necessary certain protections for the production
- 5:39activity they want on the site. So that's almost a commercial
- 5:43negotiation piece. And then to allow us to keep
- 5:47EastEnders working on the site, there were a number of
- 5:52production critical facilities that were on the wrong side of
- 5:57the dividing line across the site.
- 5:59So they had to be rebuilt. We had to create new facilities
- 6:03and we then had to cut over from old to new without any any
- 6:09impact on the EastEnders production, which as as I said,
- 6:13rolls week after week, month after month for the majority of
- 6:17the year. There were ups and downs in
- 6:20terms of the level of disruption to the production.
- 6:24I think we kept that to the lowest level possible.
- 6:29And the main disruption was actually noise.
- 6:32It was noise, it was vibration. So we had two different worlds,
- 6:37different environments, different working worlds who
- 6:40were operating very, very close to each other.
- 6:43And those two worlds should never coexist.
- 6:46If you can ever get into that situation.
- 6:50They should never really be any close to each other at all.
- 6:52However, that was just the reality of what we were managing
- 6:55on the site. I follow this up by asking him
- 6:58if he judged the project as success.
- 7:01I think so. And the way the way I judge
- 7:03success is you, you take sort of a step back and say what was our
- 7:07objective? We achieved the revenue that BBC
- 7:11was seeking from selling the site.
- 7:13We have maintained EastEnders production schedules largely
- 7:18without too much interruption and you only have to walk around
- 7:22the new buildings to see the new facilities that the cast and the
- 7:26crew are now using. So in addition to sort of new
- 7:30technology infrastructure, we've got new edit suites, we've got
- 7:32new offices, we've got new dressing rooms, we've got a new
- 7:35Cafe. So and it's all an improvement
- 7:38on what it was. I think as well though on the
- 7:42previous site a lot of EastEnders were spread out
- 7:46across the site. So you had edit sweeps in one
- 7:48building, you had offices in Wylding, you had the dressing
- 7:50rooms that were quite distant and a a relatively old
- 7:55restaurant sort of bar facility. And now everything's together.
- 7:59Simon tells me he's been working in project management for the
- 8:02BBC for around 20 years before joining from PwC in 2011 to work
- 8:07on the redevelopment of Broadcasting House, which he
- 8:10describes as a once in a lifetime project to deliver.
- 8:13Carefully managing the two very different worlds of construction
- 8:16and film production can be tricky, and he tells me how he
- 8:19manages to put it off. The main thing that I tried to
- 8:23do is focus on the facilities that were being rebuilt.
- 8:28So we always said, well, you get an edit suite, you're getting
- 8:31offices, you're getting cafes, you're getting a new IT room and
- 8:36we need to replace the studio. So rather than using a little
- 8:40bit more project terminology, we focus on what the facility did
- 8:45because people can relate to that.
- 8:46So people know that if the cafes close and I need new cafes, if
- 8:49the edit suites are closing, I need a new set of edit suites.
- 8:54So we tried to simplify the message and then we we sought to
- 8:59deliver against each of those facilities and they came online
- 9:03at different times. And of course all of those
- 9:06facilities, they needed the construction team to build them.
- 9:10Then we needed the design team to fit them out.
- 9:14And then we in pretty much all of those cases need the
- 9:17technology team to put in the appropriate technology.
- 9:20And at all stages, the key was to consult with the EastEnders
- 9:25production team to ask them what they wanted, because this was
- 9:29probably the first time that for many of those facilities,
- 9:33they've been consulted on a new facility.
- 9:37To manage the commercial and production jeopardy behind
- 9:40EastEnders move into the lease back zone during a period of
- 9:43live filming was demanding. I did point out to everybody
- 9:46that the, the live episode's brilliant, but it's sort of
- 9:51happening about 10 days before this key commercial cut off date
- 9:54for the vacant possession. But the, the reality is we sort
- 9:58of said, look, you know, the BBC is here to make tremendous IP
- 10:03and in EastEnders cases, it's, it's, we're doing it for the
- 10:08nation's sake. We have to do it.
- 10:10We have to make the live episode work.
- 10:12So what we then did is we then put some parameters around how
- 10:17all the types of decisions that the production would need to
- 10:21make, bearing in mind that the site was effectively
- 10:25fundamentally changing very, very soon after the live
- 10:29episode. So for example, we said that if
- 10:33an area has been closed of the site, you can't reopen it just
- 10:38because of the live episode. We said that if you are bringing
- 10:42vehicles onto the site to support the live episodes, they
- 10:46must be gone within 48 hours. So there were certain parameters
- 10:51that we work with every now and again.
- 10:53There was a could we have a catering bank, could we have
- 10:56this, could we have that? And we looked at those in
- 10:58isolation. We made sure that there was no
- 11:01impact from the construction team, from the technology team
- 11:05and from the project team. So we, we sort of did a check
- 11:08and balance when we got those requests in because there were a
- 11:11few and, and not unexpectedly, but we just make sure that we
- 11:14assess them each on a sort of a case by case basis.
- 11:17And thankfully, the live episode was a huge success and the
- 11:22production team managed to support us in our endeavour to
- 11:26get to that vacant session moment.
- 11:28Finally, I asked Simon what advice he would give to project
- 11:31professionals working in the media or creative sphere.
- 11:35I think you need to understand that the creative mindset is, by
- 11:42the very definition, almost the polar opposite of some of the
- 11:46skills that you would like in a, in a project manager.
- 11:49So for example, a simple waterfall project plan is
- 11:54something that a project manager would, you know, it's, it's
- 11:57almost the bread and butter to somebody, maybe from the creator
- 12:01community. That is not a way of thinking.
- 12:05They think about problems and they solve.
- 12:07They think about problems and they solve rather than following
- 12:11sort of a linear plan of activities.
- 12:13And so when you're working in this environment, it is really
- 12:16important to try to hold on to the structure, but not be too
- 12:21dogmatic because you know at some points in time you're going
- 12:25to have to flex. And it's the flex, a guess that
- 12:28gets you the buy in with the creator committee.
- 12:31Not saying you do everything and certainly not saying that you do
- 12:34everything within the either the time or the budget prescribed by
- 12:37a someone with a more creative idea.
- 12:40But it's just to try and find that middle ground between the
- 12:44two. It's almost operating on the
- 12:45grey, I suppose is how I describe it.
- 12:48And it's something that needs to be embraced rather than
- 12:52necessarily fought against. As I already mentioned, John was
- 12:57tasked by Simon to deliver the projects and he gives me a
- 13:00behind the scenes tour around the project site together with
- 13:02Adam, Ryan from Hayden and Carr who was the construction project
- 13:06manager reporting in to John. We begin at the On The Dot Cafe,
- 13:10which opened in April, where I try to spot some of the
- 13:13EastEnders casts, sadly in vain, the reception areas kitted out
- 13:18to hit like the inside of the Queen Victoria pub, with cast
- 13:20photos and TV Awards trophies everywhere.
- 13:24So this was the early building. So we brought the entire
- 13:26building back to use. So they used to this on the
- 13:28ground floor was used as sort of scenery storage and there was
- 13:32the prison to the gaol cell and there was supporting actors
- 13:37spaces down here. It was disgusting.
- 13:42And then on level 1 was just it was mostly storage at the far
- 13:48end again, set storage. And then they have the the Holby
- 13:51City set was it they sent to the old hospital which when Holbys
- 13:56City got decommissioned, EastEnders took over and started
- 13:59using. So that was there.
- 14:00And then on the top floor was construction workshop, which is
- 14:03probably a good place to start after we've done the outside
- 14:05because you'll get a flavour of what it used.
- 14:07To be like. We walked past the three filming
- 14:10stages and up into the old scenery block which had become
- 14:14derelict and which John and his team brought back to life.
- 14:17Now complete, the project took 16 months to finish.
- 14:20I asked John, who's worked with the BBC for a decade, what he
- 14:24enjoys about working in a place like this.
- 14:27It's complex. It's got a little bit of magic
- 14:32about it. No day is the same.
- 14:37Yeah, it's very interesting projects, aren't they?
- 14:40John Kaley enjoyed a complex project like this, but what were
- 14:43the challenges he faced? Massive challenges.
- 14:46I mean you only have to look up really.
- 14:49We stripped a lot of it away, but there was so much power and
- 14:53data that had just historically been laid over on top of each
- 14:57other. Time was a big challenge as well
- 14:59because we had to at that end of February date.
- 15:01So one of the big things was how do you provide the server room?
- 15:05So we actually ended up buying a container chip with a ready made
- 15:10server room in it, which was built in Germany by a company
- 15:13called Rittle shipped over to here and literally just plug and
- 15:17play and that I got our sound a big hole in terms of programme.
- 15:21I think it's the it's just the project we kept on giving.
- 15:25So we did all the surveys you could like in the world on on
- 15:29where power was located and and data cables are located.
- 15:33And again, you'd peel back something and find more.
- 15:37Adam's already alluded to. We had to put some drainage into
- 15:40the ground floor and found a perch water table which wasn't
- 15:45on any of the surveys, so yeah. I asked John to explain to me
- 15:51about what kind of project management approaches he likes
- 15:53to take. Don't necessarily follow any one
- 15:58of those particular rules of thumb.
- 16:00I think we're more of a fan of from a project management
- 16:04perspective with, with the glue that holds everyone together.
- 16:08So whatever needs to be done, we'll, we'll do in whatever way.
- 16:10We, we, of course we have our processes are our tool kits and
- 16:14our trackers and our change control logs and all that good
- 16:18stuff. But really it's, that's, that's
- 16:21probably only 20% of what we do. The other 80% is the people.
- 16:24And that's where we've become the glue because we're able to
- 16:27give, to receive I suppose is the best way of thinking.
- 16:30So, so it's a dynamic project. Things are changing.
- 16:34If I do a favour for someone, then someone will do a favour
- 16:36for me. And then you've got a wide cross
- 16:38section of people here. So known if you've got the,
- 16:40you've got the actors, but you've also got the directors
- 16:42and the production staff. You've then got the FM teams,
- 16:46you've got the construction workshop team, you've got all
- 16:48the people who look after all the props and sets, security,
- 16:53catering. So it's, it's not one language
- 16:57to speak to everybody. It's, you know, understanding
- 17:00how you know what what's everyone's driver put you put
- 17:03your feet in their shoes, trying to understand where they're
- 17:05coming from and see if you can help them.
- 17:08And if you can help them, invariably they'll repay the
- 17:10favour when you need it. Now we go upstairs into the
- 17:14scenery workshop where number 79 Albert Squares bathroom is in
- 17:18the middle of being made replete with floral wallpaper and
- 17:21smelling of wood glue with the carpenters busy around us.
- 17:25Like we're still in the construction workshop.
- 17:26This is ideal. They they think of an idea and
- 17:29they make it. Whereas for the SAT.
- 17:33But whereas we're kind of governed by process and
- 17:36regulations, health and safety, etcetera.
- 17:39So you know, if they have an idea, an hour later it's built.
- 17:42If we have an idea, it's like a month later, it might be on a
- 17:46drawing if you're lucky. So what we've what we've
- 17:49struggled with since handover of phase one in reserve February,
- 17:54beginning of February is, is they're tinkering.
- 17:57They come up with an idea and oh, next thing you know, you
- 18:00come back up and there's a a new coffee machine or or a new wall
- 18:04being built and you know, stop guys, stop tinkering.
- 18:09This is a well thought through design.
- 18:12John laughs about fridge gate and coffee machine gate.
- 18:15When EastEnders finally, you know, were sort of told, you
- 18:18know, this is definitely happening as a deal, they were
- 18:21like, well, where are you going to put us?
- 18:23Our offices and our post production facilities, which are
- 18:25the wrong side of the red line, the area we were selling.
- 18:29So he said, well, in the, in half of the construction
- 18:32workshop and I got to be honest here, I think they thought we
- 18:35were mad. And then I bought Dee who met
- 18:38earlier and Sean up here. And bearing in mind they work on
- 18:41this site all the time. It's amazing when you walk into
- 18:43a space with and you know, it's construction workshop to, to, to
- 18:47walk into the space and imagine it as something different For
- 18:50these guys, it's really easy. It's what they do creative.
- 18:53And literally I bought Sean and Dee up here and I sort of
- 18:55explained what we were thinking in terms of idea.
- 18:58Their eyes just lit up. They're like, yes, this could
- 19:01work. Here we are.
- 19:03So we're on the northern end of of the scenery block on level 2.
- 19:11Previously, like the construction workshop, it was
- 19:13just a double height space with roof lights.
- 19:17Roof lights leaked pigeons in here all the time.
- 19:20So we we cleaned out the whole space and we put in this awesome
- 19:23mezzanine level with a huge well in the middle as well.
- 19:28So, you know, it's flooded with natural daylight.
- 19:31What made a big difference? Where where they were in
- 19:33Harthouse, the previous production office, it was it was
- 19:35split over three floors and they were very much department by
- 19:39department. Now got the art department up
- 19:42here, graphics department down here.
- 19:44They can see each other, they can talk to each other.
- 19:47We look around the production offices, including the
- 19:49storyboarding office before moving downstairs to the post
- 19:52production edit suites. As we walk along the corridors
- 19:55adorned with photos from the show and the actors who play
- 19:57people like Pat Britcher, even her earrings are framed on the
- 20:01wall. John tells you what qualities
- 20:03are needed to work in a place like this successfully.
- 20:07You just got to be interested, you've got to ask questions and
- 20:09get involved and like, what's this?
- 20:11What's that real active listener?
- 20:13So yeah, so this is the production facility.
- 20:14So you've got edit suites and you've got dubbing theatres as
- 20:17well. And so basically, you know, they
- 20:19capture all the footage out on set or in the in the stages and
- 20:22it comes back in. These guys, he'll be doing a
- 20:25first rough draught of the programme and then I'll go and
- 20:28get polished and refined and then end up in the producers box
- 20:32and they'll watch it on a sofa in a quasi living room and give
- 20:38it a thumbs up Or not. I take the opportunity to ask
- 20:41John what his proudest moment on the project was.
- 20:44We got it done on time. We got the 28th of February was
- 20:48such a key milestone and so many people said we couldn't do it
- 20:51and I love it when people say you can't do something.
- 20:52Isn't it a challenge? We've all been there at school.
- 20:56Then I find myself in one huge meeting room with a giant table
- 20:59and 55 chairs with pictures of EastEnders power couples like
- 21:03Den and Ange on the walls. When they're putting together
- 21:06stories, there are loads of people throwing ideas around, so
- 21:10we needed to create a space that was big enough for them.
- 21:13And this is actually three meeting rooms that you can knock
- 21:16through into one massive long area.
- 21:19Right? Let's do dressing rooms.
- 21:22Next up are the 54 brand new dressing rooms and it's along
- 21:26this corridor with each room's resident actor's name on the
- 21:28door and costume on a rail outside that we catch sight of
- 21:31actor Kitty Castle Dean who plays Penny Branning in the
- 21:35soap, who kindly lets us look around her hotel style room with
- 21:39en suite bathroom in a wheelchair.
- 21:41Castle Dean appreciates the accessibility of the room design
- 21:45and her room is bright and modern in contrast to the cosy
- 21:48current dressing rooms which are filled to the room with costume
- 21:50and paraphernalia. Last on our tour are the makeup
- 21:53and costume rooms, which are being snagged before being moved
- 21:56into. So you asked me earlier what the
- 21:59things were you needed to be a project manager and I said about
- 22:01interested. The other one is hard work
- 22:03because the harder you work at something, the more you sort to
- 22:06own it and understand it and then you become passionate about
- 22:09it. And then that comes through in
- 22:11everything you do. Just demonstrating to the client
- 22:14team particularly that you that you properly care.
- 22:17And part of my personality is that when I do really get into
- 22:22something, I really do own it. I'm very happy to challenge the
- 22:26client on what it is they want and why they want it, not just
- 22:30for the sake of challenging, but just to get the better and the
- 22:33best result. And I think you can only get
- 22:36there if you're interested in what you're doing and you work
- 22:40jolly hard. I come to work because I want it
- 22:44to be fun. I do.
- 22:45I do something that is really fun.
- 22:48Doesn't mean that it's fun all the time, but it's only fun
- 22:50because I apply myself to it. If I didn't apply myself to it,
- 22:54I probably wouldn't get under the skin of it and understand
- 22:57how sort of rich and complex and difficult and challenging and,
- 23:01you know, political with a big P, political with a small P.
- 23:06As we've been touring around, Adam, the Construction Project
- 23:09manager has been filling us in on the details.
- 23:12The building work started in January 2024 and took 16 months
- 23:16in total. This included demolitions, strip
- 23:18out ground works and the new overclad roofing section.
- 23:23All of this had to be done by an immovable date of the 28th of
- 23:26February this year. They met the deadline and I
- 23:29asked Adam what was the secret to being as successful as he has
- 23:32been as a project manager in a live environment like this,
- 23:36where filming has to carry on regardless of construction work.
- 23:40I think it's very cliche, but communication.
- 23:44So it's a we held, we had week, weekly official business impact
- 23:49meetings with cast crew, EastEnders themselves provided
- 23:55here. Stop knocking or or what they
- 23:57classed as stop knocking. So as soon as they were coming
- 24:00to their final set and their final film take, we stopped all
- 24:05works. Now that could be anywhere
- 24:07between 3:00 and 12:00 minutes. We actually start getting into a
- 24:12routine with the directors of the Shore and they would plan it
- 24:17around our tea breaks and our lunch breaks.
- 24:20So in the events where it was outside of them breaks the the
- 24:25team on site where we're very adaptable.
- 24:28We we'd stop all noisy works, but we'd use that time on site
- 24:32to do Good Housekeeping practises, toolbox talk
- 24:36practises and communications on site.
- 24:40So we could then we use that that time on a day to then plan
- 24:45our next steps. So we never seen it as a loss of
- 24:48time. We've seen it as an opportunity
- 24:51to then plan or to go over detail that people weren't sure
- 24:56about. So we used it as an advantage in
- 25:01our own, in our own way. I think construction itself, No,
- 25:05no, no days of the same. This particular project, what
- 25:10made it different was is construction.
- 25:13We're constantly working in live environments and and we always
- 25:16mindful of what's outside about a boundary.
- 25:20This was what's outside the boundary kind of on steroids.
- 25:26If you take any any general construction site on the High
- 25:29Street, yes, you've got the public to be mindful of, but
- 25:33there's a physical barrier all the time.
- 25:37We were all, all be. We had the physical barrier of
- 25:40the scenery block itself. We were always integrating into
- 25:45different parts outside of the outside of this building in
- 25:48order to make this building work that itself was totally
- 25:53different. Compare normal construction and
- 25:56and challenges. I asked Adam about his role
- 25:59leading a team of 210 people at its busiest.
- 26:03So I was the overall project manager from the construction
- 26:08side and my my responsibility was to ensure construction was
- 26:12delivered, design was delivered on programme, on cost, reporting
- 26:18in to John, any risks, any programme impacts.
- 26:23So my construction team were the ones that were liaising with
- 26:26EastEnders and the BBC. Business impact people on a
- 26:30ground level. And also about the lessons he
- 26:33learnt from a first time project like this and what went well.
- 26:36So towards the end of the towards the end of phase one,
- 26:40which was the office fit out towards the end of phase three
- 26:44and four, which was the ground floor changing rooms and studio
- 26:49works, It was it come apparent that the end users wanted it to
- 26:56look and feel slightly different in terms of the makeup room.
- 27:00They wanted different light and different layouts to make it to
- 27:04make it feel what they've already got rather than a more
- 27:09compliant user designed friendly space.
- 27:12Other than that, again, very cliche in 18 years of project
- 27:20management, I think this is probably one of the most
- 27:24successful projects I've delivered because everybody was
- 27:29everybody understood the end goal and everybody was working
- 27:34not for themselves, they were working collaboratively towards
- 27:37that end goal. It that takes on doing to get
- 27:40everybody to buy into one one end goal solution.
- 27:45I think to answer your questions, how everybody was on
- 27:48the same same track was I think it's, it's more credit to J4,
- 27:54John, Toby and Jim because it was very much like the aviation
- 28:01sector. There was never any blame.
- 28:04It was right. This has happened.
- 28:06How do we actually resolve it or how do we move forward?
- 28:10And I think the industry as a whole probably has a lot to
- 28:16learn from. No blame, nobody comes to work
- 28:21to make mistakes, but how do we rectify it to get the end result
- 28:26the way that we need it to be? And it was a very calming and
- 28:32collaborative approach to how to build a project.
- 28:36Certainly made my life easier that I wasn't having to having
- 28:42to argue week in week hour was what I understand.
- 28:46I understand what John wants. I know how to implement that.
- 28:51John had the trust in me. I had the trust in John and we
- 28:54had each other's backs for for a matter of two years to deliver
- 28:58the end product. Yeah, it was a very sobering,
- 29:02sobering look back over 2 years. So there wasn't any immediate
- 29:08lessons learning how to deliver a project, but it was more this
- 29:13is how you should deliver a project.
- 29:15This is the right culture to deliver a project of this
- 29:17magnitude in the timeline in the space, with all the different
- 29:23dynamics outside of the actual site demise.
- 29:26Adam tells me a bit about the project he's most proud of.
- 29:30I'd probably go with the ground floor fitting room area but for
- 29:36two reasons really. We dawn Sega 2000 linear metres
- 29:42of underground drainage with 127 pop ups in an 8 week period,
- 29:51which I think is looking back I don't know how we've done it
- 29:55internally rebuilding. So that was Part 1 and Part 2
- 30:00when you actually break. When I broke the programme down
- 30:04in order to do our own internal lessons learned, we actually fit
- 30:07out each fitting room in around 22 days and again I thought that
- 30:11was quite, quite remarkable. Adam tells me how the project
- 30:16management had to flex around the creation of new dressing
- 30:18rooms. So again in in terms of that,
- 30:22that lease back arrangement, we had to have so many dressing
- 30:26rooms finished in a certain timeline.
- 30:29So it was beginning of the end of March, beginning of the
- 30:32airport. So we had to move 30 No 2026
- 30:39dressing rooms over because EastEnders brought in trailers.
- 30:46Trailers were on the the wrong side of the red line.
- 30:49So they were getting charge rent etcetera, etcetera.
- 30:52So that that itself then put speeded up the programme and we
- 30:57had to go up. We didn't finish the drainage in
- 31:02this particular area until end of Jan, which then actually only
- 31:08give us a 4 1/2 week fit out period to do 2026 dressing
- 31:14rooms. We had to connect into the main
- 31:18main sewers roundabout here. Main sewers roundabout 12 metres
- 31:23that where and everything underground actually fed in.
- 31:28This is a bit that I like 6 weeks later when you come back
- 31:31and it's actually being used. Yeah, I don't mind.
- 31:35Part of my OCD is like, yeah. To really get under the skin of
- 31:43the day-to-day running of the projects and what it meant for
- 31:45cast and crew, I grabbed a chat with Rona Mckendrick, EastEnders
- 31:49Senior Production Manager and 1st Assistant Director, to ask
- 31:53her to tell me about what it was like to keep the show on the
- 31:55road throughout the duration of the construction works.
- 31:58She's worked on the soap for 33 years and helped production move
- 32:02from the back lot of the studios to the front lot 4 years ago so
- 32:06already had experience of a project like this.
- 32:09And that was really helpful for me because it was the first time
- 32:12that I was doing something that was not solely production
- 32:15related, it was much more project related.
- 32:19And because of my input with that, that's why it seemed quite
- 32:24useful for me to help move us over to this building because I
- 32:30knew more about project basis stuff and my production
- 32:36knowledge and what would be helpful and not helpful and what
- 32:40people like and don't like, I was able to input into it.
- 32:44My role as a production manager is to try and keep everybody
- 32:48happy all of the time, which is an impossible task.
- 32:50And, and it was fairly much the same with with this as well.
- 32:54I was deputising for the line producer because her role is so
- 32:59all-encompassing with regards to the show itself and the site, et
- 33:03cetera. I was her right hand person to
- 33:05be able to take all that bit to do with the project of her
- 33:09responsibility and I could deal with all that.
- 33:11So it was, yeah, it was liaising with costume, with makeup, with
- 33:15production, with design, working out what they wanted, what they
- 33:19needed to be moved. It was letting them know that
- 33:22this is going to be the space that you're going to have.
- 33:24It is smaller. You need to really start
- 33:26clearing your stuff away now. Dump the junk as we called it.
- 33:31I asked Rona what benefits the project was bringing to the
- 33:33Korean cast. For us, it's the fact that we
- 33:36are in one building. We've never had that before.
- 33:39We had post production over there, we had crew and cast and
- 33:43green rooms over there and the studios over there.
- 33:46And now we are literally in the same building and rather than
- 33:49send an e-mail, we'll go and see the person face to face.
- 33:52So we've added it to our sustainability tally as well.
- 33:56Yeah, the one of the most important elements of this
- 33:58project for me was communication, was communicating
- 34:02with the people from the project about what production needs and
- 34:05vice versa, communicating what the project need from
- 34:11production. We don't have problems.
- 34:14We always find solutions to the problems.
- 34:17She tells me what it's like working there.
- 34:20It's very fast-paced. It's there's probably about 100
- 34:24and 8200 people that work on the show.
- 34:26If you can do EastEnders, you can do any job.
- 34:29My job is the best job in the world.
- 34:31Why? Because the people here it, I
- 34:34know people say it a lot, but it they are genuinely family.
- 34:38And so how disruptive was it? Has the project happen?
- 34:42Because of building the front lot, we've spent many years now
- 34:48dealing with it, coping with it, and again, that's to do with
- 34:52communication as in managing it. So that I have weekly meetings
- 34:57with the project. I've now got weekly meetings
- 35:00with this new site owners to talk about when we're doing
- 35:02quiet scenes. And a quiet scene will be a 2
- 35:06hander, 2 people in the scene where they're just talking
- 35:08quietly around a table. But if you've got drilling going
- 35:12on or walls being knocked down or, I don't know, large
- 35:16machinery or or vehicles reversing, you know, just that
- 35:19beeping alone, it can be really disruptive to the concentration
- 35:22of every single member of the crew, whether it's an actor or
- 35:26a, or a producer or a sound operator or a camera operator.
- 35:30It's really disruptive. So that if they know in advance
- 35:33we're going to be doing emotional scenes or two, two
- 35:36hander scenes at that time in that studio, then they can to an
- 35:40extent work around it. We also have a stop knocking
- 35:43runner. So that would be somebody who
- 35:45liaises directly between production and the project to
- 35:49say we're just going for a take. Can you hold the work
- 35:52temporarily? I asked Rona for any advice she
- 35:55has on being a good communicator and storyteller.
- 35:58I think it's. Understanding your audience,
- 36:01understanding who you're communicating to and what the
- 36:06message is, what you are trying to communicate.
- 36:09So for something like EastEnders, we are communicating
- 36:12story. That's the story that we are
- 36:14communicating. For something like the project,
- 36:17I am trying to communicate to the project.
- 36:19Why actually we can't just stop rehearsing or stop going for
- 36:25tape because they need to do some drilling.
- 36:27It was a, there was a very fine balance between what's the most
- 36:31important thing, getting the building built or us carrying on
- 36:35making production. And there was a, there was a
- 36:38short period of time where it was discussed that because the
- 36:42project can't work through the night, could EastEnders perhaps
- 36:45work through the night as an alternative?
- 36:47And no, we can't. And for various reasons we
- 36:51couldn't. So it was just, I think it for
- 36:54them, it was understanding why we, we would stop, we would ask
- 36:59to stop the noise for the last rehearsal, not just the takes,
- 37:03the last rehearsal as well. Because otherwise sound can't
- 37:07rehearse if they're constantly rehearsing the drilling going on
- 37:10in the background or they're, as I say, the vehicle reversing
- 37:15it's under. Yeah, it is understanding what
- 37:18the message is and who your audience is, I think.
- 37:21Then she tells me about one of the most enjoyable moments of
- 37:24the project. One of the most enjoyable
- 37:27moments for me was the day we moved in on that Monday.
- 37:32It was the beginning of February and at the same time, literally
- 37:37as we're moving in, we are also making our 40th anniversary
- 37:40episode. So there was an awful lot going
- 37:41on. But the Monday we moved in, in
- 37:44the afternoon, I remember standing up there and looking
- 37:47down over and everybody was at their workstations and it looked
- 37:52like we've been here for years. It was astonishing.
- 37:55They'd all right, all unpacked, they'd all looked, it looked so
- 37:57settled and you just thought, you know, this is absolutely the
- 38:00right thing. It, it feels like we, we as a
- 38:04programme feel really invested in genuinely, it feels like a
- 38:09lot of love has gone into this place and you can, you can
- 38:12genuinely feel it. We leave Rhonda's office for a
- 38:15tour around the set, which I'm afraid I can't tell you about it
- 38:18in case I give any plot secrets away, but for any fans out
- 38:21there, I did get to visit Albert Square, the Queen Victoria and
- 38:24watch some filming in the Cafe, so sadly that's a wrap for
- 38:28today. I hope I've given you an idea of
- 38:30the unique challenges and considerations that face you as
- 38:33a project professional working projects in the creative sector.
- 38:36It's been super interesting for me and a childhood dream come
- 38:40true to go behind the scenes of EastEnders, and I hope you've
- 38:42enjoyed it too. Thanks again to John, Adams,
- 38:45Simon and Rona for joining me and to you for listening to the
- 38:48APM podcast. Just to mention, you can find
- 38:51out more about my EastEnders visit in the Autumn 2025 issue
- 38:54Project Journal. Don't miss it and don't forget
- 38:57to look out for more episodes or to rate and reviews.
- 38:59Wherever you get your podcasts, we'd welcome you to get in touch
- 39:02with your comments, feedback and suggestions by emailing us at